Loading...
04-336 Resolution No.04-336 RESOLUTION APPROVING CHANGE ORDER NO. 1 AND FINAL IN THE CONTRACT WITH ELGIN SHEET METAL FOR FIRE STATION#6 WHEREAS,the City of Elgin has heretofore entered into a contract with Elgin Sheet Metal for Fire Station#6; and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and final, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that David M.Dorgan,City Manager,be and is hereby authorized and directed to execute Change Order No. I and final, a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock, Mayor Presented: December 15, 2004 Adopted: December 15, 2004 Omnibus Vote: Yeas: 6 Nays: 0 Attest: s/Dolonna Mecum Dolonna Mecum, City Clerk CHANGE ORDER Qty of Elgin No. 00001 150 Dexter Court Phone: 847-931-5605 FINAL Elgin,IL 60120 TITLE: Misc. HVAC Changes DATE: 11/12/2004 PROJECT:Elgin Fire Station#6 JOB: 20413 TO: Attn: Pat Hudgens CONTRACT NO:20413-4 Elgin Sheet Metal 695 Schneider Dr. South Elgin, IL 60177 Phone: 847-742-3486 Fax: 847-742-9037 RE: To: From: Number: DESCRIPTION OF CHANGE Title:HVAC Number:20413-4 From: SMC To :ESM Item Description Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 Credit for vehicle exhaust system in 1.000 ($20,000.00) 0.00°x° $0.00 ($20,000.00) HVAC contract 1.000 ($20,000.00) 0.00% $0.00 ($20,000.00) 00002 Credit of allowance in HVAC contract 00003 HVAC revisions(per the City of 1.000 $13,300.00 0.00% $0.00 $13,300.00 Elgin plan review) 00004 Exterior louver required for EF-5 1.000 $373.00 0.00% $0.00 $373.00 00005 Revisions to EF-4 per Addendum 1.000 $4,752.00 0.00% $0.00 $4,752.00 No. 1,MSK-1 through MSK 4 ].000 $28,925.00 0.00% $0.00 $28,925.00 00007 Assignment of Plymovent contractor(vehicle exhaust system). 00008 The reasons which necessitated the 1.000 $0.00 0.00% $0.00 $0.00 change order were unforeseeable at the time of the original agreement, the subject changes are germane to the original agreement and the execution of the change order is in the best interests of the City of Elgin and is authorized by law. Unit Cost: $7,350.00 Unit Tax: $0.00 Unit Total: $7,350.00 City of Elgin CHANGE ORDER No. 00001 150 Dexter Court Phone: 847-931-5605 FINAL Elgin,IL 60120 The Original Contract Sum was •••••••••••••••••••••••••••••••• ................................................................. $162,350.00 Net Change by Previously Authorized Requests and Changes ................................................ •••••••••••••••••........................"'•• $0.00 The Contract Sum Prior to This Change Order was ,,,,,•,,, $162,350.00 The Contract Sum Will be Increased ••••••••••••••••••••••••••••••••••••••••••••••' .................................... $7,350.00 The New Contract Sum Including This Change Order ..... $169,700.00 The Contract Time Will Not Be Changed ................................................................................. The Date of Substantial Completion as of this Change Order Therefore is ••• ACCEPTED: Elgin Sh etal City of Elgin By, By: % - -� By: Pat Hudg David Dorgan 12/3/20 Date: 12/3/2004 Date: C Ity Of Elgin Agenda Item No. ' III November 24, 2004 TO: Mayor and Members of the City Council SAFE CC MMI_JNITY FROM: David M. Dorgan, City Manager Michael Falese, Fire Chief SUBJECT: Change Order#2 for Elgin Sheet Metal for Fire Station #6 PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to approve payment for a change order to Elgin Sheet Metal for the construction of Fire Station#6. RECOMMENDATION It is recommended that the City Council approve the payment for a change order to Elgin Sheet Metal for the construction of Fire Station#6 in the amount of$7,350.00. BACKGROUND Elgin Sheet Metal was awarded the bid for heating, ventilating, and air conditioning for the construction of Fire Station #6. The original contract amount was $162,350.00. A change order in the amount of$7,350.00 was submitted by Elgin Sheet Metal for the following items: Item Description Amount I Credit for vehicle exhaust system in HVAC. ($20,000.00) 2 Credit for allowance. ($20,000.00) 3 HVAC revisions (per the City of Elgin plan review) $13,300.00 4 Exterior louver required $373.00 5 Revision of ductwork and provide increased makeup air for $4,752.00 ,.,, mechanical systems. - s �w Change Order for Fire Station#6 November 24, 2004 Page 2 6 Assignment of Plymovent as the provider of the vehicle exhaust $28,925.00 system. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None FINANCIAL IMPACT The total cost of this change order to Elgin Sheet Metal equals $7,350.00. The total budget for this project is $3.77 million with approximately $3.45 million spent and encumbered to date. There are sufficient funds available ($323,045) in account number 396-1000-795.92-36 (1996 General Obligation Bond Fund, Buildings and Structures), project number 289505 (Fire Station 6)to pay for this change order. After approving this change order, it is estimated that it will cost approximately $240,000 to complete the project (miscellaneous items that received no bids, contingency, and furnishings/equipment). LEGALIMPACT V�*None ALTERNATIVES 1. Approve the payment for a change order as recommended 2. Do not approve the payment for a change order as recommended Respectfully submitted for Council consideration. MWF/wmb Attachment