Loading...
01-92 I Resolution No. 01-92 RESOLUTION AUTHORIZING EXECUTION OF AN AGREEMENT WITH M. I . C. , INC. FOR CONSTRUCTION MANAGER SERVECES FOR THE PHASE I RIVERFRONT/CENTER C TY PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Joyce A. Parker, City Manager, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute an agreement on behalf of the City of Elgin with M. I .C. , Inc . for construction manager services for the Phase I Riverfront/Center City Project, a copy of which is attache hereto and made a part hereof by reference . sl Ed Schock Ed Schock, Mayor Presented: April 11, 2001 Adopted: April 11, 2001 Omnibus Vote : Yeas 7 Nays 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk Am. 1 , AGREEMENT THIS AGREEMENT is made and entered into this /F-Aday of 04Li /, 2001, by and between the CITY OF ELGIN, an Illinois mun* ipal corporation (hereinafter referred to as "OWNER") and M. I .C. , Inc . , an Illinois Corporation (hereinafter referred to as "CONSTRUCTION MANAGER" ) . WHEREAS, the OWNER desires to engage the CONSTRUCTION MANAGER to furnish certain professional services in connection with construction of the Phase I Riverfront/Cepter City Project, which generally includes improvements to Walton Island, Shoreline and walkway enhancements to the eastbank on the Fox River between Highland Avenue and Kimball Street and ¶ he construction of two overlooks adjacent to the Kimball Street tam. NOW, THEREFORE, it is hereby agreed by and between the OWNER and the CONSTRUCTION MANAGER that the OWNER does hereby retain the CONSTRUCTION MANAGER to act for and represent it in all construction matters involved in the PROJECT, subject to the following terms and conditions and stipulations, to-wit : ARTICLE 1 All work hereunder shall be performed un er the direction of the Director of Economic Development of t e Owner, herein after referred to as the "Manager" . ARTICLE 2 CONSTRUCTION MANAGER' S SCOPE OF SERVICES The Construction Manager shall perform the services described in this Article. The Construction Manager shall furnish construction administration and management to perform the Project in an expeditious and economical manner consistent with the interests of the Owner . The Owner sh 11 endeavor to promote harmony and cooperation among the Owner, Architect, Construction Manager and other persons or entities eMployed by the Owner for the Project . The services to be provided under Paragraph 2 . 1 and 2 .2 constitute the Preconstruction Phase services . 2 .1 PRECONSTRUCTION PHASE 2 . 1. 1 CONSULTATION The Construction Manager with the .Prchitect shall jointly schedule and attend regular meetings with the Owner and Architect . t , A The Construction Manager shall consult with the Owner and Architect regarding site use and improvements, and the selection of materials, building systems and equipment . The Construction Manager shall provide recommendations on construction feasibility; actions designated to minim ze adverse effects of labor or material shortages; time requir ments for procurement, installation and construction completion; ,and factors related to construction cost including estimates of lalternative designs or materials, preliminary budgets and possible economies . 2 . 1. 2 PHASED CONSTRUCTION The Construction Manager shall make recommendations to the Owner and Architect regarding the phased issuance of Drawings and Specifications to facilitate phased construction of the Work, if such phased construction is appropriate for the Project, taking into consideration such factors as economies, time of performance, availability of labor and materials, and provisions for temporary facilities. It is the current expectation of the parties that the Project will be construdted in phases . In the event the Project does proceed in phases it is expected that one or more phases of the Project may have proceeded into the construction phase while one or more other phases of the Project may still be in the pre-construction phase. It is the intention of the parties that the provisions of thiS agreement shall to the extent necessary be construed to accommodate and permit such phasing of the Project . 