Loading...
11-188 Resolution No. 11-188 RESOLUTION AUTHORIZING EXECUTION OF A FACADE IMPROVEMENT PROGRAM AGREEMENT WITH MICHAEL BUTIRRO (64 S. Grove Avenue) BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Sean R. Stegall,City Manager,and Kimberly A. Dewis,City Clerk,be and are hereby authorized and directed to execute a facade improvement program agreement on behalf of the City of Elgin with Michael Butirro for the property commonly known as 64 S. Grove Avenue, a copy of which is attached hereto and made a part hereof by reference. s/ David J. Kaptain David J. Kaptain, Mayor Presented: November 16, 2011 Adopted: November 16, 2011 Omnibus Vote: Yeas: 7 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk a CITY OF ELGIN FACADE IMPROVEMENT PROGRAM AGREEMENT 64 South Grove Avenue THIS AGREEMENT is made and entered into this 16th day of V t 2011, by and between the City of Elgin,Illinois,a municipal corporation(hereinafter referred to as"City"), and 11 " (hereinafter referred to as"Owner"). WHEREAS, the City has established a facade improvement program whereby owners of property or businesses located within the center city district and specified nearby areas(hereinafter referred to as"Rehabilitation Areas")who complete facade improvements may receive a grant from the City for a portion of the cost thereof(hereinafter referred to as the"City Facade Improvement Program');and WHEREAS, the purposes of the City Facade Improvement Program are`to control and prevent blight, dilapidation and deterioration of the Rehabilitation Areas, to encourage further investment and redevelopment in the Rehabilitation Areas and to increase property values within the Rehabilitation Areas;and WHEREAS, the Owner is the owner of the subject commercial building(s) and of the property commonly known as 0�a Came Avenue,Elgin,Illinois(hereinafter referred to as the "Subject Property");and WHEREAS,the Subject Property is located within the Rehabilitation Areas identified in the City Facade Improvement Program;and WHEREAS,the City of Elgin is a home rule unit and may exercise any power and perform any function pertaining to its governmental affairs; and WHEREAS,the City Facade Improvement Program,which will control and prevent blight, dilapidation and deterioration of the Rehabilitation Areas, encourage further investment and redevelopment within the Rehabilitation Areas and increase property values within the Rehabilitation Areas, are matters pertaining to the governmental affairs of the City;and WHEREAS, Owner has made application to the City to participate in the City Facade Improvement Program for the Subject Property, NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein,the sufficiency of which is hereby mutually acknowledged,the parties hereto hereby agree as follows: Section 1. The above recitals are incorporated into and made a part of this agreement. The total approved project costs for the facade improvements for the structure(s)on the Subject Property shall be $Omo , as set forth in Attachment A attached hereto made a part hereof(such total approved project costs for facade improvements are hereinafter referred to as"Eligible Costs"and r • such structure(s)is hereinafter referred to as the"Structure"). The City shall pay the Owner a sum not to exceed $21;913, being thirty-five percent (35 1/o) of the total Eligible Costs, for facade improvements to the structure approved pursuant to the provisions of this Agreement. The project shall be confined to approved improvements made to that part of the Structure visible from any public right-of-way. All parties hereto agree that all payments from the City provided for herein shall be made to Owner,who shall provide the City with a full release concurrently with receipt. Section 2. Eligible Costs shall include labor,material and equipment costs,and such other costs as may be reasonably necessary for the execution and completion of the facade improvement hereby provided for(hereinafter referred to as the"Work'),as designated from the design drawings, specifications,and/or scope of work as set forth in Attachment B attached hereto made a part hereof, and approved by the Project Review Team pursuant to the provisions of Section 3 herein and prepared by Consultant(hereinafter referred to as"Plans"). Section 3. No Work shall be undertaken or shall be considered to constitute the basis for an Eligible Cost until the design for such Work has been submitted to and approved in writing by the City's Project Review Team (hereinafter referred to as"Project Review Team")consisting of the City's Historic Preservation Planner and City's Senior Planner and any other member designated on the Project Review Team. Such design shall include,but not be limited to,a date certain by which the Work shall be completed. In no event shall such Work be completed more than one hundred eighty(180)days from the date ofthis Agreement without the written consent of the Project Review Team. Section 4. The Project Review Team shall be permitted access to Structure to periodically review the progress of the Work. Such review shall not be in lieu of any other inspections that may otherwise be required by law or by the City. Any and all portions of the Work which do not,in the sole discretion of the Project Review Team, conform to the Plans or other applicable terms of this Agreement,shall be made to conform to the Plans and other applicable terms ofthis Agreement upon written notice of the existence of such non-conforming portions. Section 5. Upon completion ofthe Work,and upon final inspection and written approval by the Project Review Team and such other final inspections and approvals as may be required by law, Owner shall submit to City:(1)an executed,notarized itemized contractor statement reflecting the total cost of the Work and each portion thereolj including, but not limited to, the cost of labor (whether provided by any contractor or subcontractor), materials and equipment; (2)copies of all bids, contracts and invoices submitted, executed or incurred pursuant to the Work; and (3) reasonable proof of payment of all costs incurred pursuant to the Work. Section 6. City shall pay to Owner the sum provided for at Section 1 herein within thirty(30) days of owner's compliance with the provisions of Section 5 herein. In no event shall the amount paid to Owner exceed the amount specified in this Agreement or in the contractor statement. Section 7. In the event Owner fails to complete the Work in accordance with the terms of this Agreement, or otherwise breaches the terms of this Agreement, City may terminate this Agreement upon written notice of breach and termination to Owner, and any and all financial or -2- 3 other obligations on the part of City shall cease and become null and void. Additionally, Owner shall refund to City all money paid to Owner by City pursuant to this agreement upon thirty(30)days written demand. This provision shall not constitute a restriction on City to pursue any and all other rights to which it may be entitled by law. Section 8. Upon completion of the Work,and for a period of five(5)years thereafter,Owner shall properly maintain the Work in its finished form,without alteration or change thereto,and shall not enter into any agreement, or take any other steps to alter, change or remove such Work, or to create or undertake any other Work which may constitute a deviation from the Plans,without prior written approval from the Project Review Team in its sole discretion. Section 9. Nothing herein is intended to limit, restrict or prohibit the Owner from undertaking any other Work in or about the subject premises that is unrelated to the facade improvement provided for in this Agreement. Section 10. This Agreement shall be binding upon City and its successors,and upon Owner, Owner's successors and assigns for a period of five(5)years from and after the date of completion and approval of the Work. Owner shall provide subsequent Owner(s)of Structure with a copy of this Agreement. This Agreement shall run with the land underlying Structure. The City may record a memorandum of this Agreement against title to the Subject Property. Notwithstanding the aforementioned five(5)-year period,the provisions of Sections 7, 12 and 19 herein shall survive the expiration,completion and/or termination of this Agreement. Section 11. If Owner does not own the underlying property for which Work is being done, Owner warrants and represents to City that Owner has a lease at the location for which the Work is proposed for a term of at least six (6) years. Owner further warrants and represents that he has received authorization from all owners of the property for which Work is to be done to accept funds under this program and to undertake the Work. Further, such owner(s) of the property for which Work is to be done hereby acknowledges that he is aware ofthis Agreement and authorized the Work that is to be made to the Structure. Said owner(s)of the property for which improvements are to be made further acknowledge that as owner of the property, he is a party to this Agreement and is bound by the provisions of this Agreement specifically,but not limited to,the provisions of Sections 8 and 10 of this Agreement. Each"Owner"signature hereto hereby warrants and represents that there are no other entities having an ownership interest in the Structure,which have not executed this Agreement. Section 12. To the fullest extent permitted by law, Owner agrees to and shall indemnify, defend and hold harmless,the City, its officials,officers,employees,agents,attorneys,boards and commissions from and against any and all claims,suits,judgments,costs,attorneys'fees,damages or other relief,including,but not limited to,workers'compensation claims,in any way resulting from or arising out of the Work to be performed and/or negligent acts or omissions of the Owner in connection herewith,including negligence or omissions of contractors,subcontractors,employees or agents of the Owner,arising out of the performance of this Agreement and/or the Work. In the event of any action against the City, its officers, employees, agents, attorneys, boards and commissions covered by the foregoing duty to indemnify,defend and hold harmless,such action shall be defended -3- f � 3 by legal counsel ofthe City's choosing. The provisions ofthis Section shall survive any expiration, completion and/or termination of this Agreement. Section 13. This Agreement shall not be construed to create a partnership,joint venture or employment relationship between the parties hereto. Section 14, This Agreement shall be subject to and governed by the laws of the State of Illinois. The parties hereto hereby agree that venue for any and all actions that may be brought by each and either of them to enforce the provisions of this Agreement shall be in the Circuit Court of Kane County,Illinois, Section 15. The terms of this Agreement shall be severable. In the event that any of the terms or provisions of this Agreement are deemed to be void or otherwise unenforceable for any reason,the remainder of this Agreement shall remain in full force and effect. Section 16. All notices, reports and documents required under this Agreement shall be in writing and shall be mailed by first-class mail,postage prepaid,addressed as follow: As to the City: City of Elgin 150 Dexter Court Elgin, IL 60120-5555 Attn: Community Development Director With a copy of any such notices to: City of Elgin 150 Dexter Court Elgin, IL 60120-5555 Attn: Corporation Counsel As to the Owner: 64 South Grove Avenue Elgin, IL 60120 Attn: Michael Butirro Section 17. No official, director, officer, agent or employee of the City shall be charged personally or held contractually liable under any term or provision of this Agreement or because of their execution,approval or attempted execution of this Agreement. Section 18. In all hiring or employment made possible or resulting from this Agreement, there shall be no discrimination against any employee or applicant for employment because of sex, age, race, color, creed, national origin, marital status, of the presence of any sensory, mental or physical handicap,unless based upon a bona fide occupational qualification,and this requirement shall apply to,but not be limited to,the following:employment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training, including apprenticeship. Section 19. Notwithstanding anything to the contrary in this Agreement, with the sole -4- ( y exception of an action to recover the monies the City has agreed to pay to the Owner pursuant to Section 1 hereof, no action shall be commenced by the Owner against the City for monetary damages. Owner hereby further waives any and all claims to interest on money claimed to be due pursuant to this Agreement and waives any and all such rights to interest which it claims it may otherwise be entitled to pursuant to law,including,but not limited to,the Local Government Prompt Payment Act(50 ILCS 501/1,et seq.),as amended,or the Illinois Interest Act(815 ILCS 205/1,et seq.),as amended. The parties hereto further agree that any action by the Owner arising out of this Agreement must be filed within one(1)year ofthe date the alleged cause of action arose or the same will be time-barred. Section 20. No official, officer, agent, employee or attorney of the City shall be charged personally or held contractually liable under any term or provision of this Agreement or because of his or her execution,approval,attempted execution or enforcement of this Agreement. Section 21. This Agreement and its attachments constitutes the entire agreement of the parties hereto and the subject matter hereof and may not be changed, modified, discharged or extended except by written amendment duly executed by the parties. Each party agrees that no representations or warranties shall be binding upon the other party unless expressed in writing herein or in a duly executed amendment hereof. Section 22. This Agreement is and shall be deemed and construed to be a joint and collective work product ofthe City and the Owner,and as such,this Agreement shall not be construed against the other party,as the otherwise purported drafter of same,by any court of competent jurisdiction in order to resolve any inconsistency, ambiguity, vagueness or conflict, if any, of the terms and provisions contained herein. Section 23. This Agreement and the obligations herein may not be assigned by the Owner without the express written consent ofthe City,which consent may be withheld at the sole discretion of the City. Section 24. The Owner shall comply with the Illinois Prevailing Wage Act, 820 ILCS 130/0.01, et seq., including, but not limited to, paying the prevailing wage and requiring all contractors and subcontractors to pay the prevailing wages required therein and completing all necessary documentation and reporting requirements in connection with the Work to be performed pursuant to this Agreement. Without limiting the foregoing the Owner and all contractors and subcontractors rendering services under this Agreement must comply with all requirements of the Prevailing Wage Act, including,but not limited to,all wage,notice and recordkeeping duties. Section 25. Notwithstanding any other provision of this Agreement, it is expressly agreed and understood that in connection with the performance of this Agreement,the Owner shall comply with all applicable federal,state,city and other requirements of law,including,but not limited to,any applicable requirements regarding the City Facade Improvement Program, prevailing wages, minimum wage, workplace safety and legal status of employees. Without limiting the foregoing, Owner hereby certifies,represents and warrants to the City that all Owner's employees and/or agents who will be providing products and/or services with respect to this Agreement shall be legal -5- r ► residents ofthe United States. Owner shall also at its expense secure all permits and licenses,pay all charges and fees and give all notices necessary and incident to the due and lawful prosecution of the work,and/or the products and/or services to be provided for in this Agreement. The City shall have the right to audit any records in the possession or control of the Owner to determine Owner's compliance with the provisions of this section. In the event the City proceeds with such an audit,the Owner shall make available to the City the Owner's relevant records at no cost to the City. Owner shall pay any and all costs of such audit. Section 26. Time is of the essence of this Agreement. IN WITNESS WHEREOF,the parties hereto have executed this Agreement on the date first appearing above. CITY OF ELGIN ATTEST: By: 1 = Kean R. Stegall Kim Dewis,City Clerk City Manager O R: By: Name/print• Property Manager f:Uegal dept\ag mmentlacade agreement template.doc -6- Fagade Improvement Estimate Comparison Masonry(tuckpointing,the replacement) $11,50.00 Electrical&Lighting $2,624, R!Carrot Electrical',„ Doors&Windows** $1422fi.56'CascoIndiistries „ • �x x,r Structure&Carpentry $15;800.00 Si nage $2j261:60 Budget$t i�'s �' Painting ter; Demolition $1i,00,00 Waterproof,Caulk,Seal $400 Roofing(includes cornice repair and roof edging) Architectural Services $5'170 t�eriia:Atcf►it�cts ,04 ` Contingency qa �G Totals $620607.10 w r City 35% $21,912.49 $29,524.25 Owner 65% $40,694.62 $54,830.75 **window costs at 50%of total bid Attachment B Scope of Work Property Address—64 South Grove Avenue Property owner—Michael Butirro -8- 64 S. Grove Scope of Work Grove(East)Fa;ade Improvements Riverside(West)Facade Improvements • 100% wash front of building (600 psi max. • 100%wash building and remove loose paint and non-abrasive chemicals) . Tuck point 20%of brick wall • Repair and seal top coping • Repair and replace 15% of brick at existing • Tuck point 100%of terra cotta glazed block deck and fire escape supports wall second floor . 100% remove and replace stair; railing at two • Replace and/or repair 10%terracotta block levels including fire escape • 100%replace windows on second floor • Remove structure,roof,and existing concrete • 100%caulk windows and storefront • Remove small mechanical decking @ first floor • Remove metal sheeting, nails, etc. as door required • Provide all new pre-finish metal flashing, • Replace transom windows behind existing gutters,coping and downspouts from roof metal sheeting • Replace three(3)doors/frames • Replace ceiling as required for new transom • Replace two (2) small original transom (approx. 3'-0"interior) on first and second windows floors . Replace seven (7) windows and enlarge three Provide new address and business signage (3)per building code • Provide electrical for entrance lighting; • Reset three(3)window sills on second floor replace four(4)fixtures . Replace two(2)panels for basement windows • Replace one single store front doors / • 100%caulk windows sidelight and frame • 100% remove windows, storefront and • Install three(3)light fixtures at each entrance wood enclosure on first floor 14 ft.high • Relocate/rework electric, cable feeds, phone • Reuse existing doorway floor slab/ramp. lines as required • Provide trim under first floor windows to • Excavate approx. 3'-W west yard to original match existing trim on second floor level for ramp • Provide new foundation, footings and stair, small deck and handicapped ramp • Provide steps to second floor to replace fire escape PROPOSAL J. B.Harris&Company, Inc. 570 N. Spring St.,Elgin, IL 60120 847-741-8875 Date: August 18,2011 Submitted to: Chooch's C/o Mike Butirro 64 S.Grove Elgin,IL 60120 Description of services Proposed: Rear Facade 1. Demolition of rear porch and stairs, including fire escape. 2. Erection of scaffolding and removal of exterior steel cladding. 3. Clean of paint from brick,power wash,and tuck-point 20%of fagade. 4. Replacement of 15%of brick at existing deck and fire escape supports. 5. Installation of 2nd floor fire stairs and landing. 6. Installation of small rear porch,stairs and ramp according to plans. 7. Installation of 1'`and 2°d floor windows. 8. Installation of new 6"gutter and downspout. 9. Replace 2 transom window frames. 10. Replace 4 larger window frames on I"floor. 11. Enlarge opening size of 3 windows on 2°d floor and install frames. 12. Replace 2 basement window frames. 13. Replace 3 doors and frames. 14. Caulk in all frames with color match caulk. 15. Excavate in new ramp approx. 3 feet in width. 16. Dig out and pour new piers for rear deck. Front Facade 1. Demolition of existing front facade and disposal of all materials. 2. Erection of scaffolding and board up building. 3. Installation of new storefront window fames on I"and 2nd floors,caulk in all frames with color match caulk. 4. Installation of new front door frame with transom. 5. Tuck-point entire front,replace 10%of terra cotta block, repair/replace 10%of terra cotta block. 6. Trim out facade according to plans. 7. Paint all necessary components. 8. Power wash front of building. 9. Repair and seal top coping. Total Bid: $38,325.00 This is not a bearing contract. Prices are good for 30 days after date printed on proposal and the costs for materials have not increased.Upon receipt of signed proposal and prior to start of job a contract will be presented and deposit collected. Please call if you have any questions. Acceptance of Proposal: Date: Tt C+-W� N Fagade Improvement Estimate Comparison arre e- m 0 Miason (turn oInting,Me replacement) Electrical&Lighting t +Nt w a ••'r (t1 Doors&Wfndows Structure&Carpentry Si age n:a; �' �« 'w n PaInting Y Demolition '• �' A Waterproof,Caurk,Seal Rooft {Includes comfce repair and roof edgingl Architectural Servioes Cont1 enc 'wr" ::,� •:;>: t '• o LO co Lin Totals City 3595 Owner 65% 1 H Cn O O W rnnt rage 1 of 1 From: Kevin Brown(kbrown @cascoonline.com) To: mikebutirro@att.net; Date: Fri, August 12,20115:02:08 PM Cc: kmatthews@cascoonline.com;nmatthews @cascoonline.com; Subject: Storefront Quotation and Clad Window Quotation Mike, I have attached a drawing with the details for your storefront system. Pricing for the system attached would be$8,200 plus tax. This includes all metal needed to install into openings,weather-strip, sweeps, hardware, locksets, closures, glass, and glazing material needed. Frames would come to jobsite assembled ready to be installed into openings. Doors will be delivered With glass installed. Frames/sidelites will not have glass installed. Glass can be installed by Casco for an additional$2,100.00. I will be off Monday and Tuesday but will have my cell phone if you would like to give me a call either day or today. I have also copied Nick Matthews and Kelly Matthews on this project so if you have questions you may also ask them and they can also relay them to Joe or myself. Please note anodize clad available for the rest of the wood windows as well, please let me know if you need the upcharge for this. Again, thank you for the opportunity and I look forward to eating at your place in the future! Kevin Brown Casco Industries, Inc. Office: 847-741-9595 (x5026) Fax: 847-741-5065 Cell: 847-652-1977 kbrown @cascoonline.com www.cascoonline.com This e-mail and any riles transmitted with it are confidential and are intended solely for the use of the individual to whom they are addressed.If you are not the intended recipient or the individual responsible for delivering the e-mail to the intended recipient,please be advised that you have received this e-mail in error and that any use,dissemination,forwarding,printing,or copying of this e-mail is strictly prohibited. http://us.mg205.mail.yahoo.com/dc/launch?.partner=sbc&.gx=1&.rand=00uulwud8d5p 8/13/2011 5 ' - 0 " CE> 4 ' 0 ° O 5 ' - 6 „ OO � / 4 ' - 0 " OO 4 ' - 0 " DRAWING- QUOTE METAL UNIT FRAMES AND GLASS SHOWN. PAGE NUMBER 1 OF 1 INSULATED UNIT INSULATED UNIT INSULATED UNIT NON-INSULATED UNIT NON-INSULATED UNIT NON-INSULATED UNIT 1' GLASS 1' GLASS 1' GLASS 1/4' GLASS 1/4' GLASS 1/4' GLASS 4'-0' mot' �5'-0'� .!�4'-0' —� T__5'-6'� �5'-0'--1 4'-6'— {' 3'-0' �TYP, TRANSOM si 0/1 0 TYP. TRANSOM q 13'-0' 0 0 13'-0' 0 0 13'-0' 0 \ 0 ® Q 7'-0' i�-3'-0' 2'-9' 1 2'-6'1 I'-3'-0'�t NOTESi 1) DRAWING SHOWN FROM OUTSIDE OF BUSINESS, 2) ALL UNITS TO BE TEMPERED 3) FINISH TO BE CLEAR ANODIZE. 4) UNITS TO BE FABRICATED READY TO ASSEMBLE. 5) INCLUDE HEAD AND SILL RECEPTOR AS NEEDED, 6) ALL WEATHERSTRIP, SWEEPS, HINGES, AND HARDWARE TO BE INCLUDED IN QUOTE, Cusco Industries.lne. SCALEo 1140 APPROVED BYe R✓.a n DR.j KWB 7) DOORS TO BE OUTSWING DOORS. CLlBCO 540 Division St. 8) DOOR MARKED 'A' DOES NOT NEED LOCKING South Elgin.Oliaois 00177 DATE- 08/05/11 PART N1 - MAT'Ls HARDWARE OR A SILL, 9) DOOR MARKED 'B' NEEDS A PANIC PANEL TOLERANCES UNLESS OTHERWISE SPECIFIED, DESCRIPTION, QUOTE EXIT HARDWARE INCLUDED. ONE PLACE .X :.030 THREE PLACE .XXX 1.005 TWO PLACE .XX t.015 ANGULAR sl/2' CUSTOMER- — DRAWING, QUOTE Date Printed:8/1?12011 Casco Industries Job Number.00000068 ' 540 Division St. South Elgin,IL 60177 Phone:(847)741-9595 Fax:(847)741-5065 JOB NO- 00000068 DATE: 8/2/2011 PREPARED BY: Kevin Brown DESCRIPTION: 64 S.Grove Software by:Bid Master.Inc..4877 Wheatley's Pond Rd.Smyrna.DE 19977 Phone:(302)6536630 D300 v 5-0 1.00 Page 1 of 5 Date Printed:8/12/2011 Casco Industries Job Number:00000068 Special Unit Combination##2 Front;1st Floor Quantity:1 e Combo R.O. Width:80 9/16" / Combo R.O.Height:132 9/16" Unit Width:40" Unit Height:96" R.O. Width:40 1/2" //; i Casco Industries (2.5) R.O.Height:961/2" / Label:Front;1st Floor 4 Specialty Unit,Rectangle, ark Bronze C d,Low E2 Tempered 779.24 3,116.96 4 Width:40" 4 Height:96" 4 4 9/16 in.Jamb Unit Width:40" Unit Height:36" R.O. Width:40 1/2" Casco Industries (2.5) R.O.Height:361/2" Label:Front;1st Floor 4 Specialty Unit,Rectangle,Dark Bronze Clad,Low E2 Tempered 403.87 1,615.48 4 Width:40" 4 Height:36" 4 4 9/16 in.Jamb 1 Mull Charge 221.76 221.76 D300 v 5.01.00 Page 2 of 5 Date Printed:8/12/2011 Casco Industries Job Number:00000068 Sub Total 1,404.87 4,95410 Special Unit Combination#I Vront;2nd Floor uantity: 1 ILA Combo R.O. Width:126 5/8" Combo R.O.Height:90 9/16" Unit Width:42" Unit Height:60" R.O. Width:421/2" Casco Industries (2.5) R.O.Height:601/2" Label:Front tad Floor 6 Specialty Unit,Rectangle,Dark Bronze Clad,Low E2 Tempered 57134 3,428.04 6 Width:42" 6 Height:60" 6 4 9/16 in.Jamb 'nit Width:42" nit Height:30" R.O. Width:42 1/2" Casco Industries (2S) R.O.Height:301/2" Label:Front 2nd Floor 6 Specialty Unit,Rectangle,Dark Bronze Clad,Low E2 Tempered 376.44 2,258.64 6 Width:42" 6 Height:30" 6 4 9/16 in.Jamb 1 Mull Charge 369.60 369.60 Sub Total 1,31738 6,056.28 D300 v 5.01.00 Page 3 of 5 Casco Industries Job Number.00000068 Date Printed:V1212011 Clad&Prime Double Hungs Casco industries (2.5) Pages 1-1,1-2,2-1 and 2-2 Label:Rear,1st Floor Eli] T- 11 Unit Width:45 3/8" Unit Height:64 3/16" R.O. Width:45 7/8" R.O.Height:65" 3 CDH4028 Double Hung,Dark Bronze Clad,Low E2 305.69 917.07 3 Tempered Glass 158.62 475.86 3 Sash Operation:Tilt Latch 3 Dark Bronze Internal Aluminum 5/8"Grille 40.81 122.43 3 (coloniallites) Coppertone Hardware(standard) 3 Dark Bronze Screens 27.72 83.16 3 4 9/16 in.Jamb —Additional Item— 2 GRILLE 2W1H PER SASH Sub Total 532.84 1,598.52 Clad&Prime Double Hungs Casco Industries (2.5) Pages 1-1,1-2,2-1 and 2-2 Label:Rear;1st Floor ffil Unit Width:37 3/8" Unit Height:64 3/16" R.O. Width:37 7/8" R.O.Height:65" 1 CDH3228 Double Hung,Dark Bronze Clad,Low E2 267.19 267.19 1 Tempered Glass 126.28 126.28 1 Sash Operation:Tilt Latch i Dark Bronze Internal Aluminum 5/8"Grille 30.80 30.80 1 (coloniallites) Coppertone Hardware(standard) 1 Dark Bronze Screens 24.64 24.64 1 4 9/16 in.Jamb --Additional Item— 2 GRILLE 2WiH PER SASH Sub Total 448.91 448.91 D300 v 5.01.00 Page 4 of 5 Date Printod:8/12/2011 Casco Industries Job Number:00000068 ' Clad&Prime Double Hungs Casco Industries (2.5) Pages 1-1,1-2,2-1 and 2-2 Label:Rear;2nd Floor Unit Width:413/8" Unit Height:64 3/16" R.O. Width:417/8" R.O.Height:65" 3 CDH3628 Double Hung,Dark Bronze Clad,Low E2 294.91 884.73 3 Tempered Glass 141.68 425.04 3 Sash Operation:Tilt Latch 3 Dark Bronze Internal Aluminum 5/8"Grille 20.41 6123 3 Top Sash Only(colonial liter) Coppertone Hardware(standard) 3 Dark Bronze Screens 24.64 73.92 3 4 9/16 in.Jamb —Additional Item— 3 TOP SASH GRILLE:2W 1 H Sub Total 481.64 1,444.92 Bid Total 14,502.83 Tax(7.5%) 1,087.71 Grand Total 15,590.54 Interior Prefinishing Options Available: -Raw(Standard),Prime,Prime w/one coat paint(White),Clear Coat,Stain(Standard Casco Colors),Stain(Custom Color) Ask your sales representative for a quote. Price,if shown,is net cost.Lead Time:3-5 Weeks TERMS AND CONDITIONS OF ORDERS:Only written orders can be accepted.You have 48 hours from the time your order is received at Casco to make changes.Changes made after 48 hours will incur a restocking charge.All orders are subject to a minimum$75 shipping charge per stop. Any jobsite delivery is subject to a minimum$150 shipping charge per stop.All the above dimensions,quantities,accessories,and pricing have been verified and accepted by the undersigned. Accepted by Date D300 v 5.01.00 Page 5 of 5 DIVISION OF CUSTOM ALUMINUM PRODUCTS INC. CASCO INDUSTRIES 540 WEST DIVISION ST. SOUTH ELGIN,IL 60177 PH:(847)741-9595 FAX:(847)741-5065 ` Sold To: Ship To: Attn: CASHSALE-RETAIL CASHSALE-RETAIL MIRE BUTIRRO Page: 1 64 S. GROVE AVE. SOUTH ELGIN IL 847-754-0751 8119111 ELGIN IL 60123 11.07.53 Fax: Contact: MIRE B. I =1 ORDER# ORDER DATE 1000. ( 64 GROVE DOORS COD 96453 6/19/11 RS Hold For Release DESCRIPTION #**#*rA##r#**#### QUOTE ******* C A S C 0 ******* CUSTOM "OVERSIZE" ALUMINUM STOREFRONT DOOR, WIDE STILE AND RAIL CONST., LO-2 1" INSULATED GLASS, ALL SWEEPS AND WEATHERSTRIPPING INCLUDED, PANIC EXIT BAR INCLUDED WITH EXTERIOR HARDWARE, DOOR CLOSURE INCLUDED. 