Loading...
09-200 Resolution No. 09-200 RESOLUTION APPROVING CHANGE ORDER NO. 2 AND FINAL IN THE CONTRACT WITH MARTAM CONSTRUCTION, INC. FOR THE SPARTAN DRIVE EXTENSION PHASE II PROJECT WHEREAS, the City of Elgin has heretofore entered into a contract with Martam Construction, Inc. for the Spartan Drive Extension Phase II Project; and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 2 and Final, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Sean R, Stegall, City Manager,be and is hereby authorized and directed to execute Change Order No. 2 and Final,a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock, Mayor Presented: September 9, 2009 Adopted: September 9, 2009 Vote: Yeas: 5 Nays: 0 Attest: s/Diane Robertson Diane Robertson, City Clerk .( OF E4 ' ,,,, 0 ' Change order ....„,, �,,,(i*n City of Elgin O't,TED 0-% ELGIN,ILLINOIS PROJECT 339783 CHANGE ORDER No. 2 AND FINAL CONTRACT: Spartan Drive Extension—Section II Project(Bid No. 07-091) SCOPE: The scope of this change order includes increasing the contract quantities to properly reflect final quantities completed by Martam Construction, Inc. of Elgin, Illinois in accordance with the awared contract on September 28,2007 and change order number one on October 15,2008. REASONS FOR CHANGE: This change order is necessary to fund the final quantities completed by the contractor in accordance with his original contract and change order number one. The increases are due to earthen material considered unsuitable excavated from areas where the road was eventually con- structed, pavement and erosion control items. Change order number one incorrectly deducted quanti- ties from the project that had been deducted at the time of the original award. The reasons supporting this change order are: • The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed. • The change is germane to the original contract as signed. ▪ The change order is in the best interests of the City of Elgin and is authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: This contract is being amended to add back funds that were incorrectly removed from the contract amount at the time of Change Order No. 1. ORIGINAL CONTRACT AMOUNT(PER PURCHASE ORDER): $3,782,605.00 CHANGE ORDER No. 2 Increase quantities for; Earth Excavation Bituminous Pavement Erosion Control TOTAL FOR CHANGE ORDER NO. 2 AND FINAL: ADD $ 53,506.20 PREVIOUS CHANGE ORDER(S): Change Order No. 1 $ 522,741.57 TOTAL OF PREVIOUS CHANGE ORDERS: ADD $ 522,741.57 TOTAL REVISED CONTRACT AMOUNT: $4,358,852.77 The original amount of the contract with Martam Construction, Inc. is $3,782,605.00. Change orders One and Two will increase the original contract amount by a total of$576,247.77, that sum representing fifteen percent(15%) of the original contract amount. The new contract amount, inclusive of all change orders is $4,358,852.77. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. TWO AND FINAL August 22,2009 Agreed to this 26th day of August, 2009. Recommended by: Public Works Department,Engineering Divison By: JO AerS Title:_ City En a neer Date: Ger r Signahu eir� ' Accepted by: Martam Construction,Inc. Party of the Second Part(Contractor) By: ,on4 g47itoV97—, Title: V t c£ P s'.d£iJ7 Date: F— 2t-c9 Signature:_ Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Sean Stegall Title: City Manager Date: (JO // Signature: 41 ' F:\Legal Dept\forms\Change Order Fonn.doc • 9 x88888 x PCg N ,_�[" S8 t gg 8 roaa mg a8ffi:> w iI is .:-Ii- 8 i g i l ' A ion l l iii tl c§$ g^ g_ $i€ 5 � `o eii iiio=ii P mm mm m u� m m mm m OOd r 03; m m •,2 I ` +yypp L 1ipyLOIgliyp9 9� yr' O •j .tom C i 0i '' ? S C}}pC !! ` Ei5 ' 1 aa0 ' t nt--s "6 1 y` D 2- -..