2.1.3 SUBCONTRACTORS AND SUPPLIERS PROJECT PROJECT PROCUREMENT The Construction Manager shall seek to develop subcontractor interest in the Project and shall furnish to the Owner and Architect for their information a list of possible subcontractors, including suppliers who are to furnish materials or equipment fabricated to a special design, from whom proposals shall be requested for each principal portion of the Work. The Architect shall promptly reply in writing to the Construction Manager if the Architect or Owner know of any objection to such subcontractor or supplier. The receipt of such list shall not require the Owner or Architect to investigate the qualifications of proposed subcontractors or suppliers, Inor shall it waive the right of the Owner or Architect later to object to or reject any proposed subcontractor or supplier. The Construction Manager shall conduct up to one (1) meeting with local firms interested in working on the Project to explain the bidding and award process and to solicit local firms to bid the project . The location and/or meeting rooms for the meetings will be furnished by the Owner. 2 t i ` m . In all contracting, hiring or employment made possible or resulting from this Agreement , there shall be no discrimination against any firm, employee or applicant fcr employment because of sex, age, race, color, creed, national origin, marital status, of the presence of any oeosocy, mental or ph sical handicap, unless based upon a bona fide occupational qualification, and this requirement shall apply, but not be limited to, employment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship . No person shall be denied or subjected to discrimination in receipt of the benefit of any services or activities made possible by or resulting from this Agreement on the grounds of sex, race, color, creed, national origin, age (except minimum age and retirement provisions) , marital status or the presence of any sensory, mental or physical handicap. Any violation of this provision shall be considered a violation of a material provision of this Agreement . The Construction Manager shall include language banning discrimination per the above in all subcontracts and purchase orders for the project . The construction work on the Project shall be performed under subcontracts or by other appropriate agreements with the Construction Manager. Source selection for all subcontractors and suppliers shall be conducted in oce with the City of Elgin procurement ordinance. The C000tr oo Manager may use a prequalification process to pre-qualify bidders to determine the responsibility of prospective bidders. The Construction Manager shall obtain bids from Subcontractors and from suppliers of materials or equipment fabricated to a special design for the Work from the list of qualified bidders previously reviewed and, after analyzing such bids, shall deliver such bids to the Owner and Architect . The Owner shall then determine, with the advice of the Construction Manager, which bids shall be accepted. The Owner may designate specific persons or entities from whom the Construction Manager shall solicit pre-qu lification information. The Construction Manager shall not be required to contract with anyone to whom the Construction Manager has reasonable objection and the Owner has determined not to be a responsible or responsive bidder or offeror. The Construction Manager shall prepare Bid Packages consisting of drawihgo' specifications, and other information prepared by theAzzbitect. Invitations to Bid, Instructions to Bidders, Proposal Form, Scopes of Work, General Requirements, General Conditions and Supplementary General Conditions, sample Trade Contracts, Performance d Payment Bond Forms, Insurance Specifications, and ocher conditions of the contract to secure trade contractor or supplier bids for all elements of the project . 3 I � � J . | Bid Packages shall be prepared and as the Construction Manager determines are in the best iotereata of the project . The form and contents of all bid packages shall be subject to the advance approval of the Owner. Bid packages shall be publicly advertised and bid openings shall be coodJcted as approved by the Owner and in conformance with the CitY of Elgin procurement ordinance. All successful bidders shall be compensated in accordance with the Illinois Prevailing Wage Act , and shall be required to comply with all federal, state, and local laws, egulations, orders, and ordinances applicable to public contrac ors in Illinois . All successful bidders shall be required to certify that they are not barred from contracting with any unit of state or local government as a result of a violation of Section 33E-3 or 33E-4 of the Interference with Public Contracting Act, 720 ILCS 5/33-E- l, et . Seq. (1996) . 