Loading...
02-230 Resolution No. 02-230 RESOLUTION APPROVING CHANGE ORDER NO. 1 AND FINAL IN THE CONTRACT UTILIZING CDBG FUNDS WITH PROTECTIVE SYSTEMS, INC. FOR FIRE ALARM SYSTEM AT THE YWCA FACILITY WHEREAS, the City of Elgin has heretofore entered into a contract with Protective Systems, Inc . utilizing CDBG funds for a fire alarm system at the YWCA facility at 220 E. Chicago Street; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Olufemi Folarin, Interim City Manager, be and is hereby authorized and directed to execute Change Order No. 1 and Final, a copy of which is attached hereto and made a part hereof by reference . s/ Ed Schock Ed Schock, Mayor Presented: June 26, 2002 Adopted: June 26, 2002 Omnibus Vote : Yeas : 7 Nays : 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk r r CHANGE ORDER NO. 1 AND FINAL ORIGINAL CONTRACT: Protective Systems, Inc. executed a contract with the City of Elgin utilizing Community Development Block Grant funds on September 13, 2002 for a fire alarm system at the YWCA facility, located at 220 E. Chicago Street, Elgin, IL 60120. SCOPE: The original agreement provided for the design and installation of a fire alarm system. However, upon an inspection by the Fire Department it was discovered that guard posts would need to be installed around the gas meters in the alley and a lock box. It was also discovered through the Contractor that magnetic door holders were missing, and replacement parts would be needed in the event warranty parts were being repaired. REASONS FOR CHANGE: The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed. SUMMARY OF CHANGES: Pursuant to the attached itemization which is made a part hereof as Exhibit A,Protective Systems, Inc. has agreed to provide the following goods and services: 1. Installation of seven(7)magnetic door holders wiring them to the fire alarm control panel, allowing them to release in the event of a fire. Cost: $3,057.00 2. Installation of two (2) concrete filled posts. Cost: $1,120.00 3. Spare parts for the fire alarm in the event warranty parts are in for service. Cost: $800.00 Total Changes: $4,977.00 Original Contract Price: $32,590.00 Revised Contract Price: $37,567.00 Other contract provisions not specifically altered herein remain in full force and effect. Agreed to this 2 kkday of June 20 o v President, Protective Systems, Inc. Acting City anage 'City of Elgin Attested by: �-� PROTECTIVE - SYSTEMS, INC. 11904 Oak Creek Parkway • Huntley, IL 60142 • (800) 749-9898 June 7, 2002 Change Order For: YWCA of Elgin 220 E. Chicago St. Elgin, IL 60120 RE: Fire Alarm Contract Changes Change Order: Description Install seven(7)magnetic door holders and interface them to the fire alarm control so as to release in the event of an alarm activation. Total Cost of Changes: $3,057.00 Description Install two (2) concrete filled steel posts in location specified by Elgin Fire Department. *The following price includes all labor and materials needed to complete this project. Total Cost of Changes: $1,120.00 Quantity Description (1) FireLite BG-12LX Pull Station (1) FireLite SD350 Smoke Detector (1) FireLite H350R Heat Detector (1) System Sensor P2475 Audio/Visual Device (1) System Sensor S2475 Strobe Light Total Cost of Changes: $800.00 New Contract Price (Including Changes): $37,567.00 By signing, I agree to pay for the above changes proposed and understand that these charges are in addition to the agreed upon contract price. MOU1A -C\et _ (e I � T/Or)...,. CA of Elgin Authorize Si nature D e g g Protective Systems, Inc.Authorize ignature Da e Professional Protection Since 1984 . .( OF e4� City of Elgin Agenda Item No. L 1121 11$$ June 7, 2002 G �TO: Ma or and Members of the Cit C , ' 1u Mayor City Council ��'' �� FINANCIALLY STABLE CITY GOVERNMENT FROM: Olufemi Folarin, Interim City Manager AND QUALLIITFY IN RA SST CTURE SUBJECT: 2001 YWCA CDBG Fire Alarm Contract Change Order No. 1, 2, and 3 for Final Payment PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information regarding Change Order No. 1, 2, and 3 for final payment to the contract for the installation of a new fire alarm system at the YWCA facility. BACKGROUND The YWCA of Elgin was awarded $77, 000 . 00 in 1999 Community Development Block Grant (CDBG) funds to replace an existing fire alarm system. A Request for Proposal was prepared and advertised with proposals being opened and reviewed on September 14, 2001 . During the review process it was determined that Protective Systems, Inc . would be the most qualified to perform the work. A contract was awarded at the November 14, 2001 City Council meeting for the installation of a fire alarm system for a total of $32, 590 . 00, leaving $44, 410 . 00 in unspent CDBG funds . The change orders being requested are for the continuing safety of the facility and its clients. The following is a break down of the three (3) change orders; Change Order #1 The installation of seven (7) magnetic door holders wiring them to the fire alarm control panel . This will cause the automatic release of the doors, once the alarm has been activated. The total for the changes total $3 , 057 . 00 . Change Order #2 The installation of a guard post around the gas meters in the alley. The City of Elgin Fire Department required this change. The cost for the changes total $1, 120 . 00 Change Order No. 1, 2, and 3 to Fire Alarm Contract ellw June 7, 2002 Page 2 Chancre Order #3 The YWCA is requesting to add to the Fire Alarm Contract replacement parts to have on hand when warranty parts are sent in for work and a lock box for the Fire Department . The cost for the changes total $800 . 00 The final payout for Protective Systems, Inc . totals $4, 977 . 00 . Copies of the change orders are attached. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None . 1„ (.FINANCIAL IMPACT Funds have been budgeted ($77, 000) and $44 , 410 . 00 remains from CDBG Program Year 1999, Major Repairs/Building-Structures, account number 230-0000-791 . 93-36, project number 154522 for the funding of three (3) change orders totaling $4 , 977 . 00 . The original contract totaled $32 , 590 . ;61///LEGAL IMPACT The proposed change orders are being reviewed by the legal department . ALTERNATIVES 1 . Approve the attached change orders . 2 . Do not approve the attached change orders . RECOMMENDATION It is recommended that the Mayor and City Council approve the change orders to the contract with Protective Systems, Inc for a total amount of $4 , 977 . 00 . Respectfully submitted, Olu emi ■lari rw. Interim C . • ager Attachment