Loading...
17-87 Resolution No. 17-87 RESOLUTION ESTABLISHING PREVAILING WAGE RATES ON PUBLIC WORKS CONTRACTS WHEREAS, 820 ILCS 130/0.01 et seq. entitled "AN ACT regulating wages of laborers, mechanics, and other workers employed in any public works by the State, county, city or any public body or any political subdivision or by anyone under contract for public works, (the "Prevailing Wage Act")" requires that any public body awarding any contract for public work, or otherwise undertaking any public works as defined herein, shall ascertain the general prevailing hourly rate of wages for employees engaged in such work; and WHEREAS, the Illinois Department of Labor has determined the prevailing rate of wages for construction work in Cook and Kane Counties in the State of Illinois. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that the most recent determination of the prevailing wages as made by the Illinois Department of Labor of June 2017, copies of which are attached hereto and made a part hereof by reference, are adopted by the City of Elgin. It shall be the obligation of any entity or person who is required to pay the prevailing hourly rate of wages pursuant to the Prevailing Wage Act to pay the prevailing wages in effect at that time as then most recently determined by the Illinois Department of Labor. BE IT FURTHER RESOLVED that all contracts for public work of the City of Elgin shall include a stipulation to the effect that not less than the prevailing rate of wages as found by the Illinois Department of Labor shall be paid to all laborers, workers and mechanics performing work under the contract. BE IT FURTHER RESOLVED that all contract bonds for public works shall include a provision to guarantee the faithful performance of the prevailing wage clause as provided by contract. BE IT FURTHER RESOLVED that a copy of the prevailing wage rate as established by the Illinois Department of Labor shall be publicly posted and kept available for inspection by any interested party. BE IT FURTHER RESOLVED that nothing herein contained shall be construed to apply to the prevailing hourly rate of wages in the locality for employment other than public works construction as defined in the Act, and that the City Clerk be and is hereby authorized to file a certified copy of this resolution with the Secretary of State Index Division and the Department of Labor of the State of Illinois. s/ David J. Kaptain David J. Kaptain, Mayor Presented: June 28, 2017 Adopted: June 28, 2017 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk - 2 - This schedule contains the prevailing wage rates required to be paid for work performed on or after Monday,June 5,2017 on public works projects in this County. Pursuant to 820 ILCS 130/4,public bodies in this County that have active public works projects are responsible for notifying all contractors and subcontractors working on those public works projects of the change(if any)to rates that were previously in effect. The failure of a public body to provide such notice does not relieve contractors or subcontractors of their obligations under the Prevailing Wage Act,including the duty to pay the relevant prevailing wage in effect at the time work subject to the Act is performed. COOK COUNTY PREVAILING WAGE RATES EFFECTIVE JUNE 5,2017 Base Foreman M-F TradeTitle Region Type Class Wage Wage OT OSA OSH H/W Pension Vacation Training ASBESTOS ABT-GEN All All 40.40 40.95 1.5 1.5 2.0 14.23 11.57 0.00 0.50 ASBESTOS ABT-MEC All BLD 37.46 39.96 1.5 1.5 2.0 11.62 11.06 0.00 0.72 BOILERMAKER All BLD 47.07 51.30 2.0 2.0 2.0 6.97 18.13 0.00 0.40 BRICK MASON All BLD 44.88 48.84 1.5 1.5 2.0 10.25 15.30 0.00 0.85 CARPENTER All All 45.35 4735 1.5 1.5 2.0 11.79 17.60 0.00 0.63 CEMENT MASON All All 44.25 46.25 2.0 1.5 2.0 13.65 15.51 0.00 0.65 CERAMIC TILE FNSHER All BLD 37.81 1.5 1.5 2.0 10.55 10.12 0.00 0.65 COMM. ELECT. All BLD 42.02 44.82 1.5 1.5 2.0 8.88 12.78 0.59 0.75 ELECTRIC PWR EQMT OP All All 48.90 53.90 1.5 1.5 2.0 11.41 16.39 0.00 3.10 ELECTRIC PWR GRNDMAN All All 38.14 53.90 1.5 1.5 2.0 8.90 12.78 0.00 2.75 ELECTRIC PWR LINEMAN All All 48.90 53.90 1.5 1.5 2.0 11.41 16.39 0.00 3.10 ELECTRICIAN All All 46.10 49.10 1.5 1.5 2.0 14.33 15.52 0.70 1.00 ELEVATOR CONSTRUCTOR All BLD 51.94 58.43 2.0 2.0 2.0 14.43 14.96 4.16 0.90 FENCE ERECTOR All All 38.34 40.34 1.5 1.5 2.0 13.15 13.10 0.00 0.40 GLAZIER All BLD 41.70 43.20 1.5 2.0 2.0 13.94 18.99 0.00 0.94 HT/FROST INSULATOR All BLD 49.95 52.45 1.5 1.5 2.0 11.62 12.26 0.00 0.72 IRON WORKER All All 46.20 48.20 2.0 2.0 2.0 13.65 21.52 0.00 0.35 LABORER All All 40.20 40.95 1.5 1.5 2.0 14.23 11.57 0.00 0.50 LATHER All All 44.35 46.35 1.5 1.5 2.0 13.29 16.39 0.00 0.63 MACHINIST All BLD 45.35 47.85 1.5 1.5 2.0 7.26 8.95 1.85 1.30 MARBLE FINISHERS All All 33.45 33.45 1.5 1.5 2.0 10.25 14.44 0.00 0.46 MARBLE MASON All BLD 44.13 48.54 1.5 1.5 2.0 10.25 14.97 0.00 0.59 MATERIAL TESTER I All All 30.20 30.20 1.5 1.5 2.0 14.23 11.57 0.00 0.50 MATERIALS TESTER II All All 35.20 35.20 1.5 1.5 2.0 14.23 11.57 0.00 0.50 MILLWRIGHT All All 45.35 47.35 1.5 1.5 2.0 11.79 17.60 0.00 0.63 OPERATING ENGINEER All BLD 1 49.10 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All BLD 2 47.80 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All BLD 3 45.25 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All BLD 4 43.50 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All BLD 5 52.85 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All BLD 6 50.10 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All BLD 7 52.10 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All FLT 1 54.75 54.75 1.5 1.5 2.0 17.65 12.65 1.90 1.35 OPERATING ENGINEER All FLT 2 53.25 54.75 1.5 1.5 2.0 17.65 12.65 1.90 1.35 OPERATING ENGINEER All FLT 3 47.40 54.75 1.5 1.5 2.0 17.65 12.65 1.90 135 OPERATING ENGINEER All FLT 4 39.40 54.75 1.5 1.5 2.0 17.65 12.65 1.90 1.35 OPERATING ENGINEER