2 .1.4 LONG-LEAD TIME ITEMS The Construction Manager shall d to the Owner and Architect a schedule for procurement o time items which shall constitute part of the Work as required to meet the Project schedule. If approved by the 'owner, the Construction Manager shall procure long-lead items in advance of subcontracts for the Work; provided however, any such procurements shall be conducted in conformance with the requirements of the City of Elgin procurement ordinance. The CooStzuctimo Manager shall expedite the delivery of long-lead time items . 2 '1'5 EXTENT OF RESPONSIBILITY The Construction Manager does not warran or guarantee estimates and schedules except as may be included apart of the Guaranteed maximum Price. The recommendations and advice of the Construction Manager concerning design alternatives shall be subject to the review and approval of the Owner and the Owner's professional consultants. The Construction Manager shall not be liable for failure to ascertain that the Drawings and Specifications are in accordance with applicable laws, statutes, ordinances, building codes, rules and regulations . However, if the Construction Manager recognizes that portions of the Drawings and Specifications are at variance therewith, the Construction Manager shall promptly notify the Architect and Owner in writing. 2 .1. 6 PRECONSTRUCTION PHASE KEY PERSONNEL The following Key Personnel of the Construction Manager shall participate and shall be involved in the Preconstruction Phase of the Project for the duration of PreconstrLctioo Services : NAME TIT1,E 1 . M. I .C . Staff See Exhibit A 2 . 3 . The Construction Manager shall not reassign or replace Preconstruction Key Personnel as identified herein without the prior approval of the Owner, which approval shall not be unreasonably withheld. Estimated and anticipated manhours included in the Construction Manager' s lump sum fee for PreconstruCtion Services for the Construction Manager' s personnel are included in Exhibit 2 to this agreement . 2.1.7 PROJECT STATUS The Construction Manager shall conduct to status sessions during the project . One status session shall be conducted during the Preconstruction Phase and shall involve the Owner, Architect and Construction Manager. One status session shall be conducted during the Construction Phase and shall involve the Owner, Architect, Construction Manager and selected Trade Contractors . In addition, periodic Owner/Architect/Construction Manager status meetings to review the progress of the project shall be held periodically through the project but not less than every three (3) months . 2 .2 GUARANTEED MAXIMUM PRICE PROPOSAL AND CONTRACT TIME 2.2 .1 Upon receipt of all subcontract and supplier bids for the project or a phase thereof, the ConStruction Manager shall propose a Guaranteed Maximum Price, which shall be the sum of the Estimated Cost of the Work (which shall include the Construction Manager' s Contingency) , the Construction Manager' s Fee, and Owner' s Allowance, if any. 2.2.2 The Estimated Cost of the Work shall include the Construction Manager' s Contingency, a sum established by the Construction Manager for the Construction Manager' s exclusive use to cover costs which are properly reimbursable as a Cost of the Work but not the basis for a Change Order. The Construction Manager' s Contingency shall be equal to 3% of the total of all subcontracts and purchase orders for the project . Savings from the awarded subcontractor or supplier contracts shall accrue and be available for use in the same manner as the Construction Manager' s contingency. The Construction Manager shall report the expenditure of Construction Manager' s Contingency to the Owner as any expenditures occur and monthly. 5 I 2 .2 .3 The Construction Manager is authorized to enter into amendments to the awarded subcontractor and supplier contracts when the subject of any such amendment does not constitute a Change in the Work, is required to complete work within the scope of the Project, and is properly reimbu sable as a Cost of the Work. Any such amendments to the sub ontractor and supplier contracts authorized by the Construction anager shall be applied and charged against the Construction Man :ger' s Contingency. Any such amendments which would cause the Guaranteed Maximum Price to be exceeded shall be paid by the Construction Manager without . reimbursement by the Owner. In the =vent any such proposed amendment is not germane to the original subcontract as signed and is in an amount equal to or greater han 10% of the original subcontract or more, the Construction Manager shall, to the extent circumstances reasonably permit obtain bids for the additional work which is the subject of the proposed amendment pursuant to the procedures as set forth in Section 2 . 