Loading...
04-220 Resolution No. 04-220 RESOLUTION AUTHORIZING EXECUTION OF A SECOND AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT WITH HITCHCOCK DESIGN GROUP FOR THE KIMBALL STREET/LIBRARY RIVERWALK PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that David M. Dorgan, City Manager, be and is hereby authorized and directed to execute a Second Amendment to Professional Services Agreement on behalf of the City of Elgin with Hitchcock Design Group for engineering services for the Kimball Street/Library Riverwalk Project, a copy of which is attached hereto and made a part hereof by reference. s/ Ed Schock Ed Schock, Mayor Presented: August 11, 2004 Adopted: August 11, 2004 Omnibus Vote: Yeas: 6 Nays: 0 Attest: s/Dolonna Mecum Dolonna Mecum, City Clerk SECOND AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT THIS SECOND AMENDMENT AGREEMENT made and entered into this ((y1- day of VG C► Cl— , 2004, by and between the CITY OF ELGIN, ILLINOIS, a municipal corporation (hereinafter referred to as the "City") , and Hitchcock Design Group, an Illinois corporation, (hereinafter referred to as the "Consultant") . WITNESSETH WHEREAS, the City and the Consultant have previously entered into a Professional Services Agreement dated July 1, 2001, wherein Consultant provided to the City certain consulting services regarding the provision of preliminary engineering services for the Kimball Street Gateway Project; and WHEREAS, the City and Consultant have previously entered into an amendment to such professional services agreement, with such Amendment Agreement being dated October 3, 2003; and WHEREAS, the City has determined it to be necessary and desirable to obtain the further assistance of the Consultant to provide continued consulting services regarding the final design development, preparation of construction documents, and bidding and award for the Kimball Street/Library Riverwalk construction project. NOW, THEREFORE, for and in consideration of the mutual promises and covenants contained herein, the receipt and sufficiency of which is hereby acknowledged, the parties hereto agree as follows: 1. The Professional Services Agreement between the City and the Consultant dated August 8,2001,as amended by the Amendment Agreement dated October 3,2003,is hereby further amended as follows: A. Paragraph 1 entitled "Scope of Work" is further amended by adding an additional paragraph thereto to read as follows: "Consultant shall also perform and direct the necessary qualified personnel to perform the professional services as set forth in the Scope of Services documents entitled "Hitchcock Design Group Kimball Street/Library Riverwalk", consisting of eight (8) pages, attached hereto and made a part hereof as Exhibit 1-B". B. Paragraph 2 entitled "Schedule and Term" is further amended by adding an additional paragraph thereto to read as follows: "The Consultant's responsibility to provide the services in Exhibit 1-B shall commence as of August 11,2004 and shall continue through the completion of the scope of services. C. Paragraph 3 entitled"Fees"is amended by adding subparagraph E thereto to read as follows: "E. Payments for services provided by the Consultant set forth in Exhibit 1-B hereof shall be reimbursed at the hourly rate of its professional and technical personnel as set forth on Exhibit 2 attached hereto and made a part hereof by this reference with the total fees and expenses due to be paid to the Consultant for the services describedin Exhibit tl=Wri To exceed$54,000 regardless of actual time expended or actual costs incurred by the Consultant unless material modifications to the Consultant's Scope of Services are authorized in writing by the City and approved by the City Council. Consultant's cost estimates for the various aspects of the services to be performed in Exhibit 1-B are set forth in Exhibit 1-B." 2. That except as expressly amended herein the terms of the Professional Services Agreement as amended by the Amendment Agreement dated October 3, 2003, between the City and the Consultant dated August 8,2001,shall remain in effect and shall apply to the additional services to be performed by the Consultant as described in this Amendment Agreement and as set forth in Exhibit 1-B hereto. IN WITNESS WHEREOF,the parties hereto have entered into and executed this amendment agreement on the date and year first written above. CITY OF ELGIN Hitchcock Desi a, Group By I ►.� r 7./1.4--./1. David M. Dorgan e t 060T City anager Attest: City Clerk Hitchcock Design Group Creating Better Places® June 3, 2004 Mr. Ray Moller Director- Economic Development and Business Services City of Elgin 150 Dexter Court Elgin, IL 60120 RE: Kimball Street/Library Riverwalk Project#: 03-0524-002-X04-03-07 Dear Ray: Thank you for asking Hitchcock Design Group to submit this proposal for Phase II - Design& Engineering Services for improvements along Kimball Street and the Gail Borden Library. We appreciate the opportunity to continue our relationship with you and the City of Elgin. Phase I—Preliminary Planning Services for this portion of the Riverfront was completed January 2004. During Phase I we confirmed the program goals and objectives for the project and incorporated them into a final schematic design(see attached plans). The goals and objectives are: • Connect the existing bike path along Ann Street. Ann Street Bike path improvements will be part of the Public Works CSO improvement project • Design the riverwalk along the library to be consistent with the Civic Riverwalk. Accommodate the future Veteran's Memorial along the riverfront. • Mitigate the environmental issues on the library site by using a soil separation fabric with 6"of topsoil over the entire library riverwalk site(This is the approach the library took and needs to reviewed officially by an environmental/geotechnical engineer to verify necessity.) • Widen the streetscape along Kimball Street to accommodate bicycles and pedestrians. Improvements are to be consistent with the riverfront. • Create a gateway to the downtown,which incorporates memorials for significant donors as directed. • Connect Kimball Street streetscape with the Civic Riverwalk. The total cost,based on the Phase I schematic design is $979,000. The initial project budget was approximately$670,000 and included streetscape and riverwalk improvements only. The additional cost is due to the gateway and memorial improvements along Kimball Street added per the City's direction. lac.,:..«:n`lipntsISL as nc7d Flgin\Kimhall Qt-1.ihraciAnrnnnca1 f151 104 molirr doc 221 W.Jefferson Avenue • Naperville,Illinois 60540 • Phone 630.961. 1787 Fax 630.961.9925 • Once the City approves the Phase I final concept design, we are ready to commence our work on the second phase of services. At the conclusion of Phase II, Design and Engineering Services, the City will have received: • Construction documents and cost opinions for the Riverwalk and related improvements • Bid results and contract award recommendations Our team proposes to provide Phase II of the attached scope of services at our standard hourly rates,plus customary out of pocket expenses for a fee not to exceed $54,000. An estimate of the hours,fees and expenses is included with this proposal along with the Phase I final schematic design and cost opinion. Under Rick's direction, I will manage the work of Hitchcock Design Group's urban design team. Hey and Associates will provide what little water resources engineering is required, and Patrick Engineering will provide civil, structural,and electrical consulting services to our team. We will work with the City's environmental consultant to identify environmental issues that may exist in the project area. Environmental consulting services are not included in the current proposal. We understand that you would like us to begin the project as soon as possible. We need to discuss when the City is anticipating construction to begin. Under normal circumstances,we believe that if we start the work in June 2004, construction could possibly begin very late in the fall 2004 or in the early spring of 2005. As always,we look forward to finalizing the scope, schedule, fees and contractual details in order to best meet your objectives. Thanks again for the opportunity to serve your community on this important project. Sincerely, Hitchcock Design Group Mark E.Underwood Senior Associate encl: scope of services,hour and fee matrices,phase I schematic design,phase I cost opinion cc: Hitchcock, Brestal, Hitchcock Design Group Hitchcock Design Group CITYOF ELGIN KIMBALL STREET/LIBRARY RIVER WALK Fee Estimate Hours LDR MGT PLN DES DOC SUP sub-tot 145 100 90 85 60 55 I PHASE I PLANNING A Program,Research,Analysis B Schematic Design and Engineering II PHASE II DESIGN&ENGINEERING SERVICES A Design Development 1 Finalize design/engineering 2 4 32 38 2 Document production 4 32 36 3 Quantitiy and cost opinion 2 8 10 4 Outline specifications 2 8 5 Construction strategy 2 2 6 Reviews 4 4 8 7 Revisions 0 2 16 16 34 8 Council presentation 4 4 8 9 Permit applications 2 2 10 Permit facilitation 2 2 Sub-total 10 28 0 64 48 0 150 Sub-total fee 1450 2800 0 5440 2880 0 12570 B Construction Documents 1 Contract documents 2 20 20 2 44 2 Cost opinion 2 8 10 3 Construction strategy 2 2 4 Reviews 4 8 12 5 Revisions 2 15 15 32 Sub-total 4 16 0 43 35 2 100 Sub-total fee 580 1600 0 3655 2100 110 8045 C Bidding and Negotiation 0 1 Document reproduction 2 4 6 2 Recommend contractors 2 2 3 Advertisement 2 2 4 Pre-bid meeting 4 4 5 Questions and clarifications 4 4 6 Bid review and tabulation 4 4 7 Council presentation 4 4 8 Sub-total 4 22 0 0 4 0 30 Sub-total fee 580 2200 0 0 240 0 3020 Consultant Fee Summary , r CITY OF ELGIN KIMBALL STREET/LIBRARY RIVER WALK irrigation water res civil structural electrical Sub-tot PHASE I PRELIM PLANNING II A Program, Research,Analysis B Schematic Design& Engineering PHASE II DESIGN & ENGINEERING A Design Development 2500 500 800 600 5000 9400 B Construction Documents 3650 600 1200 2400 6000 13850 C Bidding and Negotiation 500 0 0 0 500 1000 Sub-totals 6650 1100 2000 3000 11500 24250 Fee Estimate .- CITY OF ELGIN KIMBALL STREET/LIBRARY RIVER WALK HDG sery bur consult travel other sub-tot PHASE I PRELIM PLANNING A Program,Research,Analysis B Schematic Design&Engineering Sub-totals II PHASE II DESIGN ENGINEERING A Design Development 12570 650 9400 300 1553 24473 B Construction Documents 8045 550 13850 200 2190 24835 C Bidding and Negotiation 3020 400 1000 100 225 4745 Sub-totals 23635 1600 24250 600 3968 54053 Totals 23635 1600 24250 600 3968 54053 Hitchcock Design Group Creating Better Places° Conceptual Cost Opinion Elgin Riverfront - Kimball Street / Library City of Elgin Project#: 03-0524-002-X04-03-03 Date: January 15, 2004 Option A - Entry Columns & Walls Riverwalk/Downtown Gateway- South (Civic Riverfront) A. Temporary Environmental Controls $1,000 B. Removals $7,000 C. Earthwork -balanced Earthwork,and topsoil $3,000 E. Unit&Pathway Paving -unit paving,concrete curbs,and concrete bike path $26,000 F. Entry Wall -+/-4'height wall,material to match riverwalk $36,000 G. Gateway Structure -column w/sandblasted logo,and banner $22,000 H. Furnishings -benches and trash receptacles $4,000 I. Landscape -trees,shrubs,groundcovers,turf,and mulch $18,000 J. Irrigation -allowance to adjust existing system $10,000 K. Electrical -light fixtures and wiring $8,000 Subtotal: $135,000 Design&Bid Contingency 10% $13,000 General Requirements $3,000 Construction Total: $151,000 Riverwalk/Downtown Gateway-North (W.R. Meadows Memorial Plaza) A. Temporary Environmental Controls $1,000 B. Removals $5,000 C. Earthwork -balanced Earthwork,topsoil and soil separator $11,000 E. Unit Paving -unit paving and concrete band $27,000 F. Entry Wall -+/-4'height wall,material to match riverwalk $50,000 G. Gateway Structure -column w/sandblasted logo,banner, and plaques $58,000 H. Furnishings -benches and trash receptacles $5,000 I. Landscape -trees,shrubs,groundcovers,turf,and mulch $19,000 J. Electrical -light fixtures and wiring $16,000 Subtotal: $192,000 Design&Bid Contingency 10% $19,000 General Requirements $4,000 Construction Total: $215,000 Kimball Street Streetscape A. Removals $5,000 B. Earthwork -balanced Earthwork,topsoil and soil separator $7,000 C. Unit Paving -unit paving and concrete band $51,000 E. Landscape -trees,shrubs,groundcovers,turf,and mulch $35,000 F. Irrigation -allowance $5,000 Subtotal: $103,000 Design &Bid Contingency 10% $10,000 General Requirements $2,000 Construction Total: $115,000 Library Riverwalk A. Temporary Environmental Controls $2,000 B. Removals $5,000 C. Earthwork -balanced Earthwork,topsoil and soil separator $27,000 E. Drainage -underdrains @ wall $5,000 F. Unit Paving -unit paving and concrete band $58,000 G. Furnishings -benches and trash receptacles $2,000 H. Landscape -trees,shrubs,groundcovers,turf,and mulch $17,000 I. Irrigation $50,000 J. Electrical -light fixtures and wiring $73,000 Subtotal: $239,000 Design &Bid Contingency 10% $24,000 General Requirements $5,000 Construction Total: $268,000 Bike Pathway @ Library Riverwalk C. Earthwork -excavation,deduct topsoil and soil separator -$2,000 F. Unit Paving -deduct concrete band -$9,000 G. Concrete Bike Path - 10'wide concrete path $38,000 H. Landscape -deduct turf -$1,000 Subtotal: $26,000 Design&Bid Contingency 10% $3,000 General Requirements $1,000 Construction Total: $30,000 Total Construction Cost Opinion $779,000 Other Project Costs Construction Management $55,000 Construction Contingency- 5% $39,000 Schematic Design $13,000 Design Development and Construction Documents $60,000 Construction Phase Services $23,000 On-Site Testing $10,000 Other Project Costs Total: $200,000 Total Cost Opinion (construction total+other project costs) $979,000 , E.KhI Standard Hourly Rates CITY OF ELGIN KIMBALL STREET/LIBRARY RIVER WALK Fee Estimate Hitchcock Design Group Activity Description Hourly Rate LDR Project Leadership officer oversight, meetings,presentations $ 145.00 MGT Project Management staffing, coordination, administration $ 100.00 PLN Project Planning conceptual function,organization $ 90.00 DES Project Design technical and appearance issues $ 85.00 DOC Project Documentation graphics and document production $ 60.00 SUP Project Support clerical and secretarial $ 55.00