Loading...
05-62 Resolution No. 05-62 RESOLUTION AUTHORIZING EXECUTION OF A HIGHWAY AUTHORITY AGREEMENT WITH SPEEDWAY SUPERAMERICA LLC (851 St. Charles Street) BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Ed Schock, Mayor, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute a Highway Authority Agreement on behalf of the City of Elgin with Speedway SuperAmerica LLC to limit access to potentially contaminated soil or groundwater in the public right-of-way adjacent to 851 St.Charles Street,Elgin,Illinois,a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock, Mayor Presented: March 9, 2005 Adopted: March 9, 2005 Omnibus Vote: Yeas: 6 Nays: 0 Attest: s/Dolonna Mecum Dolonna Mecum, City Clerk 1 CITY OF ELGIN- SPEEDWAY SUPERAMERICA LLC HIGHWAY AUTHORITY AGREEMENT INITIAL INFORMATION FORM OVERVIEW The purpose of this document is to notify the City of Elgin, an Illinois municipal corporation, of the extent of hydrocarbon im- pact within soil and/or groundwater and to provide the necessary initial information needed to enter into a highway authority agreement, pursuant to 35 IAC 742 . 1020 . APPLICANT INFORMATION Property Owner: SPEEDWAY SUPERAMERICA LLC Operator (if different) : Address: P.O. Box 1500 Address: Springfield, OH 45501 Telephone No: 937.864.3000 Fax No: 937 .864.6078 Name and Title of Person Authorized to Sign for Owner: R. Scott Hiser, Corporate Environmental Manager Name and Title of Person Authorized to Sign for Operator (if different) : APPLICANT'S ATTORNEY ENVIRONMENTAL CONSULTANT Name: Jose Luis Gonzalez, Jr. Name: David Klatt, CHMM Address: P.O. Box 1500 Address: 919 North Plum Grove Road Springfield, OH 45501 Suite E Schaumburg, IL 60173 Telephone No: 937.864.3000 Telephone No: 847.517.1977, ext. 433 PROPERTY ADJACENT TO THE RIGHT-OF-WAY Address : 851 St. Charles Street, Elgin, IL 60123 RIGHT-OF-WAY(S) REQUIRING HIGHWAY AGREEMENT Highway Number(s) : (Check one or both) ❑ Soil Impact in Right-of-Way 0 Groundwater Impact in Right-of-Way Street Name (if any) : Bluff City Boulevard REGULATORY INFORMATION IEMA Incident Number: 860218A IEPA Project Manager: Mr. Steve Putrich IEPA Status : (Check one) ❑ Conditional Approval ❑ Approval Pending D Other CAP approved with modifications on 2/3/2003 . One of the IEPA's modi- fications was to request that a Highway Authority Agreement be executed for Bluff City Boulevard adjacent to 455 and 473 Bluff City Boulevard. SAMPLING IN THE RIGHT-OF-WAY (Check one) D Right-of-Way Sampled ❑ Right-of-Way Impractical to Sample (Sampling was done adjacent to right-of-way) PERSON(S) TO BE NOTIFIED IN AGREEMENT Name: R. Scott Hiser, Corporate Environmental Manager Address : Speedway SuperAmerica LLC P.O. Box 1500 Springfield, OH 45501 937 . 864 .3000, ext. 6515 2 - t NATURE AND EXTENT OF HYDROCARBON IMPACT INFORMATION - FOR EXHIBIT A The Closure Report/Closure Response Letter will document the na- ture and extent of hydrocarbon impact in the right-of-way. Soil: Refer to Figure 1 - Estimated Soil Impact in the Right-of-Way Map Using Tier One Residential Cor- rective Action Objectives Groundwater: Refer to Figure 2 - Estimated Groundwater Impact in the Right-of-Way Map Using Tier One Corrective Action Objectives Tables showing soil and groundwater sampling results in the right-of-way (if sampled) and/or adjacent to it need to be sub- mitted and keyed to Figures 1 and 2 . Samples above Tier 1 One Residential Corrective Action Objectives need to be highlighted. AREA COVERED BY HIGHWAY