18-124 Resolution No. 18-124 RESOLUTION APPROVING CHANGE ORDER NO. 1 AND FINAL FOR THE CONTRACT WITH F.H. PASCHEN, S.N. NIELSEN & ASSOCIATES LLC FOR THE POLICE SECURITY SYSTEM UPGRADES WHEREAS,the City of Elgin has heretofore entered into a contract with F.H. Paschen,S.N. Nielsen& Associates LLC for the police security system upgrades; and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1 and Final, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: November 7, 2018 Adopted: November 7, 2018 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk City of Elgin Change Order c.`�M o 1 E`C'ti V'. ELGIN,ILLINOIS PROJECT: Police Security (1.411.t)f �` CHANGE ORDER No. 1 and Final CONTRACT: Police Security System Upgrades(Job Order Contract Approved September 14,2016) SCOPE: During the project it was discovered that several existing devices did not have the anticipated wiring run to them therefore new wiring had to be installed for these devices. The original contract planned to reuse the existing wiring and install new devices. Some issues with existing equipment that was intended to remain in place also required additional time to troubleshoot and repair. REASONS FOR CHANGE: Since the wiring was hidden inside the walls and ceiling it could not be seen at the time the bid was being prepared. It was reasonable to assume that there was wiring going to the existing devices that could be reused for the new devices. • The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed • The change is germane to the original contract as signed • The change order is in the best interests of the City of Elgin and authorized by law SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $985,535.00 CHANGE ORDER No. 1 and Final Troubleshooting existing equipment $1,821.83 Additional cable and materials $12,332.70 Additional labor for cable installation $10,329.15 TOTAL FOR CHANGE ORDER NO. 1 and Final: ADD $24,483.68 TOTAL REVISED CONTRACT AMOUNT: $1,010,018.68 The original amount of the contract with F. H. Paschen is$985,535.00. Change Order No. 1 and final will increase the original contract amount by a total of$24,483.68,that sum representing two and five tenths percent(2.5%)of the original contract amount. The new contract amount, inclusive of all change orders is$1,010,018.68. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 1 and Final Agreed to this 71"day of November,2018. Recommended by: By: Rich Hoke Title: Building Maintenance Superintendent Date: /Q`-Z(// Signature: Accepted by: F. H.Paschen Party of the Second Part(Contractor) By: Anthony Izzi Title: Vice President I Preferred Projects Group Date: 10l as-IA Signature: Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G. Kozal Title: City Manager Date: November 7, ,20018 Signature40 6