All FLT 5 56.25 54.75 1.5 1.5 2.0 17.65 12.65 1.90 1.35 OPERATING ENGINEER All FLT 6 37.00 54.75 1.5 1.5 2.0 17.65 12.65 1.90 1.35 OPERATING ENGINEER All HWY 1 4730 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All HWY 2 46.75 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All HWY 3 44.70 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All HWY 4 43.30 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All HWY 5 42.10 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All HWY 6 50.30 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All HWY 7 48.30 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30 ORNAMNTL IRON WORKER All All 45.75 48.25 2.0 2.0 2.0 13.65 18.99 0.00 0.75 PAINTER All All 44.55 49.30 1.5 1.5 1.5 11.50 11.10 0.00 1.27 PAINTER SIGNS All BLD 33.92 38.09 1.5 1.5 1.5 2.60 2.71 0.00 0.00 PILEDRIVER All All 45.35 47.35 1.5 1.5 2.0 11.79 17.60 0.00 0.63 PIPEFITTER All BLD 47.50 50.50 1.5 1.5 2.0 9.55 17.85 0.00 2.07 PLASTERER All BLD 42.25 44.79 1.5 1.5 2.0 13.65 9.50 5.00 0.65 PLUMBER All BLD 48.25 50.25 1.5 1.5 2.0 14.09 12.65 0.00 1.18 ROOFER All BLD 41.70 44.70 1.5 1.5 2.0 8.28 11.59 0.00 0.53 SHEETMETAL WORKER All BLD 43.03 46.47 1.5 1.5 2.0 10.73 21.87 0.00 0.75 SIGN HANGER All BLD 31.31 33.81 1.5 1.5 2.0 4.85 3.28 0.00 0.00 SPRINKLER FITTER All BLD 47.20 49.20 1.5 1.5 2.0 12.25 11.55 0.00 0.55 STEEL ERECTOR All All 42.07 44.07 2.0 2.0 2.0 13.45 19.59 0.00 0.35 STONE MASON All BLD 44.88 49.37 1.5 1.5 2.0 10.25 15.30 0.00 0.85 TERRAZZO FINISHER All BLD 39.54 39.54 1.5 1.5 2.0 10.55 11.79 0.00 0.67 TERRAZZO MASON All BLD 43.38 43.38 1.5 1.5 2.0 10.55 13.13 0.00 0.79 TILE MASON All BLD 43.84 47.84 1.5 1.5 2.0 10.55 11.40 0.00 0.99 TRAFFIC SAFETY WRKR All HWY 33.50 39.50 1.5 1.5 2.0 6.00 7.25 0.00 0.50 TRUCK DRIVER E All 1 35.60 36.25 1.5 1.5 2.0 8.56 11.50 0.00 0.15 TRUCK DRIVER E All 2 35.85 36.25 1.5 1.5 2.0 8.56 11.50 0.00 0.15 TRUCK DRIVER E All 3 36.05 36.25 1.5 1.5 2.0 8.56 11.50 0.00 0.15 TRUCK DRIVER E All 4 36.25 36.25 1.5 1.5 2.0 8.56 11.50 0.00 0.15 TRUCK DRIVER W All 1 35.98 36.53 1.5 1.5 2.0 8.25 10.14 0.00 0.15 TRUCK DRIVER W All 2 36.13 36.53 1.5 1.5 2.0 8.25 10.14 0.00 0.15 TRUCK DRIVER W All 3 36.33 36.53 1.5 1.5 2.0 8.25 10.14 0.00 0.15 TRUCK DRIVER W All 4 36.53 36.53 1.5 1.5 2.0 8.25 10.14 0.00 0.15 TUCKPOINTER All BLD 44.90 45.90 1.5 1.5 2.0 8.30 14.29 0.00 0.48 Explanations COOK COUNTY The following list is considered as those days for which holiday rates of wages for work performed apply: New Years Day, Memorial Day, Fourth of July,Labor Day,Thanksgiving Day,Christmas Day and Veterans Day in some classifications/counties. Generally,any of these holidays which fall on a Sunday is celebrated on the following Monday. This then makes work performed on that Monday payable at the appropriate overtime rate for holiday pay.Common practice in a given local may alter certain days of celebration. If in doubt,please check with IDOL. TRUCK DRIVERS(WEST) -That part of the county West of Barrington Road. EXPLANATION OF CLASSES ASBESTOS-GENERAL-removal of asbestos material/mold and hazardous materials from any place in a building, including mechanical systems where those mechanical systems are to be removed. This includes the removal of asbestos materials/mold and hazardous materials from ductwork or pipes in a building when the building is to be demolished at the time or at some close future date. ASBESTOS-MECHANICAL-removal of asbestos material from mechanical systems,such as pipes, ducts,and boilers,where the mechanical systems are to remain. CERAMIC TILE FINISHER The grouting,cleaning, and polishing of all classes of tile,whether for interior or exterior purposes,all burned,glazed or unglazed products;all composition materials,granite tiles,warning detectable tiles,cement tiles,epoxy composite materials, pavers,glass, mosaics,fiberglass,and all substitute materials,for tile made in tile-like units;all mixtures in the like form of cement,metals, and other materials that are for and intended for use as a finished floor surface,stair treads, promenade roofs,walks,walls,ceilings, swimming pools,and all other places where tile is to form a finished interior or exterior. The mixing of all setting mortars including but not limited to thin-set mortars,epoxies,wall mud,and any other sand and cement mixtures or adhesives when used in the preparation, installation,repair,or maintenance of the and/or similar materials. The handling and unloading of all sand,cement,lime,tile, fixtures,equipment,adhesives,or any other materials to be used in the preparation,installation,repair,or maintenance of the and/or similar materials. Ceramic Tile Finishers shall fill all joints and voids regardless of method on all tile work, particularly and especially after installation of said tile work. Application of any and all protective coverings to all types of the installations including,but not be limited to,all soap compounds, paper products, tapes,and all polyethylene coverings, plywood,masonite,cardboard, and any new type of products that may be used to protect tile installations, Blastrac equipment,and all floor scarifying equipment used in preparing floors to receive tile. The clean up and removal of all waste and materials. All demolition of existing the floors and walls to be re-tiled. COMMUNICATIONS ELECTRICIAN Installation,operation, inspection,maintenance, repair and service of radio,television,recording,voice sound vision production and reproduction,telephone and telephone interconnect,facsimile,data apparatus,coaxial,fibre optic and wireless equipment,appliances and systems used for the transmission and reception of signals of any nature,business,domestic,commercial,education,entertainment,and residential purposes,including but not limited to,communication and telephone,electronic and sound equipment,fibre optic and data communication systems,and the performance of any task directly related to such installation or service whether at new or existing sites,such tasks to include the placing of wire and cable and electrical power conduit or other raceway work within the equipment room and pulling wire and/or cable through conduit and the installation of any incidental conduit,such that the employees covered hereby can complete any job in full. MARBLE FINISHER Loading and unloading trucks,distribution of all materials(all stone,sand,etc.),stocking of floors with material,performing all rigging for heavy work,the handling of all material that may be needed for the installation of such materials,building of scaffolding, polishing if needed, patching,waxing of material if damaged,pointing up,caulking,grouting and cleaning of marble, holding water on diamond or Carborundum blade or saw for setters cutting,use of tub saw or any other saw needed for preparation of material,drilling of holes for wires that anchor material set by setters, mixing up of molding plaster for installation of material, mixing up thin set for the installation of material,mixing up of sand to cement for the installation of material and such other work as may be required in helping a Marble Setter in the handling of all material in the erection or installation of interior marble,slate, travertine,art marble,serpentine,alberene stone,blue stone, granite and other stones(meaning as to stone any foreign or domestic materials as are specified and used in building interiors and exteriors and customarily known as stone in the trade),carrara, sanionyx,vitrolite and similar opaque glass and the laying of all marble tile,terrazzo tile,slate tile and precast tile, steps, risers treads, base,or any other materials that may be used as substitutes for any of the aforementioned materials and which are used on interior and exterior which are installed in a similar manner. MATERIAL TESTER I: Hand coring and drilling for testing of materials; field inspection of uncured concrete and asphalt. MATERIAL TESTER II: Field inspection of welds,structural steel, fireproofing, masonry,soil,facade,reinforcing steel,formwork, cured concrete,and concrete and asphalt batch plants;adjusting proportions of bituminous mixtures. OPERATING ENGINEER-BUILDING Class 1.Asphalt Plant;Asphalt Spreader;Autograde; Backhoes with Caisson Attachment; Batch Plant;Benoto(requires Two Engineers); Boiler and Throttle Valve; Caisson Rigs;Central Redi-Mix Plant; Combination Back Hoe Front End-loader Machine; Compressor and Throttle Valve;Concrete Breaker(Truck Mounted); Concrete Conveyor;Concrete Conveyor(Truck Mounted);Concrete Paver Over 27E cu.ft;Concrete Paver 27E cu.ft.and Under:Concrete Placer; Concrete Placing Boom; Concrete Pump(Truck Mounted);Concrete Tower;Cranes,All;Cranes, Hammerhead;Cranes,(GCI and similar Type);Creter Crane;Spider Crane;Crusher,Stone,etc.; Derricks,All; Derricks,Traveling; Formless Curb and Gutter Machine;Grader, Elevating;Grouting Machines; Heavy Duty Self-Propelled Transporter or Prime Mover; Highlift Shovels or Front Endloader 2-1/4 yd.and over; Hoists, Elevators,outside type rack and pinion and similar machines;Hoists, One,Two and Three Drum; Hoists,Two Tugger One Floor; Hydraulic Backhoes; Hydraulic Boom Trucks; Hydro Vac(and similar equipment); Locomotives,All;Motor Patrol; Lubrication Technician; Manipulators; Pile Drivers and Skid Rig;Post Hole Digger; Pre-Stress Machine; Pump Cretes Dual Ram;Pump Cretes:Squeeze Cretes-Screw Type Pumps;Gypsum Bulker and Pump; Raised and Blind Hole Drill; Roto Mill Grinder; Scoops-Tractor Drawn;Slip-Form Paver;Straddle Buggies;Operation of Tie Back Machine;Tournapull;Tractor with Boom and Side Boom; Trenching Machines. Class 2. Boilers; Broom,All Power Propelled; Bulldozers; Concrete Mixer(Two Bag and Over);Conveyor,Portable; Forklift Trucks; Highlift Shovels or Front Endloaders under 2-1/4 yd.; Hoists, Automatic; Hoists,Inside Elevators; Hoists,Sewer Dragging Machine; Hoists,Tugger Single Drum; Laser Screed;Rock Drill(Self-Propelled); Rock Drill(Truck Mounted); Rollers,All;Steam Generators;Tractors, All;Tractor Drawn Vibratory Roller;Winch Trucks with"A" Frame. Class 3.Air Compressor;Combination Small Equipment Operator; Generators; Heaters,Mechanical; Hoists, Inside Elevators(remodeling or renovation work); Hydraulic Power Units(Pile Driving, Extracting, and Drilling); Pumps,over 3"(1 to 3 not to exceed a total of 300 ft.); Low Boys; Pumps,Well Points;Welding Machines(2 through 5); Winches,4 Small Electric Drill Winches. Class 4. Bobcats and/or other Skid Steer Loaders;Oilers;and Brick Forklift. Class 5.Assistant Craft Foreman. Gass 6.Gradall. Class 7. Mechanics;Welders, OPERATING ENGINEERS-HIGHWAY CONSTRUCTION Class 1.Asphalt Plant;Asphalt Heater and Planer Combination;Asphalt Heater Scarfire;Asphalt Spreader;Autograder/GOMACO or other similar type machines:ABG Paver; Backhoes with Caisson Attachment; Ballast Regulator; Belt Loader;Caisson Rigs;Car Dumper;Central Redi-Mix Plant;Combination Backhoe Front Endloader Machine,(1 cu.yd. Backhoe Bucket or over or with attachments);Concrete Breaker(Truck Mounted);Concrete Conveyor;Concrete Paver over 27E cu.ft.; Concrete Placer; Concrete Tube Float;Cranes,all attachments;Cranes,Tower Cranes of all types:Creter Crane:Spider Crane;Crusher,Stone,etc.; Derricks,All; Derrick Boats; Derricks,Traveling; Dredges; Elevators,Outside type Rack&Pinion and Similar Machines; Formless Curb and Gutter Machine;Grader, Elevating;Grader, Motor Grader, Motor Patrol,Auto Patrol, Form Grader, Pull Grader,Subgrader;Guard Rail Post Driver Truck Mounted; Hoists,One,Two and Three Drum; Heavy Duty Self-Propelled Transporter or Prime Mover; Hydraulic Backhoes; Backhoes with shear attachments up to 40'of boom reach; Lubrication Technician; Manipulators; Mucking Machine; Pile Drivers and Skid Rig; Pre-Stress Machine; Pump Cretes Dual Ram; Rock Drill-Crawler or Skid Rig; Rock