Loading...
03-294 Resolution No. 03-294 RESOLUTION AUTHORIZING EXECUTION OF AN AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT WITH TERRACON, INC. FOR ENVIRONMENTAL SERVICES AT FESTIVAL PARK BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that David M. Dorgan, City Manager, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute an Amendment to Professional Services Agreement on behalf of the City of Elgin with Terracon, Inc . for environmental services at Festival Park, a copy of which is attached hereto and made a part hereof by reference . s/ Ed Schock Ed Schock, Mayor Presented: October 22 , 2003 Adopted: October 22 , 2003 Omnibus Vote : Yeas : 6 Nays : 0 Recorded: October 23 , 2003 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT THIS AMENDMENT AGREEMENT made and entered into this AA/v,& day of (9- `Z1 , 2003 by and between the CITY OF ELGIN, ILLINOIS, a municipal corporation (hereinafter referred to as the "City" ) , and Terracon Inc, a Kansas corporation, authorized to do business in the State of Illinois (hereinafter referred to as the "Consultant" ) . WITNESSETH WHEREAS, the City and the Consultant have previously entered into a Professional Services Agreement dated August 29, 2003 , wherein Consultant provided to the City certain consulting services regarding the Festival Park, the Crocker Theater and the South Grove Townhome Site; and WHEREAS, the City has determined it to be necessary and desirable to obtain the further assistance of the Consultant to provide continued consulting services regarding the environmental consulting services for the Festival Park and the South Grove Townhome Site . NOW, THEREFORE, for and in consideration of the mutual promises and covenants contained herein, the receipt and sufficiency of which is hereby acknowledged, the parties hereto agree as follows : 1 . The Professional Services Agreement between the City and the Consultant dated August 29, 2003 is hereby amended as follows : A. Paragraph 1 entitled "Scope of Work" is amended by adding an additional paragraph thereto to read as follows : "Consultant shall also perform and direct the necessary qualified personnel to perform the professional services as set forth in the Scope of Services documents entitled Terracon Proposal for Environmental Consulting and Remediation Services Festival Park and Townhome Redevelopment Sites Proposal, consisting of ten (10) pages, attached hereto and made a part hereof and made a part hereof as Exhibit 1-A. Consultant shall also perform and direct the necessary qualified personnel to perform the professional services as set forth in the scope of services documents entitled Amended Festival Park Redevelopment Sites ROR/RAP Reports dated September 12 , 2003 . Consisting of three (3) pages, attached hereto and made a part hereof as exhibit 1-B. " B. Paragraph 2 entitled "Schedule and Term" is amended by adding an additional paragraph thereto to read as follows : "Consultant' s responsibility to provide the services in Exhibits 1-A and 1-B shall commence as of October 23 , 2003 , and shall continue until the date the City determines that all of the Consultant' s work regarding the services in Exhibits 1-A and 1-B have been completed. Consultant shall perform the services described in Exhibits 1-A and 1-B in as expeditious a manner as reasonably practicable . " C. Paragraph 3 entitled "Fees" is amended by adding subparagraph D thereto to read as follows : "D. Payments for services provided by the Consultant set forth in Exhibits 1- A and 1-B hereof shall be reimbursed at the hourly rate of its professional and technical personnel as set forth in Exhibit 2-A attached hereto and made a part hereof by this reference with the total fees and expenses due to be paid to the Consultant for the services described in Exhibits 1-A and 1-B not to exceed $62 , 049 regardless of actual time expended or actual costs incurred by the Consultant unless material modifications to the Consultant' s Scope of Services are authorized in writing by the City and approved by the City Council . Consultant' s cost estimates for the various aspects of the services to be performed in Exhibits 1-A and 1-B are set forth in Exhibits 1-A and 1-B. The costs of all subcontractors are 091'-10-03 FR 1 04:29 NM CITY MGRS OFFICE FAX N0. 84(9315610 N, 04 included in such not-to-exceed figure of $62 , 049. " 2 . That except as expressly amended herein the terms of the Professional Services Agreement between the City and the Consultant dated August 29, 2003 shall remain in effect; and shall apply to the additional services to be performed by the Consultant as described in this Amendment Agreement and as set forth in Exhibit I-A hereto. IN WITNESS WHEREOF, the parties hereto have entered into and executed this amendment agreement on the date and year first written above. CITY OF ELGIN Terracon Inc. }3y By _ David M. organ City Manager WILLIAM B. THA ASSOCIATE PRINCIPAL Attest : x�(,G1'r` City Clerk Irerracon 135 Ambassador Drive Naperville,Illinois 60540 (630)717-4263 Fax:(630)357-9489 September 5, 2003 Mr. Raymond H. Moller Director of Economic Development City of Elgin 150 Dexter Court Elgin, IL 60120 RE: Proposal for Environmental Consulting and Remediation Oversight Services Festival Park and Townhome Redevelopment Sites Terracon Proposal No. 4403357 Dear Ray: Terracon, Inc. is pleased to be considered by the City of Elgin to provide environmental consulting and remediation oversight services related to the Festival Park and Townhome Redevelopment Sites. In response to your request, we are offing to provide these services in accordance with the City's Request for Proposal. A. Project Information Terracon completed a Remediation Objectives Report and Remedial Action Plan (ROR/RAP) for both the Festival Park and Townhome Redevelopment Sites in June 2003. (Terracon Project No. 44037034). Under these plans, soil remediation work is necessary to achieve the City's objectives of attaining a residential clean up standard for each site. At Festival Park, the City is working with the Kane County Forest Preserve District to obtain concurrence with the ROR/RAP on a private party basis. For the Townhome Site, the ROR/RAP was submitted to the IEPA's Site Remediation Program in order to obtain a NFR letter. Terracon believes that the City will realize significant benefit and cost savings by retaining Terracon to complete the environmental services at this site. Our team will offer the City continuity with all parties that are involved in this complex project including City staff and consulting team (Hitchcock Design Group and MIC construction), KCFPD personnel and consultant, IEPA Project Manager and the site developer (Par Development). Arizona■Arkansas■California■Colorado■Georgia■Idaho■Illinois■Iowa■Kansas■Kentucky■Minnesota■Missouri Montana■Nebraska■Nevada■New Mexico■North Carolina■Oklahoma■Tennessee■Texas■Utah■Wisconsin■Wyoming Consulting Engineers&Scientists Since 1965 www.terracon.com Mr. Raymond H. Moller City of Elgin — Remediation Oversight Terracon Proposal No. 4403357 Page 2 B. Scope of Services Terracon will provide the services as outlined in the Scope of Work for Environmental Oversight of Soil Remediation. Attached as Exhibit A is a copy of the scope of work with additional comments and explanation of Terracon's planned approach. Schedule Terracon will execute the project in accordance with the project schedule as currently planned. Terracon's understanding is that the current schedule calls for City Council approval of an award to a remediation contractor on September 10, 2003. Initiation of work at Festival Park will commence shortly thereafter and then proceed to Phase A of the Townhome Site in Fall 2003. The completion of the work will occur in early Spring at Phase B of the Townhome Site. Terracon has estimated its labor costs based on this proposed schedule. If delays to the project occur that are not within Terracon's control, that cause work to continue beyond June 1, 2004, then Terracon reserves the right to seek escalation of its labor costs. Staffing Mr. John M. Nardozzi, P.E., will serve as the Senior Project manager for the project. Mr. Nardozzi previously managed and directed the Site Investigation, Remediation Objectives Report, Remedial Action Plan and environmental remediation specifications for the subject sites. Mr. Nardozzi also serves as the Senior Project Manager for other sites investigated for the City of Elgin. In addition, he has extensive experience working with the Illinois Site Remediation Program, underground storage tank program and application of Illinois TACO regulations and is a registered professional engineer in the State of Illinois. Mr. Eric R. Powley and Mr. Phil Williams will be assigned to the project as the Field Oversight Leaders. Mr. Powley contributed to the completion of the site investigation work at both of the subject sites and participated in the preparation of the reports. Mr. Powley and Mr. Williams both have extensive experience working on UST and site remediation projects for the City of Elgin. Additional project staffing will be comprised of members of Terracon's Naperville, Illinois office. Information regarding Terracon's extensive qualifications to perform site investigation activities under the Illinois Brownfields program have been provided under a separate cover. Mr. Raymond H. Moller City of Elgin — Remediation Oversight Terracon Proposal No. 4403357 Page 3 C. Compensation Terracon will perform the work outlined in this proposal on a time and materials basis. The total budget established for the anticipated work is $52,120.00. A breakdown of the estimated level of effort and cost by task is provided in Table 1. This cost estimate includes Terracon's direct labor, subcontractor fees (laboratory subcontracts) and other expenses that are directly attributable to the performance of the work such as travel, field equipment, and report preparation. Table 2 provides a fee schedule of Terracon's environmental services. Analytical unit costs are provided in Table 3. We appreciate the opportunity to submit this proposal and look forward to working with you on this project. If selected for this project, Terracon would anticipate performing the work under the terms and conditions of a mutually agreeable contract. If you have any questions, please feel free to contact either of the undersigned at(630)717-4263. Sincerely, TERRACON, Inc. ohn M. Nardoui, P.E. William B. Thayer, P.E. Senior Project Manager Associate Principal Attachments: Exhibit A—Scope of Work for Environmental Oversight of Soil Remediation Cost Tables 1 through 3 Exhibit A City of Elgin Festival Park Sites Scope of Work for Environmental Oversight of Soil Remediation 1. Remediation Planning and Coordination ✓ Provide informed interpretation of the Remedial Action Plan (RAP) and required remediation sequencing with other portions of the work. ✓ Coordinate with the Project Team, including City personnel, landscape architect, construction manager and remediation contractor. ✓ Attend project planning and coordination meetings. Estimated Work Quantity: The Consultant's project manager and field oversight personnel should anticipate participating in three coordination meetings 2. Field Oversight of Soil Remediation • Provide experienced field oversight personnel to provide technical direction of soil remediation in accordance with RAP. Minimum qualifications include five years relevant field oversight experience for environmental remediation projects, degreed geologist/engineer, and OSHA 40-hour hazardous waste training. • Conduct visual and field testing of impacted soils to direct location and extent of impacted soil removal. Field oversight personnel will utilize calibrated photoionization detector and field test kits to establish field criteria to remove impacted soils to satisfy the site-specific remediation objectives. • Document the removal of impacted soils performed by remediation contractor — document soil removal actions, obtain and review soil manifests, tabulate soil quantities and document removal locations. ✓ Coordinate with Construction Manager to obtain survey elevations at soil removal areas to ensure compliance of engineered barriers with RAP requirements (i.e., meet 3-feet clean cover depth). Estimated Work Quantity: Festival Park—22 days on-site field oversight service Townhome Site: 5 days on-site field oversight service Terracon will provide field oversight services on the basis of a eight-hour day on-site. Costs per day include field oversight time, project management, field equipment (PID and Petroflag field test kits for total petroleum hydrocarbons), and travel/vehicle expenses. Up to 50 Petroflag tests have been included in the project cost. Terracon, Inc. Proposal No.4403357 Exhibit A City of Elgin -Festival Park Sites Scope of Work for Environmental Oversight of Soil Remediation 9/4/03 Page 2 Terracon offers to provide the field oversight services on unit cost per day of service basis. The unit cost has been calculated on a sliding scale basis to provide the City a reduced cost per day as the length of the project increases. 3. Topsoil Assessment Conduct analytical testing of stockpiled topsoil from the sites to assess compliance with Tier 1 residential soil remediation objectives (SROs). Conduct sampling for constituents at the frequency specified in the RAP. Direct the disposition of the topsoil based on evaluation of the analytical results. Estimated Work Quantity: Festival Park—3 samples Townhome Site—2 samples Analytical parameters include PNAs and 13 priority pollutant metals. All analytical work based on standard laboratory turnaround time (5 to 7 days). 4. Confirmation Soil Sampling Perform field screening and intermediate soil sampling activities to minimize the quantity of impacted soil removed from the site. Conduct confirmation soil sampling in accordance with Illinois IEPA Site Remediation Program protocols to confirm attainment of remediation objectives as described in the ROR/RAP. Perform statistical analysis of sample results on a site-by-site basis to determine compliance with ROR/RAP criteria. Estimated Work Quantities: Festival Park: 15 samples Townhome Site: 14 samples Analytical parameters include PNAs and lead at Festival Park, and PNAs only at Townhome site, except at SRA No. 2 where soil samples will also be analyzed for lead. All analytical work based on standard laboratory turnaround time (5 to 7 days). Terracon, Inc. Proposal No. 4403357 Exhibit A City of Elgin -Festival Park Sites Scope of Work for Environmental Oversight of Soil Remediation 9/4/03 Page 3 5. Quality Control Sampling of Imported Fill Material ✓ Conduct environmental assessment activities to verify the source location(s) used by the remediation contractor and site developer to obtain imported fill material. ✓ Conduct sampling of the source materials to determine compliance of imported fill with TACO Tier 1 residential SROs. Analytical testing of source materials shall include VOCs, PNAs, TPH, priority pollutant metals, and pesticides/PCBs. A sampling frequency as specified in the RAP shall be adhered to. Estimated Work Quantities: Festival Park: 10 samples Townhome Site: 7 samples Assume two source locations within 50 miles of site. All analytical work based on standard laboratory turnaround time (5 to 7 days). 6. Regulatory Services and Reporting ✓ Coordinate with IEPA SRP project manger during the course of the remediation effort to review any field conditions that may arise (Townhome Site). ✓ Coordinate with Kane County Forest Preserve District during the course of the remediation effort to review any field conditions that may arise (Festival Park/KCFPD property). ✓ Prepare Remedial Action Completion Report (RACR) for each site in accordance with outline for Illinois SRP. Separate reports for Festival Park, Townhome Site- Phase 1, and Townhome Site Phase 2. RACRs will be certified by a professional engineer licensed in Illinois and present documentation of the soil removal work, construction/installation of engineered barriers, and implementation of institutional controls. The report will present the results and evaluation of confirmation soil sampling and other sampling activities conducted by Consultant. Analysis of confirmation samples will be based on calculating the upper 95% confidence limit of the mean concentration for key PNA constituents to determine compliance with the Remedial Action Plan. As-built drawings reflecting the completed soil removal work and any modifications necessary to the engineered barriers as presented in the ROR/RAP shall be included. ✓ Coordinate efforts to secure No Further Remdiation letters for the Townhome Site at the earliest possible date. Terracon, Inc. Proposal No. 4403357 Exhibit A City of Elgin -Festival Park Sites Scope of Work for Environmental Oversight of Soil Remediation 9/4/03 Page 4 Terracon believes that it is in the City's best interest to retain the same team of professionals to carry the environmental issues at Festival Park and the Townhome Site to completion. We view the final attainment of the NFR for the site and acceptance of the Remedial Action Completion Report by IEPA and the KCFPD as the project endpoint. Continuity of the technical approach to the site closure with the Illinois EPA will be a critical factor in obtaining an NFR letter for the Townhome site. A key advantage of Terracon's team is its knowledge of the site background, involvement in project cost saving strategies, and established relationships with IEPA and other project team members. These factors will ensure that the City achieves its final project goals quickly and efficiently. Terracon, Inc. Proposal No. 4403357 Table 1 Fee Estimate Environmental Oversight of Soil Remediation Festival Park and South Grove Townhome Site Task No. Description Budget Amount 1 Remediation Planning &Coordination $2,450 2 Field Oversight of Soil Remediation $24,480 3 Topsoil Assessment $1,255 4 Confirmation Soil Sampling $3,690 5 Quality Control Sampling of Imported Fill Material $13,205 6 Regulatory Services & Reporting $7,040 Total Proposed Fee $52,120 Terracon, Inc. 1 Proposal No. 4403357 Table 2 City of Elgin Festival Park Redevelopment Sites Soil Remediation Oversight Costs Total Estimated Task Description Otty. Unit Cost Unft Subtotal Cost I Remediation Planning and Coordination Mobilization Project set up and coordination,HASP 1 $500.00/mobilization $500 Meetings 3 Project Meetings,2 people/mtg. 3 $650.00/meeting $1,950 Total Task Cost $2,450 2 Field Oversight of Soil Remediation 8 hours/day on-site during soil removal. Includes Terracon personnel, equipment,PPE, and vehicle Tiered Cost Schedule for Oversight Festival Park 22 Days Oversight 1st 9 $1,000.00 Cost/day $9,000 Townhome Ph 1 5 Days Oversight 2nd 9 $890.00 Cost/day $8,010 3rd 9 $830.00 Cost/day $7,470 Total Task Cost $24,480 3 Topsoil Assessment Festival Park Soil Samples(PNA+PP metals) 3 $251.00 Per sample $753 Townhome Site Soil Samples(PNA+PP metals) 2 $251.00 Per sample $502 Total Task Cost $1,255 4 Confirmation Soil Sampling Festival Park Soil Samples(PNA+lead) 15 $138.00 Per sample $2,070 Townhome Soil Samples(PNAs) 14 $112.00 Per sample $1,568 Townhome Soil Samples(Lead) 2 $26.00 Per sample $52 Total Task Cost $3,690 5 Quality Control Sampling of Imported Fill Material Mobe and GeoProbe Sampling Services(1 day investigation per 2 $1,800 Per Day $3.600 source area) Festival Park VOCs,PNAs,TPH,PP Metals,pesVPCBs 10 $565.00 Per sample $5,650 Townhome Ph 1&2 VOCs,PNAs,TPH,PP Metals,pesVPCBs 7 $565.00 Per Sample $3,955 Total Task Cost $13,205 6 Regulatory Services and Coordination Coordiantion with SRP,KCFPD 18 $130/hour $2,340 Data Evaluation TACO compliance evaluation w/soil 20 $85/hour $1,700 averaging(95 UCL Calculation) Remedial Action Completion Report w/PE Certification 2 $1,500 report $3.000 Total Task Cost $7,040 GRAND TOTAL-Festival Park&Townhomes Site $52,120 General Assumptions: Scope of work limited to oversight/management of environmentally impacted soils only. Terracon to identity locations for contractor to removal impacted soils,obtain and manage waste manifests,provide truck counts,and verity contractor quantities. No field survey or field staking is included. Analytical testing costs assumes standard turnaround(5-days) Field time is estimated based on normal contractor production rates for fully mobilized and efficient operations. Actual field times may vary depending on contractor supervision,iste operations and equipment limitations. 4403357 Elgin Rem Oversight 1 Terracon,Inc. Irerracon 135 Ambassador Drive Naperville,Illinois 60540 September 12, 2003 (630)717-4263 Fax:(630)357-9489 Mr. Raymond H. Moller Director of Economic Development City of Elgin 150 Dexter Court Elgin, IL 60120 RE: Festival Park Redevelopment Sites Change Order No. 2 —Amended ROR/RAP Reports Terracon Project No. 44037034 Dear Ray: Please find enclosed Change Order No. 2 for the above referenced project. This change order is submitted in response to changes in the scope of work related the Remediation Objectives Report (ROR) and the Remedial Action Plan (RAP) for both the Townhome and Festival Park sites. Revisions to these reports were made to take advantage of the new PNA study data recently released by the Illinois EPA and respond to IEPA comments. Revising the remediation plan allows the quantity of soil remediation to be significantly reduced at the site. The attached change order form documents the additional work performed by Terracon to revise the ROR/RAP reports. Back up is provided to indicate the level of effort necessary to implement the scope changes. Also provided is a brief recap of the project budget and invoicing history to date. Please advise if you have any questions regarding this change order request. If acceptable, please sign and return one copy for our files. Sincerely, Terracon J hn M. Nardozzi, P.E. William B. Thayer,nior Project Manager Associate Principal Encl. Arizona■Arkansas■California■Colorado■Georgia■Idaho■Illinois■Iowa■Kansas■Kentucky■Minnesota■Missouri Montana■Nebraska■Nevada■New Mexico■North Carolina■Oklahoma■Tennessee■Texas■Utah■Wisconsin■Wyoming Consulting Engineers&Scientists Since 1965 www.terracon.com CHANGE ORDER No. 2 Irerracon Page 1 of 1 Geotechnical.Environmental and Materials Engineers 135 Ambassador Drive • Naperville,Illinois 60540 Phone(630)357-7228 Fax(630)357-9489 Client/Address: Pro8ect/Location: Date: City of Elgin Festival Park Redevelopment Sites 9/12/03 150 Dexter Court Elgin, IL Elgin,IL 60120 Attn: Ray Moller, Director of Economic Development Terracon Project No: 44037034 Requested by: Client X Terracon Background Terracon's existing scope of work includes preparation of Remediation Objectives Reports and Remedial Action Plans for the Festival Park, Townhome, and Crocker Theater sites. After submittal of the Townhome Report to Illinois EPA, the IEPA suggested the use of new PNA study data to allow a reduced level of soil remediation. To incorporate these changes into the project, an Amended ROR/RAP was prepared for both the Townhome and Festival Park Sites. The amended reports required technical analysis to determine remediation objectives based on a 95%upper confidence of the mean soil concentration of the PNA compounds. Scope of Work: • Conducted new assessment of the soil data for both Townhome and Festival Park Sites to determine remediation areas based on 95%UCL analysis for PNA constituents. • Prepared amended ROR/RAP reports for each site (Townhome and Festival Park) to document the technical analysis and prepare new site drawings representing the reduced soil remediation areas. • Prepared updated soil remediation volume calculations and soil remediation cost estimates. • Participated in additional project meetings with City personnel, construction manager, and designer to address project changes and coordinate revisions to project plan. • Collected and analyzed additional groundwater samples from the Townhome Site per IEPA review comments. Groundwater results were incorporated into the Amended ROR/RAP report. Cost of Services - TOTAL ESTIMATED COST: $9,929.00 See attached for cost breakdown x Time and Materials Project Schedule Deliverables Terracon resubmitted revised reports to IEPA and KCFPD. Amended reports, revised calculations. Authorization Prepared by: ohn ar zzi P.E. Approved Willi a .T ver, .E. Client Approval by: Date: Irerracon Note: Change Order Authorization incorporates Terms and Conditions of original Agreement 9/12/2003 Level of Effort and Cost City of Elgin Festival Park Redevelopment Sites - ROR and RAP ROR/RAP Change Order No. 2 Principal Sr.Project Project Senior CADD i AdrnW Total Total Cost Task Description Qty, Mqr. Prof. Prof. Clerical Effort ___---_-------------- ;135 $130 $100 ;85 ;45 ;45 Hours $ 100 Amendment to ROR/RAPs- Townhome&Festival Park 2 Rpts PNA Data Evaluation 12 4 22.5 29.5 68 $5,200 Report Preparation 2 2 $90 Review/QA/QC 1 4 5 $655 Subtotal-Task 100 1 16 4 22.5 29.5 2 75 $5,945 200 Groundwater Assessment Townhome Site-Sample Collection 6 6 $600 Report Preparation 6 1 7 $645 Review/QA/QC 1 2 3 $395 Laboratory Services First Environmental $1,034 15% $1,189 Travel and Field Supplies $100 15% $115 Subtotal-Task 200 1 2 12 0 0 1 16 $2,829 300 Project Management& Meetings 0 $0 Mtg.w/City, Hitchcok&MIC 9/4/03 2 2 $260 Mtg.w/City, Hitchcok&MIC 9/5/03 3 3 $390 Mtg.w/City, PAR Development, Hitchcok&MIC 9/10/03 3 3 $390 Travel 100 15% $115 Subtotal-Task 300 0 8 0 0 0 01 8 $1,155 GRAND TOTAL 2 26 16 22.5 29.5 3 99 $9,929 Terracon, Inc. 1 Festival Parkt RORRAP-Budget&Costs 9/12/2003 Project Cost Summary City of Elgin Festival Park Redevelopment Sites Authorization Summary Item Description Date Date Auth. Amount Original Contract ROR/RAP for 3 Sites 2/18/2003 8/29/2003 $27,840.00 CO#1 Specification for Bidding Soil 7/9/2003 Verbal 7/03 $2,750.00 Remediation CO#2 Amended ROR/RAP 9/12/2003 $9,928.53 Total -PTD Authorizations $40,518.531 Invoice Summary Item Invoice Number Date Date Auth. Amount Invoice#1 4485110 6/16/2003 $7,090.40 Invoice#2 4485152 7/18/2003 $11,217.00 Invoice#3 4485245 9/4/2003 $13,496.17 Total -PTD Invoices $31 803.57 Budget Remaining $8,714.96 Table 3 TERRACON ENVIRONMENTAL SERVICES FEE SCHEDULE City of Elgin 2003 PERSONNEL Labor Category Billing Rate A. Professional Staff 1. Staff Professional $70.00 2. Senior Staff Professional $85.00 3. Project Professional $100.00 4. Senior Project Manager/Professional $130.00 5. Principal $135.00 6. Expert Witness $200.00 B. Technician Staff 1. Technician $45.00 2. Remedial Specialist $65.00 C. Support Staff 1. Clerical $35.00 2. CADD Tech 1 $45.00 3. CADD Tech II $60.00 Note: Hourly rates will be increased by a multiple of 1.3 for Saturday, Sunday and holiday work or off shift work when required by client or for emergency response with less than 36 hour notice. EXPENSES AND SUPPLIES Vehicle Charge(local area,within 25 miles of office) $50.00 /day Vehicle Charge(local area,within 25 miles of office, less than 4 $30.00/1/2 day hours) Vehicle Charge(outside local area) $0.45 /mile Per Diem, Lodging and Food Minimum of $85.00 /day Miscellaneous charges, including analytical laboratory tests,shipping Cost+15% charges, rental equipment,outside labor, public transportation, materials,or other contracted services Proposal No. 4403194 Terracon, Inc. 1