Loading...
G29-80 Ordinance No. G29-80 r k AN ORDINANCE AMENDING THE ELGIN ZONING ORDINANCE TO PERMIT LANDFILLS AS A SPECIAL USE IN R-1, B-1 AND M-1 DISTRICTS WHEREAS, written application has been made to amend the text of the Elgin Zoning Ordinance so as to allow landfills in the R-1, B-1 and M-1 district as a special use; and WHEREAS, the Planning Committee conducted a public hearing after due notice as required by law and has recommended the granting of the requested amendment; and WHEREAS, the City Council of the City of Elgin concurs in the recommendation of the Planning Committee. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS: Section 1. That Section 19.12.020 of Chapter 19.12 of Title 19 of the Elgin Municipal Code, 1976, as amended, be and is hereby amended by adding the following: "0. Landfill specifically for the purpose of lime residue storage. Special use approval is contingent upon receipt of acceptable, detailed operation and reclamation plans demonstrating that the public health, safety and welfare will be protected. These plans are to include the following: 1. The operation Plan shall include: (1) a site plan showing the location of buildings and processing equipment, the location of access roads and fencing and screening provi- sions; (2) environmental impact control measures; (3) written explanation and other information as required by the City of Elgin; (4) all required permits from appropriate agencies; whether Federal, State or local; and 2. The Reclamation Plan shall include a site plan, a development phasing schedule, written explanation and other information as required by the City of Elgin." Section 2. That Section 19.28.030 of Chapter 19.12 of Title 19 of the Elgin Municipal Code, 1976, as amended, be and is hereby amended by adding the following: "15. Landfills are specifically for the purpose of lime residue storage. Special use approval is contingent upon receipt of acceptable, detailed operation and reclamation plans. These plans are to include the following: 1. The Operation Plan is to include: (1) a site plan showing the location of buildings and processing equipment, the location of access roads and fencing and screening provi- sions; (2) environmental impact control measures; (3) written explanation and other information as requied by the City of Elgin; (4) all required permits from appropriate agencies whether Federal, State or local; and 2. The Reclamation Plan is to include a site plan, a development phasing schedule, written explanation and other information as required by the City of Elgin." Section 3. That Section 19.38.020 of Chapter 19.38 of Title 19 of the Elgin Municipal Code, 1976, as amended, be and is hereby amended by adding the following: "11. Landfills are specifically for the purpose of lime residue storage. Special use approval is contingent upon receipt of acceptable, detailed operation and reclamation plans. These plans are to include the following: 1. The Operation Plan is to include: (1) a site plan showing the location of buildings and processing equipment, the location of access roads and fencing and screening provi- sions; (2) environmental impact control measures; (3) written explanation and other information as required by the City of Elgin; (4) all required permits from appropriate agencies; whether Federal, State or local; and 2. The Reclamation Plan is to include a site plan, a development phasing schedule, written explanation and other information as required by the City of Elgin." Section 4. That this ordinance shall be in full force and effect from and after its passage in the manner provided by law and shall be published in pamphlet form by authority of the City Council. s/ Richard L. Verbic Richard L. Verbic, Mayor Presented: March 12, 1980 Passed: March 12, 1980 Vote: Yeas 7 Nays 0 Recorded: Published: Attest: s/ Marie Yearman Marie Yearman, City Clerk