1 . 6 hereof. Amendments to the awarded subcontractor and supplier contracts which constitute a Change in the Work and are not within the scope of the Project shall be accomplished by Change Orders pursuant to Article 7 of the General conditions . All Change Orders shall be authorized by theowner pursuant to the procedures in Article 3 . 2 . , and according to law. 2 .2 .4 BASIS OF GUARANTEED MAXIMUM PRICE The Construction Manager shall include with the Guaranteed Maximum Price proposal a written statem-nt of its basis, which shall include: .1 A list of the Drawings and Speci ications, including all addenda thereto and the Conditio s of the Contract, which were used in preparation of the Guaranteed Maximum Price proposal. .2 A list of allowances and a statem-nt of their basis. .3 A list of the clarifications and assumptions made by the Construction Manager in the p r - p a r a t i o n of the Guaranteed Maximum Price proposal to supplement the information contained in the Drawings and Specifications . .4 The proposed Guaranteed Maxim m Price, including a statement of the estimated cost organized by trade categories based upon the propo_ed low responsive bids for each category, allowances, contingency, and other items and the fee that comprise the Guaranteed Maximum Price. .5 The Date of Substantial Completion upon which the proposed Guaranteed Maximum Price i based , a n d a schedule of the Construction Docume is issuance data upon which the date of Substantial Compl=tion is based. 6 I 2 .2 .5 The Construction Manager shall meet with the Owner and Architect to review the Guaranteed Maxim m Price Proposal and the written statement of its basis. In the event that the Owner or Architect discover any inconsistencies or inaccuracies in the information presented, they shall promptly notify the Construction Manager, who shall make ap.ropriate adjustments to the Guaranteed Maximum Price proposal, its basis or both. 2. 2. 6 Unless The Owner accepts the Guaranteed Maximum Price Proposal in writing on or before the date specified in the proposal for such acceptance and so notifies the Construction Manager, the Guaranteed Maximum Price proposal shall not be effective without written acceptance by the Construction Manager. 2 .2.7 Prior to the Owner' s accept-nce of the Construction Manager' s Guaranteed Maximum Price pro•osal and issuance of a Notice to Proceed, the Construction Man.ger shall not incur any cost to be reimbursed as part of the Cost of the Work for Subcontractors, except as the Owner may .pecifically authorize in writing. 2.2 .8 Upon acceptance by the Owner of the Guaranteed Maximum Price proposal, the Guaranteed Maximum PI ice and its basis shall be set forth in Amendments to this agreQment . To the extent that the Project proceeds in phases pursuant to Subparagraph 2 . 1. 4, such amendments shall be added to the then current Guaranteed Maximum Price, it being the intent of t e parties that there be one Guaranteed Maximum Price for t e entire Project. The Guaranteed Maximum Price shall be su•ject to additions and deductions by a Change in the Work as •rovided in the Contract Documents and the date of Substant .al Completion shall be subject to adjustment as provided in Se tion 8 . 3 of the General Conditions. 2.2. 9 The Owner shall authorize an. cause the Architect to revise the Drawings and Specifications to the extent necessary to reflect the agreed-upon assumptions and clarifications contained in Amendments to this agreement . Sucrevised Drawings and Specifications shall be furnished to thz. Construction Manager in accordance with schedules agreed to by he Owner, Architect and Construction Manager. The Constructio Manager shall promptly notify the Architect and Owner if such revised Drawings and Specifications are inconsistent with the agreed upon assumptions and clarifications. 2.2 .10 The Guaranteed Maximum Price •.hall include in the Cost of the Work only those taxes which are enacted at the time the Guaranteed Maximum Price is established. 7 2 .2.11 If desired by the Owner, the uaranteed Maximum Price shall include an amount equal to 2% of he Cost of the Work for an Owner' s Allowance which shall be for the exclusive use of the Owner. In the event that the Owner' s A lowance is not expended during the project, all remaining Own is Allowance shall be returned to the Owner without any share of savings by the Construction Manager per Article 5 . 2 . 2 . 2 .3 CONSTRUCTION PHASE 2 .3.1 GENERAL The Construction Phase of the Project oI a phase thereof shall commence upon the following : . 