Loading...
13-114 Resolution No. 13-114 RESOLUTION AUTHORIZING EXECUTION OF AN AGREEMENT WITH COLLINS ENGINEERS, INC. FOR ENGINEERING SERVICES IN CONNECTION WITH THE KIMBALL STREET DAM INSPECTION PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that pursuant to Elgin Municipal Code Section 5.02.020B(9) the City Council hereby finds that an exception to the requirements of the procurement ordinance is necessary and in the best interest of the city; and BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Sean R. Stegall, City Manager, and Kimberly A. Dewis, City Clerk, be and are hereby authorized and directed to execute an Agreement with Collins Engineers, Inc. on behalf of the City of Elgin for engineering services in connection with the Kimball Street Dam Inspection Project, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: July 24, 2013 Adopted: July 24, 2013 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk AGREEMENT THIS AGREEMENT is made and entered into this 24 day of July , 2013,by and between the CITY OF ELGIN,an Illinois municipal corporation(hereinafter referred to as"CITY") and Collins Engineers, Inc. (hereinafter referred to as "ENGINEER"). WHEREAS, the CITY desires to engage the ENGINEER to furnish certain professional services in connection with the Kimball Street Dam Inspection Services(hereinafter referred to as the PROJECT); and WHEREAS, the ENGINEER represents that he is in compliance with Illinois Statutes relating to professional registration of individuals and has the necessary expertise and experience to furnish such services upon the terms and conditions set forth herein below. NOW,THEREFORE,it is hereby agreed by and between the CITY and the ENGINEER that the CITY does hereby retain the ENGINEER for and in consideration of the mutual promises and covenants contained herein,the sufficiency of which is hereby acknowledged to act for and represent it in the engineering matters involved in the PROJECT as described herein,subject to the following terms and conditions and stipulations, to-wit: 1. SCOPE OF SERVICES A. All work hereunder shall be performed under the direction of the Director of Public Works of the CITY,herein after referred to as the "DIRECTOR". B. The work hereunder shall be performed under this AGREEMENT includes providing field inspection, surveying report preparation, Illinois Department of Natural Resources (IDNR) communication and submittals, and engineering services to perform the 2013 through 2018 major and minor inspections of the Kimball Street Dam. C. A detailed Scope of Services is attached hereto as Attachment A. 2. PROGRESS REPORTS Progress Reports will not be required for this project. The inspections will occur once a year in accordance with IDNR rules and regulations and said inspection will occur in the fall of each year beginning in 2013 and extending through to the end of 2018. 3. WORK PRODUCTS All work product prepared by the ENGINEER pursuant hereto including,but not limited to, correspondence to and from the IDNR,reports,plans,designs,calculations,work drawings, studies, photographs, models and recommendations shall be the property of the CITY and shall be delivered to the CITY upon request of the DIRECTOR;provided,however,that the ENGINEER may retain copies of such work product for its records. . ENGINEER'S execution of this Agreement shall constitute ENGINEER'S conveyance and assignment of all right, title and interest, including but not limited to any copyright interest, by the ENGINEER to the CITY of all such work product prepared by the ENGINEER pursuant to this Agreement. The CITY shall have the right either on its own or through such other engineers as determined by the CITY to utilize and/or amend such work product. Any such amendment to such work product shall be at the sole risk of the CITY. Such work product is not intended or represented to be suitable for reuse by the CITY on any extension to the PROJECT or on any other project, and such reuse shall be at the sole risk of the CITY without liability or legal exposure to the ENGINEER. 4. PAYMENTS TO THE ENGINEER A. For services provided by the ENGINEER, the CITY shall pay the ENGINEER a lump sum of$53,760 over the six year period with various annual payments being specified in subparagraph D below regardless of actual cost incurred by the ENGINEER unless substantial modifications to the PROJECT are authorized in writing by the DIRECTOR and approved by way of a written amendment to this Agreement. B. For outside services provided by other firms or subconsultants,the CITY shall pay the ENGINEER the invoiced fee to the ENGINEER, plus 0 C. The fees listed in subparagraph D below include all direct expenses and reimbursables. D. The CITY shall make periodic payments to the ENGINEER based upon actual progress