Loading...
06-193 Resolution No. 06-193 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH COPENHAVER CONSTRUCTION FOR 2006 NEIGHBORHOOD SIDEWALK REPLACEMENT PROGRAM WHEREAS, the City of Elgin has heretofore entered into a contract with Copenhaver Construction for the 2006 Neighborhood Sidewalk Replacement Program; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Olufemi Folarin,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock,Mayor Presented: August 9, 2006 Adopted: August 9, 2006 Omnibus Vote: Yeas: 7 Nays: 0 Attest: -. s $Dolonna Mecum Dolonna Mecum, City Clerk I. ELGIN,ILLINOIS PROJECT 339861 CHANGE ORDER No. 1 CONTRACT: 2006 Neighborhood Sidewalk Replacement Program SCOPE: This Change Order No. 1 will provide a reduction to bid items in the 2006 Neighborhood Sidewalk Replacement Program to keep the cost within the City's budget. The reduction in the bid amount is $44,004.00 or 30.6% of the original bid amount($143,716.00). This change order affects a contract entered into between the City of Elgin and Copenhaver Construction of Gilberts, IL, an Illinois corporation, dated , 2006 for the 2006 Neighborhood Sidewalk Replacement Program. REASONS FOR CHANGE: This Change Order No. 1 is in the best interests of the City and is authorized by law. The necessity for the changes was unforeseen at the time of the original agreement, and the changes contemplated hereby are germane to the original agreement. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount the contract will be revised is as follows: Attachment A is incorporated herein and describes the revised quantities of construction work to be performed by the Contractor and revised contract amounts to be paid by the City in this Change Order No. 1 The original contract with Copenhaver Construction is $143,716.00. By reason of Change Order No. 1, the contract for the 2006 Neighborhood Sidewalk Replacement Program will be reduced in the amount of forty four thousand four and 00/100 dollars ($44,004.00). The new contract amount, inclusive of Change Order No. 1 is ninety nine thousand seven hundred twelve and 00/100 dollars ($99,712.00). CHANGE ORDER No.1 July 27, 2006 Page 2 OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this day of , 2006. Recommended: ENGINEERING DIVISION By: Title: Date: Accepted: COPENHAVER CONSTRUCTION Party of the Second P ( ontractor) By: Title: r.,s,dl4 Date: 7/2-0‘ Approved: CITY OF ELGIN Party o the First Part(Owner) By: tilh Title: LI 04,Z- ' Date: g/7/..2-6 � 'b V TuauzIPETI-V `_Revised Quantities Copenhaver Construction - 121 Center Street City of Elgin --_ -__ - Gilberts,Illinois 60136 1---- 2006 Neighborhood Sidewalk Program _(847)428-6696 City Cost Center 8495 11-Jul-06 $99,712.00 _ $143,716.00 11:00 A.M. Item Original Revised Unit Revised Bid Original Bid i No Description Quantity Unit Quantity Unit Cost Price Price 1 IL-19.0L,Bit Conc Bind Case(Low ESAL)Superpave,N30,Mix D 7 0.0 Ton 0.0 Ton - $0.00 $0.00 2 Leveling Binder(Hand Method) - 0.0 Ton 0.0 Ton $0.00 $0.00 3 Incidental Bituminous Surface 10.0 Ton 9.0 Ton - $300.00 $2,700.00 $3,000.00 4 IL-9.5L,Bit Conc Surf Cse(Low ESAL),Superpave,N30 Mix D 0.0 Ton 0.0 Ton ++ $0.00 $0.00 5 Bituminous Surface Removal,Complete 0.0 Sq Yd 0.0 Sq Yd $0.00 $0.00 6 Bituminous Surface Removal,Special 0.0 Sq Yd 0.0 Sq Yd $0.00 $0.00 7 Area Reflective Crack Control,System A 0.0 Sq Yd 0.0 Sq Yd $0.00 $0.00 8 Bituminous Materials,Prime Coat,SS-1 0.0 Gal 0.0 Gal $0.00 9 Combination Curb&Gutter Removal 147 Ln Ft 147 Ln Ft $20.00 $2,940.00 -; $2,940.00 10 'Combination B6.18 Curb&Gutter 147 Ln Ft 147 Ln Ft $20.00 $2,940.00 $2,940.00 11 ,Sidewalk Removal 13,087 Sq Ft_ 8,032 Sq Ft $2.00 $16,064.00 $26,174.00 12 P.C.C.Sidewalk,5" 12,877 Sq Ft 7,903 Sq Ft $6.00 $47,418.00 $77,262.00 , 13 P.C.C.Sidewalk,5"-Handicap Acesss(Red Stamped Concrete) 210 Sq Ft 170 Sq Ft $15.00 $2,550.00 $3,150.00 14 Driveway Pavement Removal 0.0 Sq Yd 0.0 Sq Yd $0.00 $0.00 15 P.C.C.Driveway Pavement,6" 0.0 Sq Yd 0.0 Sq Yd $0.00 $0.00 16 P.C.C.Driveway Pavement,8" 0.0 Sq Yd 0.0 Sq Yd $0.00 $0.00 17 Monolithic Sidewalk Removal 0.0 Sq Ft' 0.0 Sq Ft $0.00 $0.00 18 P.C.C.Monolithic Sidewalk 0.0 Sq Ft 0.0 Sq Ft $0.00 _ $0.00 19 Class X Concrete,Retaining Wall 0.0 Cu Yd 0.0 Cu Yd $0.00 $0.00 20 Maholes to be Adjusted 0.0 Each 0.0 Each - $0.00 $0.00 21 Manholes to be Reconstructed _ 0.0 Each 0.0 Each $0.00 $0.00 _ 22 Catch Basins to be Adjusted 3.0 Each 3.0 Each _ $1,000.00 $3,000.00 -- $3,000.00 23 Catch Basins to be Reconstructed 0.0 Each 0.0 Each ,, $0.00 $0.00 24 Catch Basins to be Cleaned(Not Adj or Recon) 0.0 Each I 0.0 Each _ $0.00 _ _ $0.00 25 Neenah R-1712-C Fr with CI Lid,390 lbs/Concealed Pick Holes - 0.0 Each 0.0 Each $0.00 j $0.00 26 Neenah R-1712-C Fr with Ty A Grate,390 lbs 1.0 Each 1.0 Each _ $2,000.00 $2,000.00 $2,000.00 27 Neenah R-3065/Ty A Frame/Open Box/410 lbs 0.0 Each 0.0 Each $0.00 $0.00 28 Neenah R-3065/Open Box/410 lbs 0.0 Each 0.0 Each $0.00 i $0.00 29 Water Boxes to be Adjusted 0.0 Each 0.0 Each _ $0.00 $0.00 30 Domestic Water Service,Lid 0.0 Each 0.0 Each $0.00 ; $0.00 31 Domestic Water Service,Top Section 0.0 Each 0.0 Each $0.00 $0.00 32 Domestic Water Service,Complete 0.0 Each 0.0 Each $0.00 $0.00 _ 33 Sodding and Supplemental Watering - 1,000.0 Sq Yd 550.0 Sq Yd $7.00 $3,850.00 -j-$7,000.00 34 Additional Supplemental Watering-Sod 5.0 Each _ 5.0 Each $50.00 $250.00 - $250.00 35 Ductile Iron Pipe-4" 0.0 Ln Ft 0.0 Ln Ft $0.00 $0.00 36 Ductile Iron Pipe-6" 0.0 Ln Ft 0.0 Ln Ft 1 $0.00 $0.00 37 Ductile Iron P 8 $0.00 $0.00 38 Ductile Iron Pipe-18" 0.0 Each 0.0 Each ---- � $0.00 $0.00 $0.00 $0.00 Item $0.00 $0.00 No Description Quantity_ Unit _Quantity Unit $0.00 $0.00 39 Ductile Iron Pipe-22" 0.0 Ln Ft 0.0 Ln Ft $0.00 _ $0.00 40 Ductile Iron Pipe-36" 0.0 Ln Ft 0.0 Ln Ft $0.00 $0.00 41 ,Ductile Iron Pipe-42" 0.0 Ln Ft 0.0 Ln Ft $0.00 $0.00 . 