Drill -Truck Mounted; Rock/Track Tamper; Roto Mill Grinder;Slip-Form Paver;Snow Melters;Soil Test Drill Rig(Truck Mounted); Straddle Buggies; Hydraulic Telescoping Form(Tunnel); Operation of Tieback Machine; Tractor Drawn Belt Loader;Tractor Drawn Belt Loader(with attached pusher-two engineers);Tractor with Boom;Tractaire with Attachments;Traffic Barrier Transfer Machine; Trenching;Truck Mounted Concrete Pump with Boom; Raised or Blind Hole Drills(Tunnel Shaft);Underground Boring and/or Mining Machines 5 ft. in diameter and over tunnel,etc;Underground Boring and/or Mining Machines under 5 ft. in diameter;Wheel Excavator;Widener(APSCO). Class 2.Batch Plant; Bituminous Mixer; Boiler and Throttle Valve; Bulldozers;Car Loader Trailing Conveyors;Combination Backhoe Front Endloader Machine(Less than 1 cu.yd. Backhoe Bucket or over or with attachments);Compressor and Throttle Valve;Compressor,Common Receiver(3);Concrete Breaker or Hydro Hammer;Concrete Grinding Machine;Concrete Mixer or Paver 7S Series to and including 27 cu. ft.;Concrete Spreader;Concrete Curing Machine, Burlap Machine, Belting Machine and Sealing Machine;Concrete Wheel Saw;Conveyor Muck Cars(Haglund or Similar Type); Drills, All; Finishing Machine - Concrete; Highlift Shovels or Front Endloader; Hoist-Sewer Dragging Machine; Hydraulic Boom Trucks(All Attachments); Hydro-Blaster; Hydro Excavating(excluding hose work); Laser Screed;All Locomotives, Dinky;Off-Road Hauling Units(including articulating) Non Self-Loading Ejection Dump; Pump Cretes:Squeeze Cretes-Screw Type Pumps,Gypsum Bulker and Pump; Roller,Asphalt; Rotary Snow Plows; Rototiller,Seaman,etc.,self-propelled;Self-Propelled Compactor; Spreader-Chip-Stone,etc.;Scraper-Single/Twin Engine/Push and Pull;Scraper-Prime Mover in Tandem(Regardless of Size);Tractors pulling attachments,Sheeps Foot, Disc,Compactor,etc.;Tug Boats. Class 3. Boilers; Brooms,All Power Propelled; Cement Supply Tender; Compressor,Common Receiver(2);Concrete Mixer(Two Bag and Over); Conveyor, Portable; Farm-Type Tractors Used for Mowing,Seeding,etc.; Forklift Trucks;Grouting Machine; Hoists,Automatic; Hoists,All Elevators; Hoists,Tugger Single Drum;Jeep Diggers; Low Boys; Pipe Jacking Machines; Post-Hole Digger;Power Saw,Concrete Power Driven; Pug Mills; Rollers,other than Asphalt;Seed and Straw Blower;Steam Generators;Stump Machine;Winch Trucks with"A" Frame;Work Boats; Tamper-Form-Motor Driven. Class 4.Air Compressor;Combination-Small Equipment Operator; Directional Boring Machine;Generators; Heaters, Mechanical; Hydraulic Power Unit(Pile Driving, Extracting,or Drilling); Light Plants,All (1 through 5); Pumps,over 3" (1 to 3 not to exceed a total of 300 ft.);Pumps,Well Points;Vacuum Trucks(excluding hose work);Welding Machines(2 through 5);Winches,4 Small Electric Drill Winches. Class 5.SkidSteer Loader(all); Brick Forklifts;Oilers. Class 6. Field Mechanics and Field Welders Class 7. Dowell Machine with Air Compressor;Gradall and machines of like nature. OPERATING ENGINEER- FLOATING Class 1. Craft Foreman; Master Mechanic; Diver/Wet Tender;Engineer; Engineer(Hydraulic Dredge). Class 2. Crane/Backhoe Operator; Boat Operator with towing endorsement; Mechanic/Welder;Assistant Engineer(Hydraulic Dredge); Leverman(Hydraulic Dredge); Diver Tender. Class 3. Deck Equipment Operator, Machineryman, Maintenance of Crane (over 50 ton capacity)or Backhoe(115,000 lbs. or more);Tug/Launch Operator;Loader/Dozer and like equipment on Barge, Breakwater Wall, Slip/Dock,or Scow,Deck Machinery,etc. Class 4. Deck Equipment Operator, Machineryman/Fireman(4 Equipment Units or More);Off Road Trucks; Deck Hand,Tug Engineer,Crane Maintenance(50 Ton Capacity and Under)or Backhoe Weighing(115,000 pounds or less);Assistant Tug Operator. Class S. Friction or Lattice Boom Cranes. Class 6. ROV Pilot, ROV Tender SURVEY WORKER-Operated survey equipment including data collectors, G.P.S.and robotic instruments,as well as conventional levels and transits. TERRAllO FINISHER The handling of sand, cement, marble chips, and all other materials that may be used by the Mosaic Terrazzo Mechanic,and the mixing, grinding,grouting,cleaning and sealing of all Marble,Mosaic,and Terrazzo work,floors, base,stairs,and wainscoting by hand or machine,and in addition,assisting and aiding Marble,Masonic,and Terrazzo Mechanics. TRAFFIC SAFETY Work associated with barricades, horses and drums used to reduce lane usage on highway work,the installation and removal of temporary lane markings,and the installation and removal of temporary road signs. TRUCK DRIVER- BUILDING, HEAVY AND HIGHWAY CONSTRUCTION-EAST&WEST Class 1. Two or three Axle Trucks. A-frame Truck when used for transportation purposes;Air Compressors and Welding Machines, including those pulled by cars,pick-up trucks and tractors; Ambulances; Batch Gate Lockers; Batch Hopperman;Car and Truck Washers; Carry-alts; Fork Lifts and Hoisters; Helpers; Mechanics Helpers and Greasers;Oil Distributors 2-man operation; Pavement Breakers; Pole Trailer,up to 40 feet; Power Mower Tractors; Self-propelled Chip Spreader;Skipman;Slurry Trucks,2-man operation; Slurry Truck Conveyor Operation,2 or 3 man;Teamsters; Unskilled Dumpman; and Truck Drivers hauling warning lights,barricades, and portable toilets on the job site. Class 2. Four axle trucks; Dump Crets and Adgetors under 7 yards; Dumpsters,Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-mix Plant Hopper Operator,and Winch Trucks,2 Axles. Class 3. Five axle trucks; Dump Crets and Adgetors 7 yards and over; Dumpsters,Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or turnapulls when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, 1-man operation; Pole Trailer,over 40 feet;Pole and Expandable Trailers hauling material over 50 feet long;Slurry trucks, 1-man operation; Winch trucks, 3 axles or more; Mechanic--Truck Welder and Truck Painter. Class 4. Six axle trucks; Dual-purpose vehicles, such as mounted crane trucks with hoist and accessories; Foreman;Master Mechanic; Self-loading equipment like P.B.and trucks with scoops on the front. Other Classifications of Work: For definitions of classifications not otherwise set out,the Department generally has on file such definitions which are available. If a task to be performed is not subject to one of the classifications of pay set out,the Department will upon being contacted state which neighboring county has such a classification and provide such rate,such rate being deemed to exist by reference in this document. If no neighboring county rate applies to the task, the Department shall undertake a special determination,such special determination being then deemed to have existed under this determination. If a project requires these,or any classification not listed, please contact IDOL at 217-782-1710 for wage rates or clarifications. LANDSCAPING Landscaping work falls under the existing classifications for laborer, operating engineer and truck driver. The work performed by landscape plantsman and landscape laborer is covered by the existing classification of laborer. The work performed by landscape operators (regardless of equipment used or its size)is covered by the classifications of operating engineer. The work performed by landscape truck drivers(regardless of size of truck driven) is covered by the classifications of truck driver. MATERIAL TESTER&MATERIAL TESTER/INSPECTOR I AND II Notwithstanding the difference in the classification title,the classification entitled"Material Tester I"involves the same job duties as the classification entitled "Material Tester/Inspector I". Likewise,the classification entitled"Material Tester 11"involves the same job duties as the classification entitled"Material Tester/Inspector 11". This schedule contains the prevailing wage rates required to be paid for work performed on or after Monday,June 5,2017 on public works projects in this County. Pursuant to 820 ILC5130/4,public bodies in this County that have active public works projects are responsible for notifying all contractors and subcontractors working on those public works projects of the change(if any)to rates that were previously in effect. The failure of a public body to provide such notice does not relieve contractors or subcontractors of their obligations under the Prevailing Wage Act,including the duty to pay the relevant prevailing wage in effect at the time work subject to the Act is performed. KANE COUNTY PREVAILING WAGE RATES EFFECTIVE JUNE 5, 2017 Base Foreman M-F TradeTitle Region Type Class Wage Wage OT OSA OSH H/W Pension Vacation Training ASBESTOS ABT-GEN All All 40.40 40.95 1.5 1.5 2.0 14.23 11.57 0.00 0.50 ASBESTOS ABT-MEC All BLD 37.46 39.96 1.5 1.5 2.0 11.62 11.06 0.00 0.72 BOILERMAKER All BLD 47.07 51.30 2.0 2.0 2.0 6.97 18.13 0.00 0.40 BRICK MASON All BLD 44.88 49.37 1.5 1.5 2.0 10.25 15.30 0.00 0.85 CARPENTER All All 45.35 47.35 1.5 1.5 2.0 11.79 17.61 0.00 0.63 CEMENT MASON All All 43.95 45.95 2.0 1.5 2.0 10.00 19.66 0.00 0.50 CERAMIC TILE FNSHER All BLD 37.81 37.81 1.5 1.5 2.0 10.55 10.12 0.00 0.65 COMMUNICATION TECH N BLD 37.39 39.49 1.5 1.5 2.0 11.30 12.97 0.00 0.66 COMMUNICATION TECH S BLD 39.02 41.27 1.5 1.5 2.0 10.90 10.93 0.00 1.37 ELECTRIC PWR EQMT OP All All 37.89 51.48 1.5 1.5 2.0 5.00 11.75 0.00 0.38 ELECTRIC PWR EQMT OP All HWY 40.59 55.15 1.5 1.5 2.0 5.25 12.59 0.00 0.71 ELECTRIC PWR GRNDMAN All ALL 29.30 51.48 1.5 1.5 2.0 5.00 9.09 0.00 0.29 ELECTRIC PWR GRNDMAN All HWY 32.50 55.15 1.5 1.5 2.0 5.25 10.09 0.00 0.58 ELECTRIC PWR LINEMAN All All 45.36 51.48 1.5 1.5 2.0 5.00 14.06 0.00 0.45 ELECTRIC PWR LINEMAN All HWY 48.59 55.15 1.5 1.5 2.0 5.25 15.07 0.00 0.85 ELECTRIC PWR TRK DRV All All 30.34 51.48 1.5 1.5 2.0 5.00 9.40 0.00 0.30 ELECTRIC PWR TRK DRV All HWY 31.40 53.29 1.5 1.5 2.0 5.00 9.73 0.00 0.31 ELECTRICIAN N All 46.02 50.42 1.S 1.S 2.0 14.07 15.33 0.00 0.92 ELECTRICIAN S BLD 48.63 52.88 1.5 1.5 2.0 11.31 13.62 0.00 1.70 ELEVATOR CONSTRUCTOR All BLD 51.94 58.43 2.0 2.0 2.0 14.43 14.96 4.16 0.90 FENCE ERECTOR All All 45.56 49.20 2.0 2.0 2.0 11.02 2131 0.00 0.70 GLAZIER All BLD 41.70 43.20 1.5 2.0 2.0 13.94 18.99 0.00 0.94 HT/FROST INSULATOR All BLD 49.95 52.45 1.5 1.5 2.0 11.62 12.26 0.00 0.72 IRON WORKER All All 45.56 49.20 2.0 2.0 2.0 11.02 21.51 0.00 0.70 LABORER All All 40.20 40.95 1.5 1.5 2.0 13.52 12.28 0.00 0.50 LATHER All All 42.52 44.52 1.5 1.5 2.0 13.29 12.76 0.00 0.63 MACHINIST All BLD 45.35 47.85 1.5 1.5 2.0 7.26 8.95 1.85 0.00 MARBLE FINISHERS All All 33.45 33.45 1.5 1.5 2.0 10.25 14.44 0.00 0.46 MARBLE MASON All BLD 44.13 48.54 1.5 1.5 2.0 10.25 14.97 0.00 0.59 MATERIAL TESTER I All All 30.20 3010 1.5 1.5 2.0 13.52 12.28 0.00 0.50 MATERIALS TESTER II All All 35.20 35.20 1.5 1.5 2.0 13.52 12.28 0.00 0.50 MILLWRIGHT All All 45.35 47.35 1.5 1.5 2.0 11.79 17.61 0.00 0.63 OPERATING ENGINEER All BLD 1 49.10 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All BLD 2 47.80 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All BLD 3 45.25 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All BLD 4 43.50 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All BLD 5 52.85 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All BLD 6 50.10 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All BLD 7 52.10 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All FLT 37.00 54.75 1.5 1.5 2.0 17.65 12.65 1.90 1.35 OPERATING ENGINEER All HWY 1 47.30 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All HWY 2 46.75 51.30 1.5 13 2.0 18.05 13.60 1.90 130 OPERATING ENGINEER All HWY 3 44.70 51.30 1.5 1.5 2.0 18.05 1160 1.90 1.30 OPERATING ENGINEER All HWY 4 43.30 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All HWY 5 42.10 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All HWY 6 50.30 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30 OPERATING ENGINEER All HWY 7 48.30 51.30 1.5 1.5 2.0 18.05 1160 1.90 1.30 ORNAMNTL IRON WORKER All All 45.06 48.66 2.0 2.0 2.0 10.52 20.76 0.00 0.70 PAINTER All All 42.93 44.93 1.5 1.5 1.5 10.30 8.20 0.00 1.35 PAINTER SIGNS All BLD 33.92 38.09 1.5 1.5 1.5 2.60 2.71 0.00 0.00 PILEDRIVER All All 45.35 47.35 1.5 1.5 2.0 11.79 17.61 0.00 0.63 PIPEFITTER All BLD 47.50 50.50 1.5 1.5 2.0 9.55 17.85 0.00 2.07 PLASTERER All BLD 42.25 44.79 1.5 1.5 2.0 13.65 9.50 5.00 0.65 PLUMBER All BLD 48.25 50.25 1.5 1.5 2.0 14.09 12.65 0.00 1.18 ROOFER All BLD 41.70 44.70 1.5 1.5 2.0 8.28 11.59 0.00 0.53 SHEETMETAL WORKER All BLD 45.77 47.77 1.5 1.5 2.0 10.65 14.10 0.00 0.82 SIGN HANGER All BLD 26.07 27.57 1.5 1.5 2.0 3.80 3.55 0.00 0.00 SPRINKLER FITTER All BLD 47.20 49.20 1.5 1.5 2.0 12.25 11.55 0.00 0.55 STEEL ERECTOR All All 45.56 49.20 2.0 2.0 2.0 11.02 21.51 0.00 0.70 STONE MASON All BLD 44.88 49.37 1.5 1.5 2.0 10.25 15.30 0.00 0.85 TERRAllO FINISHER All BLD 39.54 39.54 1.5 1.5 2.0 10.55 11.79 0.00 0.67 TERRAllO MASON All BLD 43.38 43.38 1.5 1.5 2.0 10.55 13.13 0.00 0.79 TILE MASON All BLD 43.84 47.84 1.5 1.5 2.0 10.55 11.40 0.00 0.99 TRAFFIC SAFETY WRKR All HWY 33.50 35.10 1.5 1.5 2.0 8.10 7.62 0.00 0.25 TRUCK DRIVER All All 1 36.30 36.85 1.5 1.5 2.0 8.10 9.76 0.00 0.15 TRUCK DRIVER All All 2 36.45 36.85 1.5 1.5 2.0 8.10 9.76 0.00 0.15 TRUCK DRIVER All All 3 36.65 36.85 1.5 1.5 2.0 8.10 9.76 0.00 0.15 TRUCK DRIVER All All 4 36.85 36.85 1.5 1.5 2.0 8.10 9.76 0.00 0.15 TUCKPOINTER All BLD 44.90 45.90 1.5 1.5 2.0 8.30 14.29 0.00 0.48 Explanations KANE COUNTY ELECTRICIANS AND COMMUNICATIONS TECHNICIAN (NORTH)-Townships of Burlington,Campton, Dundee,Elgin, Hampshire,Plato, Rutland,St. Charles(except the West half of Sec. 26,all of Secs.27,33, and 34,South half of Sec.28,West half of Sec. 35),Virgil and Valley View CCC and Elgin Mental Health Center. The following list is considered as those days for which holiday rates of wages for work performed apply: New Years Day, Memorial Day, Fourth of July, Labor Day,Thanksgiving Day,Christmas Day and Veterans Day in some classifications/counties. Generally,any of these holidays which fall on a Sunday is celebrated on the following Monday. This then makes work performed on that Monday payable at the appropriate overtime rate for holiday pay.Common practice in a given local may alter certain days of celebration. If in doubt,please check with IDOL. EXPLANATION OF CLASSES ASBESTOS-GENERAL-removal of asbestos material/mold and hazardous materials from any place in a building, including mechanical systems where those mechanical systems are to be removed. This includes the removal of asbestos materials/mold and hazardous materials from ductwork or pipes in a building when the building is to be demolished at the time or at some close future date. ASBESTOS-MECHANICAL-removal of asbestos material from mechanical systems,such as pipes,ducts,and boilers,where the mechanical systems are to remain. CERAMIC TILE FINISHER The grouting,cleaning,and polishing of all classes of tile,whether for interior or exterior purposes,all burned,glazed or unglazed products;all composition materials,granite tiles,warning detectable tiles,cement tiles,epoxy composite materials, pavers,glass, mosaics,fiberglass,and all substitute materials,for tile made in tile-like units; all mixtures in tile like form of cement, metals,and other materials that are for and intended for use as a finished floor surface,stair treads, promenade roofs,walks,walls,ceilings, swimming pools,and all other places where tile is to form a finished interior or exterior. The mixing of all setting mortars including but not limited to thin-set mortars,epoxies,wall mud,and any other sand and cement mixtures or adhesives when used in the preparation, installation,repair,or maintenance of tile and/or similar materials. The handling and unloading of all sand,cement, lime,tile, fixtures,equipment,adhesives,or any other materials to be used in the preparation, installation, repair,or maintenance of tile and/or similar materials. Ceramic Tile Finishers shall fill all joints and voids regardless of method on all tile work, particularly and especially after installation of said tile work. Application of any and all protective coverings to all types of tile installations including,but not be limited to,all soap compounds, paper products, tapes,and all polyethylene coverings,plywood,masonite,cardboard, and any new type of products that may be used to protect tile installations,Blastrac equipment,and all floor scarifying equipment used in preparing floors to receive tile. The clean up and removal of all waste and materials. All demolition of existing tile floors and walls to be re-tiled. COMMUNICATIONS TECHNICIAN Construction,installation, maintenance and removal of telecommunication facilities(voice,sound,data and video), telephone,security systems,fire alarm systems that are a component of a multiplex system and share a common cable,and data inside wire, interconnect,terminal equipment,central offices,PABX and equipment,micro waves,V-SAT, bypass,CAN,WAN (wide area network), LAN(local area networks),and ISDN (integrated system digital network),pulling of wire in raceways,but not the installation of raceways. MARBLE FINISHER Loading and unloading trucks, distribution of all materials(all stone,sand,etc.),stocking of floors with material, performing all rigging for heavy work,the handling of all material that may be needed for the installation of such materials,building of scaffolding,polishing if needed, patching,waxing of material if damaged,pointing up,caulking,grouting and cleaning of marble, holding water on diamond or Carborundum blade or saw for setters cutting,use of tub saw or any other saw needed for preparation of material, drilling of holes for wires that anchor material set by setters,mixing up of molding plaster for installation of material, mixing up thin set for the installation of material, mixing up of sand to cement for the installation of material and such other work as may be required in helping a Marble Setter in the handling of all material in the erection or installation of interior marble,slate, travertine,art marble,serpentine,alberene stone,blue stone, granite and other stones(meaning as to stone any foreign or domestic materials as are specified and used in building interiors and exteriors and customarily known as stone in the trade),carrara, sanionyx,vitrolite and similar opaque glass and the laying of all marble tile,terrazzo tile, slate tile and precast tile, steps, risers treads,base,or any other materials that may be used as substitutes for any of the aforementioned materials and which are used on interior and exterior which are installed in a similar manner. MATERIAL TESTER I: Hand coring and drilling for testing of materials; field inspection of uncured concrete and asphalt. MATERIAL TESTER 11: Field inspection of welds,structural steel, fireproofing, masonry,soil,facade,reinforcing steel,formwork, cured concrete, and concrete and asphalt batch plants; adjusting proportions of bituminous mixtures. OPERATING ENGINEER- BUILDING Class 1.Asphalt Plant;Asphalt Spreader;Autograde; Backhoes with Caisson Attachment; Batch Plant; Benoto(requires Two Engineers); Boiler and Throttle Valve; Caisson Rigs;Central Redi-Mix Plant; Combination Back Hoe Front End-loader Machine; Compressor and Throttle Valve;Concrete Breaker(Truck Mounted); Concrete Conveyor;Concrete Conveyor(Truck Mounted);Concrete Paver Over 27E cu.ft; Concrete Paver 27E cu.ft.and Under:Concrete Placer;Concrete Placing Boom; Concrete Pump(Truck Mounted);Concrete Tower;Cranes,All; Cranes, Hammerhead;Cranes, (GCI and similar Type);Creter Crane;Spider Crane;Crusher,Stone,etc.;Derricks,All; Derricks,Traveling; Formless Curb and Gutter Machine;Grader, Elevating;Grouting Machines;Heavy Duty Self-Propelled Transporter or Prime Mover; Highlift Shovels or Front Endloader 2-1/4 yd.and over;Hoists, Elevators,outside type rack and pinion and similar machines; Hoists, One,Two and Three Drum; Hoists,Two Tugger One Floor; Hydraulic Backhoes; Hydraulic Boom Trucks; Hydro Vac(and similar equipment); Locomotives,All; Motor Patrol; Lubrication Technician; Manipulators; Pile Drivers and Skid Rig; Post Hole Digger; Pre-Stress Machine; Pump Cretes Dual Ram;Pump Cretes:Squeeze Cretes-Screw Type Pumps; Gypsum Bulker and Pump;Raised and Blind Hole Drill; Roto Mill Grinder; Scoops-Tractor Drawn;Slip-Form Paver;Straddle Buggies;Operation of Tie Back Machine;Tournapull;Tractor with Boom and Side Boom; Trenching Machines. Class 2. Boilers;Broom,All Power Propelled; Bulldozers;Concrete Mixer(Two Bag and Over);Conveyor,Portable; Forklift Trucks; Highlift Shovels or Front Endloaders under 2-1/4 yd.;Hoists, Automatic; Hoists,Inside Elevators; Hoists,Sewer Dragging Machine; Hoists,Tugger Single Drum; Laser Screed; Rock Drill (Self-Propelled); Rock Drill(Truck Mounted); Rollers,All;Steam Generators;Tractors, All;Tractor Drawn Vibratory Roller;Winch Trucks with"A" Frame. Class 3.Air Compressor;Combination Small Equipment Operator; Generators; Heaters, Mechanical;Hoists, Inside Elevators(remodeling or renovation work); Hydraulic Power Units(Pile Driving, Extracting, and Drilling); Pumps,over 3"(1 to 3 not to exceed a total of 300 ft.);Low Boys; Pumps,Well Points;Welding Machines(2 through 5); Winches,4 Small Electric Drill Winches. Class 4. Bobcats and/or other Skid Steer Loaders;Oilers; and Brick Forklift. Class 5.Assistant Craft Foreman. Class 6.Gradall. Class 7. Mechanics;Welders. OPERATING ENGINEERS-HIGHWAY CONSTRUCTION Class 1.Asphalt Plant;Asphalt Heater and Planer Combination;Asphalt Heater Scarfire;Asphalt Spreader;Autograder/GOMACO or other similar type machines:ABG Paver; Backhoes with Caisson Attachment; Ballast Regulator; Belt Loader;Caisson Rigs;Car Dumper;Central Redi-Mix Plant;Combination Backhoe Front Endloader Machine,(1 cu.yd.Backhoe Bucket or over or with attachments);Concrete Breaker(Truck Mounted);Concrete Conveyor;Concrete Paver over 27E cu.ft.; Concrete Placer;Concrete Tube Float; Cranes,all attachments; Cranes,Tower Cranes of all types:Creter Crane:Spider Crane;Crusher,Stone,etc.; Derricks,All;Derrick Boats; Derricks,Traveling; Dredges; Elevators,Outside type Rack& Pinion and Similar Machines; Formless Curb and Gutter Machine; Grader, Elevating;Grader, Motor Grader, Motor Patrol,Auto Patrol, Form Grader, Pull Grader,Subgrader;Guard Rail Post Driver Truck Mounted; Hoists,One,Two and Three Drum; Heavy Duty Self-Propelled Transporter or Prime Mover; Hydraulic Backhoes; Backhoes with shear attachments up to 40'of boom reach; Lubrication Technician; Manipulators;Mucking Machine; Pile Drivers and Skid Rig; Pre-Stress Machine;Pump Cretes Dual Ram; Rock Drill-Crawler or Skid Rig; Rock Drill-Truck Mounted; Rock/Track Tamper; Roto Mill Grinder;Slip-Form Paver;Snow Melters;Soil Test Drill Rig(Truck Mounted);Straddle Buggies; Hydraulic Telescoping Form (Tunnel); Operation of Tieback Machine; Tractor Drawn Belt Loader;Tractor Drawn Belt Loader(with attached pusher-two engineers);Tractor with Boom;Tractaire with Attachments;Traffic Barrier Transfer Machine; Trenching;Truck Mounted Concrete Pump with Boom; Raised or Blind Hole Drills(Tunnel Shaft); Underground Boring and/or Mining Machines 5 ft. in diameter and over tunnel,etc; Underground Boring and/or Mining Machines under 5 ft. in diameter;Wheel Excavator;Widener(APSCO). Class 2. Batch Plant; Bituminous Mixer; Boiler and Throttle Valve; Bulldozers;Car Loader Trailing Conveyors;Combination Backhoe Front Endloader Machine(Less than 1 cu.yd. Backhoe Bucket or over or with attachments);Compressor and Throttle Valve;Compressor,Common Receiver(3);Concrete Breaker or Hydro Hammer;Concrete Grinding Machine;Concrete Mixer or Paver 7S Series to and including 27 cu. ft.;Concrete Spreader;Concrete Curing Machine, Burlap Machine, Belting Machine and Sealing Machine;Concrete Wheel Saw;Conveyor Muck Cars(Haglund or Similar Type); Drills,All; Finishing Machine- Concrete;Highlift Shovels or Front Endloader; Hoist-Sewer Dragging Machine; Hydraulic Boom Trucks(All Attachments); Hydro-Blaster; Hydro Excavating(excluding hose work); Laser Screed;All Locomotives, Dinky;Off-Road Hauling Units(including articulating) Non Self-Loading Ejection Dump; Pump Cretes:Squeeze Cretes-Screw Type Pumps,Gypsum Bulker and Pump; Roller,Asphalt; Rotary Snow Plows; Rototiller,Seaman,etc.,self-propelled;Self-Propelled Compactor; Spreader-Chip-Stone,etc.;Scraper-Single/Twin Engine/Push and Pull;Scraper-Prime Mover in Tandem (Regardless of Size);Tractors pulling attachments,Sheeps Foot,Disc,Compactor, etc.;Tug Boats. Class 3.Boilers; Brooms,All Power Propelled;Cement Supply Tender; Compressor,Common Receiver(2);Concrete Mixer(Two Bag and Over); Conveyor,Portable; Farm-Type Tractors Used for Mowing,Seeding,etc.; Forklift Trucks;Grouting Machine; Hoists,Automatic; Hoists,All Elevators; Hoists,Tugger Single Drum;Jeep Diggers; Low Boys;Pipe Jacking Machines;Post-Hole Digger; Power Saw,Concrete Power Driven; Pug Mills; Rollers,other than Asphalt;Seed and Straw Blower;Steam Generators;Stump Machine;Winch Trucks with"A" Frame;Work Boats; Tamper-Form-Motor Driven. Class 4.Air Compressor;Combination-Small Equipment Operator; Directional Boring Machine;Generators; Heaters, Mechanical; Hydraulic Power Unit(Pile Driving,Extracting,or Drilling); Light Plants,All (1 through 5); Pumps,over 3" (1 to 3 not to exceed a total of 300 ft.); Pumps,Well Points;Vacuum Trucks(excluding hose work);Welding Machines(2 through S);Winches,4 Small Electric Drill Winches. Class 5.SkidSteer Loader(all);Brick Forklifts;Oilers. Class 6. Field Mechanics and Field Welders Class 7. Dowell Machine with Air Compressor; Gradall and machines of like nature. OPERATING ENGINEERS-FLOATING Diver. Diver Wet Tender, Diver Tender, ROV Pilot, ROV Tender SURVEY WORKER-Operated survey equipment including data collectors, G.P.S.and robotic instruments, as well as conventional levels and transits. TRAFFIC SAFETY-work associated with barricades,horses and drums used to reduce lane usage on highway work,the installation and removal of temporary lane markings,and the installation and removal of temporary road signs. TRUCK DRIVER-BUILDING, HEAVY AND HIGHWAY CONSTRUCTION Class 1. Two or three Axle Trucks. A-frame Truck when used for transportation purposes;Air Compressors and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances; Batch Gate Lockers; Batch Hopperman;Car and Truck Washers;Carry-ails; Fork Lifts and Hoisters; Helpers; Mechanics Helpers and Greasers;Oil Distributors 2-man operation; Pavement Breakers;Pole Trailer,up to 40 feet; Power Mower Tractors; Self-propelled Chip Spreader;Skipman;Slurry Trucks,2-man operation;Slurry Truck Conveyor Operation,2 or 3 man;Teamsters; Unskilled Dumpman; and Truck Drivers hauling warning lights, barricades,and portable toilets on the job site. Class 2. Four axle trucks; Dump Crets and Adgetors under 7 yards; Dumpsters,Track Trucks, Euclids,Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-mix Plant Hopper Operator,and Winch Trucks, 2 Axles. Class 3. Five axle trucks; Dump Crets and Adgetors 7 yards and over; Dumpsters,Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or turnapulls when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, 1-man operation; Pole Trailer,over 40 feet; Pole and Expandable Trailers hauling material over SO feet long;Slurry trucks, 1-man operation;Winch trucks,3 axles or more; Mechanic--Truck Welder and Truck Painter. Class 4. Six axle trucks;Dual-purpose vehicles, such as mounted crane trucks with hoist and accessories; Foreman; Master Mechanic; Self-loading equipment like P.B. and trucks with scoops on the front. TERRAllO FINISHER The handling of sand,cement, marble chips,and all other materials that may be used by the Mosaic Terrazzo Mechanic,and the mixing, grinding,grouting,cleaning and sealing of all Marble, Mosaic, and Terrazzo work,floors,base,stairs,and wainscoting by hand or machine,and in addition,assisting and aiding Marble,Masonic,and Terrazzo Mechanics. Other Classifications of Work: For definitions of classifications not otherwise set out,the Department generally has on file such definitions which are available. If a task to be performed is not subject to one of the classifications of pay set out,the Department will upon being contacted state which neighboring county has such a classification and provide such rate,such rate being deemed to exist by reference in this document. If no neighboring county rate applies to the task, the Department shall undertake a special determination,such special determination being then deemed to have existed under this determination. If a project requires these,or any classification not listed, please contact IDOL at 217-782-1710 for wage rates or clarifications. LANDSCAPING Landscaping work falls under the existing classifications for laborer, operating engineer and truck driver. The work performed by landscape plantsman and landscape laborer is covered by the existing classification of laborer. The work performed by landscape operators (regardless of equipment used or its size) is covered by the classifications of operating engineer. The work performed by landscape truck drivers(regardless of size of truck driven)is covered by the classifications of truck driver. MATERIAL TESTER&MATERIAL TESTER/INSPECTOR I AND II Notwithstanding the difference in the classification title,the classification entitled "Material Tester 1" involves the same job duties as the classification entitled"Material Tester/Inspector I". Likewise,the classification entitled"Material Tester II" involves the same job duties as the classification entitled"Material Tester/Inspector II".