within 30 days after receipt and approval of invoice. Said periodic payments to the ENGINEER shall not exceed the amounts shown in the following schedule, and full payments for each task shall not be made until the task is completed and accepted by the DIRECTOR. The payment schedule shall be as follows: YEAR INSPECTION TYPE FEE 2013 Minor $6,650 2014 Minor $6,915 2015 Major $11,735 2016 Minor $7,480 2017 Minor $7,780 2018 Major $13,200 - 2 - 5. INVOICES A. The ENGINEER shall submit invoices in a format approved by the CITY. B. The ENGINEER shall maintain records showing actual time devoted and cost incurred. The ENGINEER shall permit the authorized representative of the CITY to inspect and audit all data and records of the ENGINEER for work done under this Agreement. The ENGINEER shall make these records available at reasonable times during the Agreement period, and for a year after termination of this Agreement. 6. TERMINATION OF AGREEMENT Notwithstanding any other provision hereof,the CITY may terminate this Agreement at any time upon fifteen (15) days prior written notice to the ENGINEER. In the event that this Agreement is so terminated, the ENGINEER shall be paid for services actually performed and reimbursable expenses actually incurred prior to termination,except that reimbursement shall not exceed the task amounts set forth under Paragraph 4 above. 7. TERM This Agreement shall become effective as of the date the ENGINEER is given a notice to proceed and,unless terminated for cause or pursuant to Article 5,shall be deemed concluded on the date the CITY determines that all of the ENGINEER's work under this Agreement is completed. A determination of completion shall not constitute a waiver of any rights or claims which the CITY may have or thereafter acquire with respect to any term or provision of the Agreement. 8. NOTICE OF CLAIM If the ENGINEER wishes to make a claim for additional compensation as a result of action taken by the CITY, the ENGINEER shall give written notice of his claim within 15 days after occurrence of such action. No claim for additional compensation shall be valid unless so made. Any changes in the ENGINEER's fee shall be valid only to the extent that such changes are included in writing signed by the CITY and the ENGINEER. Regardless of the decision of the DIRECTOR relative to a claim submitted by the ENGINEER, all work required under this Agreement as determined by the DIRECTOR shall proceed without interruption. 9. BREACH OF CONTRACT If either party violates or breaches any term of this Agreement,such violation or breach shall be deemed to constitute a default, and the other party has the right to seek such administrative, contractual or legal remedies as may be suitable to the violation or breach; and, in addition, if either party,by reason of any default, fails within fifteen(15)days after notice thereof by the other party to comply with the conditions of the Agreement,the other - 3 - party may terminate this Agreement. Notwithstanding the foregoing,or anything else to the contrary in this Agreement, with the sole exception of an action to recover the monies the CITY has agreed to pay to the ENGINEER pursuant to Paragraph 4 hereof, no action shall be commenced by the ENGINEER against the CITY for monetary damages. ENGINEER hereby further waives any and all claims or rights to interest on money claimed to be due pursuant to this Agreement, and waives any and all such rights to interest which it claims it may otherwise be entitled pursuant to law, including, but not limited to, the Local Government Prompt Payment Act (50 ILCS 501/1, et seq.), as amended, or the Illinois Interest Act(815 ILCS 205/1,et seq.),as amended. The parties hereto further agree that any action by the ENGINEER arising out of this Agreement must be filed within one year of the date the alleged cause of action arose or the same will be time-barred.The provisions of this paragraph shall survive any expiration, completion and/or termination of this Agreement. 10. INDEMNIFICATION To the fullest extent permitted by law, ENGINEER agrees to and shall indemnify, defend and hold harmless the CITY, its officers, employees,agents,boards and commissions from and against any and all claims, suits,judgments, costs, attorneys fees, damages or other relief, including but not limited to workers compensation claims,in any way resulting from or arising out of negligent actions or omissions of the ENGINEER in connection herewith, including negligence or omissions of employees or agents of the ENGINEER arising out of the performance of this Agreement. In the event of any action against the CITY,its officers, employees, agents, boards or commissions, covered by the foregoing duty to indemnify, defend and hold harmless such action shall be defended by legal counsel of the CITY's choosing. The provisions of this paragraph shall survive any expiration and/or termination of this Agreement. 