1 The Owner' s acceptance of th= Construction Manager'Guaranteed Maximum Price pr.posal for the Project or a phase thereof, and .2 The Owner' s issuance of a notice to proceed and Owner' s first authorization to the construction Manager to award a subcontract for 'he construction of the Project or phase thereof . 2 .3.2 ADMINISTRATION 2 .3 .2.2 The Construction Manager sha 1 schedule and conduct weekly meetings at which the Owner, architect, Construction Manager and appropriate Subcontractors c.n discuss the status of the Work. The Construction Manager shall prepare and promptly distribute meeting minutes. 2 .3 .2.3 The Guaranteed Maximum Price .roposal shall include a schedule in accordance with Paragraph 3 .10 of the General Conditions, including the Owner's occupancy requirements . 2.3 .2.4 The Construction Manager shall provide monthly written reports to the Owner and Architect on th; progress of the entire Work. The Construction Manager , shall maintain a daily log containing a record of weather, Subcontractors working on the site, number of workers, Work accomplish_d, problems encountered and other similar relevant data as the Owner may reasonably require. The log shall be available to t e Owner and Architect . 2.3 .2.5 The Construction Manager shall develop a system of cost control for the Work, including regu ar monitoring of actual costs for activities in progress and es imates for uncompleted tasks and proposed changes . The Cons ruction Manager shall identify variances between actual and estimated costs and report the variances to the Owner and Architect at regular intervals. 8 2 .4 UNSAFE MATERIALS In addition to the provisions of Paragr.ph 10 . 1 of the General Conditions, if precautions are inadequate to prevent foreseeable bodily injury or death to persons resulting from a material or substance encountered but not created on the site by the Construction Manager, the Construction Manager shall, upon recognizing the condition, immediately stop Work in the affected area and report the condition to the owner and Architect in writing. The Owner, Construction Manag-r and Architect shall then proceed in the same manner described in Subparagraph 10 . 1 .2 of the General Conditions. The Owner shall obtain the services of a licensed laboratory, or other reason.bly appropriate entity, to verify the presence or absence of th= material or substance reported by the Construction Manager a d, in the event such material or substance is found to be pre-.ent, to verify that it has been rendered harmless . Unless oth=rwise required by the Contract Documents, the Owner shall fur ish in writing to the Construction Manager and Architect the n.:mes and qualifications of persons or entities who are to perform tests verifying the presence or absence of such material or •.ubstance or who are to perform the task of removal or safe containment of such material or substance. The Construction Manage and Architect shall promptly reply to the Owner in writing stating whether or not either has reasonable objection to the persons or entities proposed by the Owner. If either the lonstruction Manager or Architect has an objection to a person or entity proposed by the Owner, the Owner shall propose another to whom the Construction Manager and Architect have no reasonable oojection. 2.5 PROGRESS REPORTS 2 .5.1 An outline project milestone scheoule is provided herein under: f ] 2.5.2 A preliminary project schedule fo the Project shall be prepared by_Ma}c_(1Lr2(1(1L- in accord-nce with Article 2 . 1. 3 above . Progress shall be recorded on the project schedule and submitted monthly as a componen of the Status Report described in . 3 below_ A detailed construction schedule shall be submitted with each phase of the Guaranteed Maximum Price . 9 • . 2 .5.3 The Construction Manager shall submit to the Owner monthly a Status Report keyed to the Project Schedule . A brief narrative shall be provided identifying progress, findings and outstanding issues . Construction progress shall be recorded and submitted monthly as a component of the status report in 2 .3 .2 . 4 . 2. 6 WORK PRODUCTS All work products prepared by the Const uction Manager pursuant hereto including, but not limited to, reports, photographs and recommendations shall be the property of the Owner and shall be delivered to the Owner upon request of the Manager; provided, however, that the Construction Manager may retain copies of such work products for its records . Such work products are not intended or represented to be suitable for reuse by the Owner on any extension of the Project or on any other project, and such reuse shall be at the sole risk of the Owner without liability or legal exposure by the Construction ManageF. 