Loading...
08-44 Resolution No. 08-44 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH SINNETT BUILDERS, INC. FOR ELGIN SHORES FOREST PRESERVE PARK IMPROVEMENT PROJECT WHEREAS, the Citycof Elgin has heretofore entered into a contract with Sinnett Builders, Inc. for Elgin Shores Forest Preserve Park Improvement Project; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Olufemi Folarin,City Manager,be and is hereby authorized and directed to execute Change Order No. 1,a copy of which is attached hereto and made a part hereof by reference. s/ Ed Schock Ed Schock, Mayor Presented: February 27, 2008 Adopted: February 27, 2008 Omnibus Vote: Yeas: 7 Nays: 0 Attest: s/Diane Robertson Diane Robertson, City Clerk Resolution No. 08-44 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH SINNETT BUILDERS, INC. FOR ELGIN SHORES FOREST PRESERVE PARK LMPROVEMENT PROJECT ' I . fkiliX) WHEREAS, the City of Elgin has heretofore entered into a contract with Sinnett Builders, . Inc. for Elgin Shores Forest Preserve Park Improvement Project; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described Jr)( in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,that Olufemi Folarin, City Manager,be and is hereby authorized and directed to execute Change Order No. 1,a copy of which is attached hereto and made a part hereof by reference. Ed Schock, Mayor Presented: Adopted: Vote: Yeas Nays: Recorded: Attest: Diane Robertson, City Clerk CHANGE ORDER OWNER 0 CONSTRUCTION MANAGER-ADVISER EDITION CONSTRUCTION MANAGER 0 AIA DOCUMENT G701/CMa ARCHITECT 0 CONTRACTOR 0 FIELD 0 (Instructions on reverse side) OTHER 0 PROJECT: Elgin Shores Forest Preserve CHANGE ORDER NO.: 1 (Name and address) Rte 31 Elgin, IL INITIATION DATE: 1/7/08 TO CONTRACTOR: Sinnett Builders, Inc.. .,, PROJECT NOS.: 509670 (Name and address) 39W171 Highland Ave. Elgin, IL 60124 CONTRACT FOR: Excavation CONTRACT DATE: 9/26/07 • The Contract is changed as follows: 1 .Undercut unsuitable soils, install 3" stone $ 3 , 500 . 00 2 .Misc. Work (playground drainage, batting cage paving, additional access drive) $27 , 000 .00 3 .Additional equipment to grade haul spoils $19, 800 . 00 4 .Landscape matting $24 , 960 . 00 Total $75 , 260 . 00 Not valid until signed by the Owner, Construction Manager, Architect and Contractor. The original(Contract Sum)(61(XIXIMIEOClgitaitteXCIDCPriCti was $ 569, 000 . 00 Net change by previously authorized Change Orders S 0 .00 The(Contract Sum)( araolieXdG>Milaaean>rnxRt ) prior to this Change Order was s 569 , 000 . 00 The(Contract Sum)Iuarac emckbOtxlnlo>r hilts) will be (increased) ( MM3dq:(tiH Mali ) by this Change Order $ 75 , 260 .00. The new (Contract Sum)(ficartetIDECCM2ticatutsCzkitp including this Change Order will be $ 644 , 260 . 00 The Contract Time will be (XX.dia t t' f ) (unchanged) by ( 0 )days Y The date of Substantial Completion as of the date of this Change Order therefore is NOTE:This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. CONSTRUCTION MANAGER ARCHITECT ADDRESS ADDRESS BY DATE BY DATE City of Elgin CONTRACTOR Sinnett Builders, Inc. OWNER 39W171 Highland Ave. 151 Dexter Court, Elgin, IL 60120-5555 ADDRESS F1 rTin, IL 60124 A.ii 1 • BY j44/#,A114,19.41F DATE 1/7/08 BY Olufe •Folari DATE 2/27/08 City nag CAUTION: You should use an original AIA document w ich has this caution printed in red. AIAAn original assures:that.changes will not be obscured as may occur when documents are reproduced. AIADOCUMENT d7GU0Aa•CHANGE ORDER•CONSTRUCTION MANAGER-ADVISER EDITION• 1992 EDITION•AIAa ®IS$)2•THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVENUE.N.W., WASHINGTON, D.C. 2txXX-5292 • r WARNING:unlicensed photaropying violates U.S. copyright laws arta will subject the violator to legal prosecution. G701/CMa-1992 E Y y February 8, 2008 G N TO: Mayor and Members of the City Council RECREATIONAL LEISURE AN[,CULTURAL OPPORTUNIT IFS illR Al ,ITIZFNS FROM: Olufemi Folarin, City Manager Randel Reopelle, Parks and Recreation Director SUBJECT: Elgin Shores Change Order No. 1 with Sinnett Builders Inc. PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider authorization of Change Order No. 1 with Sinnett Builders, Inc. for the Elgin Shores Forest Preserve park improvement project. RECOMMENDATION It is recommended that the City Council approve the execution of Change Order No. 1 with Sinnett Builders, Inc. for the Elgin Shores Forest Preserve park improvement project for a total of$75,260. BACKGROUND In September of 2007, the City entered into a contract for $569,000 with Sinnett Builders to construct phase I of the Elgin Shores Forest Preserve park improvements, which included site grading, roadway and parking lot improvements, wetland restoration, natural landscaping and the installation of a boat launch. During the course of the construction, which is 90% complete, a number of issues surfaced that required change orders. The project is partially funded through an Open Space Land Acquisition and Development Grant and these outlined change orders have been approved and accepted by the Illinois Department of Natural Resources. The first item listed in the change order is related to unsuitable soils present in the area that the boat ramp was to be constructed. Although the original contract did include an allowance for the removal and fill of unsuitable soils,the actual quantity turned out to be larger then the allowance. The cost for the additional undercut and fill is $3,500. The second item listed in the change order is infrastructure work related to phase II of the project, which will include the playground, shelter, batting cages and boat dock. It includes under drainage and concrete work for the playground, paving for the batting cages and a paved drive. The cost for these improvements is $27,000. Elgin Shores Change Order No. 1 with Sinnett Builders, Inc. February 8, 2008 Page 2 The third item listed in the change order is related to the excavated material that was hauled to the Highlands phase II site. Based on the recommendation from the Highlands site engineer, a bull dozer and operator were brought onto the site to spread the soil hauled from Elgin Shores, after it was dumped on the golf course site. The cost for the operator and equipment to spread the excavated material was $19,800. The last item in the change order is for additional soil erosion blankets for the detention areas and was required by Kane Dupage Soil and Water Conservation Service. The total cost for the erosion control blankets is $24,960. The net increase for Change Order# 1 is $75,260. A copy of the change order is attached. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED Elgin Continental Little League FINANCIAL IMPACT The total cost for Change Order No. 1 with Sinnett Builders, Inc is $75,260. There are sufficient funds budgeted ($880,000) and available ($85,631) in the Riverboat Fund, account number 275- 0000-791.92-37, "Park Development and Acquisition," project number 509670, "Elgin Shores" to fund this change order. LEGAL IMPACT None ALTERNATIVES 1. The Council may choose to approve Change Order No. I with Sinnett Builders for $75,260 as recommended. 2. The Council may choose to not approve Change Order No. 1 with Sinnett Builders for $75,260 as recommended. Respectfully submitted for Council consideration. pb attachment