AUTHORITY AGREEMENT - FOR EXHIBIT B (Check one) Cif Refer to Figure 3 - Proposed Highway Authority Agreement Loca- tion Map ❑ Location not proposed (The Department will draw map based on Figures 1 and 2 . ) Attachments : Q Figure 1 Estimated Soil Impact Map D Figure 2 Estimated Groundwater Impact Map Q Figure 3 Proposed Highway Agreement Location Map Q Tables Showing Sampling Results ❑ Closure Report ❑ Other 3 MASTER AGREEMENT TIERED APPROACH TO CORRECTIVE-ACTION OBJECTIVES AGREEMENT This Agreement is entered into this day of , 2004 pursuant to 35 Illinois Administrative Code Section 742 . 1020 by and between Speedway SuperAmerica LLC ("Owner") and Speedway SuperAmerica LLC ("Operator") , referred to herein as "Owner/Operator, " and the City of Elgin, an Illinois municipal corporation ("City") , as follows : 1 . This Agreement shall not be binding upon the City until it is executed by the undersigned representative of the City and prior to execution, this Agreement constitutes an offer by Owner/Operator. The duly authorized representatives of Owner/Operator have signed this Agreement and this Agreement is binding upon them, their successors and assigns . 2 .a. Owner/Operator is pursuing a corrective action of a Site and of the right-of-way adjacent to the boundary of the Site located at 851 St . Charles Street, Elgin, IL 60123 (the "Site") . 2 .b. Attached as Exhibit A are site maps prepared by Owner/Operator which show the area of estimated contaminant impacted soil and/or groundwater at the time of this Agreement in the right-of-way above Tier 1 residential levels under 35 Illinois Administrative Code Part 742 . Also shown in Exhibit A are tables prepared by Owner/Operator showing the concentration of contaminants of concern, hereafter "Contaminants, " in soil and/or groundwater within the Site and which shows the applicable Tier 1 soil remediation objectives for residential property and Tier 1 objectives for groundwater of the Illinois Pollution Control Board ("IPCB") which are exceeded along the boundary of the Site adjacent to the Right of-Way. The right-of- way, and only the right-of-way, as described in Exhibit B, hereinafter the "Right-of-Way, " adjacent to the site is subject to this Agreement . As the drawings in the Exhibits are not surveyed plats, the boundary of the Right-of-Way in the Exhibits may be an approximation of the actual right-of-way lines . The Right-of-Way is impractical to sample for Contaminants; however, the parties believe that the area of the Right-of-Way is adequate to encompass soil and/or groundwater within the Right- of-Way possibly impacted with Contaminants from a release at the Site. 2 .c . The Illinois Emergency Management Agency has assigned incident number 860218A to this release at the Site . 2 .d. Owner/Operator intends to request risk-based, site specific soil and/or groundwater remediation objectives from the Illinois Environmental Protection Agency ("IEPA" ) under 35 Illinois Ad- ministrative Code Part 742 . 2 .e. Under these rules, use of risk-based, site specific reme- diation objectives in the Right-of-Way may require the use of a Highway Authority Agreement as defined in 35 Illinois Adminis- trative Code Section 742 . 1020 . 3 . The City holds a fee simple interest or a dedication for highway purposes in the Right-of-Way, or the Right-of-Way is a platted street, and has jurisdiction of the Right-of-Way. For purposes of this Agreement, "jurisdiction" means that the City exercises access control over the use of groundwater beneath the Right-of-Way and over access to the soil beneath the Right-of- Way because it requires a permit for that access . 4.a. Under 35 Illinois Administrative Code Section 742 . 1020, this Agreement is intended to be an acceptable "Highway Author- ity Agreement" to IEPA, as the City is willing to agree that it will not allow the use of groundwater under the highway Right- of-Way as a potable or other domestic supply of water and that it will limit access as described herein to soil under the high- way Right-of-Way that is contaminated from the release at levels above residential Tier 1 remediation objectives . 4 .b. The IEPA must review and approve this Agreement, and this Agreement shall be referenced in the IEPA' s "No Further Remedia- tion" determination in the chain of title for the Site in the county where the Site is located. 4 .c. This Agreement shall be null and void as a Highway Author- ity Agreement should the IEPA not approve it or should it not be referenced in the "No Further Remediation" determination. This Agreement shall not be effective between the Owner/Operator and the City unless and until the IEPA approves this Agreement and the IEPA accordingly references the Agreement in the IEPA' s "No Further Remediation" determination in the chain of title for the Site in the county where the Site is located. 5. The City promises IEPA and the Owner/Operator that it will prohibit the use of groundwater that is contaminated from the release at the Site at levels above Tier 1 remediation objec- tives beneath its Right-of-Way as a potable or other domestic supply of water and will limit access to soil as described herein under the Right-of-Way that is contaminated from the re- 5 lease at the Site at levels above Tier 1 remediation objectives . As the pavement in the Right-of-Way may be considered an engi- neered barrier, the Owner/Operator agrees to reimburse the City for maintenance activities requested by Owner/Operator in writ- ing in order to maintain it as a barrier. The City does not oth- erwise agree to perform maintenance of the Right-of-Way, nor does it agree that the highway Right-of-Way will always remain a highway or that it will maintain the Right-of-Way as an engi- neered barrier. 6 . The Owner/Operator agrees to indemnify and hold harmless the City, and other highway authorities, if any, maintaining the highway Right-of-Way by an agreement with the City, and the City's agents, contractors, officers or employees for all obli- gations asserted against or costs incurred by them, including attorney's fees and court costs, associated with the release of Contaminants from the Site, regardless whether said obligations or costs were caused by the negligence, but not the gross negli- gence, of them. 7 . As an additional consideration, Owner/Operator agrees to re- imburse the City for the reasonable costs it has incurred in protecting human health and the environment, including, but not limited to, identifying, investigating, handling, storing and disposing of contaminated soil and groundwater in the Right-of- Way as a result of the release of contaminants at this Site, and the review and processing of this Agreement. The City has deter- mined those costs for Owner and such costs amount to two thou- sand five hundred dollars ($2500 . 00) . A cashier's check made payable to "City of Elgin, Illinois" shall be tendered to the City at the time Owner/Operator furnishes a signed Agreement to the City for its signature. That check will be deposited when all necessary parties sign this Agreement. 8 . This Agreement shall be binding upon all successors in inter- est to the Owner/ Operator or highway Right-of-Way. A successor in interest of the City would include a highway authority to which the City would transfer jurisdiction of the highway. 9 . Violation of the terms of this Agreement by Owner/Operator, or their successors in interest, may be grounds for voidance of this Agreement as a Highway Authority Agreement. Violation of the terms of this Agreement by the City will not void this Agreement, unless the IEPA has determined that the violation is grounds for voiding this Agreement as a Highway Authority Agree- ment and the City has not cured the violation within such time as IEPA has granted to cure the violation. 6 10 . This Agreement shall continue in effect from the date of this Agreement until the Right-of-Way is demonstrated to be suitable for unrestricted use and there is no longer a need for this Agreement as a Highway Authority Agreement, and the IEPA has, upon written request to the IEPA by the Owner/Operator and notice to the City, amended the notice in the chain of title of the Site to reflect unencumbered future use of that highway Right-of-Way. 11 . This Agreement is in settlement of claims the City may have arising from the release of Contaminants into the Right-of-Way associated with incident number 860218A. 12 . This Agreement does not limit the City's ability to con- struct, reconstruct, improve, repair, maintain and operate a highway upon its property or to allow others to use the highway Right-of-Way by permit. To that extent, the City reserves the right and the right of those using its property under permit to remove contaminated soil or groundwater above Tier 1 residential remediation objectives from its Right-of-Way and to dispose of them as they deem appropriate not inconsistent with applicable environmental regulations so as to avoid causing a further re- lease of the Contaminants and to protect human health and the environment. Prior to taking any such action, the City will first give Owner/Operator written notice, unless there is an immediate threat to the health or safety to any individual or to the pub- lic, that it intends to perform a site investigation in the Right-of-Way and remove or dispose of contaminated soil or groundwater to the extent necessary for its work. Failure to give notice shall not constitute a violation of this Agreement. The removal or disposal shall be based upon the site investiga- tion (which may be modified by field conditions during excava- tion) , which Owner/Operator may review or may perform, if re- quested to do so by the City. If practicable, as determined by the City, the City may request Owner/Operator to remove and dis- pose of the contaminated soil and/or groundwater necessary for the City's work in advance of that work. The Owner/Operator shall reimburse the reasonable costs incurred by the City to perform the site investigation and to dispose of any contami- nated soil or groundwater, provided, however, that if notice to Owner/Operator has not been given and there was no immediate threat to health or safety, reimbursement for those costs shall be limited to twenty thousand dollars ($20, 000 . 00) . There is a rebuttable presumption that the Contaminants found in the high- 7 way Right-of-Way arose from the release of Contaminants from the Site. Should Owner/Operator not reimburse the reasonable costs under the conditions set forth herein, this Agreement shall be null and void, at the City's option, upon written notice to Owner/Operator by the City that those costs have not been reim- bursed. Owner/Operator may cure that problem within twenty work- ing days by making payment, or may seek to enjoin that result. 13 . Written notice required by this Agreement shall be mailed to the following: To Owner/Operator: R. Scott Hiser, Corporate Environmental Manager Speedway SuperAmerica LLC P.O. Box 1500 Springfield, OH 45501 To City: Mr. John Loete Public Works Director 150 Dexter Court Elgin, IL 60120-5555 14 . The City's sole responsibility under this Agreement with re- spect to others using the highway Right-of-Way under permit from the City is to include the following, or similar language, in the future standard permit provisions and to make an effort to notify its current permit holders of the following: As a condition of this permit, the permittee shall re- quest the City' s Public Works Department to identify sites in the Right-of-Way where access to contaminated soil or groundwater is governed by Tiered Approach to Corrective-Action Objectives ( "TACO" ) Agreements . The permittee shall take measures before, during and after any access to these sites to protect worker safety and human health and the environment . Excavated, contami- nated soil should be managed off-site in accordance with all environmental laws . Owner/Operator hereby releases the City from liability for breach of this Agreement by others under permit and indemnifies the City against claims that may arise from others under permit causing a breach of this Agreement. Owner/ Operator agrees that its personnel, if any, at the Site who are aware of this Agree- ment will notify anyone they know is excavating in the Right-of- Way about this Agreement. 8 15 . Should the City breach Paragraph 5 of this Agreement, Owner/Operator' s sole remedy is for an action for damages in the Circuit Count for the Sixteenth Judicial Circuit, Kane County, Illinois . Any and all claims for damages against the City, its agents, contractors, officers, employees or its successors in interest arising at any time for a breach of paragraph 5 of this Agreement are limited to an aggregate maximum of two thousand five hundred dollars ($2500 . 00) . No breach by the City, its agents, contractors, officers, employees and its successors in interest of a provision of this Agreement other than Paragraph 5 is actionable in either law or equity by Owner/Operator against the City or its agents, contractors, officers, employees and its successors in interest and Owner/Operator hereby releases the City, its agents, contractors, officers, employees and its suc- cessors in interest for any cause of action it may have against them, other than as allowed in this paragraph, arising under this Agreement or environmental laws, regulations or common law governing the contaminated soil or groundwater in the highway Right-of-Way. Should the City convey, vacate or transfer juris- diction of that highway Right of-Way, Owner/Operator may pursue an action under this Agreement against the successors in inter- est, other than a State agency, in a court of law. 16 . This Agreement is entered into by the City in recognition of laws passed by the General Assembly and regulations adopted by the Pollution Control Board that encourage a tiered-approach to remediating environmental contamination. This Agreement is en- tered into by the City in the spirit of those laws and under its right and obligations as a municipality. Should any provisions of this Agreement be struck down as beyond the authority of the City, however, this Agreement shall be null and void. 17 . The Owner and Operator shall be jointly and severally liable for their obligations under this Agreement and all references to "Owner/Operator" shall effect the Owner and Operator both jointly and individually. 9 IN WITNESS WHEREOF, Owner/Operator, Speedway SuperAmerica LLC, has caused this Agreement to be signed by its duly authorized representative. BY: 0.r DATE: 7/0;34,691 R. SCOTT HISER, CORPORATE ENVIRONMENTAL MANAGER (Y/j/ . IN WITNESS WHEREOF, the City has caused this Agreement to be signed by its Mayor. CITY OF ELGIN BY: DATE: ,3//1/0. ED SC OCK, MAYOR ATTEST: X‘P4-1"-1,-e /1/(e-Ctz DOLONNA MECUM, CITY CLERK 10 Table 1 SOIL SAMPLE BTEX ANALYTICAL DATA(mg/kg) SPEEDWAY STATION#7095 851 ST.CHARLES STREET ELGIN,ILLINOIS Sample Date Depth Benzene Toluene Ethylbenzene Xylenes Number (feet) &1 12/13/95 9-11 1-'u >.,, a, ;„ 0.370 3.7 62 11 B-2 12/13/95 9-11 0.007 ND 0.079 0.140 MW-1A 7/5/00 3.5-5 0.003 ND ND ND MW-1A 7/5/00 8.5-10 0.015 0.006 0.002 0.011 MW-2A 7/5/00 3.5-5 ND ND ND ND MW-2A 7/5/00 8.5-10 0.004 0.005 ND 0.004 MW-3A 7/5/00 3.5-5 ND ND ND ND MW-3A 7/5/00 8.5-10 ND ND 0.080 0.730 MW-4A I 5/10/01 I 9-11 I ND ND I ND ND MW-5A I 5/16/02 I 3.5-5 0.006 0.012 I ND 0.010 MW-6A 5/16/02 I 3.5-5 0.006 0.012 0.006 0.009 Tier 1 Soil Remediation Objectives for 0.030 12 13 150 Class I Groundwater ND=Not Detected Note: Shaded cells represent concentrations that exceed Tier 1 soil remediation objectives. 1 Table 2 GROUNDWATER SAMPLE BTEX ANALYTICAL DATA (mg/L) SPEEDWAY STATION#7095 851 ST. CHARLES STREET ELGIN, ILLINOIS Sample Date Benzene Toluene Ethylbenzene Xylenes Number SUMP 1 5/18/89 0.0007 ND ND 0.0023 SUMP 2 I 5/18/89 ` (1,41Xii; 'I 0.130 I 0.052 I 0.380 SUMP 3 5/18/89 ', 041'0 I 0.011 0.011 I' 0.110 RW-1 I 12/28/99 I ND I ND I ND I ND MW-1 5/17/89 ND I ND ND I ND MW-2 5/17/89 .1 1 I ? ; q.. .,. . .,. MW-3 5/17/89 r.,.:' 0.6 i; 6.8 MW-3 6/6/94 (0-101 0.018 0.280 0.180 MW-3 9/8/94 ; (1,14 I NA NA NA F r14.-% MW-3 3/21/95 t, �.�.�_41 0.012 0.390 0.450 MW-4 5/17/89 0.0007 0.0006 0.0001 0.00016 MW-4 6/6/94 ND ND ND ND MW-4 9/8/94 ND ND ND ND MW-5 I .4, .. � «. I 0.610 I 1.8 MW-6 5/17/89 0.0022 0.0025 0.001 0.0046 MW-6 6/6/94 ND ND ND ND MW-6 9/8/94 ND ND ND ND Tier 1 Groundwater 0.005 1 0.700 10 Remediation Objectives for Class I Groundwater 2 Table 2 (continued) GROUNDWATER SAMPLE BTEX ANALYTICAL DATA (mg/L) SPEEDWAY STATION#7095 851 ST. CHARLES STREET ELGIN, ILLINOIS Sample Date Benzene Toluene Ethylbenzene Xylenes Number MW-9 I 5/19/89 I 0.0003 I 0.0008 I ND I ND MW-11 5/19/89 ND ND ND ND MW-12 I 5/17/89 „ tll Sl I 0.0005 I ND I ND MW-13 5/17/89 0.005 0.0008 0.0015 0.0037 MW-13 6/6/94 ND ND ND ND MW-13 3/24/95 ND ND ND ND MW-14 5/17/89 1,i4ii l ND ND ND MW-14 6/6/94 ND ND ND ND MW-14 9/8/94 ND ND ND ND MW-15 5/17/89 ND ND ND ND MW-15 6/6/94 ND ND ND ND MW-15 9/8/94 ND ND ND ND MW-15 3/24/95 ND ND ND ND MW-15 12/28/99 ND ND ND ND MW-15 8/8/00 ND ND ND ND MW-16 I 6/6/94 I ND I ND I ND I ND J MW-19 6/6/94 I 41,. a(I_ 0.096 0.590 2.2 MW-19 3/24/95 04i,:' 0.140 0.140 0.580 Tier 1 Groundwater 0.005 1 0.700 10 Remediation Objectives for Class I Groundwater 3 Table 2 (continued) GROUNDWATER SAMPLE BTEX ANALYTICAL DATA (mg/L) SPEEDWAY STATION#7095 851 ST. CHARLES STREET ELGIN, ILLINOIS Sample Date Benzene Toluene Ethylbenzene Xylenes Number MW-20 12/28/99 ND ND ND ND MW-20 8/8/00 ND ND ND ND MW-20 8/30/01 0.0032 ND ND ND MW-20 7/17/03 ND ND ND ND MW-22 6/6/94 0.004 ND ND ND MW-22 3/24/95 0.003 ND ND ND MW-22 12/28/99 ND ND ND ND MW-23 5/17/89 ( Ill: 0.0011 0.0082 0.0009 MW-23 6/6/94 ND ND ND ND MW-23 9/8/94 ND ND ND ND MW-23 3/22/95 ND ND ND ND MW-24 6/6/94 ND ND ND ND MW-24 3/27/95 ND ND ND ND MW-24 12/28/99 ND ND ND ND MW-24 8/8/00 ND ND ND ND MW-25 5/17/89 31,1 tail 0.0034 0.007 0.003 MW-25 6/6/94 ND ND ND ND MW-25 9/8/94 ND ND ND ND MW-25 3/24/95 ND ND ND ND Tier 1 Groundwater 0.005 1 0.700 10 Remediation Objectives for Class I Groundwater - - 4 Table 2 (continued) GROUNDWATER SAMPLE BTEX ANALYTICAL DATA(mg/L) SPEEDWAY STATION#7095 851 ST. CHARLES STREET ELGIN,ILLINOIS Sample Date Benzene Toluene Ethylbenzene Xylenes Number MW-26 5/17/89 ;,Irk Ii7`i1 s 0.0018 0.0028 0.0026 MW-26 6/6/94 ND ND ND ND MW-26 3/24/95 ND ND ND ND MW-26 12/28/99 ND ND ND ND MW-26 8/8/00 ND ND ND ND MW-27 5/17/89 (Hit:? 0.110 0.200 0.880 MW-27 6/6/94 ai_;t.:{i • 0.038 19 1 , 1.6 MW-27 9/8/94 t;;Eiis� NA NA NA ' ,::i MW-27 3/24/95 ,,f,, 1,1i i$ 0.025 0.340 0.180 MW-27 12/28/99 ND ND ND ND MW-27 8/8/00 71$1771 ND 0.007 0.001 MW-28 5/18/89 iTdi, , i!'�' `I 0.0067 I 0.016 0.042 MW-30 5/18/89 ND ND ND ND MW-30 6/6/94 ND ND ND ND MW-30 9/8/94 ND ND ND ND MW-30 3/22/95 ND ND ND ND Tier 1 Groundwater 0.005 1 0.700 10 Remediation Objectives for Class I Groundwater 5 Table 2 (continued) GROUNDWATER SAMPLE BTEX ANALYTICAL DATA (mg/L) SPEEDWAY STATION#7095 851 ST. CHARLES STREET ELGIN,ILLINOIS Sample Date Benzene Toluene Ethylbenzene Xylenes Number MW-31 5/18/89 ND ND ND ND MW-31 6/6/94 ND ND ND ND MW-31 9/8/94 ND ND ND ND MW-31 3/22/95 ND ND ND ND MW-32 5/18/89 ND ND ND ND MW-32 9/8/94 ND ND ND ND MW-34 5/18/89 �. .._ '4 ,,._ �.' {�...�. ...r._ 5.6 MW-34 6/6/94 (1, 1111 :I 0.017 0.100 0.290 MW-34 9/8/94 0.004 NA NA NA MW-34 3/22/95 .^,(IA ND 0.021 0.007 MW-35 6/6/94 ND ND ND ND MW-35 3/22/95 ND ND ND ND MW-37 5/18/89 0.0013 0.004 ND ND MW-37 6/6/94 ND ND ND ND MW-37 9/8/94 ND ND ND ND MW-37 3/22/95 ND ND ND ND Tier 1 Groundwater 0.005 1 0.700 10 Remediation Objectives for Class I Groundwater 6 Table 2 (continued) GROUNDWATER SAMPLE BTEX ANALYTICAL DATA(mg/L) SPEEDWAY STATION# 7095 851 ST. CHARLES STREET ELGIN,ILLINOIS Sample Date Benzene Toluene Ethylbenzene Xylenes Number MW-1A 8/8/00 i` iii 4L 0.026 0.150 0.310 MW-1A 5/10/01 ND ND ND ND MW-1A 1/10/02a NI)t 0.001 0.001 ND MW-1A 7/17/03 ,y /111(,4 ND ND ND MW-2A 10/25/00 ND ND ND ND MW-2A 5/10/01 iI.WW1: ND ND ND MW-2A 1/10/02 4141;q: : ND ND ND MW-2A 7/17/03 0.0015 ND ND ND MW-3A 8/8/00 , 41 t°4lt ND 0.650 2.1 MW-3A 5/10/01 41ef11 f r" ND ,w, ,, 3.9 MW-3A 1/10/02 ; '4('� �° y ND 0.400 0.180 f MW-3A 7/17/03 i! i` i A 0.0029 0.570 0.300 MW-4A 8/30/01 ND ND ND ND MW-4A 4/29/02 ND ND ND ND MW-4A 7/17/03 ND ND ND ND MW-5A 5/20/02 ND ND ND ND MW-5A 7/17/03 ND ND ND ND MW-6A 5/20/02 ND ND ND ND MW-6A 7/17/03 ND ND ND ND Tier 1 Groundwater 0.005 1 0.700 10 Remediation Objectives for Class I Groundwater ND=Not Detected NA=Not Available Note: Shaded cells represent concentrations that exceed Tier 1 groundwater remediation objectives. 7 A. BLUFF CITY BOULEVARD _1 _ — srrsuY- �— - - srrsuv• - - srrsw- �} sirsur — `srrsov --- MW-8 r \. MW-11 MW-10 NF -0 FORMER iDIL �� NF ANA MAy-9 VAPOR EXTRACTION`1ti TRAFFIC LIGHT NF # -7 \'g' MW-24 • MW-Z5 I�.r.l—— —— — MW-29 T 6,1 MW-14 :--2232.16 -26 I T 1 - 0 5 4 tA¢ - tli NF ¢ 4- MR. ROBERT JUUENe1 - 1 4� -0 NF NF 1 I ROCKFORD I. NA-121 APARTMENT B . I i i AN11-2 -c}-144 B-RAGE TA&& N+11::.