2 .7 KEY PERSONNEL The Construction Manager shall assign and maintain during the duration of the Construction Phase of the project the following key personnel : NAME POSITION 1 . M. I .C. Staff 2 . See Exhibit A 3 . The Construction Manager shall not reassign or replace Key Personnel as identified herein without the prior approval of the Owner, which approval shall not be unreasonably withheld. Estimated and anticipated manhours inclUded in the Construction Manager' s lump sum fee for Construction Phase Services for the Construction Manager' s personnel are included in Exhibit 2 to this agreement . In the event requested by the Owner and for good cause, the Construction Manager shall reassign or replace any key personnel as identified herein. 2 .8 COMMUNICATIONS The Construction Manager shall respond tO requests from the Owner within a reasonable time, but not les S than two weeks after receipt by the Construction Manager. ARTICLE 3 OWNER'S RESPONSIBILITIES 10 . 3 .1 INFORMATION AND SERVICES 3 '1. 1 The Owner shall provide full information in a timely manner regarding the requirements of tgro 'ect, including a program which sets forth the Owner' s objectives, constraints and criteria, including space requirements and relationships, flexibility and expandability reguiremeotS' special equipment and systems, and site requirements . 3 .1.2 The Owner shall establish and update an overall budget for the Project , based on consultation with the Construction Manager and Architect, which shall include contingencies for changes in the Work and other costs which are the responsibility of the Owner. 3 . 1.3 STRUCTURAL AND ENVIRONMENTAL TESTS, SURVEYS AND REPORTS In the Preconstruction Phase, the Owner shall furnish the following at the Owner's expense, and the Construction Manager shall be entitled to rely upon the accuracy of any such information, reports, surveys, drawings and tests described in Clauses 3 . 1 . 4 .I through I . 1 '4 .4, except to the extent that the Construction Manager knows of any inaccuracy. 3 '1' 3 .1 Reports, surveys, drawings a d tests concerning the conditions of the site which are required by law. 3 .1.3 .2 Surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a written legal description of the site . The surveys and legal information shall include, as applicable' grades and lines of etreeto, alleys, pavements and adjoining property and structures; adjacent drainage; rights-of-way, restrictions, eaoemeoto, encroachments, zoning, deed estrictions, boundaries and contours of the site; locations, imenoi000 and necessary data pertaining to existing buildings, other improvements and trees; and information concerning available utility services and lines, both public and private, above and below grade, including inverts and depths . All information On the survey shall be referenced to a project benchmark. 3 '1'3 '3 The services of geotechnical engineers . Such services may include but are not limited to test borings, test pits, determinations of soil bearing values' percolation tests, ground and of hazardous materials, corrosion resistivity tests, including necessary operations for anticipating subsoil conditions, with reports and appropriate professional- recommendations . i| I • 3 . 1.3 .4 Structural, mechanical, ch mical , air and water pollution tests, tests for hazardou materials, and other laboratory and environmental tests, insp ctions and reports which are required by law. 3 .1.3 .5 The services of other consultants when such services are reasonably required by the scope lof the Project and are requested by the Construction Manager. 3 .1.4 The Owner shall only communicate with Subcontractors through the Construction Manager. 3.2 OWNER'S DESIGNATED REPRESENTATIVE The Owner' s Designated Representative shall be the Owner' s General Services Manager who shall hav- the authority to make decisions on behalf of the Owner which do not affect or change the Cost of the Work or the scope of the Project . For the purposes of this contract, the Owner' s City Manager shall have the authority to authorize change orders relating to the construction of the Project up to -n amount of less than $10, 000 .00 per change order. Any such change orders authorized by the City Manager shall be appli-d against the Owner's Allowance established in Section 2 .2 .11 hereof . A change order shall not be artificially or arbitrarily divided so as to be limited to an amount which may be author zed by the City Manager. Any change order of $10, 000 . 