42 Ductile Iron Pipe-48" 0.0 Ln Ft 0.0 Ln Ft $0.00 $0.00 43 Polyethene Wrap-6" 0.0 Ln Ft 0.0 _Ln Ft $0.00 $0.00 44 Polyethene Wrap-8" 0.0 Ln Ft 0.0 Ln Ft $0.00 $0.00 45 5'Diameter Valve Vault 0.0 Each 0.0 Each $0.00 $0.00 46 Fire Hydrant to be Removed 0.0 Each 0.0 Each $0.00 I $0.00 47 Fire Hydrant,Complete 0.0 Each 0.0 Each $0.00 $0.00 48 Ductile Iron Fittings 0.0 Lbs 0.0 Lbs $0.00 $0.00 49 Near Side Water Service 0.0 Each 0.0 Each $0.00 $0.00 50 Far Side Water Service 0.0 Each 0.0 Each $0.00 $0.00 51 Reconnect Exiting Water Service 0.0 Each 0.0 Each _ $0.00 $0.00 52 4"x 4"Pressure Connection 0.0 Each 0.0 Each • $0.00 $0.00 53 6"x 6"Pressure Connection 0.0 Each 0.0 Each $0.00 _ $0.00 54 8"x 8"Pressure Connection 0.0 Each 0.0 Each $0.00 $0.00 55 8"x 16"Pressure Connection 0.0 Each 0.0 Each $0.00 $0.00 56 8"x 24"Pressure Connection 0.0 Each 0.0 Each $0.00 $0.00 57 8"Gate Valve 0.0 Each 0.0 Each ; $0.00 $0.00 58 6"Ductile Iron Pipe,Sanitary • 0.0 _Ln Ft 0.0 Ln Ft $0.00 $0.00 59 8"Ductile Iron Pipe,Sanitary _ 0.0 Ln Ft_ 0.0 Ln Ft $0.00 $0.00 60 4"Thermoplastic Pavement Marking 0.0 Ln Ft 0.0 Ln Ft $0.00 $0.00 61 6"Thermoplastic Pavement Marking _ 0.0 Ln Ft 0.0 Ln Ft $0.00 $0.00 62 12"Thermoplastic Pavement Marking 0.0 Ln Ft 0.0 Ln Ft $0.00 $0.00 63 24"Thermoplastic Pavement Marking 0.0 Ln Ft 0.0 Ln Ft $0.00 $0.00 64 Thermoplastic Pavement Marking Letters&Symbols 0.0 Sq Ft 0.0 Sq Ft _ $0.00 $0.00 65 Traffic Control&Protection 1.0 L Sum 1.0 L Sum $16,000.00 $16,000.00 _ $16,000.00 66 Dust Control-Watering with Calcium Chloride Unit _ Unit $0.00 $0.00 67 Dust Control-Mechanical Sweeping I $0.00 _ j $0.00 68 Unsuitable Material,Rem&Repl,CA-1,100%Crushed Stone _ Ton _ Ton $0.00 _ $0.00 69 Class"C"Patch-8" Sq Yd Sq Yd _ $0.00 $0.00 70 Class"D"Patch _ Sq Yd Sq Yd _ $0.00 _ - $0.00 71 Catch Basin,Ty A 4'Diameter Each _ Each _ $0.00 r I $0.00 _ 72 Catch Basin,Ty C 2'Diameter Each _ Each $0.00 i $0.00 73 Pavement Saw Cutting,Special _ i Ln Ft Ln Ft � I $0.00 _ $0.00 74 Catch Basin to be Removed C 7 Each Each $0.00 $0.00 75 Miscellaneous Additions to the Project at the City's Discretion I L Sum L Sum $0.00 $0.00 76 Water Main Encasement-14"-16"Min.Diameter-Trenched Ln Ft Ln Ft $0.00 _ $0.00 77 Water Main Encasement-14"-16"Min.Diameter-Augered _ Ln Ft 1 Ln Ft _ $0.00 $0.00 _ 78 Concrete Wall Removal Ln Ft Ln Ft $0.00 1 $0.00 79 Pavement Removal Sq_Yd Sq Yd� $0.00 i $0.00