§Tm - ��' .m .2 LTi •.S In'T[ m m m my y, nZ y;x x�sc��'� F', -11 Ell I jQ ;: m2' A _ • P� w-8yQ Cs § ffiy •R9I TTYty y�� CFC C= C� 1. t� '^ f .J_.. u.�y ° -. ° vs Fmm �]If�DIO QFl °' •I8 �. sr xPa� .2 -. . Fr42 SIS .41 D QEFA m •D �T' p cox¢ '_m Vo c c •g 5 , g° n n i x Hr q �� f°m , s1 ❑E7 i � � .; .iii •,� I itl Ro ;Ii ; i� i a 44_ m m ii-.D 4 fP o r + aro - v ad ..a'R a +o- 00 ` 1, ,it':o=8 g B m E w T : m _ -c§iff. c . 0 a #:0:: 188Yi8S8ai6YP� i2�1'" 1 1 • oga000b 0 0 0 0 0 0 0 0 poo b b -pom.oG�.ou00000 0000bb-'++bovbbbbbeb.b 1 011iII!IIH!ii!!lP!IPIPPIHPIIUIUIPuIIIUIP! 1111111 111 1 IR I � t` I�, Ii . H. ,. .gp q45:4.'. :A6 KN: : o b g Plc, 0 11 f:. o c m b o G b o' b.P o�•o 111 �■■�J, X11 11111111T��� N, S '[ 11' pi a; bk... ler' °' II i 111. riiti P I;IIIIii; ! i L - : [ ' ' 8 . i . : ' f!lir' plp4d -P '. ° }: S 0 o Et 31 n 5 gi 'v 86<0 0 0 D e - f'Z =_x100 g ' Z °: : o g u m m _ Q� oo 2gpn1 vgo.Ivs_o gNN,-,ORIR Ro&a 174W g y ;:;::°; vmmo uoomobo0 ;;° : : °: . 8 ' > N x t _ _ me- cc- :" aggg€off x ..7_,. i kls:g n § ils88,gsxgwbss', 41P : o 18? gign5.1; ggr;:E-gl 8 88888 8 8 •8" 8 8 8 888 8 8 888888gRs8..wr8=008888 8ob;i: 88$,:8g8888So s .f-tee O O OP V V V J II I _ ptio i $ ir18113 i jp, ! 'iit'ILI1 3S mmm� mam2 i1 11 Y a A Jym Z gAzz ; I l a sn �� i : � -p, , m ♦ !4" �i� m-Qu4 wf! E A i!mmAI EL .Z m ~ I Fp p 8a > m � r` �11 : A : � f `%1 E 'ti f i wppp 1. C µ A P. I Ilk L i W_ N m{+ U� �Nj `y� \ ga4 4.24 1 - A p OH._ m N _ 'X P V SCI YL" P NI 000 oco b-ob000-b-- - oa cobboc bib - - 0 0 0 0 ob 000bbbc . .iiIiI .iiIb!Isi:': . _ . ,,, §: + : ' .f. : , . A ' qit illiiiiiiNitt t � iii ,.! [11 ,1 0 ; .. i . . ‘ - : : - -PIA; !:.: : : : 11. : : , t ',. P§ , - : J ,M9 - o Oq - m.O-o ... oep- - 01 - -1 - - 1 il :4 ll !!!, : Plg: : i i qr0" ''' 111111111111111111111111111111111111111111111, 711117!!!!!!!!MIT!!!!111111111 1 11 m gl € o Q$ iN J sT N I ! fig at N AN _ o $meoo- =�a9'.�iio oo_o _r$ S moo o-ao m a m w-. 'oo-1u.' 9rte cj T o 0 o p o m o m o poo a o o m o O w in o o O V G b G O p V o q « M 3m p p L ar a O L p An . L L� u+m 0 r _ m V ?m q o �1 o:gg s$�sa a §s .A s§,411:A1 s - _tso o §§ao:a v Aa § 8 s 6 ai; - ..'. , 8a8ss ssgs 8 8s8s's88s:$:'a$ 88; ;88888 : :8a 888888$$8$8 8 8 $ 88 88s8"ds8 . h a e 4 ' �A %:%- 1'7. 1%12f . YPYY P�:b ..9gg p 7" idrS TO Oppm pVmYN+ :0,444 ,ba. q :' Vv IW S �_ :6:*q. ` 6 sdyi 92 is I!i; .m,g ,4 75 ;,8m iPP " y ,; 'ig v- iewi' !AS —L; f110,i1g6 p y, �iC sa - 'ymmm m y p x9 :yob ' Jj� V01(]ZE �.4fgm " 1; i 7•+l 116 •, 2 1 pp��-+ vI~,vya 1px.�.0 Si 1 g px� -.OP rl'ri $ T 2<s $ ! 3 .� l li S7 s :. F Oixot m '- 4 AMIW ,,1 R-3 p w< ... 2 ;1 ac_ m$ i ig a. m 2 N m .=1 P = Al S •"ti1 1 s . . E i :Ilk 4� !! �Zp O N {y N a \ ,1".,1� a_-i�Li.....%t',r„! y ,ub"b'8t:•$'_ -0..a S py,, $m M fS .iA -A-i 8�-1 0o b bb abi obbobbo a bbbbbboo oMoo ob -bo bo 'o-bi bb b'-bb o b o b of9 i Illi gg iEll :12::::ED MID MEE* 01111:111:111- i gip . 1! !It' MIE113111FM1111111 o 4 Y 7yt JR5 III o- 'yo- !II 'tee is o ♦ 'p" v Oob il r ./ 110140r1r . 1 t . R 1111111111111111111111111111111111111111111111111111111111111111121 1il _ : , . : ; : :ill ' : 111111111111111111 1111111111111111111111111111111111111 1 . PA gki 22 24 P m 33 0 Y r. 54 'un 4=3 m . - tri �a�vgm i O d� '-A� &o _ , ; ww000�+u $- g' Po Y� •--i L u = m 'o3 •N 35 I ob b ooYN !17,blli`V.OUb yobb000bb omob oo OOb YW�O mOJu. n,"GMabb b O is b 000 f. i7L' r ISZZt 4 -O 3; NMT t ..O N m .5 ttg t v 5 V :8 8 88888888 888 8 888688888 8888 88 g88 48 5888 8888888 8 8 8 8 : ;8g xlmmmmm RV PM opp �q IIii 7�� � � .. u- jo ZS iC L''Y �� 1 I 1/11 � �r. 11 M, i:i�. 1 is a , iv ;lit r m+ s3 'rb' ii H .A Aga. g 1 m 13 tog a _" 'z a o s Q. I S m r1 a rs 8 Zi 1 f h it 2 i .14i\ r 43 fa+ee 3 ' \ . o -`'`;`y� al i t I g� M Fil IN Fl III i ga y u �O 'l v 4• GGG v O. 21 si 1IIII1IHII A 4 filEQQ 4. 1E el RI,F i' 113 111 1 , ..-� gn �$ •9 y �:- c =tiiit p n ' � mu �,oeo3 �• e Z PT.; P x i yJ� Py 3 -11 1s 285 $ V088888 • OF ESC 'a Agenda Item No. City of Elgin rn o 1 VI '17ED IA' : y� : August 20, 2009 s� �. Its TO: Mayor and Members of the City Council "'/ . ,` `k FROM: Sean R. Stegall, City Manager ,1, 1. �' inn arty Stable City Government Joe Evers, City Engineer SUBJECT: Change Order No. 2 and Final with Martam Construction for the Spartan Drive Extension Phase II Project PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider authorization of Change Order No. 2 and Final for the Spartan Drive Extension—Phase II Project. RECOMMENDATION elk It is recommended that the City Council authorize the City Manager to execute Change Order No. 2 and Final to the contract with Martam Construction for the Spartan Drive Extension — Phase II Project in the amount of$53,605.20. BACKGROUND On September 12, 2007, the City Council awarded the subject project to Martam Construction. The project provided for the completion of the extension of Spartan Drive west from the Elgin Community College (ECC) campus approximately 3,000 feet to its terminus east of Randall Road. The project included construction of a 36 foot wide roadway with curb and gutter, storm sewer, roadway lighting, bike path, street trees, landscaping and extension of an eight inch diameter water main. On October 22, 2008, the City Council approved Change Order No. 1 ($522,741.57) which added three new contract pay items and quantity increases/decreases to existing contract pay items. Change Order No. 1 resulted primarily from the need to replace poor existing subbase soils with material suitable upon which to build a roadway. The attached change order increases the quantity of contract items included in the awarded amount to reflect the final contract. The majority of the increases are due to additional excavation of unsuitable materials (asphalt and erosion control materials)that were removed. Spartan Drive Extension,Phase II, Change Order and Final August 20, 2009 Page 2 COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None FINANCIAL IMPACT The cost of Change Order No. 2 totals $53,506.20. The first change order totaled $522,741.57 /o�L for a total of$576,247.77 added to the original award amount of$3,782,605.00 for a final project v/r total of $4,358,852.77. There are sufficient funds budgeted ($5,033,680) and available ($354,844) in the Riverboat Lease Fund, account number 276-0000-791.93-80, "Public Ways- Street Improvements", project number 339783, "Spartan Drive Extension" to complete this change order. Per the agreement with ECC,the City will be reimbursed 50%of the roadway construction costs. Therefore,the final cost of Change Order No. 2 to the City will be 26,753.10. L GAL IMPACT None ALTERNATIVES 1. The City Council may choose to approve Change Order No. 2 and Final with Martam Construction for the Spartan Drive Extension — Phase II Project in the amount of $53,605.20. 2. The City Council may choose not to approve Change Order No. 2 and Final with Martam Construction for the Spartan Drive Extension—Phase II Project. Respectfully submitted for Council consideration. JE Attachment 4) .(OF E-<Ci. ' r '"'€ City of Elgin Change Order � * f ELGIN,ILLINOIS PROJECT 339783 CHANGE ORDER No.2 AND FINAL CONTRACT: Spartan Drive Extension—Section II Project(Bid No.07-091) SCOPE: The scope of this change order includes increasing the contract amount to properly reflect what should have been awarded originally to Martam Construction, Inc. of Elgin, Illinois on September 28, 2007 and amended via a change order number one on October 15, 2008. The original award amount included a deduction/alternate that proved to be unnecessary. REASONS FOR CHANGE: This change order is required to correct a deduction that was made at the time of the original contract award. The deduction was identified in the original contract as Alternate One which included creating a berm on the Elgin Community Campus (ECC) utilizing earthen material excavated from areas where the road was eventually constructed. If ECC had agreed to allow the con- struction of the berm,the cost of the contract could be reduced by the cost to truck the material to a new site some distance from the project. The reasons supporting this change order are: • The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed • The change is germane to the original contract as signed • The change order is in the best interests of the City of Elgin and authorized by law SUMMARY OF CHANGES IN CONTRACT AMOUNT: This contract is being amended to add back in funds that were incorrectly removed from the contract amount at the time of the City's award. ORIGINAL CONTRACT AMOUNT(PER PURCHAE ORDER): $3,782,605.00 CHANGE ORDER No.2 Add back in the cost to truck material offsite $63,606.00 (original award memo) Deduct unused contract quantities $10,100.00(-) Correct purchase order $ 0.20 TOTAL FOR CHANGE ORDER NO.: ADD $ 53,506.20 PREVIOUS CHANGE ORDER(S): Change Order No. One $522,741.57 TOTAL OF PREVIOUS CHANGE ORDERS: ADD $ 522,741.57 TOTAL REVISED CONTRACT AMOUNT: $4,358,852.77 ow The original amount of the contract with Martam Construction, Inc. is $3,782,605.00. Change orders One and Two will increase the original contract amount by a total of$576,247.77,that sum representing fifteen percent (15%) of the original contract amount. The new contract amount, inclusive of all change orders is$4,358,852.77. '4111) OTHER CONTRACT PROVISIONS:All other contract provisions remain the same. CHANGE ORDER No. TWO AND FINAL August 22,2009 Agreed to this day of ,2009. Recommended by: Public Works Department,Engineering Divison By: Title: City Engineer Date: Signature: Accepted by: [INSERT NAME OF CONTRACTOR] Party of the Second Part(Contractor) By: Title: Date: Signature: Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Sean Stegall Title: City Manager Date: Signature: Mega!Dept\forms\Change Order Fonn.doc n , • co •Mn 'ti Memorandum r , City of Elgin �o�.�. 11-,, 0 �44flDFEg Date: September 28, 2009 To: Joe Evers, City Engineer From: Jennifer Quinton, Deputy City Clerk Subject: Resolution No. 09-200, Adopted at the September 9, 2009, Council Meeting Enclosed you will find the agreement listed below. Please retain a copy for your records. If you have any questions please feel free to contact our office 847-931-5660 and we will do our best to assist you. Thank you. • Change Order No. 2 and Final in the Contract with Martam Construction, Inc. for the Spartan Drive Extension Phase II Project