Loading...
04-166 Certified State of Illinois ) County of Kane) City of Elgin ) CERTIFICATE OF CITY CLERK I, Dolonna Mecum, DO HEREBY CERTIFY that I am the duly qualified City Clerks of the City of Elgin, in the Counties of Kane and Cook in the State of Illinois, and that as such City Clerk I am the keeper and custodian of the files and records of said City of Elgin and the seal thereof. I DO FURTHER CERTIFY that the attached is a full, true, and correct copy of: RESOLUTION NO. 04-166 RESOLUTION ESTABLISHING PREVAILING WAGE RATES ON PUBLIC WORKS CONTRACTS adopted by the Elgin City Council at its legally convened meeting held on June 23, 2004. In Witness Whereof, I have hereunto set my hand an affixed the corporate seal of the City of Elgin at the said City in the County and State aforesaid this June 25, 2004. c041-‘4242 City lerk (SEAL) •, • , • Resolution No. 04-166 RESOLUTION ESTABLISHING PREVAILING WAGE RATES ON PUBLIC WORKS CONTRACTS WHEREAS, 820 ILCS 130/0.01 et seq. entitled "AN ACT regulating wages of laborers, mechanics, and other workers employed in any public works by the State,county,city or any public body or any political subdivision or by any one under contract for public works." requires that any public body awarding any contract for public work, or otherwise undertaking any public works as defined herein,shall ascertain the general prevailing hourly rate of wages for employees engaged in such work; and WHEREAS, said Act further provides that if the public body desires that the Department of Labor ascertain the prevailing rate of wages,it shall notify the Department of Labor to ascertain the general prevailing wage rate; and WHEREAS, at the request of the City of Elgin the Department of Labor has determined the prevailing rate of wages for construction work in Cook and Kane Counties in the State of Illinois. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that the determination of the prevailing wages as made by the Department of Labor, copies of which are attached hereto and made a part hereof by reference, are adopted by the City of Elgin. BE IT FURTHER RESOLVED that all contracts for public work of the City of Elgin shall include a stipulation to the effect that not less than the prevailing rate of wages as found by the Department of Labor shall be paid to all laborers,workers and mechanics perfol ming work under the contract. BE IT FURTHER RESOLVED that all contract bonds for public works shall include a provision to guarantee the faithful performance of the prevailing wage clause as provided by contract. BE IT FURTHER RESOLVED that a copy of the prevailing wage rate as established by the Department of Labor shall be publicly posted and kept available for inspection by any interested party. BE IT FURTHER RESOLVED that nothing herein contained shall be construed to apply to the prevailing hourly rate of wages in the locality for employment other than public works construction as defined in the Act, and that the City Clerk be and is hereby authorized to file a certified copy of this resolution with the Secretary of State Index Division and the Department of Labor of the State of Illinois. s/Ed Schock Ed Schock, Mayor , ,Cook County Prevailing Wage for June 2004 Page 1 of 7 Cook County Prevailing Wage for June 2004 Trade Name RG TYP C Base FRMAN *M-F>8 OSA OSH H/W Pensn Vac Trng ASBESTOS ABT-GEN ALL 29.000 29.750 1.5 1.5 2 .0 4 .170 3 .380 0.000 0.170 ASBESTOS ABT-MEC BLD 23.300 24 .800 1.5 1.5 2 .0 3 .640 5 .520 0.000 0.000 BOILERMAKER BLD 35.600 38.800 2 .0 2.0 2 .0 4.550 5.690 0.000 0.210 BRICK MASON BLD 30.550 32.550 1.5 1.5 2.0 4.950 5.860 0.000 0.550 CARPENTER ALL 33.320 34.820 1.5 1.5 2.0 4.930 4.140 0.000 0.440 CEMENT MASON ALL 34 .000 35.000 2 .0 1.5 2 .0 5.080 3 .750 0.000 0.150 CERAMIC TILE FNSHER BLD 24.450 0.000 2 .0 1.5 2 .0 4.750 3 .950 0.000 0.210 COMM. ELECT. BLD 29.940 32 .340 1.5 1.5 2 .0 5 .100 5 .240 0.000 0.700 ELECTRIC PWR EQMT OP ALL 33.000 38.450 1.5 1.5 2.0 5.570 7.770 0.000 0.170 ELECTRIC PWR GRNDMAN ALL 25.740 38.450 1.5 1.5 2.0 4.350 6.060 0.000 0.120 ELECTRIC PWR LINEMAN ALL 33.000 38.450 1.5 1.5 2.0 5.570 7.770 0.000 0.170 ELECTRICIAN ALL 33.650 36.150 1.5 1.5 2 .0 7.450 5.980 0.000 0.750 ELEVATOR CONSTRUCTOR BLD 37.245 41.900 2.0 2.0 2 .0 6.525 3.150 2 .230 0.340 FENCE ERECTOR ALL 23 .540 24.790 1.5 1.5 2.0 6.000 5.320 0.000 0.000 GLAZIER BLD 29.000 30.000 1.5 2.0 2.0 5.340 7.900 0.000 0.400 HT/FROST INSULATOR BLD 30.450 32.200 1.5 1.5 2.0 6.810 8.010 0.000 0.230 IRON WORKER ALL 32.580 34.080 2.0 2.0 2 .0 6.000 9.660 0.000 0.270 LABORER ALL 29.000 29.750 1.5 1.5 2 .0 4 .170 3 .380 0.000 0.170 LATHER BLD 33 .320 34.820 1.5 1.5 2 .0 4.930 4.140 0.000 0.440 MACHINIST BLD 33 .230 34 .980 2.0 2 .0 2 .0 3 .200 3 .600 2.290 0.000 MARBLE FINISHERS ALL 24.050 26.050 1.5 1.5 2.0 4.470 5.860 0.000 0.550 MARBLE MASON BLD 30.550 32.550 1.5 1.5 2 .0 4.950 5.860 0.000 0.550 MILLWRIGHT ALL 33.320 34.820 1.5 1.5 2.0 4.930 4.140 0.000 0.440 OPERATING ENGINEER BLD 1 37.600 41.600 2.0 2 .0 2 .0 6.050 4.850 1.800 0.600 OPERATING ENGINEER BLD 2 36.300 41.600 2.0 2 .0 2 .0 6.050 4.850 1.800 0.600 OPERATING ENGINEER BLD 3 33 .750 41.600 2 .0 2.0 2 .0 6.050 4.850 1.800 0.600 OPERATING ENGINEER BLD 4 32.000 41.600 2.0 2.0 2 .0 6.050 4.850 1.800 0.600 OPERATING ENGINEER FLT 1 38.350 38.350 1.5 1.5 2.0 5.400 4.250 1.700 0.000 OPERATING ENGINEER FLT 2 36.850 38.350 1.5 1.5 2 .0 5.400 4.250 1.700 0.000 OPERATING ENGINEER FLT 3 32.800 38.350 1.5 1.5 2 .0 5 .400 4.250 1.700 0.000 OPERATING ENGINEER FLT 4 27.300 38.350 1.5 1.5 2 .0 5 .400 4.250 1.700 0.000 OPERATING ENGINEER HWY 1 35. 800 39.800 1.5 1.5 2 .0 6.050 4 .850 1.800 0.600 OPERATING ENGINEER HWY 2 35.250 39.800 1.5 1.5 2 ,0 6.050 4.850 1.800 0.600 OPERATING ENGINEER HWY 3 33.200 39.800 1.5 1.5 2 .0 6.050 4.850 1.800 0.600 OPERATING ENGINEER HWY 4 31.800 39.800 1.5 1.5 2 .0 6.050 4.850 1.800 0.600 OPERATING ENGINEER HWY 5 30.600 39.800 1.5 1.5 2 .0 6.050 4 .850 1.800 0.600 ORNAMNTL IRON WORKER ALL 30.850 32.600 2.0 2 .0 2.0 6.000 9.490 0.000 0.750 PAINTER ALL 31.350 35.260 1.5 1.5 1.5 4.700 4.400 0.000 0.340 PAINTER SIGNS BLD 25.530 28.660 1.5 1.5 1.5 2.600 2.040 0.000 0.000 PILEDRIVER ALL 33.320 34.820 1.5 1.5 2.0 4.930 4.140 0.000 0.440 PIPEFITTER BLD 34.000 36.000 1.5 1.5 2.0 5.720 5.350 0.000 0.000 PLASTERER BLD 29.990 30.990 1.5 1.5 2 .0 4.500 5.450 0.000 0.400 PLUMBER BLD 36.000 38.000 1.5 1.5 2 .0 5.100 3 .040 0.000 0.390 ROOFER BLD 31.450 33 .450 1.5 1.5 2 .0 4.790 2.630 0.000 0.330 SHEETMETAL WORKER BLD 33.370 36.040 1.5 1.5 2 .0 4.960 7.390 0.000 0.540 SIGN HANGER BLD 22.980 23.830 1.5 1.5 2.0 4.130 2.240 0.000 0.000 SPRINKLER FITTER BLD 33.700 35.500 2.0 2.0 2.0 6.600 5.000 0.000 0.450 STEEL ERECTOR ALL 32.580 34.080 2.0 2.0 2 .0 6.000 9.660 0.000 0.270 STONE MASON BLD 30.550 32 .550 1.5 1.5 2 .0 4 .950 5. 860 0.000 0.550 TERRAZZO FINISHER BLD 25.140 0.000 2 .0 1.5 2 ,0 5.450 4.630 0.000 0.200 TERRAZZO MASON BLD 29.050 30.550 2 .0 1.5 2 .0 5.450 5.550 0.000 0.160 TILE MASON BLD 29.850 31.850 2.0 1.5 2.0 4.750 4.750 0.000 0.430 TRAFFIC SAFETY WRKR HWY 22.050 23.550 1.5 1.5 2.0 2 .478 1.800 0.000 0.000 TRUCK DRIVER E ALL 1 26.900 27 .550 1.5 1.5 2 .0 4.200 3.200 0.000 0.000 http://www.state.il.us/agency/idol/rates/EVENMO/COOK9999.htm 6/1/2004 ,Cook County Prevailing Wage for June 2004 Page 2 of 7 TRUCK DRIVER E ALL 2 27'150 27.550 1.5 1.5 2 .0 4 .200 3 .300 0.000 0.000 TRUCK DRIVER E ALL 3 27.350 27.550 1.5 1.5 2 .0 4.200 3 .200 0.000 0.000 TRUCK DRIVER E ALL 4 27.550 27.550 1.5 1.5 2 .0 4 .200 3 .200 0.000 0.000 TRUCK DRIVER W ALL 1 27.500 28.050 1.5 1.5 2 .0 4 .200 3 .I00 0. 000 0. 000 TRUCK DRIVER W ALL 2 27.650 28 .050 1.5 1.5 2 .0 4 .200 3 .100 0. 000 0. 000 TRUCK DRIVER W ALL 3 27 .850 28.050 1.5 1.5 2 .0 4.200 3 .100 0.000 0.000 TRUCK DRIVER W ALL 4 28.050 38.050 1 .5 1.5 2 .0 * .300 3 .100 0.000 0.000 TUCKPOINTER BLD 32.200 33 .200 1.5 1.5 2 .0 3 .760 5.590 0.000 0.580 Legend: M-F>8 (Overtime is required for any hour greater than 8 worked each day, Monday through Friday. OSA (Overtime is required for every hour worked on Saturday) OSH (Overtime is required for every hour worked on Sunday and Holidays) o/w (Health & Welfare Insurance) Pensn (Pension) Vac (Vacation) Trng (Training) Explanations CooK COUNTY TRUCK DRIVERS (WEST) - That part of the county West of Barrington Road. The following list is considered as those days for which holiday rates of wages for work performed apply: New Years Day, Memorial/Decoration Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day, Christmas Day. Generally, any of these holidays which fall on a Sunday is celebrated on the following Monday. This then makes work performed on that Monday payable at the appropriate overtime rate for holiday pay. Common practice in a given local may alter certain days of celebration such as the day after Thanksgiving for Veterans Day. If in doubt, please check with IDOL. EXPLANATION OF CLASSES ASBESTOS - GENERAL - removal of asbestos material from any place in a building, including mechanical systems where those mechanical systems are to be removed. This includes the removal of asbestos materials from ductwork or pipes in a building when the building is to be demolished at the time or at some close future date. ASBESTOS - MECHANICAL - removal of asbestos material from mechanical systems, such as pipes, ducts, and boilers, where the mechanical systems are to remain. CERAMIC TILE FINISHER The grouting, cleaning, and polishing of all classes of tile, whether for interior or exterior purposes, all burned, glazed or unglazed products; all composition materials, granite tiles, warning detectable tiles, cement tiles, epoxy composite materials, pavers, glass, mosaics, fiberglass, and all substitute materials, for tile made in tile-like units; all mixtures in tile like form of cement, metals, and other materials that are for and intended for use as a finished floor surface, stair treads, promenade roofs, walks, walls, ceilings, swimming pools, and all other places where tile is to form a finished interior or exterior. The mixing of all setting mortars including but http:/han^nm.Qtate.il.no/ogeoov/idol/ro1eo/E\/ENIVIO/CO(}K9990.hbn 6/}/]004 rookCountyPrevailingWageforJune2004 Paue3of7 not limited to thin-set mortars, epoxies, wall mud, and any other sand and cement mixtures or adhesives when used in the preparation, installation, repair, or maintenance of tile and/or similar materials. The handling and unloading of all sand, cement, lime, tile, fixtures, equipment, adhesives, or any other materials to be used in the preparation, installation, repair, or maintenance of tile and/oz similar materials. Ceramic Tile Finishers shall fill all joints and voids regardless of method on all tile work, particularly and especially after installation of said tile work. Application of any and all protective coverings to all types of tile installations including, but not be limited to, all soap compounds, paper products, tapes, and all polyethylene coverings, plywood, masonite, cardboard, and any new type of products that may be used to protect tile installations, Blastrac equipment, and all floor scarifying equipment used in preparing floors to receive tile. The clean up and removal of all waste and materials. All demolition of existing tile floors and walls to be re-tiled. COMMUNICATIONS ELECTRICIAN - Installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound vision production and reproduction, telephone and telephone interconnect, facsimile, data apparatus, coaxial, fibre optic and wireless equipment, appliances and systems used for the transmission and reception of signals of any nature, business, domestic, commercial, education, entertainment, and residential purposes, including but not limited to, communication and telephone, electronic and sound equipment, fibre optic and data communication systems, and the performance of any task directly related to such installation or service whether at new or existing sites, such tasks to include the placing of wire and cable and electrical power conduit or other raceway work within the equipment room and pulling wire and/or cable through conduit and the installation of any incidental conduit, such that the employees covered hereby can complete any job in full. MARBLE FINISHER Loading and unloading trucks, distribution of all materials (all stone, sand, etc. ) , stocking of floors with material, performing all rigging for heavy work, the handling of all mateiral that may be needed for the installation of such materials, building of scaffolding, polishing if needed, patching, waxing of material if damaged, pointing up, caulking, grouting and cleaning of marble, holding water on diamond or Carborundum blade or saw for setters cutting, use of tub saw or any other saw needed for preparation of material, drilling of holes for wires that anchor material set by setters, mixing up of molding plaster for installation of material, mixing up thin set for the installation of material, mixing up of sand to cement for the installatin of material and such other work as may be required in helping a Marble Setter in the handling of all material in the erection or installation of interior marble, slate, travertine, art marble, serpentine, alberene stone, blue stone, granite and other stones (meaning as to stone any foreign or domestic materials as are specified and used in building interiors and experiors and customarily known as stone in the trade) , carrara, sanionyx, vitrolite and similar opaque glass and the laying of all marble tile, terrazzo tile, slate tile and precast tile, steps, risers treads, base, or any other materials that may be used as substitutes for any of the aforementioned materials and which are used on interior and experior which sare installed in a similar manner. hth`://vmanw.Q1ate.il.nn/avenoy/idoVru1cs/El7ENMO/COOfC9999.htm 6/1/2004 ,CookCountyPrevailingWageforJune 2004 Page 4 of 7 TERRAZZO FINISHER The handling of sand, cement, marble chips, and all other materials that may be used by the Mosaic Terrazzo Mechanic, and the mixing, grinding, grouting, cleaning and sealing of all Marble, Mosaic, and Terrazzo work, floors, base, stairs, and wainscoting by hand or machine, and in addition, assisting and aiding Marble, Masonic, and Terrazzo Mechanics. TRAFFIC SAFETY Work associated with barricades, horses and drums used to reduce lane usage on highway work, the installation and removal of temporary lane markings, and the installation and removal of temporary road signs. TRUCK DRIVER - BUILDING, HEAVY AND HIGHWAY CONSTRUCTION - EAST & WEST Class 1. Two or three Axle Trucks. A-frame Truck when used for transportation purposes; Air Compressors and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry-alls; Fork Lifts and Hoisters; Helpers; Mechanics Helpers and Greasers; Oil Distributors 2-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Power Mower Tractors; Self-propelled Chip Spreader; Skipman; Slurry Trucks, 2-man operation; Slurry Truck Conveyor Operation, 2 or 3 man; TEamsters Unskilled dumpman; ancl Truck Drivers hauling warning lights, barricades, and portable toilets on the job site. Class 2 . Four axle trucks; Dump Crets and Adgetors under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-mix Plant Hopper Operator, and Winch Trucks, 2 Axles. Class 3 . Five axle trucks; Dump Crets and Adgetors 7 yards and over; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or turnapulls when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, 1-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long; Slurry trucks, 1-man operation; Winch trucks, 3 axles or more; Mechanic--Truck Welder and Truck Painter. Class 4 . Six axle trucks; Dual-purpose vehicles, such as mounted crane trucks with hoist and accessories; Foreman; Master Mechanic; Self-loading equipment like P.B. and trucks with scoops on the front. OPERATING ENGINEERS - BUILDING Class 1. Mechanic; Asphalt Plant; Asphalt Spreader; Autograde; Backhoes with Caisson attachment; Batch Plant; Benoto; Boiler and Throttle Valve; Caisson Rigs; Central Redi-Mix Plant; Combination Back Hoe Front End-loader Machine; Compressor and Throttle Valve; Concrete Breaker (Truck Mounted) ; Concrete Conveyor; Concrete Paver; Concrete Placer; Concrete Placing Boom; Concrete Pump (Truck Mounted) ; Concrete Tower; Cranes, All; Cranes, Hammerhead; Cranes, (GCI and http://www.state.il.us/agency/idol/rates/EVENMO/COOK9999.htrn 6/1/2004 Cook ' ' \�/aeeforJooc2O04 Pugo5of7 . ~ _ . similar Type) ; Creter Crane; Crusher, Stone, etc. ; Derricks, All; Derricks, Traveling; Formless Curb and Gutter Machine; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2-1/4 yd. and over; Hoists, Elevators, outside type rack and pinion and similar machines; Hoists, one, two and three Drum; Hoists, Two Tugger One Floor; Hydraulic Backhoes; Hydraulic Boom Trucks; Hydro Vac (and similar equipment) ; Locomotives, All; Motor Patrol; Pile Drivers and Skid Rig; Post Hole Digger; Pre-Stress Machine; Pump Cretes Dual Ram; Pump Cretes; Squeeze Cretes-screw Type Pumps; Raised and Blind Hole Drill; Roto Mill Grinder; Scoops - Tractor Drawn; Slip-form Paver; Straddle Buggies; Tournapull; Tractor with Boom and Side Boom; Trenching Machines. Class 2 . Bobcat (over 3/4 cu. yd. ) ; Boilers; Brick Forklift; Broom, All Power Propelled; Bulldozers; Concrete Mixer (Two Bag and Over) ; Conveyor, Portable; Forklift Trucks; Greaser Engineer; Highlift Shovels or Front Endloaders under 2-1/4 yd. ; Hoists, Automatic; Hoists, inside Freight Elevators; Hoists, Sewer Dragging Machine; Hoists, Tugger Single Drum; Laser Screed; Rock Drill (self-propelled) ; Rock Drill (truck mounted) ; Rollers, All; Steam Generators; Tractors, All; Tractor Drawn Vibratory Roller; Winch Trucks with "A" Frame. Class 3 . Air Compressor; Combination - Small Equipment Operator; Generators; Heaters, Mechanical; Hoists, Inside Elevators - (Rheostat Manual Controlled) ; Hydraulic Power Units (Pile Driving, Extracting, and Drilling) ; Pumps, over 3" (1 to 3 not to exceed a total of 300 ft. ) ; Pumps, Well Points; Welding Machines (2 through 5) ; Winches, 4 small Electric Drill Winches; Bobcat (up to and including 3/4 Cu. yd.) . Class 4 . Bobcats and/or other Skid Steer Loaders; Oilers; and Brick Forklift. OPERATING ENGINEERS - FLOATING Class 1 . Craft foreman (Master Mechanic) , diver/wet tender, engineer (hydraulic dredge) . Class 2 . Crane/backhoe operator, mechanic/welder, assistant engineer (hydraulic dredge) , leverman (hydraulic dredge) , and diver tender. Class 3 . Deck equipment operator (machineryman) , maintenance of crane (over 50 ton capacity) or backhoe (96,000 pounds or more) ' tug/launch operator, loader, dozer and like equipment on barge, breakwater wall, slip/dock or scow, deck machinery, etc. Class 4. Deck equipment operator (maobioer}mao/fireman) ' (4 equipment units or more) and crane maintenance 50 ton capacity and under or backhoe weighing e6,000 pounds or less, assistant tug operator. OPERATING ENGINEERS - HEAVY AND HIGHWAY CONSTRUCTION Class 1. Craft Foreman; Asphalt Plant; Asphalt Heater and Planer Combination; Asphalt Heater Soartire/ Asphalt Spreader; Autograder/GOMACO or other similar type machines; ABG Paver; Backhoes with Caisson attachment; Ballast Regulator; Belt Loader; Caisson Rigs; Car Dumper; Central Redi-Mix Plant; Combination Backhoe Front Endloader Machine, (1 cu. yd. Backhoe Bucket or over or with attachments) ; Concrete Breaker (Truck Mounted) : Concrete Conveyor; hnn://vvnw.ot01e.il.uo/ageocv/idol/ru1ca/EVBNMO/C{]OK9949.htnu 6/1/2004 .Cook ' ��ogefor}uoe2O04 Poge6of7 Concrete Paver over 27E Cu. ft. ; Concrete Placer; Concrete Tube Float; Cranes, all attachments; Cranes, Hammerhead, Linden, Peco & Machines of a like nature; Crete Crane; Crusher, Stone, etc. ; Derricks, All; Derrick Boats; Derricks, Traveling; Dowell machine with Air Compressor; Dredges; Field Mechanic-Welder; Formless Curb and Gutter Machine; Gradall and Machines of a like nature; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver Mounted; Hoists, One, Two and Three Drum; Hydraulic Backhoes; Backhoes with shear attachments; Mucking Machine; Pile Drivers and Skid Rig; Pre-Stress Machine; Pump Cretes Dual Ram; Rock Drill - Crawler or Skid Rig; Rock Drill - Truck Mounted; Roto Mill Grinder; Slip-Form Paver; Soil Test Drill Rig (Truck Mounted) ; Straddle Buggies; Hydraulic Telescoping Form (Tunnel) ; Tractor Drawn Belt Loader (with attached pusher - two engineers) ; Tractor with Boom; Tractaire with Attachments; Trenching Machine; Truck Mounted Concrete Pump with Boom; Raised or Blind Hole; Drills (Tunnel Shaft) ; Underground Boring and/or Mining Machines; Wheel Excavator; Widener (&PSCO) . Class 2 . Batch Plant; Bituminous Mixer; Boiler and Throttle Valve; Bulldozers; Car Loader Trailing Conveyors; Combination Backhoe Front Endloader Machine (less than 1 cu. yd. Backhoe Bucket or over or with attachments) ; Compressor and Throttle Valve; Compressor, Common Receiver (3) ; Concrete Breaker or Hydro Hammer; Concrete Grinding Machine; Concrete Mixer or Paver 7S Series to and including 27 Cu. ft. ; Concrete Spreader; Concrete Curing Machine, Burlap Machine, Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck Cars (Haglund or Similar Type) ; Drills, All; Finishing Machine - Concrete; Greaser Engineer; Highlift Shovels or Front Endloader; Hoist - Sewer Dragging Machine; Hydraulic Boom Trucks (All Attachments) ; Hydro-Blaster; All Locomotives, Dinky; Pump Cretes; Squeeze Cretes-Screw Type Pumps, Gypsum Bulker and Pump; Roller, Asphalt; Rotory Snow Plows; Rototiller, Seaman, etc. , self-propelled; Scoops Tractor Drawn; Self-Propelled Compactor; Spreader - Chip - Stone, etc. ; Scraper; Scraper - Prime Mover in Tandem (Regardless of Size) ; Tank Car Heater; Tractors, Push, Pulling Sheeps Foot, Disc, Compactor, etc. ; Tug Boats. Class 3 . Boilers; Brooms, All Power Propelled; Cement Supply Tender; Compressor, Common Receiver (z) ; Concrete Mixer (Two Bag and over) / Conveyor, Portable; Farm-Type Tractors Used for Mowing, Seeding, etc. ; Fireman on Boilers; Forklift Trucks; Grouting Machine; Hoists, Automatic; Hoists, All Elevators; Hoists, Tugger Single Drum; Jeep Diggers; Pipe Jacking Machines; Post-Hole Digger; Power Saw, Concrete Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with "A" Frame; Work Boats; Tamper - Form-Motor Driven. Class 4 . Air Compressor; Combination - Small Equipment Operator; Directional Boring Machine; Generators; Heaters, Mechanical; Hydraulic Power Unit (Pile Driving, Extracting, or Drilling) ; Hydro- Blaster; Light Plants, All (1 through 5) ; Pumps, over 3" (1 to 3 not to exceed a total of 300 ft. ) ; Pumps, Well Points; Tractaire; Welding Machines (2 through 5) ; Winches, 4 Small Electric Drill Winches. Class 5 . Bobcats (all) ; Brick Forklifts, Oilers. Other Classifications of Work: }ttp://www.mCate.i}.ns/agency/ido[/rateo/EVENIVIO/COOK9999.htm 6/1/2004 . . CookCountyPrevailingWageforJune2004 Paec7of7 For definitions of classifications not otherwise set out, the Department generally has on file such definitions which are available. If a task to be performed is not subject to one of the classifications of pay set out, the Department will upon being contacted state which neighboring county has such a classification and provide such rate, such rate being deemed to exist by reference in this document. If no neighboring county rate applies to the task, the Department shall undertake a special determination, such special determination being then deemed to have existed under this determination. If a project requires these, or any classification not listed, please contact IDOL at 618/993-7271 for wage rates or clarifications. LANDSCAPING Landscaping work falls under the existing classifications for laborer, operating engineer and truck driver. The work performed by landscape plantsman and landscape laborer is covered by the existing classification of laborer. The work performed by landscape operators (regardless of equipment used or its size) is covered by the classifications of operating engineer. The work performed by landscape truck drivers (regardless of size of truck driven) is covered by the classifications of truck driver. {ttp://www.state.il.us/ageocy/idol/rates/EVENMO/COOK9999.htm 6/1/2004 Kane County Prevailing Wage for June 2004 Page 1 of 7 • Kane County Prevailing Wage for June 2004 Trade Name RG TYP C Base FRMAN *M-F>8 OSA OSH H/W Pensn Vac Trng ASBESTOS ABT-GEN ALL 29.000 29.750 1.5 1.5 2 .0 4.170 3 .380 0.000 0.170 ASBESTOS ABT-MEC BLD 23 .300 24.800 1.5 1.5 2 .0 3 .640 5.520 0.000 0.000 BOILERMAKER BLD 35.600 38. 800 2. 0 2. 0 2.0 4.550 5.690 0.000 0.210 BRICK MASON BLD 30.550 32.550 1.5 1.5 2 .0 4.950 5.860 0.000 0.550 CARPENTER ALL 33 .320 34.820 1.5 1.5 2 .0 4.930 4.150 0.000 0.440 CEMENT MASON ALL 31.000 34.100 2 .0 1.5 2 .0 4.800 7 .060 0.000 0.050 CERAMIC TILE FNSHER BLD 24 .450 0.000 2.0 1.5 2 .0 4.750 3 .950 0.000 0.210 COMMUNICATION TECH N BLD 24.990 26.070 1.5 1.5 2 .0 5.870 0.750 0.000 0.000 COMMUNICATION TECH S BLD 29.680 31.480 1.5 1.5 2 .0 5.390 6.830 0.000 0.590 ELECTRIC PWR EQMT OP ALL 26.940 34.540 1.5 1.5 2.0 3.250 6.740 0.000 0. 130 ELECTRIC PWR GRNDMAN ALL 20.970 34.540 1.5 1.5 2 .0 3 .250 5.240 0.000 0.100 ELECTRIC PWR LINEMAN ALL 31. 980 34.540 1.5 1.5 2 .0 3 .250 8.000 0.000 0.160 ELECTRIC PWR TRK DRV ALL 21.640 34.540 1.5 1.5 2 .0 3 .250 5.410 0.000 0.110 ELECTRICIAN N ALL 35.730 39.300 1.5 1.5 2 .0 5.895 8.217 0.000 0.447 ELECTRICIAN S BLD 35.910 39.500 1.5 1.5 2 .0 5.390 8.260 0.000 0.720 ELEVATOR CONSTRUCTOR BLD 37.245 41.900 2.0 2.0 2 .0 6.525 3 .150 2 .230 0.340 FENCE ERECTOR ALL 32.490 33. 840 2.0 2. 0 2 .0 5.440 11. 82 0.000 0.230 GLAZIER BLD 29.000 30.000 1.5 2 .0 2 .0 5.340 7.900 0.000 0.400 HT/FROST INSULATOR BLD 30.450 32.200 1.5 1.5 2 .0 6.810 8.010 0.000 0.230 IRON WORKER ALL 32 .490 33 .840 2.0 2 .0 2 .0 5.440 11.82 0.000 0.230 LABORER ALL 29.000 29.750 1.5 1.5 2 .0 4.170 3 .380 0.000 0.170 LATHER BLD 33 .320 34.820 1.5 1.5 2 .0 4.930 4.150 0.000 0.440 MACHINIST BLD 33 .230 34.980 2 .0 2 .0 2 .0 3 .200 3 .600 2.290 0.000 MARBLE FINISHERS ALL 24.050 26. 050 1.5 1.5 2.0 4.470 5. 860 0.000 0.550 MARBLE MASON BLD 30.550 32.550 1.5 1.5 2 .0 4.950 5.860 0.000 0.550 MILLWRIGHT ALL 33 .320 34. 820 1.5 1.5 2 .0 4.930 4.150 0.000 0.440 OPERATING ENGINEER BLD 1 37.600 41.600 2.0 2 .0 2 .0 6.050 4.850 1.800 0.600 OPERATING ENGINEER BLD 2 36.300 41.600 2.0 2.0 2 .0 6.050 4.850 1.800 0.600 OPERATING ENGINEER BLD 3 33.750 41.600 2.0 2 .0 2 .0 6.050 4.850 1.800 0.600 OPERATING ENGINEER BLD 4 32 .000 41.600 2.0 2.0 2 .0 6.050 4 .850 1.800 0.600 OPERATING ENGINEER HWY 1 35. 800 39. 800 1.5 1.5 2.0 6.050 4. 850 1.800 0.600 OPERATING ENGINEER HWY 2 35.250 39. 800 1.5 1.5 2 .0 6.050 4.850 1.800 0.600 OPERATING ENGINEER HWY 3 33 .200 39.800 1.5 1.5 2 .0 6.050 4.850 1.800 0.600 OPERATING ENGINEER HWY 4 31.800 39. 800 1.5 1.5 2 .0 6.050 4.850 1.800 0.600 OPERATING ENGINEER HWY 5 30.600 39.800 1.5 1.5 2 .0 6.050 4.850 1.800 0.600 ORNAMNTL IRON WORKER ALL 32 .490 33. 840 2.0 2 .0 2 .0 5.440 11.82 0.000 0.230 PAINTER ALL 30.980 31.980 1.5 1.5 2 .0 4.400 3.700 0.000 0.300 PAINTER SIGNS BLD 25. 150 28.240 1.5 1.5 1.5 2.600 2. 010 0.000 0.000 PILEDRIVER ALL 33 .320 34.820 1.5 1.5 2 .0 4 .930 4.150 0.000 0.440 PIPEFITTER BLD 33 .010 35.010 1.5 1.5 2 .0 5.550 6.240 0.000 0.800 PLASTERER BLD 29.990 30. 990 1.5 1.5 2 .0 4.500 5.450 0.000 0.400 PLUMBER BLD 33 .010 35.010 1.5 1.5 2 .0 5.550 6.240 0.000 0.800 ROOFER BLD 31.450 33.450 1.5 1.5 2 .0 4 .790 2.630 0.000 0.330 SHEETMETAL WORKER BLD 32 .530 34.280 1.5 1.5 2 .0 5.170 6.390 0.000 0.440 SIGN HANGER BLD 26. 070 27.570 1.5 1.5 2. 0 3. 800 3.550 0.000 0.000 SPRINKLER FITTER BLD 33 .500 35.500 1.5 1.5 2 .0 6.600 5.000 0.000 0.450 STEEL ERECTOR ALL 32 .490 33.840 2 .0 2.0 2 .0 5.440 11.82 0.000 0.230 STONE MASON BLD 30 .550 32 .550 1.5 1.5 2 .0 4 .950 5.860 0.000 0.550 TELECOM WORKER ALL 22 .900 24.400 1.5 1.5 2 .0 3 .000 2.650 1.430 0.000 TERRAZZO FINISHER BLD 25 .140 0.000 2.0 1.5 2 .0 5.450 4 .630 0.000 0.200 TERRAZZO MASON BLD 29.050 30.550 2 .0 1.5 2.0 5.450 5.550 0.000 0.160 TILE MASON BLD 29. 850 31. 850 2. 0 1. 5 2.0 4.750 4.750 0.000 0.430 TRAFFIC SAFETY WRKR HWY 22 .050 23.550 1.5 1.5 2 .0 2.478 1.800 0.000 0.000 TRUCK DRIVER ALL 1 27.500 28.050 1.5 1.5 2 .0 4.200 3 .100 0.000 0.000 http://www.state.il.us/agency/idol/rates/EVENMO/KANE9999.htm 6/1/2004 Kane County Prevailing Wage for June 2004 Page 2 of 7 • TRUCK DRIVER ALL 2 27 .650 28 .050 1 .5 1.5 2 .0 4 .200 3 .100 0 .000 0 .000 TRUCK DRIVER ALL 3 27.850 28.050 1.5 1.5 2 .0 4.300 3 . 100 0.000 0.000 TRUCK DRIVER ALL 4 28. 050 28 .050 1.5 1.5 2 .0 4 .200 3 . 100 8.000 0.000 TUCKPOINTER BLD 32 .200 33 .200 1.5 1.5 2 .0 3 .760 5.590 0.000 0.580 Legend: M'r,x (Overtime is required for any hour greater than 8 worked each day, Monday through Friday. OSA (Overtime is required for every hour worked on Saturday) OSH (Overtime is required for every hour worked on Sunday and Holidays) H/W (Health & Welfare Insurance) Pensn (Pension) Vac (Vacation) Trng (Training) Explanations� D� �� �� s � KANE COUNTY ELECTRICIANS AND COMMUNICATIONS TECHNICIAN (NORTH) - Townships of Burlington, Campton, Dundee, Elgin, Hampshire, Plato, Rutland, St. Charles (except the West half of Sec. 26' all of Secs. 27, 33, and 34, South half of Sec. 28, West half of Sec. 35) , Virgil and Valley View CCC and Elgin Mental Health Center. The following list is considered as those days for which holiday rates of wages for work performed apply: New Years Day, Memorial/Decoration Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day, Christmas Day. Generally, any of these holidays which fall on a • Sunday is celebrated on the following Muoday' This then makes work performed on that Monday payable at the appropriate overtime rate for holiday pay. Common practice in a given local may alter certain days of celebration such as the day after Thanksgiving for Veterans Day. If in doubt, please check with IDOL. EXPLANATION OF CLASSES ASBESTOS - GENERAL - removal of asbestos material from any place in a building, including mechanical systems where those mechanical systems are to be removed. This includes the removal of asbestos materials from ductwork or pipes in a building when the building is to be demolished at the time or at some close future date. ASBESTOS - MECHANICAL - removal of asbestos material from mechanical systems, such as pipes, ducts, and boilers, where the mechanical systems are to remain. CERAMIC TILE FINISHER The grouting, cleaning, and polishing of all classes of tile, whether for interior or exterior purposes, all burned, glazed or unglazed products; all composition materials, granite tiles, warning detectable tiles, cement tiles, epoxy composite materials, pavers, glass, mosaics, fiberglass, and all substitute materials, for tile made in tile-like units; all mixtures in tile like form of cement, metals, and other materials that are for and intended for use as a finished floor surface, stair treads, promenade roofs, walks, walls, ceilings, htho://wvvvv.mCate'il.oa/ageocy/idol/r41eG/EVENMO/QANE9999.hLnm 6/1/2004 Kane County Prevailing Wage for June 2004 Paum3of7 ' ^ swimming pools, and all other places where tile is to form a finished interior or exterior. The mixing of all setting mortars including but not limited to thin-set mortars, epoxies, wall mud, and any other sand and cement mixtures or adhesives when used in the preparation, installation, repair, or maintenance of tile and/or similar materials. The handling and unloading of all sand, cement, lime, tile, fixtures, equipment, adhesives, or any other materials to be used in the preparation, installation, repair, or maintenance of tile and/or similar materials . Ceramic Tile Finishers shall fill all joints and voids regardless of method on all tile work, particularly and especially after installation of said tile work. Application of any and all protective coverings to all types of tile installations including, but not be limited to, all soap compounds, paper products, tapes, and all polyethylene coverings, plywood, masonite, cardboard, and any new type of products that may be used to protect tile installations, Blastrac equipment, and all floor scarifying equipment used in preparing floors to receive tile. The clean up and removal of all waste and materials. All demolition of existing tile floors and walls to be re-tiled. COMMUNICATIONS TECHNICIAN Construction, installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) , telephone, security systems, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central offices, PABX and equipment, micro waves, V-SAT, bypass, CATV, WAN (wide area network) , LAN (local area networks) , and ISDN (integrated system digital network) , pulling of wire in raceways, but not the installation of raceways. MARBLE FINISHER Loading and unloading trucks, distribution of all materials (all stone, sand, etc. ) , stocking of floors with material, performing all rigging for heavy work, the handling of all mateiral that may be needed for the installation of such materials, building of scaffolding, polishing if needed, patching, waxing of material if damaged, pointing up, caulking, grouting and cleaning of marble, holding water on diamond or Carborundum blade or saw for setters cutting, use of tub saw or any other saw needed for preparation of material, drilling of holes for wires that anchor material set by setters, mixing up of molding plaster for installation of material, mixing up thin set for the installation of material, mixing up of sand to cement for the installatin of material and such other work as may be required in helping a Marble Setter in the handling of all material in the erection or installation of interior marble, slate, travertine, art marble, serpentine, alberene stone, blue stone, granite and other stones (meaning as to stone any foreign or domestic materials as are specified and used in building interiors and experiors and customarily known as stone in the trade) , carrara, sanionyx, vitrolite and similar opaque glass and the laying of all marble tile, terrazzo tile, slate tile and precast tile, steps, risers treads, base, or any other materials that may be used as substitutes for any of the aforementioned materials and which are used on interior and experior which sare installed in a similar manner. TRAFFIC SAFETY - work associated with barricades, horses and drums http:// vvvw.mta4e'il.u8/ogeoov/idol/rates/EVENMO/KANE9999'h1m 6/1/2004 Kane County Prevailing Wage for June 2004 Page 4 of 7 used to reduce lane usage on highway work, the installation and removal of temporary lane markings, and the installation and removal of temporary road signs. TRUCK DRIVER - BUILDING, HEAVY AND HIGHWAY CONSTRUCTION Class 1. Two or three Axle Trucks. A-frame Truck when used for transportation purposes; Air Compressors and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry-alls; Fork Lifts and Hoisters; Helpers; Mechanics Helpers and Greasers; Oil Distributors 2-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Power Mower Tractors; Self-propelled Chip Spreader; Skipman; Slurry Trucks, 2-man operation; Slurry Truck Conveyor Operation, 2 or 3 man; Teamsters; Unskilled dumpman; and Truck Drivers hauling warning lights, barricades, and portable toilets on the job site. Class 2 . Four axle trucks; Dump Crets and Adgetors under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yeards; Ready-mix Plant Hopper Operator, and Winch Trucks, 2 Axles. Class 3 . Five axle trucks; Dump Crets and Adgetors 7 yards and over; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or turnapulls when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, 1-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long; Slurry trucks, 1-man operation; Winch trucks, 3 axles or more; Mechanic--Truck Welder and Truck Painter. Class 4. Six axle trucks; Dual-purpose vehicles, such as mounted crane trucks with hoist and accessories; Foreman; Master Mechanic; Self-loading equipment like P.B. and trucks with scoops on the front. OPERATING ENGINEERS - BUILDING Class 1. Mechanic; Asphalt Plant; Asphalt Spreader; Autograde; Backhoes with Caisson attachment; Batch Plant; Benoto; Boiler and Throttle Valve; Caisson Rigs; Central Redi-Mix Plant; Combination Back Hoe Front End-loader Machine; Compressor and Throttle Valve; Concrete Breaker (Truck Mounted) ; Concrete Conveyor; Concrete Paver; Concrete Placer; Concrete Placing Boom; Concrete Pump (Truck Mounted) ; Concrete Tower; Cranes, All; Cranes, Hammerhead; Cranes, (GCI and similar Type) ; Creter Crane; Crusher, Stone, etc. ; Derricks, All; Derricks, Traveling; Formless Curb and Gutter Machine; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2-1/4 yd. and over; Hoists, Elevators, outside type rack and pinion and similar machines; Hoists, one, two and three Drum; Hoists, Two Tugger One Floor; Hydraulic Backhoes; Hydraulic Boom Trucks; Hydro Vac (and similar equipment) ; Locomotives, All; Motor Patrol; Pile Drivers and Skid Rig; Post Hole Digger; Pre-Stress Machine; Pump Cretes Dual Ram; Pump Cretes; Squeeze Cretes-screw Type Pumps; Raised and Blind Hole Drill; Roto Mill Grinder; Scoops - Tractor Drawn; Slip-form Paver; Straddle Buggies; Tournapull; Tractor with Boom and Side Boom; Trenching Machines. http://www.state.il.us/agency/idol/rates/EVENMO/KANE9999.htm 6/1/2004