11. NO PERSONAL LUBILITY No official, director,officer, agent or employee of the CITY shall be charged personally or held contractually liable under any term or provision of this Agreement or because of their execution, approval or attempted execution of this Agreement. 12. INSURANCE A. Comprehensive Liability. The ENGINEER shall provide,pay for and maintain in effect,during the term of this Agreement,a policy of comprehensive general liability insurance with limits of at least $1,000,000 aggregate for bodily injury and $1,000,000 aggregate for property damage. The ENGINEER shall deliver to the DIRECTOR a Certification of Insurance naming the CITY as additional insured. The policy shall not be modified or terminated without thirty (30) days prior written notice to the DIRECTOR. The Certificate of Insurance which shall include Contractual obligation assumed by the ENGINEER under Article 10 entitled "Indemnification" shall be provided. - 4 - This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the CITY. There shall be no endorsement or modification of this insurance to make it excess over other available insurance, alternatively, if the insurance states that it is excess or prorated, it shall be endorsed to be primary with respect to the CITY. B. Comprehensive Automobile Liability. Comprehensive Automobile Liability Insurance covering all owned,non-owned and hired motor vehicles with limits of not less than$500,000 per occurrence for damage to property. C. Combined Single Limit Policy. The requirements for insurance coverage for the general liability and auto exposures may be met with a combined single limit of $1,000,000 per occurrence subject to a $1,000,000 aggregate. D. Professional Liability. The ENGINEER shall carry Engineers Professional Liability Insurance Covering claims resulting from error,omissions or negligent acts with a combined single limit of not less than $1,000,000 per occurrence. A Certificate of Insurance shall be submitted to the DIRECTOR as evidence of insurance protection. The policy shall not be modified or terminated without thirty (30) days prior written notice to the DIRECTOR. 13. CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, PROCEDURES AND SAFETY The ENGINEER shall not have control over or charge of and shall not be responsible for construction means,methods,techniques,sequences or procedures,or for safety precautions and programs in connection with the construction,unless specifically identified in the Scope of Services. 14. NONDISCRIMINATION In all hiring or employment made possible or resulting from this Agreement,there shall be no discrimination against any employee or applicant for employment because of sex, age, race, color, creed, national origin, marital status, of the presence of any sensory,mental or physical handicap, unless based upon a bona fide occupational qualification, and this requirement shall apply to, but not be limited to, the following: employment advertising, layoff or termination,rates of pay or other forms of compensation and selection for training, including apprenticeship. No person shall be denied or subjected to discrimination in receipt of the benefit of any services or activities made possible by or resulting from this Agreement on the grounds of sex,race,color,creed,national origin,age except minimum age and retirement provisions, marital status or the presence of any sensory,mental or physical handicap. Any violation of this provision shall be considered a violation of a material provision of this Agreement and - 5 - shall be grounds for cancellation, termination or suspension, in whole or in part, of the Agreement by the CITY. 15. ASSIGNMENT AND SUCCESSORS This Agreement and each and every portion thereof shall be binding upon the successors and the assigns of the parties hereto; provided, however, that no assignment shall be made without the prior written consent of the CITY. 16. DELEGATIONS AND SUBCONTRACTORS Any assignment, delegation or subcontracting shall be subject to all the terms, conditions and other provisions of this Agreement and the ENGINEER shall remain liable to the CITY with respect to each and every item,condition and other provision hereof to the same extent that the ENGINEER would have been obligated if it had done the work itself and no assignment, delegation or subcontract had been made. Any proposed subcontractor shall require the CITY's advanced written approval. 17. NO CO-PARTNERSHIP OR AGENCY This Agreement shall not be construed so as to create a partnership, joint venture, employment or other agency relationship between the parties hereto. 18. SEVERABILITY The parties intend and agreed that,if any paragraph, sub-paragraph,phrase,clause or other provision of this Agreement, or any portion thereof, shall be held to be void or otherwise unenforceable, all other portions of this Agreement shall remain in full force and effect. 19. HEADINGS The headings of the several paragraphs of this Agreement are inserted only as a matter of convenience and for reference and in no way are they intended to define, limit or describe the scope of intent of any provision of this Agreement,nor shall they be construed to affect in any manner the terms and provisions hereof or the interpretation or construction thereof 20. MODIFICATION OR AMENDMENT This Agreement and its attachments constitutes the entire Agreement of the parties on the subject matter hereof and may not be changed,modified,discharged or extended except by written amendment duly executed by the parties. Each party agrees that no representations or warranties shall be binding upon the other party unless expressed in writing herein or in a duly executed amendment hereof, or change order as herein provided. 21. APPLICABLE LAW - 6 - This Agreement shall be deemed to have been made in,and shall be construed in accordance with the laws of the State of Illinois. Venue for the resolution of any disputes or the enforcement of any rights pursuant to this Agreement shall be in the Circuit Court of Kane County, Illinois. 22. NEWS RELEASES The ENGINEER may not issue any news releases without prior approval from the DIRECTOR, nor will the ENGINEER make public proposals developed under this Agreement without prior written approval from the DIRECTOR prior to said documentation becoming matters of public record. 23. COOPERATION WITH OTHER CONSULTANTS The ENGINEER shall cooperate with any other consultants in the CITY's employ or any work associated with the PROJECT. 24. INTERFERENCE WITH PUBLIC CONTRACTING The ENGINEER certifies hereby that it is not barred from bidding on this contract as a result of a violation of 720 ILCS 5/33E et seq.or any similar state or federal statute regarding bid rigging. 25. SEXUAL HARASSMENT As a condition of this contract,the ENGINEER shall have written sexual harassment policies that include, at a minimum, the following information: A. the illegality of sexual harassment; B. the definition of sexual harassment under state law; C. a description of sexual harassment, utilizing examples; D. the vendor's internal complaint process including penalties; E. the legal recourse,investigative and complaint process available through the Illinois Department of Human Rights, and the Illinois Human Rights Commission; F. directions on how to contact the department and commission; G. protection against retaliation as provided by Section 6-101 of the Human Rights Act. A copy of the policies shall be provided by ENGINEER to the Department of Human Rights upon request 775 ILCS 5/2-105. - 7 - 26. SUBSTANCE ABUSE PROGRAM. As a condition of this agreement,ENGINEER shall have in place a written substance abuse prevention program which meets or exceeds the program requirements in the Substance Abuse Prevention Public Works Project Act at 820 ILCS 265/1 et seq. A copy of such policy shall be provided to the City's Assistant City Manager prior to the entry into and execution of this agreement. 27. WRITTEN COMMUNICATIONS All recommendations and other communications by the ENGINEER to the DIRECTOR and to other participants which may affect cost or time of completion, shall be made or confirmed in writing. The DIRECTOR may also require other recommendations and communications by the ENGINEER be made or confirmed in writing. 28. NOTICES All notices, reports and documents required under this Agreement shall be in writing and shall be mailed by First Class Mail, postage prepaid, addressed as follows: A. As to CITY: Joseph Evers,P.E. City Engineer City of Elgin 150 Dexter Court Elgin, Illinois 60120-5555 B. As to ENGINEER: S.L.Kaderbek, S.E.,P.E. Senior Vice President Collins Engineers, Inc. 123 N Wacker Drive, Suite 900 Chicago, IL 60606 29. COMPLIANCE WITH LAWS Notwithstanding any other provision of this Agreement it is expressly agreed and understood that in connection with the performance of this Agreement that the ENGINEER shall comply with all applicable Federal, State, City and other requirements of law, including,but not limited to,any applicable requirements regarding prevailing wages, minimum wage, workplace safety and legal - 8 - status of employees. Without limiting the foregoing, ENGINEER hereby certifies, represents and warrants to the CITY that all ENGINEER'S employees and/or agents who will be providing products and/or services with respect to this Agreement shall be legal residents of the United States. ENGINEER shall also at its expense secure all permits and licenses, pay all charges and fees and give all notices necessary and incident to the due and lawful prosecution of the work, and/or the products and/or services to be provided for in this Agreement. The CITY shall have the right to audit any records in the possession or control of the ENGINEER to determine ENGINEER'S compliance with the provisions of this section. In the event the CITY proceeds with such an audit the ENGINEER shall make available to the CITY the ENGINEER'S relevant records at no cost to the CITY. ENGINEER shall pay any and all costs associated with any such audit. IN WITNESS WHEREOF,the parties hereto have entered into and executed this Agreement effective as of the date and year first written above. FOR THE CITY: FOR THE ENGINE By By: 'ity Manager Name/Print: a Title: ° J 16F Raft Attest: �?"k�z City Clerk CADocuments and Settings\evers;\I,ocal Settings\Temporary Internet Files\Content.Outlook\UMKS63KE\ENGINEERING AGREEMENT- 2013 with changes per BC 4-24-13.doc - 9 - r f ATTACHMENT A SCOPE OF SERVICES Inspection of the Dam and Appurtenances The inspections will be performed by a team of engineer-divers experienced in underwater structural inspections of dams and spillway structures. The team will be led by a licensed Professional Engineer registered in the State of Illinois who is also registered as a Bridge Inspection Team Leader with the Illinois Department of Transportation. The investigations will consist of a visual and tactile inspection of the exposed surfaces of the Dam from the upstream slopewall to the downstream toe with particular attention given to any observed areas of deterioration or apparent distress. The West Retaining Wall and the East Abutment Wall will also be inspected. Photographs will be taken as necessary to document general conditions and observed deficiencies. Observations of the channel adjacent to the upstream slopewall and the downstream toe will be made to determine the channel bottom material, the presence or extent of scour, the presence or extent of riprap, and the presence or extent of drift and debris. Water depth soundings will be taken along the crest of the dam during the minor inspections and additional soundings will be taken upstream and downstream of the spillway during the major inspections. The waterline will be referenced to a known elevation on the West Retaining Wall. The members of the inspection team will be properly equipped and trained, and the diving operations will be conducted in accordance with the Occupational Safety and Health Administration Commercial Diving Operations Standard(29 CFR 1910,Subpart T)and Collins Engineers' Manual of Safe Dive Practices. All inspection divers will have completed FHWA Course BITM 90"Safety Inspection of In-Service Bridges"or NHI Course 130091 "Underwater Bridge Inspection". Detailed Inspection Report A comprehensive inspection report will be prepared for each annual inspection of the dam. The report text will include the purpose and scope of the inspection, general description of the structure, method of investigation, summary of existing conditions, and evaluation and recommendations. Detailed descriptions of the existing conditions will be located in the inspection figures and briefly summarized in the text. The report figures will include a location map,sounding plan,and the inspection notes. The report will also include color photographs of general conditions and observed deficiencies. One copy of the draft inspection report will be submitted for review. All comments on the draft report will be incorporated into the final report. Three hard copies of the final report and one digital copy of the final report in PDF format will be submitted. Ilk ELGIN THE CITY IN THE SUBURBS- I DATE: August 1, 2013 TO: Joe Evers, City Engineer FROM: Jennifer Quinton, Deputy City Clerk SUBJECT: Resolution No. 13-114, 13-120, and 13-121 Adopted at the July 24, 2013, Council Meeting Enclosed you will find the agreement listed below. Please distribute this agreement to the other party and keep a copy for your records if you wish. If you have any questions please feel free to contact our office 847-931-5660 and we will do our best to assist you. Thank you. • Resolution 13-114 Adopted Authorizing Execution of an Agreement with Collins Engineers, Inc. for Engineering Services in Connection with the Kimball Street Dam Inspection Project • Resolution 13-120 Adopted Authorizing Execution of Amendment Agreement No. 1 with Chastain& Associates, LLC for Construction Engineering Activities- Phase III Engineering Services in Connection with the 2013 Neighborhood Street Rehabilitation-Hammond/Cookane Project • Resolution 13-121 Adopted Authorizing Execution of Seventh Amendment Agreement with TranSystems Corporation for Design Engineering Services Regarding the 2014 Roadway and