Loading...
08-233 Resolution No. 08-233 RESOLUTION APPROVING CHANGE ORDER NO. 7 IN THE CONTRACT WITH ARTLOW SYSTEMS FOR FIRE STATION NO. 7 WHEREAS,the City of Elgin has heretofore entered into a contract with Artlow Systems for concrete finishes at Fire Station No. 7; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 7, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Olufemi Folarin,City Manager,be and is hereby authorized and directed to execute Change Order No. 7,a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock, Mayor Presented: October 8, 2008 Adopted: October 8, 2008 Omnibus Vote: Yeas: 5 Nays: 0 Attest: s/Diane Robertson Diane Robertson, City Clerk City of Elgin Change Order ELGIN,ILLINOIS PROJECT 289506 CHANGE ORDER No. 7 CONTRACT: Construction of Fire Station 7 (Bid No. 06-053) SCOPE: On June 13, 2007,the City Council awarded a contract to Artlow Systems for the concrete fin- ishes of Fire Station#7 totaling$39,765. After the application of the concrete finishing system, it was noticed that Artlow Systems had applied the wrong color in the epoxy flooring. Rather than delay the opening of Fire Station 7 for the removal and reapplication of the epoxy finishing system,Artlow Systems is proposing to reduce the original con- tract price for the installation of the concrete finishes by$7,500. Additional caulking was required by the State Fire Marshal's Office in the combustible liquids room totaling $500. The total cost of the deduct change order to Artlow Systems is$7,000. REASONS FOR CHANGE: Change Order No. 7 is in the best interest of the city and is authorized by law. The necessity for the change was unforeseen at the time the contract was originally executed. The changes contemplated in Change Order No. 7 are germane to the original agreement. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The original contract will be amended as to scope and costs to include the reduction in the concrete finishing systems to reflect the incorrect color application and additional work completed. ORIGINAL CONTRACT AMOUNT: $39,765 CHANGE ORDER No. 7 Installation of incorrect epoxy flooring -$7,000 TOTAL FOR CHANGE ORDER NO. 7 DEDUCT -$7,000 PREVIOUS CHANGE ORDER(S): Change Order No. $0 TOTAL OF PREVIOUS CHANGE ORDERS: ADD $0 TOTAL REVISED CONTRACT AMOUNT: $32,765 The original amount of the contract with Artlow Systems is $39,765. Change Order No. 7 totaling $7,000 will decrease the original contract amount by a total of$7,000,that sum representing seventeen and six tenths percent(17.6%)of the original contract amount. The new contract amount, inclusive of all change orders is $32,765. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 7 October 9,2008 Agreed to this 9th day of October,2008. Recommended by: Fire Department By: Mike Baker Title: Assistant Fire Chief Date: 9 /&&F Signature: Accepted by: Artlow Systems Party of the Second Part(Contractor) By: RANDALL S. RICHTER Title: PRESIDENT Date: 9/23/2008 Signatur,-�-?"-- Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Olufemi Folarin Title: City Manager Date: U Signature: r September 18, 2008 TO: Mayor and Members of the City Council . rF COMMUNITY FROM: Olufemi Folarin, City Manager John Henrici, Fire Chief SUBJECT: Change Order No. 7 for the Construction of Fire Station 7 PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider authorizing Deduct Change Order No. 7 to the contract with Artlow Systems for the concrete finishes for Fire Station 7. RECOMMENDATION It is recommended that the City Council authorize the execution of Deduct Change Order No. 7 to the contract with Artlow Systems for the concrete finishes for Fire Station 7 in the amount of $7,000. BACKGROUND On June 13, 2007, the City Council awarded a contract to Artlow Systems for the concrete finishes of Fire Station 7 totaling $39,765. After the application of the concrete finishing system, it was noticed that Artlow Systems had applied the wrong color in the epoxy flooring. Rather than delay the opening of Fire Station 7 for the removal and reapplication of the epoxy finishing system, Artlow Systems is proposing to reduce the original contract price for the installation of the concrete finishes by $7,500. Additional caulking was required by the State Fire Marshal's Office in the combustible liquids room totaling $500. The total cost of the deduct change order to Artlow Systems is $7,000 for a total contract price of$32,765. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None Change Order No. 7 for Concrete Finishes for Fire Station 7 September 18, 2008 Page 2 FINANCIAL IMPACT The original cost of the project with Artlow Systems for the concrete finishes of Fire Station 7 is $39,765. Change Order No. 7 will decrease the contract amount by$7,000. The revised contract amount will be $32,765. The account that was used for this project is 276-0000-791.92-36, "Buildings/Structures"project 289506, "Fire Station 7". LEGAL IMPACT None ALTERNATIVES 1. The City Council may choose to approve Deduct Change Order No. 7 with Artlow Systems for the concrete finishes for Fire Station 7 in the amount of$7,000. 2. The City Council may choose not to approve Deduct Change Order No. 7 with Artlow Systems for the concrete finishes for Fire Station 7 in the amount of$7,000. Respectfully submitted for Council consideration. JH/wmb attachments