Loading...
15-70 Resolution No. 15-70 RESOLUTION APPROVING CHANGE ORDER NO. 1 FOR THE CONTRACT WITH JETCO, LTD. FOR REPAIRING AND REPAINTING THE INTERIOR AND EXTERIOR OF THE AIRLITE ELEVATED WATER TANK WHEREAS, the City of Elgin has heretofore entered into a contract with Jetco, Ltd. for repairing and repainting the interior and exterior of the Airlite elevated water tank; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS, that Sean R, Stegall, City Manager, be and is hereby authorized and directed to execute Change Order No. 1,a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor o Presented: May 6, 2015 Adopted: May 6, 2015 Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk ��� � Change Order City of Elgin ELGIN,ILLINOIS PROJECT 409714 CHANGE ORDER NO. 1 CONTRACT: Repair and Repaint the interior and exterior of One 500,000 Gallon Elevated Water Tank —Airlite Tank—Bid 14-038 SCOPE: Modify the scope of work from roof and roof support structure repair, to design and replace the roof down to the top of the shell. REASONS FOR CHANGE: The project as specified included extensive roof structure repair and re- placement of components. Once the construction began and the center roof vent was removed, access was provided to a structural steel hub that exhibited severe corrosion and metal loss. Based on the cost and effort required to replace the center hub along with the rest of the roof structure, the Contractor pro- posed a value engineering solution of replacing the entire roof. The proposed roof was designed to use modern construction and support methods and require significantly less cost to apply coatings at this coating, as well as future repainting operations. It was determined that the replacement roof proposal is in the best short and long term service of this tank. The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed. The changes to the original contract provided in this change order are germane to the original contract as signed and this change order is in the best interest of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The cost net increase of this change is $76,150.00. ORIGINAL CONTRACT AMOUNT: $953,000.00 CHANGE ORDER NO. 1 Add: Roof replacement per Jetco email proposal: $296,300.00 Bid item 6 -Deduct: Roof structural bolts—64 @ $50.00 ($ 3,200.00) Bid item 7—Deduct: Replace roof rafters— 16 @ $9,900.00 ($158,400.00) Bid item 8—Deduct: Replace roof purlins— 16 @ $1,700.00 ($ 27,200.00) Deduct—Clean and prime interior roof, per Jetco email proposal ($ 20,600.00) Deduct—Caulk interior roof per Jetco email proposal ($ 1,700.00) Deduct—Clean and prime exterior roof per Jetco email proposal. ($ 9,000.00) TOTAL FOR CHANGE ORDER NO.1 ADD $76,150.00 PREVIOUS CHANGE ORDER(S): Change Order No. N/A $0 TOTAL OF PREVIOUS CHANGE ORDERS: ADD $0 TOTAL REVISED CONTRACT AMOUNT: $1,029,150.00 The original amount of the contract with Jetco LTD is $953,000.00. Change Order No. 1 totaling $76,150.00 will increase the original contract amount by a total of $76,150.00, that sum representing 7.9% of the original contract amount. The new contract amount, inclusive of all change orders is $1,029,150.00. OTHER CONTRACT PROVISIONS: The substantial completion date is hereby increased by 45 cal- endar days. All other contract provisions remain the same. CHANGE ORDER NO. 1 Agreed to this 6 tlday of May , 2015. Recommended by: WATER DEPARTMENT By:_Kyla B. Jacobsen Title: Water Director Date: .0075 Signature: ' .(�- Accepted by: JETCO, LTD. Party of the Second Part(Contractor) By:_Kenneth Brend Title:_President Date: th Signature: Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Sean R Stegall Title: City Manager Date: May 6, 115 Signature: ,a� • �✓