Loading...
04-284 Resolution No.04-284 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH RIVER VALLEY LAND IMPROVEMENT CO. FOR FIRE STATION#6 WHEREAS,the City of Elgin has heretofore entered into a contract with River Valley Land Improvement Co. for the construction of Fire Station#6; and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that David M.Dorgan,City Manager,be and is hereby authorized and directed to execute Change Order No. 1,a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock,Mayor Presented: October 27, 2004 Adopted: October 27, 2004 Omnibus Vote: Yeas: 6 Nays: 0 Attest: s/Dolonna Mecum Dolonna Mecum, City Clerk City of Elgin CHANGE ORDER No. 00001 150 Dexter Court Phone: 847-931-5605 Elgin,IL 60120 TITLE: Site Utilities DATE:9/15/04 PROJECT:Elgin Fire Station#6 JOB: 20413 TO: Attn: Jeff Giertz CONTRACT NO:20413-13 River Valley Land Improvement Co. 11N263 Brookside Elgin, IL 60123 Phone: 847-742-4694 Fax: 847-742-4792 RE: To: From: Number: DESCRIPTION OF CHANGE Item Description Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00006 Excavated test holes to confirm 1.000 $921.24 0.00% $0.00 $921.24 borings. Unit Cost: $9,984.36 Unit Tax: $0.00 Total: $9,984.36 The reasons that necessitated this change order were unforeseeable at the time of the original agreement. The subject changes are germane to the original agreement. The execution of the change order is in the best interests of the City of Elgin and is authorized by law. TheOriginal Contract Sum was ................................................................................................. $88,167.00 Net Change by Previously Authorized Requests and Changes ................................................ $0.00 The Contract Sum Prior to This Change Order was ......... $88,167.00 The Contract Sum Will be Increased ................................................................................... $9,984.36 The New Contract Sum Including This Change Order ..... $98,151.36 TheContract Time Will Not Be Changed ................................................................................. The Date of Substantial Completion as of this Change Order Therefore is ••• ACCEPTED: River Valley Land I rovement C- City of Elgin B By: By. y: Jeff Gie David Dorgan Date: 9/15/04 Date: 9/15/04 Date: Page 2 of 2 Expedition • Agenda Item No. City of Elgin September 29,2004 TO: Mayor and Members of the City Council SAFE COMMUNITY FROM: David M. Dorgan, City Manager JVkb�4 Michael Falese, Fire Chief SUBJECT: Change Order#1 for River Valley Land Improvement for Fire Station#6 PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to approve payment for a change order to River Valley Land Improvement Co. for the construction of Fire Station#6. RECOMMENDATION It is recommended that the City Council approve the payment for a change order to River Valley Land Improvement Co. for the construction of Fire Station#6 in the amount of$9,984.36. BACKGROUND River Valley Land Improvement Co. was awarded the bid for site utilities for the construction of Fire Station #6. The original contract amount was $88,167.00. A change order in the amount of $9,984.36 was submitted by River Valley Land Improvement Co. for the following items: Item Description Amount 1 Once the excavation was completed at the storm sewer tie-in $748.20 manhole, it was discovered that the height limitation between existing utilities (gas main, electrical, etc.)would not allow the installation of the specified pipe material (concrete). A change in material (ductile iron pipe) was required to clear the obstructions and complete the connection. 2 The City of Elgin during its review of the plans prior to issuing a $3,469.00 building permit required an additional water service into the facility rk to accommodate the sprinkler system. The bid documents only showed one service. Change Order for Fire Station#6 September 29, 2004 Page 2 3 An existing sanitary sewer was shown on the bid documents for the site utility contractor to tie the new sanitary sewer into. During the $5,195.92 soil remediation excavation, it became evident that the line reflected on the drawings was not there. A new service had to be installed. It is our understanding that the civil engineer based their drawings from information received from the City of Elgin. 4 During a review by the City of Elgin, it was determined that ($1,200.00) additional storm lines that were required to be installed to accommodate an existing field tile did not need to be installed. 5 A portion of the existing building foundation was left in place to $850.00 keep the bank stable along Chicago Street until such time that the excavation from the soil remediation could be backfilled. This wall was encountered during the storm sewer installation and needed to be removed. 6 Exploratory excavation was completed prior to the soil remediation $921.24 work starting to confirm/deny the findings of the soil borings. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None FINANCIAL IMPACT The total cost of this change order to River Valley Land Improvement Company equals $9,984.36. The total budget for this project is $3.77 million with approximately $3.43 spent and encumbered to date. Therefore sufficient funds budgeted and available to approve this change order. Account number 275-0000-791.92-36 (Riverboat Fund, Capital Additions- Buildings/Structures), project number 289505 (Fire Station 6)will be charged. LEGAL IMPACT WNone. r Change Order for Fire Station #6 September 29, 2004 Page 3 ALTERNATIVES 1. Approve the payment for a change order as recommended 2. Do not approve the payment for a change order as recommended Respectfully submitted for Council consideration. MWF/wmb attachment