00 or more ust be authorized by the City Council of the City of Elgin. 3 .3 ARCHITECT The Owner shall retain an Architect to provide the Basic Services, including normal structural, Mechanical and electrical engineering services, other than co-t estimating services, described in the Agreement between the Owner and the Hitchcock Design Group, dated September 27, 2000, including the additional services described therein if required by the Project . Such services shall be provided in accorda ce with time schedules agreed to by the Owner, Architect and Co struction Manager. 3 .4 LEGAL REQUIREMENTS The Owner shall determine and adv se the Architect and Construction Manager of any special le•al requirements relating specifically to the Project which dif er from those generally applicable to construction in the juri•.diction of the Project . The Owner shall furnish such legal services as are necessary to provide the information and services equired under Paragraph 3 . 1 . 12 1 A , 3 .5 OWNER' S INSURANCE The Owner shall provide liability i _surance and property insurance (Builder' s Risk Insurance) as efined in Article 11 .2 and 11 . 3 of the AIA A201 General Conditio s, 1987 version. ARTICLE 4 COMPENSATION AND PAYMENTS FOR PRECONSTR CTION PHASE SERVICES The Owner shall compensate and make paym-nts to the Construction Manager for Preconstruction Phase service as follows : 4.1 COMPENSATION 4 .1.1 For the services described in Par:graphs 2 .1 and 2 .2 the Construction Manager' s compensation shall be a Lump Sum of $33, 927 . 00 inclusive of all fees and -xpenses regardless of actual time expended or actual costs incugred by the Construction Manager for such services . 4.1.2 Compensation for Preconstruction Phase services shall be equitably adjusted if such services exte d beyond 5-31 -01 or if the originally contemplated -cope of services is significantly modified. Prior to performing any such additional preconstruction phase services the Construction Manager shall receive the advance approval of the Owner for such additional services by way of amendment to this agreement . In the event such additional preconstruction phase services are approved by the Owner, the Construction Manager sh:ll receive additional compensation on an hourly basis equal t• one and eight-tenths (1. 80) times the Basic Labor Rate inclus ve of all overhead and profit . The Basic Labor Rate Schedule is attached as Exhibit 1 . Additional reimbursable expenses shall se paid at the actual costs of additional expenses times an o erhead factor of 115% (actual cost x 1 . 15) . 4.2 PAYMENTS 4.2.1 The Owner shall make monthly paymenus to the Construction Manager within 30 days after receipt of the Construction Manager' s invoice. Said periodic payme is to the Construction Manager shall not exceed the amounts sho n in the following fee schedule, plus any changes, and full pa ent for each task shall not be made until the task is completed and accepted by the Owner. Amounts unpaid after the date o, which payment is due shall bear interest at the rate of 7 34% pet annum. BILLING DATE ACTIVITY FEES [ ] 13 . 1 / . ARTICLE 5 COMPENSATION FOR CONSTRUCTION Pli&SE SERVICES The Owner shall compensate the Constructioh Manager for Construction Phase services as follows : 1 5.1 COMPENSATION 5 '1'1 For the Constructionconstruction administration and management services during the construction phase including the services as describec1 in Paragraph 2 . 3 , the Owner shall pay the Construction Manager in current funds for the Cost of the Work as defined in Article 6 and the Construction Manager' s Fee . The Construdtion Manager' s Fee for Construction and Post Construction Phase Services shall be lump sum of $277' 069 . 00 inclusive of all fees 4od expenses regardless of actual time expended or actual oOoto incurred by the Construction Manager for such services . The Construction Manager' s Fee for construction phase srvices is subject to possible increases in accordance with Article 5 . 3 . The Construction Manager' s Fee for construction and Post Construction phase services may also be equitably adjusted if such services extend beyond a twelve ( 2) month construction phase and such additional duration of th6 construction phase is as a result of matters identified in Section 8 .3 . 