-'.: 11 STOP-N-GO INC. I I I MR. ROBERT JUUEN j BLUFF 'KW , 1 Cs o C) MW-3A +^' 455 BLUFF CITY BLVD. MW-30 I MW-28 I CITY BLVD -t� MW-16 I it , 6`S- ,-t,r a MW-3 NA II NA NF MW-20 Nq _tA'�' i.•- 1-1•- NF I i} A4 IG-—/.1-13 - -- --IC- - - y BMW-tl' -!-_._ MW-15 I A, 0 NW-31 I BMW- - FL DRIVEWAY �: NF I MR. & MRS. HERNANDEZ I L I MR. & MRS. GUZMAN MW-21 865 ELIZABETH Sr. j a 857 ST. CHARLES ST. Mw- M-34 _at F-- -- -- -- -- -- -- -- - .0- A - I 858 ST. CHARLES ST. I F I DRIVEWAY I MW-37 MW 36 I I 1 - •--•-- -•--•-- -.--.-_. I 0 MR. ANGEL I'ERQ I 859 ST. CHARLES ST. FORMER SOIL ' I VAPOR EXTRACTION t I SYSTEM #2 LEGEND ESTIMATED AREA OF _.76 MW-2 MONITORING WELL LOCATION IMPACTED SOIL o S-1 Q AF3ANDONED SUMP LOCATION MN �� 8-1 ® SOIL BORING LOCATION 0 40' 6 FORMER LOCATION OF FUEL DISPENSER DRILLING DEEMED NOT FEASIBLE —sr r MN-- 15" STORM & SANITARY SEWER LINE WITHIN ST. CHARLES STREET ROW Practical Environmental Consultants, Inc. aDUE TO UTILITIES 919 Nora Plum crow Rood,Sidle E Wane (847 517-1177 -- seN - - 8" SANITARY SEWER LINE NOTES Sehoumbwg, Mole 10173 FaaYnNs 0$4 517-1916 3 v WATER UNE NF-NOT FOUND N.-NOT AICESSIBLE ESTIMATED SPEEDWAY STATION #7095 GAS LINE Ft.-FORMER SOIL IMPACT • 851 ST. CHARLES STREET chi ---Fa TELEPHONE LINE ELGIN, ILLINOIS OATS SCALE APPROVED OWN.6Y FIOUAE 8121/2003 AS SHOWN SR AJR 1 ESTIMATED AREA OF IMPACTED GROUNDWATER i. BLUFF CITY BOULEVARD -I srrse— — — Tr4 six- — — — -STtSAN— — Q SrtSIN — bTt SIN----•MW-8 -,0 FORMER IL �`� TRAFFIC MW-10 VAPOR CTION •>NF ANA MW-9¢ SYSTEM#1 i PROPOSED HIGHWAY AUTHORITY AGREEMENT LOCATION 6. BLUFF CITY BO V`^Axn �♦����• V*47 ,t-sr t se, _. �4P -.v#. 440 ; — s7'.SIN — sr.SIN---- MW-11 t -10 ;:♦NF- o�♦:♦:.:♦:.:♦ V q t' IL Cti TRAFFIC �4 NF ����.4 r #' ( j -- --�— -- . ∎.;�i l 1 1.►P A P.���A.i��o l 2�∎1 1 I N �� — `--It -- I g !NF MIW 19 .0. -24 MW-25 0 ' ,, r MW^29 T I NF-14 o mw-23!4 R. ROBERT JULIEN T I I i t INAFW-5 MW-4® MW-4A NF I APARTMENT BLDG, o ' i 4 B-t FORAGER TANK I I STOP_N GO INC. I NNAA-1214 477,479, & 481 I MNYFV_2 0B-2 STORAGE AREA -0' a I 455 BLUFF CITY BLVD. I MR. ROBERT JUIJEN j BLUFF CITY BLVD. i "^'1 -'s-3 C; MW-3A MW-30 I MW-28 MW-20 I 473 BLUFF I _ 4NF_g'� -t 4 4 CITY BLVD.NA "1. MW-14 I r tA' My MW-3 NA I I - RW-1 I -,p- Ji ` NF ' — -- — -- l--•— NF IG- -- 4- -- -- --_ -- --MW-15 MW-1 I DPoVEWAY ^NA 4MW- f$I DRNEWAY -0-MW-33 DRVEWAY —I NF i I MR. & MRS. HERNANDEZ I ( ' MR. & MRS. GUZMAN MW-21 865 ELIZABETH ST. 1 1 857 ST. CHARLES ST. MW - I l' 4MW-i I--•--•--•—-It--•--•--•--•- ¢-0 858 Si. CHARLES ST. I NF i DanEwY MW-37 MW-36 I I �a I 'I--.—6—_ M-'5%r1 --1—- -- -- -- 1_- -- -- - — I . I I MR. ANGEL PEREZ I FORMER SOIL i I r i 859 ST. CHARLES ST. i I VAPOR EXTRACTION I SYSTEM f2 LEGEND MW-2 4 MONITORING WELL LOCATION c S-1 `' ABANDONED SUMP LOCATION tcALc IN rat mom ° B-1 0 SOIL BORING LOCATION o 40' x 3 mo FORMER LOCATION OF FUEL DISPENSER DRILLING DEEMED NOT FEASIBLE —s}t six-- 15" STORM & SANITARt SEWER LINE WITHIN ST. CHARLES STREET ROW Practical Environmental Consultants, Inc. Ei ----sex-- DUE TO UTILITIES III Plum e noon,Sulk E aaa& (47) 517-1177 8�SANITARY SEWER LINE NOTES t( i • WATER LINE NF-NOT Farm -NOT ACCESSIBLE PROPOSED HIGHWAY SPEEDWAY STATION #7095 GAS LINE 'FORMER=ATM AUTHORITY AGREEMENT 6 851 ST. CHARLES STREET 7 TELEPHONE LINE LOCATION ELGIN, IWNOIS 8/21/2003 AS SHN APPI AJR F13t£ OW