04-0422 Change Order 1C5 • • oM}-o4 ELGIN, ILLINOIS PROJECT 339570-NEW PUBLIC WORKS FACILI Y CHANGE ORDER NO. 1 AND FINAL FOR BID ITE C-5 SCOPE: Change Order No. 1 and Final will add fourteen ork items to and delete three work item from the lump sum contract with Lamp, Inc. for Bid I em C-5, "Carpentry" of the New Public Works Facility Project- Bid Package C. REASONS FOR CHANGE: This Change Order No. 1 . d Final is in the best interest of the City and is authorized by law. The construction work sco.- adjustments were unforeseen at the time of original contract award. SUMMARY OF CHANGES IN CONTRACT AMO 'T: The amount the contract will be revised is as follows: ITEM TOTAL 1. Upgrade ceiling tile to "Glacier" style in six Engineer' : offices. $763.80 2. Replace existing toilet partitions in main men's bathroo $1,911.00 3. Install sound proofing insulation above crew leaders' o iii ces and $982.00 Capital Projects inspectors' office. 4. Replace existing countertop in Engineering common ar'a. $554.30 5. Install framing and drywall for soffit and walls in emplo,ee entrance $573.70 hallway outside locker room. Not shown on plans. 6. Install ceiling and grid for employee entrance hallway o tside locker $628.98 room. Not shown on plans. 7. Install structural framing and protective decking for ce. '1g in employee $3,179.91 entrance hallway outside of locker room. Not shown o plans. 8. Install louvers in doors for men's bathroom and wome 's locker room. $232.30 Not shown on plans. 9. Install structural framing and protective decking to sup ort ceiling for $4,149.55 extension of training room. 10. Deletion of stucco finish on door frames for new over ead garage -$1,725.00 doors. 11. Deletion of counter in Fleet Services office—provided by others. -$1,656.00 • ELGIN, ILLINOIS PROJECT 339570—NEW PUBLIC WORKS FACILITY CHANGE ORDER NO. 1 AND FINAL FOR BID ITEM C-5 Page 2 12. Installation of temporary enclosures on door openings during $1,486.50 construction. 13. Utilization of temporary enclosure allowance in bid. -$15,000.00 14. Provide and install four urinal screening panels in Men's restroom. $504.00 15. Add laminate back splash to sink in lunchroom. $375.00 16. Weld patches on various doors with cut out for electric s,rike. Door $1,516.90 order not corrected after security plan changed. 17. Provide and install louvers on door to electrical panel ro s m. $204.00 18. Deduction for interior signage due to unsatisfactory performance of -$4,800.00 sub-contractor. The original contract with Lamp, Inc. is for $302,475.00. B reason of Change Order No. 1 and Final, the contract for Bid Item C-5, "Carpentry" of the Ne Public Works Facility Project - Bid Package C will be decreased by the amount of six thousand, i ne hundred and nineteen and 66/100 dollars(-$6,119.66). The new contract amount, inclusive of Change Order No. 1 and Final, is two hundred and ninety-six thousand, three hundred and 1 ' -five and 34/100 dollars ($296,355.34). OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this J2�`�day of r, /, 2004 Recommended: j,,,, 71 ', ,4--- 2--- PUBLIC WO S DEPARTMENT By: do ii` , fri LOQ Title: Public Works Director Date: y/`i'/e>."'Y • • r ELGIN,ILLINOIS PROJECT 339570-NEW PUBLIC WORKS FACILI Y CHANGE ORDER NO. 1 AND FINAL FOR BID ITE C-5 Page 3 Accepted: LAMP INC. Party of the Second Part (Contractor) By: C > ACLAG.44•4 -1.- Title: 7a.or-jEc"- 1V1,Or04.4&at.. Date: 4/ t4 /c4 Approved: CITY OF ELGIN Party of the First Part (Owner) By: Title: City Manager Date: 7/2 F/ 7