1 0 1 EA 4/0 X 7/0 DOOR WITH FRAME 2,160.00 2,160.00 MASONITE EXTERIOR DOOR, 6-9/16" FJP JAMB, OUTSWING DOOR, BRASS SPRING LOADED HINGES, FLUSH DOOR SLAB 1 0 1 EA 3/0 X 6/8 225.00 225.00 Comments: 178.88 Order Taker: XBC Ship Via: DELIVERED 2 563.88 ww#w*w Bwail Copy *w#r##w R J. CARROLL ELECTRICAL 628 SOUTH STREET ELGIN IL.. (PHONE) 60123 (847)902-9047 TO DATE Chooch's Mike Butirro Aug.18 2011 64 South Grove Ave Elgin IL.60120 PHONE)(847) 754-0751 JOB Chooch's GENERAL Mike Butirro 64 S.Grove Ave. ESTIMATE NO. 12676 THE UNDERSIGNED HEREBY AGREES TO FURNISH LABOR AND MATERIAL TO INSTALL ELECTRICAL VURI NG AND EQUIPMENT,ON TILE PREMISES AS SPECIFIED HEREIN.THE PRICE TERMS AND CONDITIONS AS MENTIONED HEREIN MAY BE CHANGED,IF CUSTOMERS ACCEPTANCE IS NOT IN OUR HANDS IN 30 DAYS FROM DATE..UPON ACCEPTING,THIS PROPOSAL BECOMES A CONTRACT.THE PROPOSED WORK TO BE DONE IS AS FOLLOWS. WORKMEN WILL BE PROPERLY COVERED BY PUBLIC LIABILITY INSURANCE,A INSURANCE CERTIFICATE OF INSURANCE WILL BE ISSUED TO YOU UPON REQUEST,OWNERS TO CARRY FIRE INSURANCE ON THE ABOVE WORK. ALL WORK PERFORMED UNDER THIS PROPOSAL IS TO BE EXECUTED DURING THE REGULAR WORKING HOURS OF THE DAY,NAMELY BETWEEN 8:00 AM AND 4:30 PM MONDAY THROUGH FRIDAY EXCEPTING LEGAL HOLIDAYS. THE ACCEPTOR AGREES TO PAY AND DISCHARGE ALL COST AND ATTORNEYS FEES AND EXPENSES THAT SHALL ARISE FROM ENFORCING THE TERMS OF THIS CONTRACT BY THE UNDERSIGNED. INCLUDING SUCH REASONABLE ATTORNEY FEES INCURRED RESULTING FROM THE NON-PAYMENT OF THE AMOUNT HEREUNDER THE UNDERSIGNED SHALL NOT BE LIABLE FOR ANY LOSS OR DAMAGE WHATSOEVER RESULTING FROM DELAY OR DESTRUCTION OF OR INJURY TO THE WORK OR MATERIAL DURING CONSTRUCTION LF CAUSED BY LOCKOUT,LABOR DIFFICULTIES,FIRE,RIOT,MOB,THE ELEMENTS,EARTHQUAKE,TORNADO. CYCLONE,LIGHTING,PUBLIC ENEMY,OR ACT OF GOD. ADDITIONAL WORK MAY BE ORDERED BY THE CUSTOMER ANY TIME,BEFORE THE WORK IS STARTED,AT THE UNIT PRICES NAMED IN THE SCHEDULE,ANY OTHER CHANGE FROM THE WORK AS HEREIN DESCRIBED INVOLVING ADDITIONAL COST OF LABOR AND MATERIAL IS TO BE PAID FOR BY THE CUSTOMER IN ADDITION TO THE CONTRACT PRICE NAMED HEREIN.AT THE PRICE AGREED UPON OR OUR REGULAR RATES FOR THE TIME AND MATERIAL WORK.THE CONTRACTOR SHALL RECEIVE WRTITEN ORDERS FOR ALL ADDITIONAL WORK,WHETHER IT BE ON A CONTRACT PRICE,UNIT PRICE.OR TIME AND MATERIAL.BASIS.BEFORE PROCEEDING WITH SUCH EXTRA WORK PAYMENTS FOR ADDITIONAL CONTRACTS TO THE ORIGINAL CONTRACT,SHALL BE MADE UNDER THE SAME TERMS.AND CONDITIONED AS ARE EMBODIED IN THE ORIGINAL CONTRACT.THE CONTRACTOR SHALL NOT BE REQUIRED TO PROCEED WITH INSTALLATION OF WORK IF THE PAYMENTS APPLYING ON SAME HAVE BEEN MADE AS SPECIFIED IN THE CONTRACT. (1) (a) Install piping,outlet boxes and wiring,from basement area to front above entry for sign service disconnect. (Note) Sign circuit to be connected to 24 hour timer in basement area. front outside lighting. (a)install piping,outlet boxes,and wiring for,2-wall mount light fixture's l- each side of entry. (b)install piping,outlet boxes and wiring for 2-indirect light fixtures (Note) Lighting Fixture's are included within the hereunder proposal amount. Lighting fixture's shall be connected to 24 hour timer ustall piping,outlet boxes and wiring,for 4-out door light fixture's on rear of building.,connected to 24 hour timer. (#�fiistall 1-2/pole intermatic 24 hour timer for out door lighting and sign. (TERMS) 65%to be paid upon electrical rough% remaining 35 % to be paid upon final inspection/ (note)Electrical permits are not within the hereunder proposal amount. All Material and or that of lighting fixtures,timer,and apparatuses are included within proposal amount Total light fixture(9)Nine, (1)One Sign. ACCEPTOR AGREES TO PAY Two Tbousaud_Six Hendreo—Twenty Four —&—.00 CENTS S 2,624.00 _&_.00 CENTS IT IS AGREED BETWEEN PARTIES HEREIN ALL RIGHT,TITLES AND INTEREST IN AND TO THE PROPERTY MATERIAL,EQUIPMENT AND FDCPURES INSTALLED UNDER THIS CONTRACT SHALL REMAIN ON THE PROPERTY OF THE ELECTRICAL CONTRACTOR UNDER THE TERMS OF THIS CONTRACT UNTIL PAYMENT IN FULL HAS BEEN MADE.WHEN THE CONTRACT HAS BEEN SIGNED AND ACCEPTED,MATERIAL ORDERED FOR THIS WORK AND CONTRACT SHALL NOT THEREFORE BE SUBJECT TO CANCELLATION. ALL THE ABOVE WORK WELL BE DONE,IN A NEAT AND WORKMANLIKE MANNER,AND COMPLY WITH THE RULES AND REGULATIONS OF THE DEPARTMENT OF ELECTRICAL INSPECTION OR NATIONAL ELECTRICAL CODE. ACCEPTED BY By CONTRACTOR DATE DATE THIS PROPOSAL DOES NOT BECOME A CONTRACT UNTIL SIGNED BY THIS COMPANY PRICES MAY CHANGE WITHIN A 30 DAY PERIOD DUE COST OF MATERIAL � r BUDGET SIG NS 20 S. Spring Street Elgin, IL 60120 647-741-6899 fax 847-741-8899 r bsgraphics0sbcglobal.net QUOTE i 9/16/11 CHOOCH'S PIZZERIA i 64 S. Grove, Elgin 15" formed plastic letters installed CHOOCH'S PIZZERIA $1,871.60 Vinyl lettering above door $355.00 Vinyl lettering on door address $35.00 Total $2,261.60 Quote good for 30 days Dale Wisniewski CHOOCH ' S PIZZERIA � CHOOCH'S PIZZERIA CHOOCH 'S PIZZERIA � CHOOCH 'S PIZZERIA CHOOCH'S PIZZERIA J Letters 15" x 19. 5' 1 se 3 -----— S Z.4 ...... ............: pe et 69AY PteW"& _ Tv H Aft W \ hooch's 1 1 ! i .t-4 D P I Z—f LW i 7,77". # 64 • iii � ��a, i ,ROV s - i tss,►. nza , .: rsat9cr bo BERN4 FACADE REMODELING FOR: COLOR 11101 64 S GROVE AVE RENDERING -AR Cffi_tD= 2 ELGIN, IL 60120 s-4-11 Al T w? �V 1� R PEPOIF T 10 AAAYOR& t\AEf'ABERS OF CITY COUNCIL _ u ELGIN THE CITY IN THE SUBURBS AGENDA ITEM: MEETING DATE: October 26, 2011 ITEM: Facade Improvement Project at 64 South Grove Avenue ($21,912) OBJECTIVE: Award grants to businesses in downtown Elgin to promote the redevelopment of exterior fa- cades. RECOMMENDATION: Approve a facade improvement grant to the property at 64 South Grove Avenue for the resto- ration of the exterior building facades in the amount of$21,912. BACKGROUND The Elgin Facade Improvement Program is designed to promote improvements to storefronts in the city's center core area. Under the Facade Improvement Program, property owners or busi- ness owners within the target area are eligible to apply for grants for work to improve facades of commercial buildings that are visible from a public right-of-way. These grants are provided in recognition of the positive impact that individual facade renovations can have on the overall appearance and quality of their storefronts. Established in 1991, the program has been instru- mental in providing funds for the improvement of over 50 buildings in downtown Elgin. The program has also been used as a guide by many communities in the region such as Libertyville and Geneva, Illinois that are in the process of promoting the revitalization of their downtown areas. The proposed facade improvement grant application for 64 South Grove Avenue, submitted by the property owner Mr. Michael Butirro (Attachment B), is another example of how the city's economic development incentives can encourage additional private investment in downtown Elgin. OPERATIONAL ANALYSIS Under the requirements of the Facade Improvement Program, a property owner is eligible to receive 35 percent of the cost of eligible improvements, up to a maximum of$100,000, with an additional $50,000 provided to high-impact projects. The minimum project cost to participate in the program is $5,000. Improvements are recommended to be approved in advance, and each eligible improvement will be funded only once. Architectural services are an eligible cost funded by the program. The property owner proposes to make approximately $63,000 in facade improvements to the property. The scope of work covers both the front and rear facade of the building. Because the rear facade of the building is visible from a street—Riverside Drive—it is also eligible for funding under the program. Attachment B contains the details on the proposed scope of work and cost estimates. The property was also one of five projects approved by city council for a commercial energy re- trofit grant in the amount of$40,000 to cover 50 percent of the costs of a new energy efficient HVAC system, windows and doors, insulation and interior lighting. The project received the second highest score of the twenty applications that were submitted. Windows and doors are also eligible expenses under the facade improvement program, but, by utilizing the commercial energy retrofit grant, 50 percent of these costs will be paid by federal dollars. Of the property owner's cost, 35 percent would be covered by the facade program. INTERESTED PERSONS CONTACTED The Downtown Neighborhood Association (DNA) has negotiated the proposed facade im- provement project with Mr. Michael Butirro on the city's behalf in accordance with DNA's ex- panded responsibilities under its 2010 purchase of services agreement with the city. DNA's Design Committee reviewed the proposal and submitted a recommendation for approval of the project. The DNA Design Committee is a seven member committee chaired by Tom Armstrong, former principal planner for the city, and is comprised of three architects, a graphic designer and one representative each from the Elgin Heritage Commission and the Green Build- ing Technology and Energy Efficiency Committee of Elgin's Sustainable Action Plan. The applica- tion and submitted documentation was also reviewed by staff of the Community Development Department. A site visit to the property by DNA was conducted to assess the existing condition and configuration of the building. FINANCIAL ANALYSIS The applicant has obtained two competitive bids for each item within the proposed scope of work (reference Attachment D). The eligible cost for the project, based on the low bids, totals $62,607.10. At a funding rate of 35%, the city's participation would be $21,912.49. 2 BUDGET IMPACT FUND(S) ACCOUNT(S) PROJECT#(S) AMOUNT AMOUNT BUDGETED AVAILABLE Riverboat 275-0000-791.78-99 079901 $21,913 $21,913 LEGAL IMPACT If funding were to be approved, an agreement between the city and Mr. Michael Butirro, the property owner, would be required. ALTERNATIVES If the council does not approve the facade improvement project, the applicant will be required to fund 100 percent of the project himself. At this time, the applicant has indicated that the project is viable only with the combination of federal and local program funds to offset the costs of improvements. NEXT STEPS 1. Staff will have the grant recipient sign a legal agreement before starting work. 2. The property owner will need to obtain the necessary building permits for the facade work. All permits will need to be obtained prior to starting construction on the project. 3. Through the duration of the project, staff, with the help of DNA, will monitor the project and work with the property owner to resolve any issues that arise during construction. Major changes or elimination of certain items in the approved design plan must be ap- proved by the city with a recommendation from DNA. 4. Upon completion of the project, copies of all bids, contracts and invoices will need to be submitted to the city along with contactors' waivers of lien (or partial waivers of lien for individual discrete components of work). The property owner will need to request a final inspection on the project. 5. City staff will inspect the work for compliance with city codes and conformance with the design plans approved for the project. A final payout of the grant amount will only be made on completion of the final inspection and review of all out of pocket expenses. 1 3 Originators: Sarosh Saher, Senior Planner Marc Mylott, Director Community Development Department Final Review: Colleen Lavery, Chief Financial Officer William A. Cogley, Corporation Counsel/Chief Development Officer Richard G. Kozal, Assistant City Manager/Chief Operating Officer Sean R. Stegall, City Manager ATTACHMENTS A. Recommendation of the DNA Design Committee B: 64 South Grove Avenue Fagade Application C. Eligible Scope of Work and Contractor Cost Estimates D. Eligible Cost Comparison E. Fagade and Interior Renovation Plans and Guidance Documents 4 ' . dowfItOV4f"' ���������� ��8�� ���or» »oo — Memorandum neighborhood~~" " "~°" ~"" " ^=" " " » » —~ �J �� (�\ ��\�� /1c�^��)�—\/\7'\��. , ��. ^_`_~ Date: October 13, ZD11 To: 5anoshSaher,Senior Planner Rick Knza[Assistant City Manager 2 [�oug�m� z»venue^Eiqin u 6O��o 8�� 48� 14�6^Dmvvn�ovvnE|go�zon` From: Tonya Hudson, DNA Executive Director DNA Design Review Committee 0e: Recommendation on fa�acle improvement grant for 64 S. Grove Avenue,Chooch's Pizzeria Provided herein is recommendation from the Downtown Neighborhood Association's Design Review Committee regarding afa�ade improvement grant for 64 S. Grove Avenue' the future site of[hooch's Pizzeria. Project Background Brothers Daniel and Michael 8uttiro purchased the building at 64 S. Grove Avenue in April, 2011 for $256'000 with plans to open a pizzeria on the first floor, create a single residence on the second floor and restore the historical character of the building's front and rear facades. The Butdnm'sare investing close to $SOC\DOO in the project, which includes the purchase and complete exterior and interior rehabilitation of the building and the opening of the pizzeria on the first floor.The Buttivo's selected a Downtown Elgin architecture firm, BernaArchitectn'to design the project inside and out. Berna has worked on numerous downtown fagade projects over the past decade' including the Hines & Aasociates building on Douglas Avenue and a handful of buildings on E. Chicago St. The owners are working with local contractor seasoned in historic renovation,J.13. Harris' on the interior renovation of the first and second floors. According to the Elgin Historical Society, the building is thought to be built in the 1909 as the first movie theater in Elgin called the Lyric Theatre. The clean,classic design and original glazed terracotta block on the second floor showcases newer materials and a design that is not present in the surrounding buildings from the late 1800's. The second floor of the building's fa�ade has examples of classic designs that have been used for centuries, including the "Greek Key" trim on the windows and the "Egg and Dart"trim along the cornice line. Throughout the past century, the building's first floor has housed a women's clothing store, a bakery, a pizzeria and offices. The second floor has been untouched since the early 1950s' when it appears to have been a doctor's office and a dentist's office. The building has sat entirely vacant and unmaintained since 2008. It is uncertain when the storefront was covered with the large aluminum and wood panels that exist today. DNA estimates this may have been done in the 1970s when many downtown buildings were subjected to "modernization," especially with techniques that were inexpensive. Rather than replacing large storefront windows, owners used other materials to close up the storefronts with minimal windows. Facade Improvement Grant Recommendation Berna Architects has designed the Grove facade to restore the building's clean-lined architectural character.The Riverside fagade will also get a facelift to match a new outdoor dining and gathering area that will fit in well with the city's plans for the Riverside Drive Promenade. DNA's Design Review Committee recommends that both the Grove and Riverside facades be considered "primary" facades as they are both highly visible from the public right of way. Therefore, all facade improvements outlined in the following scope of work would be eligible for a 35% rebate through the program(See attached Conceptual and CAD drawings). Facade Scope of Work Grove(East) Facade Improvements Riverside(West) Facade Improvements • 100% wash front of building (600 psi max. • 100%wash building and remove loose paint and non-abrasive chemicals; see attached . Tuck point 20%of brick wall preservation brief) • Repair and replace 15% of brick at existing • Repair and seal top coping deck and fire escape supports • Tuck point 100% of terra cotta glazed block • 100% remove and replace stair; railing at two wall second floor levels including fire escape • Replace and/or repair 10%terracotta block . Remove structure, roof,and existing concrete • 100% replace windows on second floor . Remove small mechanical decking @ first floor (50% of total cost is eligible; other 50% door covered by EECDBG) • 100%caulk windows and storefront • Provide all new pre-finish metal flashing, gutters, coping and downspouts from roof • Remove metal sheeting, nails, etc. as • Replace three(3)doors/frames required • Replace transom windows behind existing • Replace two (2) small original transom o metal sheeting (50% of total cost is eligible; windows (50% of total cost is eligible, other other 50%covered by EECDBG) 50%covered by EECDBG) • Replace ceiling as required for new transom • Replace seven (7) windows and enlarge three o (approx. T-0"interior) on first and second (3) per building code (50% of total cost is floors eligible,other 50%covered by EECDBG) • Provide new address and business signage • Reset three (3) window sills on second floor a o (50/of total cost is eligible;other 50%covered • Provide electrical for entrance lighting; by EECDBG) replace four(4)fixtures • Replace two (2) panels for basement windows • Replace one single store front doors / (50%of total cost is eligible,other 50%covered sidelight and frame (50% of total cost is by EECDBG) eligible,other 50%covered by EECDBG) • 100%caulk windows • 100% remove windows, storefront and • Install three(3) light fixtures at each entrance wood enclosure on first floor 14 ft. high . Relocate/rework electric, cable feeds, phone • Reuse existing doorway floor slab/ramp. lines as required • Provide "egg and dart" trim under first floor • Excavate approx. 3'-0" west yard to original windows to match existing trim on second level for ramp floor . Provide new foundation, footings and stair, small deck and handicapped ramp • Provide steps to second floor to replace fire escape Fa4ade Estimate Comparison The owners gathered two competitive estimates for all eligible improvements within the scope of work with the understanding that all work be estimated at Illinois prevailing wage rates. The completed and signed facade application includes a statement of understanding regarding the same. DNA recommends to city staff that city council approve $21,912.49 for this project, which is 35% of the total eligible expenses of the lowest bid provided. Masonry ,Y,. � Electrical& Lighting Doors&Windows* 6 Structure &Carpentry M� . Signage E 6 64? Al Painting Demolition ,. Waterproof, Caulk,Seal k Architectural Services Contingency $ $ Totals City 35% Owner 65% $40,694.61 $54,830.75 *Indicates 50%o total estimate or windows/doors;other 50%covered by EECDBG) f f With this recommendation come the following conditions: • The terra cotta tiles on the facade on Grove are to be cleaned, tuck pointed and replaced as needed by a reputable masonry company experienced in commercial historic rehabilitation. Our preference is Seyller's Masonry & Tuckpointing due to their experience in downtown with the terra cotta facade on the Burritt Building and other historic facades such as the McBride Building, the Leath Building and Fred Steffen's building which houses Villa Verone and Bangkok House,among others.See attached preservation brief for details. • The attached design concept and drawings for the Riverside facade are not finalized and do not reflect the approved scope of work previously outlined. The Buttiro's are working with city staff on ADA requirements for that exit. It is our understanding at the time of this recommendation that the plan includes a small deck at the first level door that may or may not include a handicapped-accessible ramp, a new wooden staircase to replace the fire escape to the second floor apartment (per code), a poured concrete patio and an iron gate around the perimeter of the patio. This area will serve primarily as an outdoor dining area, access to which is limited from inside the building only. It will not serve as a second entrance to the pizzeria at this time. However,the owners have the option to build a larger deck and create a "Riverside entrance' in the future should they desire to capitalize on traffic from the proposed Riverside Drive Promenade. • The drawings also do not reflect changes requested by the committee in our meeting with the architect for the Grove facade to continue the vertical side columns of the building from the top of the storefront to the ground to provide a termination for the bulkhead paneling and a break point with the remaining building facade to the north and the neighboring building to the south. • Lastly, the quality of the materials selected is extremely important, especially in regards to the pre-finished gray metal cladding to be used to frame the storefront.We defer to the architect to select the appropriate quality materials. Additionally, 64 S. Grove Avenue was one of five projects approved by city council for a grant in the amount of $40,000 to cover 50% of the costs of a new, energy efficient HVAC system, windows and doors, insulation and interior lighting. The project received the second highest score of the 20 applications. Windows and doors are eligible expenses under the facade improvement program. By utilizing the commercial energy retrofit grant, 50% of these costs were paid by federal dollars. Of the property owner's 50% of the cost, 35% may be covered by the facade program. Utilizing these two programs in combination leaves more money in the facade budget for other improvements while also encouraging property enhancements that are both historically sound and energy efficient. Conclusion In addition to the facade improvement grant, DNA is working with the owners on a combination of other downtown grant programs that will help provide financial stability for the business and the property. Recommendations will be submitted within the next 30 days for the Downtown Business Loan Interest Subsidy Program (approx. $15,000 over 3 years), Grease Trap Incentive Program (max. $7,500) and Projecting Sign Grant (max. $2,500). The project at 64 S. Grove is an impactful example of sustainable, preservation-focused downtown economic development utilizing city programs in tandem with federal programs such as the commercial energy retrofit program. The project will serve as a catalyst for additional private investment along Grove Avenue when coupled with the renovation of the Riverside Drive Promenade in the spring of 2012. Respectfully Submitted, DNA Design Review Committee Tom Armstrong,Chair Tonya Hudson Retired City Planner DNA Executive Director David Jurina John Roberson Architect Architect Darlene Hulin Betsy Couture Graphic Designer Historic Preservation Commissioner Dave Segel John Hrivnak Sustainability Consultant Architect Jerry Sorenson Sarosh Saher Designer, Preservationist City Liaison Attachments: 1. Facade Application 2. Existing Site Photos 3. Scope of Work 4. Facade Estimate Comparison &Supporting Documents 5. Architect's Renderings& Drawings 6. Preservation Brief on Cleaning& Repairing Terra Cotta Attachment B A4 !3- (1 DOWNTOWN ECONOMIC DEVELOPMENT PROGRAMS THE CnY IN TM SUBURBS Pre-Application: Fagade Improvement Grant Program —C k p o c,� ' 5 ? i M I C"k OL C, Business Name Applicant Name Business Mailing Address(for legal correspondence) ` City/State/Zip Business Phone Cell Phone Email SOL4r< A.S abodf 0WieV- Downtown Property Address Property Owner's Name(if applicant is tenant) 1, Please prioritize your goals for this project:(1=very important; 2=important, 3=not an issue) 1 Property Enhancement Business Visibility Code Compliance ' Energy-efficient Upgrades Other: 2. What eligible improvements do you wish to make to the exterior of the building? Canopy/Awning &Signage El"Windows/Doors Exterior Lighting LT�Painting Ll Restoration of Architectural Feature(s) `Brick Cleaning/Tuckpointing DA Compliance(ramps, handrails,etc.) 3. Please describe in detail the improvements you plan to make to the exterior of the property. Refer to the program guidelines for more information about eligible improvements. Attach a "before" picture for reference. Include copies of code violation reports, if applicable. Include other interior or exterior renovation work that will be done in conjunction with the eligible fa4ade improvements. �I t!t _.. lxC L+) j,V it 5� Cjf j t 4r1 ' (00-Cl— . --till- j'A J Aw VI'l,I!ex- S I Y\3 4L, I Cl (� 1t VX" Li i tt ....._....... ... 4. What is the maximum amount of private investment you plan to make in this fagade improvement project? $ `" D 00 5. if you plan to do additional interior or exterior work in conjunction with the facade improvement project,what is your total budget for the entire project?$ 3 5 DOD Statement of Understanding The applicant (undersigned) agrees to comply with the guidelines and procedures of the Facade Improvement Program and the conceptual design and outline specifications as agreed to by the applicant and the application review team. The applicant understands that the applicant must submit detailed cost documentation, copies of building permits, bids,contracts and invoices and contractor's final waivers of lien upon completion of the approved improvements. if utilizing this program for the purposes of building improvements and/or business development, any work done by contractors or laborers must comply with the Illinois Prevailing Wage Act.The fol- lowing language shall appear in any agreement between the program applicant and the city: • bed du€�t� �retie�ri t `j�� �" i e MW FApiflicant Signature Date If the applicant is other than the owner,please complete the following: I certify that 1, the owner of the property at (,tf authorize the app(ic to a ply for a rebat der the Facade Improvement Program and undertak the appr ve impr veme ts. Property Owner Signature at Submit this application and supporting materials to: DNA Design Review Committee I Attn:Tonya Hudson 2 Douglas Avenue I Elgin,IL 60120 (847)488-1456 ( Fax(847)488-1449 i thudson @downtownelgin.com [ I In I i 14e < F $ x. e i -v � w A.00 k Vil w P--t � M V, s FRONT(S. Grove Avenue) REAR(Riverside Drive) 64 S.Grove Avenue Proposed Site"' ooch's Pizzeria ' Attachment C 1 64 S. Grove Scope of Work Grove(East)Fa4ade Improvements Riverside(West) Facade Improvements • 100% wash front of building (600 psi max. • 100%wash building and remove loose paint and non-abrasive chemicals) . Tuck point 20%of brick wall • Repair and seal top coping • Repair and replace 15% of brick at existing • Tuck point 100% of terra cotta glazed block deck and fire escape supports wall second floor . 100% remove and replace stair; railing at two • Replace and/or repair 10%terracotta block levels including fire escape • 100%replace windows on second floor • Remove structure, roof,and existing concrete • 100%caulk windows and storefront • Remove small mechanical decking @ first floor • Remove metal sheeting, nails, etc. as door required • Provide all new pre-finish metal flashing, • Replace transom windows behind existing gutters,coping and downspouts from roof metal sheeting • Replace three (3)doors/frames • Replace ceiling as required for new transom • Replace two (2) small original transom (approx. 3'-0"interior) on first and second windows floors . Replace seven (7) windows and enlarge three • Provide new address and business signage (3) per building code • Provide electrical for entrance lighting; • Reset three(3)window sills on second floor replace four(4)fixtures • Replace two(2) panels for basement windows • Replace one single store front doors / . 100%caulk windows sidelight and frame • 100 remove windows, storefront and • Install three(3) light fixtures at each entrance wood enclosure on first floor 14 ft. high • Relocate/rework electric, cable feeds, phone • Reuse existing doorway floor slab/ramp. lines as required • Provide trim under first floor windows to • Excavate approx. 3'-0" west yard to original match existing trim on second floor level for ramp • Provide new foundation, footings and stair, small deck and handicapped ramp • Provide steps to second floor to replace fire escape rant rage r ui c From: Kevin Brown(kbrown @cascoonline.com) To: cnikebutirro@att:net; Date: Fn, August 12,20115:02:08 PM Cc: kmatthews @cascoonline.com;rttnatthewsCa),cascoonline.corn; Subject: Storefront Quotation and Clad Window Quotation: Mike, I have attached a drawing with the details.for your storefront system. Pricing for the system attached would be$8,200 plus tax. This includes all metal needed to install into openings,weather-strip, sweeps, hardware, locksets, closures, glass, and glazing material needed. Frames would come to jobsite assembled ready to be installed into openings. Doors will be delivered with glass installed. Frames/sidelites will not have glass installed. Glass can be installed by Casco for an additional$2,104.00. I will be off Monday and Tuesday but will have my cell phone if you would like to give me a call either day or today. I have also copied Nick Matthews and Kelly Matthews on this project so if you have questions you may also ask them and they can also relay them to Joe or myself. Please note anodize clad available for the rest of the wood windows as well, please let me know if you need the upcharge for this. Again, thank you for the opportunity and t look forward to eating at your place in the future! Kevin Brown Casco Industries, Inc. Office: 847-741-9595 (x5026) Fax:-847-741-5065 Cell: 847-6521977 kbrown @cascoonline.com www.cascoonline.com This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual to whom they are addressed.If you are not the intended recipient or the individual responsible for delivering the e-mail to the intended recipient,please be advised that you have received this e-mail in error,and that any use,dissemination,forwarding,printing,or copying of this e-mail is strictly prohibited. http:/tus.mg205.mail.yahoo.com/dc/launcli?.partner--sbc&.gx=1&.rand=00uul.vvud8d5p 8/13/2011 J I � „ 0 - , 0 , b // 0 - / g J J DRAWING, QUOTE METAL UNIT FRAMES AND GLASS SHOWN, IPAGE NUMBER 1 OF 1 INSULATED UNIT INSULATED UNIT INSULATED UNIT NON-INSULATED UNIT NON-INSULATED UNIT NON-INSULATED UNIT 1' GLASS 1' GLASS 1' GLASS 1/4' GLASS 1/4' GLASS 1/4' GLASS _ 0 0 3'-0' TYP, TRANSOM -4 3'-0' TYP. TRANSOM 11'-0' 13-0' . \ o Oi 13'-0' 0 0' 13'-0' �!r i3'-o' 9i ` 0 � o o I I l 1) DRAWING SHOWN FROM OUTSIDE Of BUSINESS, 2) ALL UNITS TO BE TEMPERED 3) FINISH TO BE CLEAR ANODIZE. 4) UNITS TO BE FABRICATED READY TO ASSEMBLE. 5) INCLUDE HEAD AND SILL RECEPTOR AS NEEDED, 6) ALL WEATHERSTRIP, SWEEPS, HINGES, AND HARDWARE TO BE INCLUDED IN QUOTE: °°°olndr..rrro..J.,e` SCALE 1+40 APPROVED BYi S7i«a DR,' KW9 7) DOORS TO BE OUTSWING DOORS. �'tt8CC3 saa nrer.ron sz 8) DOOR MARKED 'A' DOES NOT NEED LOCKING So"rh Elgin.1711.or.60177 DATE, 08/05/11 PART k. — MAT'L HARDWARE OR A SILL, 9) DOOR MARKED 'B' NEEDS A PANIC PANEL TOLERANCES UNLESS OTHERWISE SPECIFIED DESCRIPTIONi QUOTE EXIT HARDWARE INCLUDED, ONE PLACE ,X $.030 THREE PLACE ,XXX 2,005 TWO PLACE .XX f.015 ANGULAR it/2'I CUSTOMERi DRAWING, QUOTE Date,Printed-8/12f2011 Casco Industries Job Number 00000068 540 DiYision St. South Elgin,IL 60177 Phone:(847)741-9595 Fax:(847)741-5065 JOB NO. 00000068 DATE. 8/212011 PREPARED BY: Kevin Brown DESCRIMON: 64 S.Grove Scftware by:Bid Master,Inc.,4877 Wheatley's Pond Rd.,Smyrna,DE 19977 PhoW.(302)6&36630 0300 v 5.01.66 Page 1 of 5 Casco Industries Job Number:00000068 Bate Printed;9/12/2011 ___..__. _._.__ ______ __ .. Special Unit Combination#2 Front;Ist)Floor Quantity:1 Combo R.O. Widtb:80 9/16" Combo R.O.Height:132 9/16" Unit Width:40" ✓X Unit Height:96" RO. Width:40 1/2" '- / Casco Industries (2S) R.O.height•961/2" Label:Front;Ist Floor le ark Bronze C d Low E2 Tempered 779.24 3,116.96 4 specialty Unit,Rectangle, � Pe 4 Width:40" 4 Height:96" 4 4 9/16 in.Jamb Unit Width:40" Unit Height:36" R.O. Width. 1!4' Casco Industries (2.5) R.O.Height:361/2" Label:Front; Ist Floor 4 Specialty Unit,Rectangle,Dark Bronze Clad,Low E2 Tempered 403.87 1,615.48 4 Width:40" 4 Height:36" 4 4 9116 in.Jamb 1 Mull Charge 221.76 221.76 1530 _0 x 5.01.00 Page 2 of 5 Date Printed:8/1212011 Casco Industries Job Number.00000068 Sub Total 1,404.87 4,954.20 pedal(fait Combination#1 _._-- vront;god Floor uantity: 1 Combo R.O. Width:126 S/8" Combo R.O.height:90 9/16" Unit Width:42" Unit Height:60" R.O. Width:421/2" Casco Industries (2.5) R.O.Height:601/2" Label:Front 2nd Floor 6 Specialty Unit,Rectangle,Dark Bronze Clad,Lwow E2 Tempered 571.34 3,428.04 6 Width:42" 6 Height:60" 6 4 9/16 in.Jamb Tnit Width:42" nit Height:30" R.O. Width:42 1/2" Casco Industries (2S) R.Q.Height:30 1/2" Label:Front 2nd Floor 6 Specialty Unit,Rectangle,Dark Bronze Clad,Low E2 Tempered 376.44 2,258.64 6 Width:42" 6 Height:30" 6 4 9/16 in.Jamb 1 Mull Charge 369.60 369.60 Sub Total 1,31738 6,0+6.28 - v 5.01.00 Page 3 of 5 a3CO IndtS#1ie$ Dace Printed:&f 12/2111 Job Number;4004006$ Clad&Prime Double Rungs Casco industries (2S) Pages 1-1,1-2,2-1 and 2.2 Label:Rear;1st Floor Unit Width:45 3/8" Unit Height-64 3/16" R.O. Width:45 7/8" R.O.Height:65" 3 CDH4028 Double Hung,Dark Bronze Clad,Low E2 305.69 917.07 3 Tempered Glass 158.62 475.86 3 Sash Operation:Tilt Latch 3 Dark Bronze Internal Aluminum 5/8"Grille 40.81 122.43 3 (coloniallites) Coppertone Hardware(standard) 3 Dark Bronze Screens 27.72 83.16 3 4 9/16 in_Jamb - Additional.Item-- 2 GRILLE 2W1H PER SASH Sub Total 532.84 1,598.52 ......_.._... .._.__..._.. Claid Prinie Double Hungs Casco Industries (2.5) Pages 1-1,1-2,2-1 and.2-2 (.abet:Rear;Ist Floor ITH Unit Width.:37 3/8" Unit Height;64 3/16 R.O. Width:377/8" R.O.Heigbt:65" 1 CDH3228 Double Hung,Dark Bronze Clad,Low E2 267.19 26719 1 Tempered Glass 126.28 126.28 1 Sash Operation:Tilt Latch 1 Dark Bronze Internal Aluminum 5/8"Grille 30.80 30.80 1 (coloniallites) Coppertone Hardware(standard) 1 Dark Bronze Screens 24.64 24.64 1 4 9/16 in.Jamb --Additional Item- 2 GRILLE 2W1H PER SASH Sub Total 448.91 448.91 15340 v 5.01.00 Page,4 of 5 Date Printed:8l12/201 l Casco Industries Job Number:00000068 Clad&Prime Double:Huags Casco Industries (2.5) AMI,Pages 1-1,1-2,2-1 and`2-2 Label:Rear;2nd Floor Eft Ll Unit Width:413/8" Unit Height:64 3/16" R-O. Width:417/8" R.Q.Height:65" 3 CDH3628 Double Hung,Dark Bronze Clad,Low E2 294.91 884.73 3 Tempered Glass 141.68 425.04 3 Sash Operation:Tilt Latch 3 Dark Bronze Internal Aluminum 518"Grille 20.41 61.23 3 Top Sash Only(colonial liter) Coppertone Hardware(standard) 3 Dark Bronze Screens 24.64 73.92 3 4 9 11G in.Iamb --Additional Item— 3 TOP SASH GRILLE:2W I H Sub Total 431.64 1,444.92 Bid Total 14,502.83 Tae(7.5%) 1,087.71 Grand Total 15,590.54 Interior Prefinishing Options Available: -Raw(Standard),Prime,Prime w/one coat paint(White),Clear Coat,Stain(Standard Casco Colors),Stain(Custom Color) Ask your sales representative fora.quote. Price,if shown,is net cost Lead Time:3-5 Weeks TERMS AND CONDITIONS OF ORDERS:Only written orders can be accepted.You have 48 hours from the time your order is received at Casco to make changes.Changes made after 48 hours will incur a restocking charge.All orders are subject to a minimum$75 shipping charge per stop. Any jobsite delivery is subject to a minimum$150 shipping charge per stop.All the above dimensions,quantities,accessories,and pricing have been verified and accepted by the undersigned. Accepted by Date —— ---- _ _ D300 v 5.01.00 Page 5 of 5 DIVISION OF CUSTOM ALU AI- NUMPRODUCTS INC. CASCO INDUSTRIES 540 WEST DIVISION ST. SOUTH ELGIN,IL 60177 PH:(847)741-5595 FAX.(847)741-5065 Sold To: Ship To: Attn: CASHSALE-RETAIL CASHSALE-RETAIL MIRE BUTIRRO Page: 1 64 S. GROVE AVE SOUTH ELGIN IL 847-754-0751 8/19/11 ELGIN IL 60123 11.07.53 Fax: Contacti MIKE S. 1000 6��4 GROVE DOORS SOD 96453 8/19/11 &B 4161d For-,Aal*age •-r r �ii'i -- r '� DESCRIPTION • wwtxx rw*xxxxx,rsxx QUOTAS rx w*xxxt,xxtr€w• x ♦xrt* C A S C 0 xx* xs* CUSTOM ROVBRSI'Z'$" ALUMINUM STOREFRONT DOOR, WIDE STILE AND RAIL CONST., LO-E 1" INSULATED GLASS, A,LL 'SWEBFS AND WEATHERSTRIPPING INCLUDED, PANIC'EXIT BAR INCLUDED WITH SXTBRIOR HARDWARE, DOOR CLOSURE INCLUDED. 1 0 1 BA 4/0 X 7/0 DOOR WITH FRAME 21160.00 21160.00 MASONITE EXTERIOR DOOR, 6-9;116" FJP JAMB, OUTSWING DOOR, BRASS SPRING LOADED HINGES, FLUSH DOOR SLAB 1 0 1 BA 3/0 X 61'8 228.00 225.00 Comments` 178.88 Order Taker: KBC Ship Via: DELIVERED * , 2,563.88 x*xxx* Email Copy' xx*�xxx R. J. CARR+a L L ELECTRICAL 628 SOUTH STREET ELGIN IL.. (PHONE) 60123 (847)902-9047 TO DATE Chooch's Mike Butirro Aug.18 2011 64 South Grove Ave Elgin TL.6012 PHONE)(847) 759-OIY51 JOB Chooch's GENERAL Mike Butrro 64 S.Grove Ave. ESTIMATE, NO. M76 THE UNDERSIGNED HEREBY AGREES TO FURNISH LABOR AND MATERIAL TO INSTALL ELECTRICAL WIRING AND EOUIPMM,ON THE PREMISES AS SPECIFIED HEREIN.THE PRICE TERMS AND CONDITIONS AS MENTIONED IIEREWMAYBE CHANGED,IF CUSTOMERS ACCEP'T'ANCE IS NOT IN OUR HANDS Lei 30 DAYS FROM DATF-,UP0NACCEP7TNG,THIS PROPOSAL BECOMES A CONTRACT,THE PROPOSED WORK TO BE DONE IS AS FOLLOWS'. WORKMEN WILL BE PROPERLY COVERED BY PUBLIC LIABILITY INSURANCE,A INSURANCE CERTIFICATE OF INSURANCE WILL BE ISSUED TO YOU UPON REQUEST,OWNERS TO CARRY FIRE INSURANCE ON THE ABOVE WORK. ALL WORK PERFORMED UNDER TATS PROPOSAL IS TO BE EXECUTED DURING THE REGULAR WORKING HOURS Of TIE DAY,NAMELY BETWEEN 8:00 AM AND 4:30 PM MONDAY THROUGH FRIDAY EXCEF TING LEGAL HOLIDAYS. THE ACCEPTOR AGREES TO PAY AND DISCHARGE ALL COST AND ATTORNEYS FEES AND EXPENSES THAT SHALL ARISE FROM ENFORCING THE TERMS OF THIS CONTRACT BY THE UNDERSIGNED, INCLUDING SUCH•RL4$0NABLI ATr ORNEY FEES INCURRED RESULTING FROM THE NON-PAYMENT OF THE AMOUNT HEREUNDER. THE UNDFRSIGNEI)SHALL NOT BE LIABLE FOR ANY LOSS OR DAMAGE WHATSOEVER RESULTING FROM DELAY OR DESTRUCTION OF OR 1NAMY TO THE WORK OR MATERIAL[TURING CONSTRUCTION IF CAUSED BY LOCKOUT,LABOR DIFFICULTIES,FIRE,RIOT,M0I3,THE ELEMENTS,EARTHQUAKE,TORNADO. CYCLONE,LIGHTD G,PUBLIC ENEMY,OR ACT OF GOD. ADDITIONAL WORK MAY BE ORDERED BY THE CUSTOMER ANY TTME,BEFORE THE WORK IS STARTED,AT THE UNIT PRICES NAMED IN THE SCHEDULE,ANY OTHER CHANGE FROM THE WORT{AS HEREIN DESCRIBED INVOLVING ADDITIONAL COST OF LABOR AND MATERIAL IS TO BE PAID FOR BY THE CUSTOMER IN ADDITION TO THE CONTRACT PRICE NAMED HEREIN.AT THE PRICE AGREED UPON OR OUR REGULAR SLATES FOR THE TIME AND MATERIAL WORK THE CONTRACTOR SHALL RECEIVE WRITTEN ORDERS FOR ALL ADDITIONAL WORK,WHETTER IT BE ON A CONTRACT PRICE,UNIT PRICE,OR TIME AND MATERIAL.BASIS_BEFORE PROCEEDING WrrH SUCH EXTRA WORK PAYMENTS FOR ADDITIONAL CONTRACTS TO THE ORIGINAL CONTRACT,SHALL BE MADE UNDER THE SAME TERMS,AND CONDITIONED AS ARE EMBODIED IN THE ORIGINAL CONTRACT.THE CONTRACTOR SHALL NOT TIE REQUIRED TO PROCEED WITH INSTALLATION OF WORK IF THE PAYMENTS APPLYING ON SAME HAVE BEEN MADE AS SPECIFIED IN THE CONTRACT. (a) Install piping,outlet boxes and wiring,from basement area to front above entry for sign service disconnect. (Note) Sign circuit to be connected to 24 hour timer in basement area. 0-front outside fighting. (a)install piping,outlet boxes,and wiring for,2-wall mount light fixture's l- each side of entry. (b)install piping,outlet boxes and wiring for 2• indirect light fixtures (Note) Lighting Fixture's are included within the hereunder proposal amount. Lighting future's shall be connected to 24 hour timer i atoll piping,outlet boxes and wiring,for 4-out door light fixture's on rear of building.,connected;to 24 hour timer. (41,:install 1-2/pole intermatic 24 hour timer for out door lighting and sign. (TERMS) 65%p to be paid upon electrical rough % remaining 35% to be paid upon final inspection/ (note)Electrical permits are not within the hereunder proposal amount, All Material and or that of lighting fixtures,timer,and apparatuses are included within proposal amount Total light fixture(9)Nine, (1)One Sign. ACCEPTOR AGREES TO PAY Two Thaasaad_Six iiundren Twenty Four —&-.00 CENTS S2,624.00 _&_00 CENTS IT IS AGREED 111 ['4!EEN PART=HEREINALL.RIGHT,TTTLg$,AND INTEREST IN AND TO THE PROPERTY MATERIAL,EQUIPMEWr AND FIXTURES INSTALLED UNDER TRW CONTRACT SHALL"REMAIN ON THE PROPERTY OF TIDE ELECTRICAL CONTRACTOR UNDER THE T'EIIMBUF THIS'CONTRACT"i UNTIL PAYMENT IN FULL HAS BEEN MADE.WHEN THE CONTRACT HAS SEEN SIGNED AND ACMPTVD,MATERIAL ORDERED FOR THIS WORK AND CONTRACT SHALL NOT THEREFORE BE SUBJECT TO CANCELLATION. ALL THE ABOVE WORK WILL BE DONE,IN NEAT AND WOR104MLIKX MANNER,AND COMPLY WITH THE RULES AND REGULATIONS OF TIIE DEPARTMENT OF ELECTRICAL INSPECTION OR NATIONAL ELECTRICAL CODE. ACCEPTED BY BY CONTRACTOR DATE DATE THIS PROPOSAL DOES NOT BECOME A CONTRACT UNTIL SIGNED BY THIS COMPANY PRICES MAY CHANGE WITHIN A 30 DAY PERIOD DUE COST OF MATERIAL i i j r"IQET I N I 20 S. Spring Street Elgin, IL 60 120 84?-'?41- 3829 fax 84'7---'741--88! 9 bsgraphi,cs a sbcglobal.net QUOTE r 9/16/11 CHOOCH'S PIZZERIA 64 S. Grove, Elgin jJ `. 15" formed plastic letters installed CHOOCH'S PIZZERIA $1,871.60 Vinyl lettering above door $356.00 Vinyl lettering on door address $35.00 i Total $2,261.60 Quote good for 30 days { Dale Wisniewski .............. ....... ..................... CHOOCH ' S PIZZERIA CHOOCH'S PIZZERIA _ ' CHOOCH 'S PIZZERIA CHOOCH'S PIZZERIA .................................. ...................... ............................. ........................ .......... CHOOCH 'S PIZZERIA Letters 15" x 19. 55 t .••... a•. • 11� -.. y wYY.+_•�4�.� ...r.. ....e.F..{,.'S - r _ S . _ ..... .....-_ i /4 �............ hooctfs :9A: } �y1 � �x oxim Em.' � ♦ 4 . i ;ry-�• t y (! l f I D�]•'��t;1j]��rrp M. DATA lT I& PRWsS't� B L'2-1'Y A FACADE REMODELING FOR: COLOR 11101 S GROVE VE RENDERING ARCHME Dru SIGN ELGIN, IL 60120 Muols am l - � bid to be revised and resubmitted . -•�� Construction Management Proposal September 23,2011 Mike Butirro 64 S. Grove Avenue Elgin,Illinois 60120 REGARDING: Renovation work on buildinn exterior at 64S.Grove,Elgin,Illinois Dean Mr.Butirro, Thank you for the opportunity to present you with a proposal for the above address to complete the work for the exterior renovations. SCOPE OF WORK: 1. Demolition per specification submitted 9/14/11 and drawings dated 9/6/11. rk a. Demolition cost$5,940.00 2. Carpentry for the ADA Ramp per plans installed in wood per drawings dated 9/6/11. a. Carpentry cost$4,010.00 3. Carpentry for the 2id floor wood stairs installed per drawings dated 9/6/11. a. Carpentry cost$4,240.00 4. Masonry tuckpointing and modifications per spec/drawings dated 9/6/11. a. Masonry cost$11,625.00 5. Painting rear of building only per spec/drawings dated 9/6/11. a. Painting cost$1,400.00 "J All work notated above will be completed for the lump sum cost of Twenty-Seven Thousand Two Hundred Fifteen Dollars Even ($27,215.00). Again,thank you for the opportunity to submit this proposal. Please call or email me with V� any questions. i Respectfully submitted, h ' Brian Harrington President DESIGN BUILDERS,GENERAL CONTRACTING CONSTRUCTION MANAGEMENT 800 Dundee Avenue,Elgin,IL 60120 Office:847-760-6655 qty f Fax:847-841-1020 Toll Free Fax:866-944-3DCM www.3dimensionconstruction.com HINES ELECTRIC P.P. Box 967• Elgin, 11. 60121 847--:888_3399 PRO.P05ftl SUBMIfSEff;TO Py.ONE DA-M 2.01 STREe -Joe MXKFF.. CITY,rSTATE Ali-ZIP CODE JOBIOCA,T,ION ARCRCr£CT O 8 PHONE ? .[PhTf We:hereby submit spQCificafions and estimete5 tor- _.._.. t • p_ � lh __.._..__._._...._.. -._........._... s _..._ �...__... . ....... -......_... __ ..._.......-. _... _.._............_..........._._._...:.:_.......... �- — j L r ;p -f p; lfllit hereby to .furnish material and labor — complete in accordance with above specifications, for the -sum of: dollars($ 5� Payment to tie made as foilows: 6f :—> � (oa o°-= All material lg.guaranteQiJ to he as specified, 1411 work to Ue completed In a workmanlike Authorized r � rhanner_according-to standard practices.Any etteration:orAeviatiorn from abovq spec tflcg Si na tions Invelvi.i)-g extra costs_ yAl be executed only upon-written orders and wip-become!in .g Lure extre.charge over and aladve.theestimate.All agreements contingent upon strikes,accident Note Th1s.proposal maybe u or delays beyond cur control.Owner to.carry fire,tornado and other necessary rnsurance. withdrawn.b us.rf not.accepted.within / days. Our workors are tlitly covered by Workmen's Comoeosation Insurance. Y 1—The above rices,.specifieations XX .' X .. p Signature and condttions.are satisfactory and are hereby.accepted. You are authorized to do the work as specified.-Payment will be made as outlined above, Signature Date Pf Acceptance: -- PRODIICTIi&3 � lac.Caton,MmOI471.ToedvnlONETOttfREEI+M2256380 - nc. .. ........ 725 Schneider Drive • Unit 4 • South Elgin, IL 60177 • Phone: (847) 741-0988 • Fax: (847) 741-0958 DATE: August 4, 2011 TO: Mike Butirro PROJECT: Chooch's Pizza 64 South Grove Elgin, Illinois WE HEREBY PROPOSE TO FURNISH AND INSTALL THE ITEMS LISTED BELOW Aluminum doors, frames, storefront windows and glazing Including: Three (3) doors at east entry (1), interior vestibule (1) and west entrance(1) Fourteen (14)dormer windows Storefront windows at east and west elevations per drawings Interior vestibule at east entry Clear anodized 2"x 4 1/2°; thermallv broken aluminum Push/pulls, deadiatches with paddle, closers, hi n es, and weatherstri in 1"insulated clear qlass TOTAL: $67p860.00 Add for operable vent windows at west a eva io ADD: 680.00E EACH We are a union shop and pa revailin yva es ADDENDA: None EXCEPTIONS: None DELIVERY: Jobsite TERMS OF PAYMENT: NET 30 DAYS THE ABOVE PRICES, SPECIFICATIONS AND CONDITIONS ARE SATISFACTORY AND ARE HEREBY ACCEPTED. ACCEPTED BY: RESPECTFULLY SUBMITTED: SIGNATURE: QUINT G, INCORPORATED DATE: GREGORY D. GUDEMAN Note—Phis proposal may he withdrawn If not accepted within is days. S�B'YCT�OwASOW 847-742-9530 QUOTE FAX 847-742-9579 DATE Quote# 8/19t2011 8003 BILL TO Cboocb's Pizzeria Attn: Mike Butirro 64 S.Grove Ave. Elgin,IL 60120 P.O.NO. TERMS PROJECT 50'/o deposit with o... DESCRIPTION QTY RATE AMOUNT In X 3/8"thick Flat Curt Acrylic,stud mount,standard color- 1 799.68 799.68T CHOOCH'S PIZZERIA Mounting Pattern 1 136.00 136.00T shipping 1 25.00 25.00 TX 5'2 color Pre-spaced lettering-Logo on glass 1 257.32 257.32T Installation by SBT personnel 1 200.00 200.00 NOTE: Permits by others. Flush Stud mount available for an additional charge. Reducing letter thiclmess will reduce the price. If installation is over 15'above ground,then a lift will have to be rented for$630. Illinois/Kane County sales tax 7.75% 92.46 WE APPRECIATE YOUR BUSINESS,PLEASE STAY IN TOUCH. Total $1,510.46 Attachment Q� + Fagade Improvement Estimate Comparison Masonry(tuckpointing,tile replacement) Electrical & Lighting Doors &Windows* , Structure & Carpentry , � h.° - Signage r"j, Paintings"......p �� Demolition Waterproof, Caulk,Seal Roofing (includes cornice repair and roof edging) ' Architectural Services 4 a Contingency Totals City 35% Owner 65% $40,694.61 $54,830.75 * Indicates 500 of total estimate for windows/doors; other 50% covered by EECDBG. Attachment E + Y .; .,s-t�`:;1-;p:q:�- •''�.Rt•. 1'Y;;.it'��. .. .:r �..�•... ''��� •wiJ.'i�-Q•bv#lY.Y.b+•dI'4.. - :. Y T. Si=�YY�.��,li-.T •I A ia - �e.j.'i: a, kY.iF •�.`-fr '� LF tV Aq... ....... •.yu. - ':Z�i"}:'R:�^,!.i l?YUs:l4'.wI rR 1'Y'•t...u.�R1• I- + .r/ JET pP-c f 2 `;- \ W� 1 hooch's /-t"c I r� GgI20 a.. i e4 ZAY -ir S. GROVE AVE ELEVATION 1Y. DAM 9HM TYPE°. pson ? No. B S:}iS.iV A FACADE REMODELING FOR: COLOR 19101 64 S GROVE AVE RENDERING .ARCIRTE DESIGN 221 DUPA STRUT ELGIN, IL 60120 DAPS 8-4-9 Al Elgin. Minis 80120 847 897-•0280 OF i ,. �r.�� _:.:!'.. �'�.1t..4F..�.i- �_ .�rc�icl�d. -")•eft �.f,i, - ((l. S Y ,ar7arwa� casv►aaa� ti►r► r.ea�►�' �►.w .�r�aa� R ►A-yR i``7 R ! 1 � S� �}�..�.._ �'�}r.rT.M �:bt i�i•1_.. m-trP 4^�' � } <n�i � .i.`t 7 a• ,i ,1 �1 ME t qQ c� w-1 � rS¢19i?".YI"µ...�.allYG'S.�..-.".Ri.�-��%•7N ►. �;l!■111ttt'/�IRI i!'%r'�c`-Y; b.:�� iii•rt..,...� tY R#1115A it1E!Y NR i!•I t£J',ftl2 i.::l ��..`! pwSv I ` Y 0.7SIn yyyyS�yy��yy�� a■rr TSf~L'.-: RCx'9�.._,;] 1 tlY RQA171 �R � �tSt7°!41`J9 1R,YiiR1 �� k`.°'Y'�QW RR I49 fr9 K:! 1:5".IP47 ,- Al �c5�iiiiMi! in..f7!!�3741 rim IR f3s1! �� � ■ M171W i1i,1 '�'![+ 7•ll ling fill I =M11 am m mm R i,r QM!1 Emma :4YIi1�■ FACADE • i •' ®� • - ® r fiELGIN, IL 60120 A minds mm r __ r. ir,:1 a ............. ...... ....-sEaoND t:LOOR eEIIING UNE \ lUC1C PANT 75X CK OCY'G MORTAR.ONn AND \ 0.UX TOOE CF CXTG GlAW WIRA COTTA NEW 4gk30YlS TO Rf9tACE EXT'C. SECOND FLOOR LINE FIRST BOOR I=CWIT m or Wo. CEILING LINE AR 4INTS AND OLEM TFs'gtA COTTA ss� Eq NO DART rft PNhW TO MATCH MO=M CITY ROSY SICH 1 DETA9L ASOW KOTOSlf.O METAL PANEL Hl .............................................................................................. .................... N�........ CEILING LINE 6ASEMEN7 ...........................................................FkQ..QB lmg........ t S. GROVE AVE ELEVATION A I Ii.d'dV' l f " Vor NMI�t teta psa/z�+r INU. $ERNA.FACADE REMODELING FOR:64 S GROVE AVE D �ELGIN I L 60120 2JZ3 DvpA 20 ELGIN, i11bS 7-`Z7-11 Al �s4�'69�0290 20_.,, L TUCKPOINT AND CLEAN cxrG MASONRY EXTERIOR .................... ................. ........I................... ;—.. ................................ SECOND FLOOR CEILING LINE w ILREUGVE EXTC.AND!NSTAI.L NEW GUTTER AND D.S- REMOVE DOOR Ar*' ......... ..... ...... ..... WINDOW k DooR ........ L HT TO 44'A.FF AND INSTALL NEW WINDOWS' .............. .... . .... ......................... SECOND .............. ......... .......................FLOOR LINE ........................ FIRST FLOOR NEW WOOD DECK,HANDRAILS, STAIRS AND LANDING CEILING LINE TUCKPOINT AND CLEAN EXT-0 NY EXTERAO.R: REMOVE PRIME-0 PAINT AS REOD. f 1,41M. DEMO.ALL EVE WINDOW COtiIRr,WINDOWS. DOORS.FIRE ESCAPE ROOFS,DECK, GUTTERS - REMOVE WNDOWS oj%D REMOVE EXVC AND DO%VNSpOUTS INSTALL NEW immowS —REMOvk-Exro. 000R AtID U INSTALL NEW DOOR N� NEW LARGE BEA?j UIURE PLANTER BOXES N.!.C. ......................... NEW tww RAMP ...... W/LANDING FIRST FLOOR LIN ........... ........I......I......... .......... 6 FT MCH NEW METAL CATS CEILING LINE f X 2'COMMoN GRADE LINE S?JOCK MASONRY 2.X 2z'ooytjoMN NEW WOOD NEW WOOD BRICK MASONRY RARJNG AND STAIRS Fire.X431d.re........ ........ IRS Amo DECK PJEJR.J5M.CAp......................... ....�MD I R ........ ...... EASEMENT RIVER VIDE ELEVATION FACADE REMODELING FOR: IRREV. DATE SHUT MIR pJTOJarr ND. BERNA 64 S GROVE AVE 11101 ARCHITEI�QjL_,CN MET ELGIN,. IL 60120 DATE 2 221 D STREET 7-27-11 Elgin, Illinois 60120 847 897-0260 1 � 4i�R x;412' I a' :. c7 1 .y ... vi a,in fi 'ri � 9 F 157Tk6 FLOC %.-•+• r- }I((I WOiE: sEE 3/ Cx i 1 fiN5TAJ.E[1 SiJC T<OiT 6' 8aa {RAVP M i7 iE EASM&T `WHCDUM INTO EASRNC 12--N t—. I 0-fl vERt;CALLY Vrm-AL AT DUST.FWD. ` -•�� !I� 1s:h'• apk 77^ EiS Fi { r r • 1 t� r I :n O uJ N t ooz 1 Kill, a uj i LL I 1 RIVER SIDE EXTERIOR BASEIMENT FLOOR PLA N � I� t tits"=1L�° f f f 11 I � i n� . Qo FUTURE = .a CUMPSTER. AREA d .. .... .. .. T I 2O:_S 9.. .T. �.. 5'rO"'•'... to Tom,M1 i6'-a', �� tv�., a L' .'.',Y,.OQA[�NT.CiVa.Q'...'.'.............. ... i cai a .c .......... METAL CASE ir 1 I I U, ') WWP DOM TO SAMWENI*LEVEL BELOW STAIR --IJP•.• a� SEE 0140.3/A2 1 E a•-D` I I )N CONCAFTE RE7AININC WAIT I I a T 0 11'= 7-.4' ne-1i I j1 INSTAL'ED SMUG TIGHT 6' FUTURE i PATIO n I I EM9..0DED INTO EXIS144O 12'.^, D.C. %'F.TMCALLY 7.-TiCAL A �1 BEAM ABOVE--, J y s AT FXISf.PAD. 1 y�M1 PLANTER- I i U _ •; o;) ` PL•4N1S N.M.C. r V ' O M I Iu Y• �! LL.LLI N MASONRY PIER- I I I AND CAP \ I I J Q CD 0>O UP --) f I "�� LANDING UP— » e 1 Z_ I I ON z ---f)u j i fl C7 I .t !i i I RIVER SIDE EXTERIOR FIRST FLOOR PLAN f —A, fv7Uf 4�� } STER' AREA N () ..8— K G a •J�—p" C ...... .................... ................................................................ J.•."....."...... V .............................................................. ................. .............f8 T O ii"a SR'-6� �iba•I METAL DATE V I ° 1 ( I! Ri.MP DOY,N TO 6A' ENT VEL h'LOw STAL � SAW ENT II 1 f Il I+I { 8 T D ff'. 7-a" `-CONCRETE RETAMING WALL 1 II 1 INSTALIF_D SNUG tii#IT E" Fv'm ( - !1: EMBEDOW INTO EXISTNG e 1 PATIO n I I O.C. VERTICALLY TYP(CAL^+ �I BEAM ABO%E {{ YWi AT EXIST.FNO, 1 PLANTER- �y I _ I PINITS N.I,C�\ `\. 2'X 2' �•. -:�+�. Q' MASONRY PIER-- 1` _ AND CAP \ I I \ 1 N \ w, 11 � o> o f t 11P- ► n !I <--DN tANCInc up--+ �0 Z i:fJ W J z Lu f SO'-O. 12 5'-0" It •• 0.' 0 .. V W I� l I RIVER 'SM EXTERIOR SECOND FLOOR PLAN it I 'IIa-1 U 1 I 7 Technical Presemtion services Preservation Briefs t4atianal Park service U.S.Department of the tntor or The preservation of Historic Glazed Architectural Terra-Cotta de Teel Patterson Tiller >>What is Terra-Cotta »Types of Terra-Cotta 4 >>Characteristics of Glazed Architectural Terra-Cotta >>Common Deterioration Problems A >>Deterioration Inspection and Analysis >>Maintenance, Repair and Replacement >>Summary >>Further Reading A NOTE TO OUR USERS:The web versions of the Preservation Briefs differ somewhat from the printed versions. Many illustrations are new, captions are simplified, illustrations are typically in color rather than black and white, and some complex charts have been omitted. Glazed architectural terra-cotta was significant in the development of important architectural idioms in this country--specifically, the "Chicago School," the High Rise and the Historic or Beaux Arts styles. In fact, glazed architectural terra-cotta is one of the most prevalent masonry building materials found in the urban environment today. Popular between the late 19th century and the 1930s, glazed architectural terra-cotta offered a modular, varied and relatively inexpensive approach to wall and floor construction. It was particularly adaptable to vigorous and rich ornamental detailing. However, with changing vogues in materials and architectural styles and rising production costs, glazed architectural terra-cotta fell into disfavor and disuse by the mid 20th century. Today, information on the maintenance, rehabilitation and replacement of glazed architectural terra-cotta is limited, as are sources of new glazed architectural terra-cotta. This report, then, will discuss some of the major deterioration problems that commonly occur in historic glazed architectural terra-cotta, methods of determining the extent of that deterioration and recommendations for the maintenance, repair and replacement of the deteriorated historic material. What is Terra-Cotta? Generically, the broadest definition of terra-cotta refers to a high grade of weathered or aged clay which, when mixed with sand or with pulverized fired clay, can be molded and fired at high temperatures to a hardness and compactness not obtainable with brick. Simply put, terra-cotta is an enriched molded clay brick or block. The word terra-cotta is derived from the Latin word terra-cotta--literally, "cooked earth." terra-cotta clays vary widely in color according to geography and types, ranging from red and brown to white. Terra-cotta was usually hollow cast in blocks which were open to the back, like boxes, with internal compartment-like stiffeners called webbing. Webbing substantially strengthened the load-bearing capacity of the hollow terra-cotta block without greatly increasing its weight. Terra-cotta blocks were often finished with a glaze; that is, a slip glaze (clay wash) or an aqueous solution of metal salts was brushed or sprayed on the air-dried block before firing. Glazing changed the color, imitated different finishes, and produced a relatively impervious surface on the weather face of the final product. The glaze on the terra-cotta unit possessed excellent weathering properties when properly maintained. It had rich color and provided a hard surface that was not easily chipped off. Glazing offered unlimited and fade- resistant colors to the designer. Even today, few building materials can match the glazes on terra-cotta for the range and, most importantly, the durability of colors. Types of Terra-cotta Historically there are four types or categories of terra-cotta which have enjoyed wide use in the history of the American building arts: 1) brownstone, 2) fireproof construction, 3) ceramic veneer, and 4) glazed architectural. Brownstone terra-cotta is the variety of this masonry material used earliest in American buildings (mid to late 19th century). The brownstone type is a dark red or brown block either glazed (usually a slip glaze) or unglazed. It was hollow cast and was generally used in conjunction with other masonry in imitation of sandstone, brick or real brownstone. It is often found in the architecture of Richard Upjohn, James Renwick, H. H. Richardson and is associated with the Gothic and Romanesque Revival movements through such ornamental detailing as moldings, finials and capitals. Fireproof construction terra-cotta was extensively developed as a direct result of the growth of the High Rise building in America. Inexpensive, lightweight and fireproof, these rough-finished hollow building blocks were ideally suited to span the I-beam members in floor, wall and ceiling construction. Certain varieties are still in production today, although fireproof construction terra-cotta is no longer widely employed in the building industry. Ceramic veneer was developed during the 1930s and is still used extensively in building construction today. Unlike traditional architectural terra-cotta, ceramic veneer is not hollow cast, but is as its name implies: a veneer of glazed ceramic tile which is ribbed on the back in much the same fashion as bathroom tile. Ceramic veneer is frequently attached to a grid of metal ties which has been anchored to the building. Glazed architectural terra-cotta was the most complex development of terra-cotta as a masonry building material in this country. The hollow units were hand cast in molds or carved in clay and heavily glazed (often in imitation of stone) and fired. Sometimes called "architectural ceramics," glazed architectural terra-cotta was developed and refined throughout the first third of the 20th century and has been closely associated with the architecture of Cass Gilbert, Louis Sullivan, and Daniel H. Burnham, among others. Significant examples in this country Glazed architectural terra-cotta was a practical include the Woolworth Building (1913) in New and highly decorative building material. Photo: York City and the Wrigley Building (1921) in NPS files. Chicago. Late 19th and early 20th century advertising promoted the durable, impervious and adaptable nature of glazed architectural terra-cotta. It provided for crisp, vigorous modeling of architectural details as the molds were cast directly from clay prototypes without loss of refinement. Glazed architectural terra-cotta could accommodate subtle nuances of modeling, texture and color. Compared to stone, it was easier to handle, quickly set and more affordable to use. Thought to be fireproof and waterproof, it was readily adaptable to structures of almost any height. The cost of molding the clay, glazing and firing the blocks, when compared to carving stone, represented a considerable savings, especially when casts were used in a modular fashion--that is, repeated over and over again. Maintenance of the fired and glazed surface was easy; it never needed paint and periodic washings restored its original appearance. With the passage of time, many of the phenomenal claims of the early proponents of glazed architectural terra-cotta have proven true. There are many examples throughout this country that attest to the durability and permanence of this material. Yet present-day deterioration of other significant glazed architectural terra-cotta resources ultimately belie those claims. Why? Historically, the lack of foresight or understanding about the nature and limitations of the material has, in many instances, allowed serious deterioration problems to occur that are only now becoming apparent. Characteristics of Glazed Architectural Terra-cotta as a Building Material Glazed architectural terra-cotta has many material properties similar to brick or stone. It also has many material properties radically different from those traditional masonry materials. It is those differences which must be considered for a better understanding of some of the material characteristics of glazed architectural terra-cotta when it is used as a building material. Difficult to identify: Glazed architectural terra-cotta probably comprises one of the largest if not the largest constituent material in some of our urban environments today. However, the infinite varieties of glazing have hidden this fact from the casual observer. One of the attractive features of glazed architectural terra-cotta in its time was that it could be finished (glazed) in exact imitation of stone. In fact, many building owners and architects alike are often surprised to discover that what they presumed to be a granite or limestone building is glazed architectural terra-cotta instead. Two separate systems: Historically, glazed architectural terra-cotta has been used in association with two specific and very different .�t types of building systems: as part of a traditional load-bearing masonry wall in buildings of modest height, and as a cladding material in High Rise s construction. As cladding, glazed architectural °" .. terra-cotta often utilized an extensive metal anchoring system to attach it or to "hang it" onto t a wall framing system or superstructure. In the first instance the anchoring was limited; in the second, the anchoring was often extensive and complex. Likewise, in the first instance, deterioration has generally been limited. Typical construction detail of glazed However, where glazed architectural terra-cotta architectural terra-cotta ornament. Drawing: was used as cladding, particularly in high rise Detail,Architectural Terra Cotta, Charles E. Construction, present-day deterioration and White,Jr., 1920. failure are often severe. Complexity of deterioration: Deterioration is, by nature of the design, infinitely complex--particularly when glazed architectural terra-cotta has been used as a cladding material. Deterioration creates a "domino"like breakdown of the whole system: glazed units, mortar, metal anchors, and masonry backfill. In no other masonry system is material failure potentially so complicated. Poor original design: The root of deterioration in glazed architectural terra-cotta systems often lies in a misapplication of the material. Historically, glazed architectural terra-cotta was viewed as a highly waterproof system needing neither flashing, weep holes nor drips. This supposition, however, has proved to be untrue, as serious water-related failure was evident early in the life of many glazed architectural terra-cotta clad or detailed buildings. Common Deterioration Problems No one case of deterioration in glazed architectural terra-cotta is ever identical to another owing to the infinite number of variations with the material: original manufacture, original installation inconsistencies, number of component parts, ongoing repairs or the various types and sources of deterioration. However, certain general statements may be made on the nature of glazed architectural terra-cotta deterioration. Material failure can most commonly be attributed to water-related problems. However, less frequent though no less severe causes may include: faulty original craftsmanship, which is often cited but hard to determine; stress-related deterioration; damage caused by later alterations and additions; or inappropriate repairs. Water-related deterioration: As with most building conservation and rehabilitation problems, water is a principal source of deterioration in glazed architectural terra-cotta. Terra-cotta systems are highly susceptible to such complex water-related deterioration problems as glaze crazing, glaze spalling and material loss, missing masonry units and deteriorated metal anchoring, among others. Crazing, or the formation of small random cracks in the glaze, is a common form of water- related deterioration in glazed architectural terra-cotta. When the new terra-cotta unit first comes from the kiln after firing, it has shrunken (dried) to its smallest possible size. With the passage of time, however, it expands as it k absorbs moisture from the air, a process which may continue for many years. The glaze then , goes into tension because it has a lesser capacity for expansion than the porous the n' body; it no longer "fits" the expanding unit onto water and air-borne moisture entering the which it was originally fired. If the strength of glazed architectural terra-cotta causes the glaze is exceeded, it will crack (craze). expansion of the porous clay body, increasing its volume.This upsets the "fit" of the glaze Crazing is a process not unlike the random and makes its surface shatter, which is hairline cracking on the surface of an old oil commonly called "crazing." Photo: NPS files. painting. Both may occur as a normal process in the aging of the material. Unless the cracks visibly extend into the porous the body beneath the glaze, crazing should not be regarded as highly serious material failure. It does, however, tend to increase the water absorption capability of the glazed architectural terra-cotta unit. Spalling, the partial loss of the masonry material itself, is, like crazing, caused by water and is usually a result not only of airborne water but more commonly of water trapped within the masonry system itself. Trapped water is often caused by poor water detailing in the original design, insufficient maintenance, rising damp or a leaking roof. In most cases, trapped water tends to migrate outward through masonry walls where it eventually evaporates. In glazed architectural terra-cotta, the water is impeded in its journey by the relatively impervious glaze on the surface of the unit which acts as a water barrier. The water is stopped at the glaze until it builds up sufficient pressure (particularly in the presence of widely fluctuating temperatures) to pop off sections of the glaze (glaze spalling) or to cause the wholesale destruction of portions of the glazed architectural terra- cotta unit itself (material spalling). Glaze spalling (left) may appear as small coin-size blisters where the glaze has ruptured and exposed the porous tile body beneath. This may occur as several spots on the surface or, in more advanced cases of deterioration, it may result in the wholesale Va�ii R disappearance of the glaze. Spalling of the glaze may also be symptomatic of deterioration (rusting) of the internal metal anchoring system which holds the terra-cotta units together and to the larger building structure. The increase in volume of the $ metal created by rusting creates increased internal g pressures in the terra-cotta unit which, in turn, may rc spall the glaze, or in more extreme cases, cause material spalling. Material spalling is a particularly severe situation. Blistering of the glaze, like crazing, is the Not only is the visual integrity of the detailing result of the increase in water in the impaired, but a large area of the porous underbody, porous clay body and the subsequent webbing and metal anchoring is exposed to the destruction of the glaze as a result of destructive effects of further water entry and water migration and pressure. Glaze spalling may also be caused by deterioration. Both glaze and material spalling must deterioratoln of metal anchors behind the be dealt with as soon as possible. Missing units is a terra-cotta unit. photo: NPs files. serious situation which particularly plagues architectural terra-cotta systems. Unlike brick or stone, damaged glazed architectural terra-cotta is exceedingly difficult to replace. New production is extremely limited. Missing units create gaps which increase the structural load on the remaining pieces and also permit water to enter the system. Exposed or freestanding glazed architectural terra-cotta detailing (balusters, urns, parapet walls, etc.) are particularly susceptible to extensive loss of material. These elements face the most severe vicissitudes of water and temperature-related deterioration in direct proportion to the extent of their exposure. The replacement of missing units should be a high priority work item in the rehabilitation of glazed architectural terra-cotta. Deterioration of metal anchoring; Deteriorated anchoring systems are perhaps the most difficult form of glazed architectural terra-cotta deterioration to locate or diagnose. Often, the damage must be severe and irreparable before it is noticed on even the most intense "prima facie" examination. Water which enters the glazed architectural terra-cotta system can rust the anchoring system and substantially weaken or completely disintegrate those elements. Where water has been permitted to enter the system, some deterioration has more than likely taken place. Partial deterioration results in staining and material spalling. Total deterioration and the lack of any anchoring system may result in the loosening of the units themselves, threatening the architectural or structural integrity of the building. Recently, failing glazed architectural terra-cotta units have become a serious safety concern to many building owners and municipal governments. Early detection of failing anchoring systems is exceedingly difficult. Deterioration of mortar and other adjacent materials: Deteriorated mortar has always been a key to the survival or failure of any masonry system. This is particularly true with glazed architectural terra-cotta. In recognition of the fragile nature of the system, the need for insuring a relatively dry internal system is important. Sound mortar is the "first line" of defense in terra-cotta systems. It is a maintenance "must." Deteriorated mortar joints are a singularly culpable source of water and, therefore, of deterioration. Mortar deterioration may result from improper original craftsmanship or air--and waterborne-- pollution. More often, however, lack of ongoing maintenance is mainly responsible. Deteriorated mortar should not be overlooked as a major source of glazed architectural terra-cotta failure. The deterioration of materials adjoining the glazed architectural terra-cotta (flashing, capping, roofing, caulking around windows and doors) bears significant responsibility in its deterioration. When these adjoining materials fail, largely as a result of lack of maintenance, water-related deterioration results. For instance, it is not uncommon to find wholesale terra-cotta spalling in close proximity to a window or doorway where the caulking has deteriorated. Stress-related deterioration: Stress-related deterioration of glazed architectural terra-cotta frequently occurs in high rise buildings. The evolution of stress relieving details (flexible M joints, shelf angles, etc.) occurred late in the development of American building construction. Consequently, most early �r continuously clad High Rise buildings (c.1900-1920s) had little or no provisions for normal material and building movement in their original design. The development of large stress-related cracks or wholesale material deterioration is often caused by unaccommodated building-frame shortening under load, thermal expansion and contraction of the facade and moisture expansion of the glazed architectural terra-cotta units themselves. Cracks running through many units or stories or large areas of material deterioration often indicate stress-related problems. This sort of The damage shown here is deterioration, in turn, permits significant water entry into the the result of direct live load terra-cotta system. on a mid-rise building.The y steel frame has settled and shifted the weight onto the Inappropriate repairs: Inappropriate repairs result because exterior terra-cotta cladding, using new terra-cotta for replacement of deteriorated or resulting in rupturing of the material. Photo: NPS files. missing glazed architectural terra-cotta has generally been impractical. Repairs, therefore, have traditionally been made in brick or cementitious build ups of numerous materials such as stucco or fiberglass. Some materials are appropriate temporary or permanent replacements, while others are not. (These issues are discussed at a later point in this report.) However, improper anchoring or bonding of the repair work or visual incompatibility of repairs have themselves, with the passage of time, become rehabilitation problems: replacement brick that is pulling free, cement stucco that is cracking and spalling, or a cement or bituminous repairs that are not visually compatible with the original material. Alteration damage: Alteration damage has occurred as a result of the installation of such building additions as signs, screens, marquees or bird proofing. These installations often necessitated the boring of holes or cutting of the glazed architectural terra-cotta to anchor these additions to the building frame beneath. As the anchoring or caulking deteriorated, or as these elements were removed in subsequent renovation work, these holes have become significant sources of water-related damage to the glazed architectural terra-cotta system. Deterioration Inspection and Analysis Certain deterioration in glazed architectural terra-cotta may be on the building surface and patently obvious to the casual observer--crazing, spalling, deterioration of mortar joints. Other deterioration may be internal or within the masonry system and hard to determine-- deterioration of anchoring, deterioration behind the glaze, crumbling of internal webbing. Prima facie, "first inspection," examination may indicate surface deterioration problems while not revealing others. This demonstrates one of the most frustrating aspects of dealing with deteriorated glazed architectural terra-cotta: that there are two systems or levels of deterioration, one which is visible and the other which is not. Material failure in glazed architectural terra- cotta is necessarily complex. For this reason, it is generally advised that the examination and repair of this material should be the responsibility of an experienced professional. {` Few restorationists have experience in the inspection, repair and replacement of glazed architectural terra-cotta. This is certainly never the province of the amateur or the most well- intentioned but inexperienced architect or engineer. b There are some methods of internal and external inspection and analysis which are Material spalling is the result of excessive expansion of the porous tile body caused by relatively simple to the trained professional. water and freezing temperatures.This is a Other methods, however, are expensive, time serious condition, often difficult to repair. consumin g, and only hoto: NPS files. yin the experimental stage at this writing. These all generally preclude the use of anyone but an experienced professional. Preliminary cleaning: Before a terra-cotta building is analyzed for deterioration, it is often advisable, but not always necessary, to clean the surface of the material. This is particularly true when the material has been exposed to the vicissitudes of heavy urban pollution. While most building materials are cleaned for "cosmetic" purposes, the cleaning of glazed architectural terra-cotta for the purpose of inspection and analysis may be advised. Dirt on glazed architectural terra-cotta often hides a multitude of problems. It is only with cleaning that these problems become obvious. Recommended cleaning procedures are covered later in the report. Methods of inspection: Prima facie analysis is the unit by unit, firsthand, external inspection of the glazed architectural terra-cotta building surface. Special note of all visible surface deterioration (staining, crazing, spalling, cracking, etc.) should be made on elevation drawings. Binoculars are often used where cost, height, or inaccessibility prevent easy inspection. However, much deterioration may go unnoticed unless scaffolding or window-washing apparatus is used in a true "hands on" inspection of each unit of the facade. Tapping, a somewhat inexact method of detection of internal deterioration is, nevertheless, the most reliable inspection procedure presently available. Quite simply, tapping is the striking of each unit with a wooden mallet. When struck, an undamaged glazed architectural terra-cotta unit gives a pronounced ring, indicating its sound internal condition. Conversely, deteriorated units (i.e., units which are failing internally) produce a flat, hollow sound. Metal hammers are never to be used, as they may damage the glazed surface of the unit. Extensive experience is the best teacher with this inspection method. Infrared scanning is only in the experimental stage at this time, but its use seems to hold great promise in locating deteriorated internal material in terra-cotta. All materials emit heat--heat which can be measured in terms of infrared light. While infrared light cannot be seen by the human eye, it can be measured by infrared scanning. Infrared photography, a kind of infrared scanning, has been of particular use in detecting sources of heat loss in buildings in recent years. Broken or loose internal terra-cotta pieces have a less firm attachment to the surrounding firm or attached pieces and, therefore, have different thermal properties, i.e., temperatures. These temperature differences become evident on the infrared scan and may serve as a fair indication of internal material deterioration in terra-cotta. Sonic testing has been successfully used for some time to detect internal cracking of concrete members. In the hands of an experienced operator, there are conditions where it can detect internal failure in glazed architectural terra-cotta. Sonic testing registers the internal configuration of materials by penetrating the material with sound waves and reading the patterns that "bounce back" from the originating source of the sound. Readings at variance with those from undeteriorated material might indicate collapsed webbing or pools of water in the interior of the terra-cotta unit. Metal detection is a non-destructive and generally useful way of locating the position of internal metal anchoring. Metal detectors indicate the presence of metals by electromagnetic impulses. These impulses are transmitted onto an oscilloscope where they may he seen or they are converted to sound patterns which may be heard by the operator. Original drawings are eminently useful in predicting where internal metal anchoring should be. Metal detectors can confirm that indeed they are still there. Without original drawings, the contractor or architect can still locate the metal anchoring, however. No reading where an anchor would be expected could indicate a missing anchor or one that has seriously deteriorated. The information produced by metal detection is, at best, only rough. However, it is the most viable way of locating the internal metal anchoring without physically removing, thus irreparably damaging, the glazed architectural terra-cotta units themselves. Laboratory analysis may be carried out on samples of removed original material to find glaze absorption, permeability or glaze adhesion, or to evaluate material for porosity. These tests are useful in determining the present material characteristics of the historic glazed architectural terra-cotta and how they may be expected to perform in the future. Maintenance, Repair and Replacement Deterioration in glazed architectural terra-cotta is, by definition, insidious in that the outward signs of decay do not always indicate the more serious problems within. It is, therefore, of paramount importance that the repair and replacement of deteriorated glazed architectural terra-cotta not be undertaken unless the causes of that deterioration have been determined and repaired. As mentioned , before, one of the primary agents of deterioration in glazed architectural terra-cotta is water. Therefore, water-related damage can be repaired only when the sources of that water have been eliminated. Repointing, caulking and replacement of missing Exposed or freestanding terra-cotta mason feces are also of primary concern. Where detailing {parapets, urns, balusters, etc.) masonry P P rY have traditionally been subjected to the detailing to conduct water in the original design has most severe vicissitudes of deterioration been insufficient, the installation of new flashing or as a result of freezing temperatures and weep holes might be considered. water. Photo: NP5 files. Where stress-related or structural problems have caused the deterioration of glazed architectural terra-cotta, the services of a structural engineer should be sought to mitigate 4) these problems. This may include the installation of relieving joints, shelf angles or flexible joints. In any case, stress-related and structural deterioration, like water-related deterioration, must be stopped before effective consolidation or replacement efforts may begin. Cleaning: The successful cleaning of glazed architectural terra-cotta removes excessive soil from the glazed surface without damaging the masonry unit itself. Of the many cleaning materials available, the most widely recommended are water, detergent, and a natural or nylon bristle brush. More stubborn pollution or fire-related dirt or bird droppings can be cleaned with steam or weak solutions of muriatic or oxalic acid. A note of caution: Any acids, when used in strong enough solutions, may themselves deteriorate mortar and "liberate" salts within the masonry system, producing a situation called efflorescence. Commercial cleaning solutions may be appropriate but probably are not necessary when water and detergent will suffice. There are, however, certain cleaning techniques for glazed terra-cotta which are definitely not recommended and which would damage the surface of the material. These include: all abrasive cleaning measures (especially sandblasting), the use of strong acids, (particularly fluoride-based acids), high-pressure water cleaning and the use of metal bristle brushes. All of these techniques will irreparably harm the glaze in one fashion or another and subsequently expose the porous tile body to the damaging effects of water. It is important to remember that glazed architectural terra-cotta was designed to be cleaned cheaply and easily. This, in fact, was one of its major assets and was much advertised in the selling of the material early in this century. Waterproofing: The covering of crazed glazing with waterproof coatings is the subject of an ongoing controversy today. The question involves whether or not the micro-cracks conduct substantial amounts of water into the porous tile body. Tests indicate that the glaze on new unexposed terra-cotta is itself not completely waterproof. Some testing also indicates that most crazing on historic glazed terra-cotta does not substantially increase the flow of moisture into the porous tile body when compared to new material. Excessive and serious crazing is, however, an exception and the coating of those areas on a limited scale may be wholly appropriate. In an effort to stem water-related deterioration, architects and building owners often erroneously attribute water-related damage to glaze crazing when the source of the deterioration is, in fact, elsewhere: deteriorated caulking, flashing, etc. The waterproof coating of glazed architectural terra-cotta walls may cause problems on its own. Outward migration of water vapor normally occurs through the mortar joints in these systems. The inadvertent sealing of these joints in the wholesale coating of the wall may exacerbate an already serious situation. Spalling of the glaze, mortar, or porous body will, more than likely, result. Repointing: Repointing of mortar which is severely deteriorated or improperly or infrequently maintained is one of the most useful preservation activities that can be performed on historic glazed architectural terra-cotta buildings. Ongoing and cyclical repointing guarantees the long life of this material. Repointing should always be carried out with a mortar which has a compressive strength (measured in p.s.i.) lower than the adjacent masonry unit. Hard (Portland cement) or coarsely screened mortars may cause point loading and/or prevent the outward migration of the water through the mortar joints, both of which ultimately damage the terra-cotta unit. Repointing with waterproof caulking compounds or similar waterproof materials should never be undertaken because, like waterproof coatings, they impede the normal outward migration of moisture through the masonry joints. Moisture then may build sufficient pressure behind the waterproof caulk and the glaze on the terra-cotta to cause damage to the unit itself. Repair of glaze spatting: Glaze spalling is also a highly culpable source of water-related deterioration in glazed architectural terra-cotta. It is important to coat or seal these blistered areas and to prevent further entry of water into the system by this route. All loose or friable material should be removed. This may be done easily by hand; chisels or similar small tools are most effective. The exposed material is then painted over. At this time, no permanently effective reglazing materials are available. However, there are several acrylic- based proprietary products and masonry paints which can be used effectively to protect these exposed areas, thus preventing the entry of water. These materials are effective for 5 to 7 years A worker cleans out mortar and can be reapplied. They also can be tinted to approximate joints in preparation for closely the original glaze color. repointing the architectural terra-cotta photo: NPS files. Repair of minor material spatting: Minor material spalling, where visual or cosmetic considerations are negligible, should be treated in a manner similar to glaze spalling damage. That is, areas where small portions of the body and glaze have spalled and which are far removed from close scrutiny (i.e., detailing on entablatures, upper story windows, etc.) are best remedied by painting with a masonry paint or an acrylic-based proprietary product. Units on which material spalling is easily observed (on the street level, door surrounds, etc.), and on which visual integrity is a consideration, may be better replaced. Patching is not appropriate. Stucco-like or cementitious buildups are difficult to form satisfactorily, safely and compatibly in situ to replace missing pieces of glazed architectural terra-cotta. Cementitious repairs never satisfactorily bond to the original material. The differential expansion coefficients of the two materials (the repair and the original) preclude a safe, effective and long-term attachment. Repair of major spatting: Glazed architectural terra-cotta units, which have spalled severely thereby losing much of their material and structural integrity in the wall, should be replaced. Partial in situ repair will not be long lasting and may, in fact, cause complicated restoration problems at a later date. Appropriate methods of replacement are discussed at a later point in this report. Temporary stabilization: Stabilization measures are necessary when deterioration is so severe as to create a situation where pieces of glazed architectural terra-cotta may fall from the building. This is a particular concern with greatly exposed detailing: cornices, balconies, balustrades, urns, columns, buttresses, etc. Restoration work on these pieces is expensive and often must be carried on over a period of time. Unstable terra-cotta pieces are often removed or destroyed in lieu of such measures. This is particularly true in areas of heavy traffic-related vibrations or in earthquake zones. There are, however, less severe measures which may be employed on a temporary basis. Substantial success has been achieved in securing unstable glazed architectural terra-cotta pieces with metal strapping and nylon net. While these measures should not be seen as permanent preservation solutions, they do offer temporary alternatives to the wanton destruction of significant glazed architectural terra-cotta detailing in the name of public safety and local code compliance. Repair of addition and structural damage: Holes, sign anchors, slots for channel steel, or structural cracking in the surface of glazed architectural terra-cotta cladding should be permanently sealed with a material that will expand with the normal dynamics of the surrounding material, yet effectively keep water out of the system. Any one of a number of commercially available waterproof caulking compounds would be appropriate for this work. Holes and static (non-moving) cracks may be caulked with butyl sealants or acrylic latex caulks. For dynamic (moving or active) cracks, the polysulfide caulks are most often used, although others may be safely employed. It is, however, important to remember that these waterproof caulking compounds are not viable This crack is being measured. Structural repointing materials and should not be used as cracking, whether static (nonmoving)or such. dynamic (moving) should be caulked to prevent water entry into the glazed architectural terra- Temporary replacement: Temporary cotta system. Photo: NPS files. replacement measures should be implemented when missing units are scheduled to be replaced but work cannot be undertaken immediately. Lengthy delivery time, prorating of work or seasonal considerations may postpone replacement work. Severe deterioration should at least be ameliorated until work can begin. Temporary repointing, removal and saving of undamaged units to be reset later, or the temporary installation of brick infill to retard further deterioration might be considered. Removing earlier repairs: Removing earlier repairs may be necessary when the work has either deteriorated or has become visually incompatible. Cementitious stucco, caulkings with black bituminous compounds or brick repair work may become structurally or visually unstable or incompatible and should be removed and properly rehabilitated. Replacement of glazed architectural terra-cotta: Replacement of severely spalled, damaged, or missing glazed architectural terra-cotta elements is always difficult. Certainly, in-kind replacement is advisable, but it has a number of drawbacks. Stone, fiberglass, and precast concrete are also viable choices, but like in-kind replacement, also have their inherent problems. Several notes on replacement: When replacing glazed architectural terra-cotta, all of the original deteriorated material should be completely removed. Half bricks or similar cosmetic replacement techniques are not advised. -- When possible and where applicable, replacement units should be anchored in a manner similar to the original. Both structural and visual compatibility are major considerations when choosing replacement materials. -- Removing and re-anchoring damaged glazed architectural terra-cotta is an extremely difficult if not impossible task. The complexity of the interlocking system of masonry units, backfill, and metal anchoring system precludes the removal of the glazed architectural terra-cotta unit without destroying it. -- Re-anchoring deteriorated units is likewise impossible. Therefore, if the terra-cotta in question is loose, severely deteriorated, or its structural integrity in serious question, it is best removed and replaced. In-kind replacement is possible today, but only on a limited basis. Most new glazed architectural terra-cotta is machine made, not hand made as the original. Thus, the porous tile body of the new material tends to be more uniform but less dense and often not as durable. The glaze on the new glazed architectural terra-cotta tends to be thinner than that on the older material and subsequently more brittle. Machine processing has also produced a glaze that is uniform in color as opposed to historic glazes which were slightly mottled and, therefore, richer. Visual compatibility is an important consideration when replacing in- kind. Only a fairly limited inventory of in-kind pieces is presently available for replacement such as plain ashlar blocks and the simpler details such as cappings and sills. When deterioration severely damages the more ornate pieces (urns, cartouche work, balusters, etc.) either expensive hand casting or alternative materials must be sought. There is a tendency today to replace damaged ornamental work with simpler, cheaper and more readily available units. This decision cannot, however, be supported, as the removal of this work inevitably diminishes the character and integrity of the building. Another major consideration in choosing in-kind replacement is the question of delivery time, which is often quite lengthy. If new glazed architectural terra-cotta is chosen as a replacement material, the architect or building owner should plan far in advance. Stone may be a suitable replacement material for damaged glazed architectural terra- cotta. Its durability makes it highly appropriate, although the increase in weight over the original hollow units may be of some concern. The fact that historic glazed architectural terra-cotta was glazed in imitation of stone, however, may make the choice of stone as a replacement material a fortuitous one. Metal anchoring may be accommodated easily in the carving. Cost, however, is the major drawback in stone replacement, particularly where rich detailing must be carved to match the original. Fiberglass replacement is a viable alternative, particularly when rich and elaborate ornamentation has to be duplicated. Casting from original intact pieces can produce numerous sharp copies of entablatures, moldings, balusters, voussoirs, etc. Anchoring is easily included in casting. Significant drawbacks in using fiberglass replacement are color compatibility, fire code violations, and poor weathering and aging processes. The appropriate coloring of fiberglass is exceedingly difficult in many instances. Painting is often unsatisfactory, as it discolors at a rate different than that of the historic glazed original. While fiberglass casting is lighter than the original units and, therefore, of great interest in the rehabilitation of buildings in areas of high seismic activity, many fire code requirements cannot be met with the use of this material. Precast concrete units show great promise in replacing glazed architectural terra-cotta at this writing. Precast concrete units can, like fiberglass, replicate nuances of detail in a modular fashion: they can also be cast hollow, use lightweight aggregate and be made to accommodate metal anchoring when necessary. Concrete can be colored or tinted to match the original material with excellent results. It is cost effective and once production is in process, precast concrete call be produced quickly and easily. Experience shows that it is advisable to use a clear masonry coating on the weather face of the precast concrete units to guarantee the visual compatibility of the new unit, to prevent moisture absorption, to obtain the proper reflectivity in imitation of the original glaze and to prevent weathering of the unit itself. Precast concrete replacement units are presently enjoying great use in replicating historic glazed architectural terra-cotta and show promise for future rehabilitation programs. Once the replacement material is selected (new glazed architectural terra-cotta. stone, precast concrete, or fiberglass), it must be reanchored into the masonry system. Original metal anchoring came in numerous designs, materials and coatings ranging from bituminous-coated iron to bronze. While most of these anchors are no longer available, they may be easily replicated in large quantities either in the original material when appropriate or out of more durable and available metals such as stainless steel. Since the masonry backfill is already in place in the historic building, the new replacement unit with anchoring may simply be fitted into the existing backfill by boring a hole or slot for anchor and bedding the anchor and the unit itself in mortar. When replacing historic glazed architectural terra-cotta which originally employed metal anchoring, it is important to replace that anchoring when replacing the unit. Serious problems may result if anchoring is omitted in restoration, when it was used originally. It is erroneous to assume that mortar alone will be sufficient to hold these replacement pieces in place. Summary Today, many of this country's buildings are constructed of glazed architectural terra-cotta. However, many of these are in a state of serious deterioration and decay. Glazed architectural terra-cotta was, in many ways, the "wonder" material of the American building industry in the late 19th century and during the first decades of the 20th century. New technology and methods of rehabilitation now hold promise for the restoration and rehabilitation of these invaluable and significant resources. Restoration/rehabilitation work on glazed architectural terra-cotta is demanding and will not tolerate halfway measures. Today's preservation work should equal the spirit, attention to detail, pride in workmanship and care which characterized the craftsmanship associated with this widely used, historic masonry material. Suggested Further Readings "Recipes for Baked Earth." Progressive Architecture (November, 1977). McIntyre, W.A. Investigations into the Durability of Architectural Terra Cotta. Special Report 12. London: Department of Scientific and Industrial Research, Building Research Station, 1929. Prudon, Theodore H.M. "Architectural Terra-cotta: Analyzing the Deterioration Problems and Restoration Approaches." Technology and Conservation, Vol. 3 (Fall, 1978), pp. 30-38. Prudon, Theodore H.M. Terra Cotta as a Building Material. A Bibliography. Ottawa, Ontario: Association for Preservation Technology, 1976. Acknowledgements This Preservation Brief was written by de Teel Patterson Tiller,Architectural Historian,Technical Preservation Services Division. Information for this publication was based in part upon interviews and consultation with Theodore H.M. Prudon,The Ehrenkrantz Group, P.C., New York, New York. Additional comments and information were provided by Si A. Bortz, Illinois Institute of Technology Research Institute, Chicago, Illinois, and Jerry G. Stockbridge, Wiss,Janney, Elstner, and Associates, Northbrook, Illinois. Washington, D.C. June, 1979 Home page logo:Terra-cotta detail on the Adams Hotel,Tulsa, Oklahoma. Photo: NPS files. This publication has been prepared pursuant to the National Historic Preservation Act of 1966, as amended, which directs the Secretary of the Interior to develop and make available information concerning historic properties. Technical Preservation Services (TPS), Heritage Preservation Services Division, National Park Service prepares standards, guidelines, and other educational materials on responsible historic preservation treatments for a broad public. Preservation Briefs I Questions KDW