Loading...
18-128 Resolution No. 18-128 RESOLUTION APPROVING CHANGE ORDER NO. 1 AND FINA I FOR THE CONTRACT WITH F.H. PASCHEN, S.N. NIELSEN & ASSOCI ATES LLC FOR THE POLICE FACILITY EXTERIOR CL ANING WHEREAS,the City of Elgin has heretofore entered into a contract with F.H. Paschen,S.N. Nielsen & Associates LLC for the police facility exterior clean ng; and WHEREAS, it is necessary and desirable to modify the erms of the contract as is described in Change Order No. 1 and Final attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE C TY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G. Kozal,City Manager,be ani is hereby authorized and directed to execute Change Order No. 1 and Final, a copy of which is attac ed hereto and made a part hereof by reference. s/ David J. Ka stain David J. Kaptain, Mayor Presented: November 28, 2018 Adopted: November 28, 2018 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk City of Elgin Chan! - Or•er 0 OF I,c O ''L 03 4.7 ELGIN,ILLINOIS PROJECT: Police Facility Exterior Cleaning CHANGE ORDER No. 1 and Final CONTRACT: Police Facility Exterior Cleaning (Job Order Contr. t Approved June 13,2018) SCOPE: A masonry sealer was added to all of the exterior masonr surfaces to help protect them from moisture and dirt in the future.This should extend the life of the be k and the frequency of the cleaning. REASONS FOR CHANGE: While working on the exterior clean'ig of the police facility we looked for ways to extend the life of the work being done. It was decided t i at adding a sealer to the masonry after the cleaning should help protect against future moisture and d'i t. Since the masons were on site do- ing the cleaning it made the most sense to apply the sealer immedia ely before the brick could re-soil. With the contractor already on site with lifts and other necessary eq iipment it made the application of the sealer more cost effective than coming in to do it at a later date. • The circumstances said to necessitate the change in perform:mice were not reasonably foreseeable at the time the contract was signed • The change is germane to the original contract as signed • The change order is in the best interests of the City of Elgin and authorized by law SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $478,446.00 CHANGE ORDER No. 1 and Final Labor and material to apply sealer to brick $47,09 .89 TOTAL FOR CHANGE ORDER NO. 1 and Final: ADD ,47,093.89 TOTAL REVISED CONTRACT AMOUNT: $525,539.89 • The original amount of the contract with F. H. Paschen is$478,446 $0. Change Order No. 1 and final will increase the original contract amount by a total of$47,093.89, ghat sum representing nine and eight tenths percent(9.8%)of the original contract amount. The new contact amount, inclusive of all change orders is$525,539.89. OTHER CONTRACT PROVISIONS: All other contract provisi.ns remain the same. 1 CHANGE ORDER No. 1 and Final Agreed to this 28`"day of November, 2018. Recommended by: By: Rich Hoke Title: Building Maintenance Superintendent Date: /0A.V/. Signature: Accepted by: F. H. Paschen Party of the Second Part (Contractor) By: Anthony Izzi Title: Vice President I Preferred Projects Group Date: /0 414 g Signature: Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G. Kozal Title: City Manager Date: November 2018 Signature: