Loading...
17-2 Resolution No. 17-2 RESOLUTION ACCEPTING FOR OWNERSHIP AND MAINTENANCE THE PUBLIC IMPROVEMENTS IN SHADOW HILL UNIT 4, PHASE 2 SUBDIVISION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that the City of Elgin hereby accepts for ownership and maintenance the public improvements within the Shadow Hill Unit 4, Phase 2 Subdivision which include sanitary sewer, water main, storm sewer, pavement, street lights, and street signs. Acceptance of the public improvements will add the following city-maintained facilities: approximately 959 lineal feet of 8-inch water main; 2, 8-inch valves in 4-foot vaults; 5 fire hydrants; 1,131 lineal feet of 12-inch storm sewer; 14 catch basins; 1,680 lineal feet of 8-inch PVC sanitary sewer; 13,4-foot sanitary manholes;9 street lights;2 street signs; 105 parkway trees,750 lineal feet of 10 foot bike path and 1,716 lineal feet of improved street (including curb, gutter and sidewalk or bike path on both sides) and all their respective appurtenances. s/David J. Kaptain David J. Kaptain, Mayor Presented: January 11, 2017 Adopted: January 11, 2017 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk