Loading...
02-340 Resolution No. 02-340 RESOLUTION AUTHORIZING EXECUTION OF AMENDMENT NO. 3 TO AN ENGINEERING SERVICES AGREEMENT WITH CIVIL DESIGN GROUP, INC. FOR THE 2001 SEWER REHABILITATION PROJECT-ALLEN DRIVE/BRUCE DRIVE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Olufemi Folarin, Interim City Manager, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute Amendment No. 3 to an Engineering Services Agreement on behalf of the City of Elgin with Civil Design Group, Inc . for the 2001 Sewer Rehabilitation Project-Allen Drive/Bruce Drive Drainage Improvements, a copy of which is attached hereto and made a part hereof by reference . s/ Ed Schock Ed Schock, Mayor Presented: October 23 , 2002 Adopted: October 23 , 2002 Omnibus Vote : Yeas : 7 Nays : 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk • CConsulting EngineerFAX www.civildesigngroupinc.com CITY OF ELGIN, ILLINOIS 2001 SEWER REHABILITATION ENGINEERING SERVICES AGREEMENT AMENDMENT NO. 3 THIS AGREEMENT AMENDMENT NO. 3, made and entered into this day of ,2002, by and between the CITY OF ELGIN, an Illinois municipal corporation (hereinafter referred to as "CITY") and CIVIL DESIGN GROUP, INC. (hereinafter referred to as "ENGINEER"), shall modify that Agreement dated March 20, 2001,Amendment No.1 dated August 10, 2001 and Amendment No.2 dated July 22, 2001, whereby the ENGINEER was engaged to perform professional services in connection with the preparation of final design plans, specifications and quantities as needed for contract bid and construction of the 2001 Sewer Rehabilitation (hereinafter referred to as the PROJECT). WHEREAS, the services did not include professional design services for drainage improvements in the Highview Hills Subdivision as part of the PROJECT, AND WHEREAS, the CITY desires the ENGINEER to provide design services for this part of the PROJECT, AND WHEREAS, the CITY desires to include the payments to the ENGINEER under the AGREEMENT in connection with the professional services with the PROJECT. In response to these additional services, certain revisions and additions must be made to the AGREEMENT. In compliance, therefore, the terms and conditions of the AGREEMENT are modified as specifically set out below. All other parts of the AGREEMENT remain unchanged. SECTION I of the AGREEMENT is hereby amended to include PARAGRAPHS H. and I.: H. An outline of the design services to be provided by the ENGINEER includes development of preliminary design concepts to be selected for implementation by the CITY; preparation of final design plans,specifications and quantities as needed for contractor bid and construction for the Highview Hills Drainage Improvements. I. A detailed Scope of Design Services is attached hereto as attachment A-4. 1754 North Washington Street Suite 120 Naperville, Illinois 60563-1334 SECTION IV, PARAGRAPH A. of the AGREEMENT is hereby deleted and replaced with the following: A. For services provided, the Engineer shall be reimbursed at hourly rates as given in Attachment B-2 for the personnel employed on this PROJECT,with the total fee not to exceed $144,000 regardless of the actual costs incurred by the ENGINEER unless substantial modifications to the scope of the work and authorized in writing by the DIRECTOR. SECTION IV, PARAGRAPH C. of the AGREEMENT is hereby deleted and replaced with the following: C. Reimbursable expenses will include mileage for vehicles used,printing costs for plans and specifications as needed for review by the CITY, permit applications, and review by utility companies. Additionally included are one set of reproducible plans and specifications for use by the CITY in making sets for the bid and construction phases of the PROJECT. The total for these expenses is given in E, F, G and H. Fees required by other agencies for permit application will be paid directly by the CITY. SECTION IV of the AGREEMENT is hereby amended to include PARAGRAPH H: H. The schedule of Fees and Expenses for the design services to be performed by the ENGINEER as described in Paragraphs I.H. and I.I. is attached hereto as Attachment C-4. Any such fees are included in the above-referenced figure of$144,000.00. IN WITNESS Whereof, the undersigned have placed their hands and seals upon and executed this Agreement in triplicate as though watch copy hereof was an original and that there are no other oral agreements that have not been reduced to writing in this statement. For the City: ATTEST: THE CITY OF ELGIN By A► / 7 •_ By �� �\ City Clerk City Man!- (SEAL) For the ENGINEER: Dated this day of A-r-ikti OFFICIAL SEAL p +,Q AD.,2002 PATRICIA M POIRIER �,, NOTARY PUBLIC,STATE OF ILLINOIS ATTEST: � t•� 11G-14A-e"'t, MY COMMISSION EX S:OS/02/03 4.1!" —�� //l 'nevi 5climiz1h54/ Vice Preside (SEAL) ATTACHMENT A-4 CITY OF ELGIN 2001 SEWER REHABILITATION HIGHVIEW HILLS DRAINAGE IMPROVEMENTS DETAILED SCOPE OF DESIGN SERVICES 1. Make or cause to be made such drainage studies as may be required to furnish sufficient data for the design of the proposed improvement. 2. Prepare detailed plans which will include the following as required: - Cover Sheet - Index of sheets - Existing and proposed typical sections - General Notes - Summary of Quantities - Existing topography within right of way as necessary to cover improvements. - Proposed Geometrics - Proposed drainage - Existing easements and right of way - Proposed easement and right of way - Construction Staging - Existing and Proposed cross sections - Standards and Special Details 3. Make complete specifications special provisions, proposals and Estimate of Cost. 4. Attend progress meetings at any reasonable time when required to do so by representatives of the city. 5. Attend the bid opening and prepare bid tabulations and award recommendation. • I ATTACHMENT B-3 CITY OF ELGIN - 2001 SEWER REHABILITATION HIGHVIEW HILLS DRAINAGE IMPROVEMENTS HOURLY RATES AND REIMBURSABLE COSTS - 2002 Hourly Salary Classification Des. $ Rate Principal in Responsible Charge P1 130.00 Senior Project Manager E5 110.00 Project Manager E4 90.00 Project Engineer E3 80.00 Civil Engineer E2 75.00 Landscape Architect L1 90.00 Senior Engineering Technician T5 75.00 Engineering Technician T4 70.00 Technician T3 65.00 Junior Technician or Field Crew Chief T2 59.00 Field Crew Technician T1 52.00 Administrative Assistant Al 45.00 Field Survey Crew (2 Person) 111.00 Reimbursable Costs Use of GPS Survey Equipment $50.00 / Hour (if in Agreement) Printing & Reproduction Actual Cost x 1.1 Automobile Transportation 0.345 per mile x 1.1 Other Transportation Costs Actual Cost x 1.1 Package Delivery Services Actual Cost x 1.1 Outside Sub-consultant Services Actual Cost Other Project-Specific Reimbursable Costs Actual Cost x 1.1 Notes on Billing Rates & Reimbursable Costs 1. Salary rates include general office and payroll overhead. 2. Computer systems are utilized for all design, drafting, and project administration tasks. The rates quoted above include provision for the use of these systems. There are no extra fees for computer usage. 3. Reimbursable costs will be itemized in billing statements. 4. Other consultant services (if required) will only be used with prior authorization and will be specifically itemized in the Consulting Agreement. 5. Hourly Billing Rates normally change on January 1st of each year. I ATTACHMENT C-4 CITY OF ELGIN 2001 SEWER REHABILITATION HIGHVIEW HILLS DRAINAGE IMPROVEMENTS SCHEDULE OF FEES AND REIMBURSABLE COSTS Description of Work Fees Drainage Study/ Preliminary Design Services 2,208.00 Final Design Services 24,284.00 Bid Opening /Tabulations 1,104.00 Total Professional Services $27,596.00 Reimbursable Costs Printing & Reproduction 318.00 Automobile Transportation 86.00 Total Reimbursable Costs $404.00 Total Fees (Professional Services plus Reimbursables) $28,000.00 r✓ ti Agenda Item No. City of Elgin E L ' , 011 G ot 1$P October 4, 2002 101 pi 011 N F"' FINANCIALLY STABLE CITYGOVERNMENT TO: Mayor and Members of the City Council EF FIC TENT SE MIC ES, AND OUAUTY INFRASTRUCTURE FROM: Olufemi Folarin, Interim City Manager SUBJECT: Amendment No. 3 to an Agreement with Civil Design Group, Inc . for the 2001 Sewer Rehabilitation Project for Construction Related Inspection Services for the Allen Drive/Bruce Drive Drainage Improvements PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider an exception to the procurement ordinance and approval of Amendment No. 3 to the engineering services agreement with Civil Design Group, Inc . (CDG) for design services related to drainage improvements in the Allen Drive/Bruce Drive neighborhood. BACKGROUND The agreement with CDG ($75, 000) for the preparation of final plans, specifications, cost estimates and bidding assistance for the 2001 Sewer Rehabilitation Projects was authorized by the City Council on February 28, 2001 . The project included a combination of both sanitary sewer and storm sewer repairs/extensions that required conventional construction techniques to implement . It was a counterpart to the "trenchless" sewer lining contract and was funded by both the 2001 Neighborhood Storm Sewer Program and the 2001 Neighborhood Sewer Repair Program. Amendment No. 1 ($13 , 000) for construction engineering services for the 2001 Sewer Rehabilitation Projects was authorized by City Council on August 25, 2001 . Amendment No. 2 ($28, 000) for construction engineering services for the Country Knoll Relief Sewer Project was authorized by City Council on June 26, 2002 . r • . telk Allen Dr. /Bruce Dr Drainage Improvements October 4 , 2002 Page 2 The drainage improvements on Allen Drive and Bruce Drive were chosen as the project to be completed under the 2002 Neighborhood Storm Sewer Program. The City received numerous complaints from residents in the neighborhood about storm water and ground water drainage problems . The problems include standing water in the ditches, which makes them very difficult to mow and properly maintain, and very shallow or non-existent ditches, which causes the drainage to run onto the street pavement and create icing problems in the winter. Due to the similarity of the work and the lateness of the season, it is recommended that CDG' s agreement be amended to include this work rather than do a consultant selection process for the project . The approval of the amendment will require an exception to the procurement ordinance . Amendment No. 3 ($28, 000) will add design engineering, preparation of final plans, specifications and cost estimates and bidding assistance for the project which will regrade and sod all the drainage ditches after installing an under drain system and re-establishing the culvert pipes under the driveway entrances . The under drain will keep the ditches dry and mowable, even in the areas of high groundwater. A copy of Amendment No. 3 is attached as Exhibit A. A project location map is attached as Exhibit B. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None . FINANCIAL IMPACT Amendment No. 3 totals $28 , 000 and covers design related engineering services for the Allen Drive/Bruce Drive Drainage Improvement Project . Funding is available in the amount of $250, 400, account no. 276-0000-791 . 93-80, project no. 339657, 2002 Neighborhood Storm Sewer Rehabilitation. The revised not-to-exceed agreement amount with CDG will now total $144 , 000 . ems Allen Dr. /Bruce Dr Drainage Improvements October 4, 2002 Page 3 TOOL/ LEGAL IMPACT Approval of the agreement will constitute an exception to the procurement ordinance. ALTERNATIVES 1 . Authorize Amendment No. 3 with CDG. 2 . Do not authorize Amendment No. 3 with CDG. RECOMMENDATION It is recommended that the City Council authorize Amendment No. 3 with Civil Design Group, Inc . in the amount of $28, 000 and authorize staff to execute the necessary documents . Respectfully submitted, Olufemi F.'1 rin ' Inter' ' y anager SP:do Attachments r Vain Resolution No. 02-340 RESOLUTION AUTHORIZING EXECUTION OF AMENDMENT NO. 3 TO AN ENGINEERING SERVICES AGREEMENT WITH CIVIL DESIGN GROUP, INC . FOR THE 2001 SEWER REHABILITATION PROJECT-ALLEN DRIVE/BRUCE DRIVE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Olufemi Folarin, Interim City Manager, and Dolonna Mecum, City Clerk, he and are hereby authorized and directed to execute Amendment No . 3 to an Engineering Services Agreement on behalf of the City of Elgin with Civil Design Group, Inc . for the 2001 Sewer Rehabilitation Project-Allen Drive/Bruce Drive Drainage Improvements, a copy of which is attached hereto and made a part hereof by reference . s/ Ed Schock Ed Schock, Mayor Presented: October 23 , 2002 Adopted: October 23 , 2002 Omnibus Vote: Yeas : 7 Nays : 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk