13-17 Resolution No. 13-17 RESOLUTION APPROVING CHANGE ORDER NO. 1 AND FINAL FOR THE CONTRACT WITH CSR ROOFING CONTRACTORS, INC. FOR ROOF REPAIRS AT VARIOUS CITY BUILDINGS WHEREAS, the City of Elgin has heretofore entered into a contract with CSR Roofing Contractors, Inc. for roof repairs at various city buildings; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Sean R, Stegall, City Manager,be and is hereby authorized and directed to execute Change Order No. 1 and Final,a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: February 13, 2013 Adopted: February 13, 2013 Omnibus Vote: Yeas: 7 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk 0 p,. City of Elgin Change Order ELGIN,ILLINOIS PROJECT: M00001 CHANGE ORDER No. 1 AND FINAL CONTRACT: Roof Repair and Replacement for 2012 (Bid No. 12-044) SCOPE: Repairs to roof decking, drains, flashings and skylights at the Lords Park Pool, City Hall, Bowes Creek Clubhouse and Public Works. The condition of these items could not be seen until they were exposed during the roofing repair project. Unit costs for these repairs were included in the original bid and all pricing for this change order was based on those costs. REASONS FOR CHANGE: Since the condition of these materials could not be seen until the roofing was removed,the circumstances said to necessitate the change in performance were not reasonably fore- seeable at the time the contract was signed. The change is germane to the original contract as signed and the change order is in the best interests of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $52,513.00 CHANGE ORDER No. 1 and FINAL City Hall flashing repairs $8,141.77 Lords Park Pool skylight and sheathing repairs $ 590.00 Bowes.Creek Clubhouse shingle repair $1,811.39 Public Works roof drain repairs $1,933.02 TOTAL FOR CHANGE ORDER NO. 1 and Final: ADD $12,476.18 TOTAL REVISED CONTRACT AMOUNT: $64,989.18 The original amount of the contract with CSR Roofmg Contractors, Inc. is $52,513.00. Change Order No. 1 and Final will increase the original contract amount by a total of$12,476.18,that sum represent- ing twenty four percent(24%) of the original contract amount. The new contract amount, inclusive of all change orders is $64,989.18. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. NUMBER LAND FINAL Agreed to this 23`d day of January, 2013. Recommended by: Building Maintenance Department By: Rich Hoke Title: Building Maintenance Superintendent Date: Signature: Accepted by: CSR Roofing Party of the Second Part (Contractor) By: Title: Date: �- l Signature: Approved by: CITY OF ELGIN Party of the First Part (Owner) By: Sean Stegall Title: City Manager Date: February 13, 2013 Signature: F:U-egal Dept\forms\Change Order Form.doc