Loading...
11-195 Resolution No. 11-195 RESOLUTION APPROVING REIMBURSEMENT TO WYNDHAM DEERPOINT HOMES FOR THE COST OF OVERSIZING THE WATER MAIN IN THE TALL OAKS SUBDIVISION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that it hereby approves the reimbursement in the amount of$100,979.90 to Wyndham Deerpoint Homes for the cost of oversizing the water main in the Tall Oaks Subdivision from a 12-inch to 1,085 linear feet of 16-inch diameter and 1,196 linear feet of 24-inch diameter. s/David J. Kaptain David J. Kaptain, Mayor Presented: December 7, 2011 Adopted: December 7, 2011 Omnibus Vote: Yeas: 6 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk ELGIN THE art IN THE SUBURBS" AGENDA ITEM: E MEETING DATE: November 16, 2011 ITEM: Reimbursement to Wyndham Deerpoint for Water Main Oversizing in the Tall Oaks Subdivision ($100,980) OBJECTIVE: Install oversized water main for planned water distribution system reinforcement and growth. RECOMMENDATION: Approve payment to Wyndham Deerpoint for water main oversizing in the Tall Oaks subdivision in the amount of$100,980. BACKGROUND r The Water Department Master Plan utilizes a hydraulic modeling program that identifies the most efficient means to move water through the water distribution system to ensure adequate flow and pressure. Using the information from this model, the city can identify areas where there is a need for transmission mains larger than twelve inches in diameter. When a develop- ment is proposed within the city, staff works with the developer to ensure that appropriately sized pipe is utilized in accordance with the Master Plan. When it is determined to be necessary to increase the diameter of a distribution main to a size larger than what is required for distri- bution to the subject development, the city ordinances require the city to pay the cost for over- sizing the water main. The developer's amount of reimbursement is determined by the water director, subject to city council approval. OPERATIONAL ANALYSIS The developer, Wyndham Deerpoint, completed the oversized water main in the Tall Oaks Sub- division in 2007. The oversized water main is comprised of 1,085 linear feet of 16-inch water main and 1,196 linear feet of 24-inch water main. Attachment A depicts the location of this wa- ter main. These improvements are presented for council consideration and acceptance under a separate agenda item for the November 16, 2011 Committee of the Whole meeting. On August 18, 2011, the developer submitted a request for Reimbursement for Water Main rok Oversizing—Tall Oaks. The request letter is Attachment B. INTERESTED PERSONS CONTACTED None. FINANCIAL ANALYSIS Water department staff has thoroughly reviewed the request for reimbursement. That review included the verification of the costs associated with the oversizing. The cost of the reimburse- ment to Wyndham Deerpoint totals $100,979.90. BUDGET IMPACT FUND(S) ACCOUNT(S) PROJECT#(S) AMOUNT AMOUNT BUDGETED AVAILABLE Water Develop- 420-0000-771.92-41 409807 $236,082 $100,980 ment LEGAL IMPACT None. ALTERNATIVES The city council may choose not to authorize staff to reimburse Wyndham Deerpoint for the water main oversizing as part of the Tall Oaks development. NEXT STEPS 1. Remit payment to Wyndham Deerpoint. Originators: Eric B. Weiss, Water Operations Engineer I Kyla B. Jacobsen, Water Director Final Review: Colleen Lavery, Chief Financial Officer William A. Cogley, Corporation Counsel/Chief Development Officer Richard G. Kozal, Assistant City Manager/Chief Operating Officer Sean R. Stegall, City Manager 2 ATTACHMENTS A: Map Depicting Location of Water Main B: Request from Wyndham Deerpoint and Spreadsheet Identifying Unit Pricing for Upsized Water Main a 3 . gt it TALL OAKS ., ,,, „ t .:,, NNNNN"-._ i 1 CD -111 S II- 2/S 1 > \.,_ to/ __/' ----N) , LOCATION MAP ; WATER MAIN OVERSIZING - TALL OAKS ,-, ENGINEERS SURVEYORS .. e ,M4 Oakbrook Terrace, IL. 601131 :' r WYNDI IAM DEERPOI NT Telephone(630)956-1M Teletopler(630)966.1006 August 18,2011 Kyla Jacobsen Water Director City of Erin 150 Dexter Court Elgin, IL 60I20-5555 Re: Reimbursement for Water Main Oversizing—Tall Oaks Dear Ms.Jacobsen, This letter is an application for reimbursement by the City of Elgin to Wyndham Deerpoint Homes in the amount of ,$100,979.90for water main oversizin, in the Tall Oaks Subdivision. You forwarded an email outlining certain requirements for the reimbursement, a copy of which is enclosed. 1. The Annexation Agreement does not refer to the reimbursement for oversizing. Our attorney, Bud Heimberg, confirmed the reason with the City attorney, Bill Cogley. The requirements for reimbursement are based on a city policy which requires Elgin to reimburse any watermain oversizing over 12 inches. This can be verified with a call to Mr. Cogley. Please advise if you require anything additional. 2.The requisite record drawings and electronic copies are enclosed. 3. The water main was increased to 24". Enclosed are bids from Louis Ruffolo & Son Construction Company. 4. The payment applications, invoices and waivers have been previously submitted to the City when a reduction was approved for the Letter of Credit. 5. We request that this letter be treated as the pay application for reimbursement. If another form is required please let us know as soon as possible. 6. Enclosed is a location map for the Water Main extension. We believe this letter satisfies all of the requirements and request that the reimbursement of these expenses is included in your budget for the year 2010.November 4, 2011 Kyla Jacobsen August 18,2011 Page TWO Ifyou have any questions,please cell Milne Beaulieu at(630)816-2855,Mary lCrasner at(630)248- 3300,or me at(630)698-4700. Yours truly, Richard M.Guerard RMOtjmh Enc. cc: Mike Beaulieu Mary Krasner 4111) TALL OAKS UNIT 1 WATER MAIN UPGRADES 8 C 0 E F=D-E F'B Unit Price item Quantity Unit Unit Price for 12" Difference Recapture Total 16"WATER MAIN,CL-52 1085 L.F. $61.20 $39.70 $21.50 $23,327.50 24"WATER MAIN,CL-52 1196 LF. $96.20 $39.70 $56.50 $67,574.00 16"BUTTERFLY VALVE IN VAULT 3 EACH $4,799.20 $2,854.40 $1,944.80 $5,834.40 24"GATE VALVE IN VAULT 1 EACH $7,098.40 $2,854.40 $4,244.00 $4,244.00 TOTAL RECAPTURE $100,979.90 r