Loading...
06-279 . . Resolution No. 06-279 RESOLUTION AUTHORIZING EXECUTION OF AMENDMENT NO. 1 TO AGREEMENT WITH METCALF & EDDY, INC. FOR THE BARTLETT ELGIN INTERCONNECTION BE IT RESOLVED BY THE CITY couNcn OF TH CITY OF ELGIN, ILLINOIS, that Olufemi Folarin,City Manager,and Dolonna Mecum, City Cl k,be and are hereby authorized and directed to execute Amendment No. 1 to engineering service agreement on behalf of the City of Elgin with Metcalf& Eddy, Inc. for the Bartlett Elgin Intercorinection, a copy of which is attached hereto and made a part hereof by reference. 1 s/Ed1Schock Ed Schock, Mayor Presented: November 29, 2006 Adopted: November 29, 2006 Omnibus Vote: Yeas: 7 Nays: 0 Attest: s/Dolonna Mecum Dolonna Mecum, City Clerk OF E(�, � City of Elgin Agenda Item No. 1,7 • rob` �U�•IICD �� e .` 'g November 3, 2006 TO: Mayor and Members of the City Council FROM: Olufemi Folarin, City Manager a Broome Kyla Jacobsen, Water System S perintendent SUBJECT: Amendment No. 1 to the Agreement for Engin-ering Services With Metcalf&Eddy for the Elgin-Bartlett Interconnection PURPOSE The purpose of this memorandum is to provide the Mayor anc members of the City Council with information to consider Amendment No. 1 to the agreement with Metcalf & Eddy to provide additional engineering services for the Elgin—Bartlett interconnection project. RECOMMENDATION It is recommended that the City Council authorize the execution of Amendment No. 1 to the agreement for engineering services with Metcalf&Eddy for a total cost of$22,500. BACKGROUND On February 11, 2004, the City Council awarded a contract for the Elgin-Bartlett water main interconnection to Mola Construction. On September 28, 2005 the agreement with Mola Construction was terminated because Mola Construction had breached the agreement by failing to perform and to complete the construction pursuant to the contractual completion dates. Due to Mola Construction's failure to complete the work in accordance with the contract, the engineering firm of Metcalf& Eddy (project designer and construction phase management) has been required to extend their work effort. Metcalf&Eddy's :ervices included on-site inspection, preparation and attendance at progress meetings, phone calls with the construction contractor, correspondence with the City, review of contractor submittals, and an additional fifteen (15) months of project management. Additional engineering services are required to complete the project and include review of shop drawings, construction inspection, start-up services, completion of a final punch list,project close-out services, review of contractor pay requests, and providing the City with record drawings. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None •. ,I elli.k Amendment No. 1 with Metcalf and Eddy November 3, 2006 Page 2 IP FINANCIAL IMPACT The total cost for Amendment No.1 with Metcalf and Eddy tiill total $22,500. There are funds budgeted ($294,610) and available ($17,712) in the water pot ion of the 2001, 2002, 2003 and 1999 Bond Funds; account numbers 381-4000-795.92-41 382-4000-795.92-41, 383-4000- 795.92-41 and 399-4000-795.92-41, project number 409590, "Bartlett-Gifford Interconnect" to cover a portion of the proposed contract. The remaining required funds ($5,000) can be transferred from the Water Operating Fund, account numb r 401-4002-771.92-36. A budget adjustment will be necessary. \04EGAL IMPACT None ALTERNATIVES 1. Authorize execution of the amendment No. 1 to the engineering agreement with Metcalf &Eddy as recommended rill‘ 2. Do not authorize the amendment No. 1 to the engineeifing agreement with Metcalf& Eddy. Respectfully submitted for Council consideration. KBJ/PLB Attachment AMENDMENT NO. 1 TO AGREEMENT BETWEE OWNER AND ENGINEE Engineer: Metcalf& Eddy, Inc. Owner: City of Elgin Project: Elgin-Bartlett Interconnection Amendment No. 1 : Additional Engineering Servic?s This Amendment No. 1 modifies and amends the Agreement between Owner and Engineer dated April 4, 2003 (Agreement)to provide supplemental engineering services related to the construction services for the Elgin-Bartlett Interconnection project. SCOPE OF SERVICES The Scope of Services in Paragraph I, Section 2 of the Agreement shall be modified to include the additional supplemental services indicated below. 1. Provide construction phase services beyond the 9riginal contract completion date of August 12, 2004. Services were provided thrqugh November 10, 2005. Services included on-site inspection, preparation pnd attendance at progress meetings, phone calls with the construction contractor, correspondence with the City, review of contractor submittals, and an additional fifteen (15) months of project administration. The fee for these services is $14,000. 2. Provide additional engineering services for project completion. Services include review of shop drawings, construction inspection,i start-up services, completion of a final punch list, project close-out services, review of contractor pay requests, and record drawings. The fee for these services is $q,500. COMPENSATION The Owner agrees to pay the Engineer for the supplemental services described above as outlined in Paragraph III of the Agreement. The contract amount shall be increased as follows: Original Contract Amount: $29,890.00 This Amendment No. 1: $22,500.00 Adjusted Contract Amount: $52,390.00 1 4 . . . . • .. . .: '. The contract amount for the supplemental services to be rovided pursuant to this Amendment No. 1 shall not exceed $22,500.00 without f rther authorization by a written amendment to this Agreement approved by both parties. The circumstances set to necessitate the changes and p rformances provided in this Amendment No. 1 were not reasonably foreseeable at th time the contract was signed, the changes to the contract as set forth in this Amendme t No. 1 are germane to the original contract as signed, and this Amendment No. 1 is in the best interests of the City of Elgin and is authorized by law. All other terms of the Agreement remain unchanged. IN WITNESS WHEREOF, Owner and Engineer have e4cuted this Amendment No. 1: CITY OF ELGIN, ILLINOIS METCALF & EDDY, INC. (Owner) (Engineer) / . /. By: ft ' B v: . _ . __ _ Oluf- ii Fola in Title: - y ManagerTitle: / ' , >eg-if .7e• i-x>f, Date: /1.4v4444,1 ..2._ , J.__06 4 *e: Attest: 4i-edr-44,1..., Dolonna Mecum, City Clerk 2