1 of the General Conditions as amended by the Supplementary General Conditions dated 0-14-00 . Prior to performing any such additional construction and Post Construction phase services the Construction Manager shall receive the aidnaoca approval of the Owner for such additional services by way of amendment to this agreement. If such additional servies for an additional duration of the construction and Post Construction phases are so approved by the Owner the Construction Manager shall receive . additional compensation on an hourly aio equal to one and eight-tenths (1 . 80) times the basic labo rate inclusive of all overhead and profit . The basic labor rate is attached as Exhibit 1 . Additional reimbursable exposes shall be paid at the actual costs of additional expenses times an overhead factor of one hundred fifteen percent (115%) (actual costs times l . lS) . The Construction Manager' s lump sum fee is understood to include but is not limited to the following costs to support the Construction Manager on the Project : . 1 Wages or salaries of the onstruction Manager' s supervisory and administrative when stationed at the site or home office pe sonnel performing the duties of Construction SuperviSor (including Project Executive) , Estimating, Scheduling, Purchasing, Accounting, Cost Control and Safetif. 14 ~ r ` . . . 2 Wages and salaries of the Construction Manager' s supervisory and administrative ipersonnel engaged at factories, workshops or on the rbad in expediting the production or transportation of Materials or equipment required for the Project . .3 Costs paid or incurred by the Construction Manager for taxes, insurance, cootzibuti ua' assessments, and benefits required by law or collective bargaining agreements, and for personnel ot covered by such agreements the Construction Maoaer' o standard fringe benefits, including sick leave, medical and health benefits, holidays, vacations, allowed absences and pensions, provided that such costs are based on wages and salaries included in clauses 5 . l . 1 .i through 5 . 1 . 1 .2 . .4 Costs to support the Construction Manager on the Project : Field Office Rental First Aid FieldOffice Move in/Set up Bottled Water Field Office Maintenance/Repair Communication Equip . Field Office Utilities Computer Cost Field Office Janitor Services Field Staff Travel Field Office Furniture Small Tools/Safety Fax Machine Progress Photographs Copier & Supplies Record Storage Temporary Office Supplies Home Office Travel Postage/Express Mail Home Office Telephone Storage of Record Documents Telephone General & Excess Liability Insulrance Refer to Exhibit 2 for estimated and anticipated amounts of the above. 5 'I.3 The Construction be increased on account of Changes in the Work by an amount equal to eight percent (8%) of the Cost of the Change determined in accordance with Subparagraph 7 . 3 . 3 .3 of the General Conditions . The cost for extended or additional staff shall be equal to one and eight tenths (1 .80) times the applicable Basic Labor Rate shown in Exhibit 1 . 5.2 GUARANTEED MAXIMUM PRICE 5 .2 .1 The Sum of the Cost of the Work as defined in Article 6 and the Construction Manager' s Fee guaranteed by the Construction Manager not to exceed amount provided in Amendments to this agreement, subje t to additions and deductions by changes in the Work as provided in the Contract Documents . Such maximum sum as adjusted by approved Changes in . �b� Work is referred to in the Contract Documents as the Guaranteed Maximum Price . 15 Costs which would cause the Guaranteei Maximum Price to be exceeded shall be paid by the Constr ction Manager without reimbursement by the Owner. 5 .2 .2 If, upon completion of the Proj -ct, the Actual Cost of the Work plus the Construction Manager'. Fee is less than the Guaranteed Maximum Price as set forth herein and as adjusted by Change Orders and less the amount of t e Owner' s contingency, the Owner shall pay the Construction Manger an amount equal to twenty-five percent (25%) of such .avings as additional compensation. 5.3 CHANGES IN THE WORK 5.3 .1 Adjustments to the Guaranteed Maximum Price on account of changes in the Work subsequent to the ex;cution of Amendments to this agreement may be determined by any of the methods listed in Subparagraph 7 .3 . 3 of the General Conditions . 5.3 .2 In calculating adjustments to suBcontracts (except those awarded with the Owner's prior consent o the basis of cost plus a fee) , the terms "cost" and "fee" as us-d in Clause 7 . 3 .3 .3 of the General Conditions and the terms "costs" and "a reasonable allowance for overhead and profit" as us:d in Subparagraph 7 .3 . 6 of the General Conditions shall have t e meanings assigned to them in that document and shall not be edified by this Article 5 . Adjustments to subcontracts awarded with the Owner' s prior consent on the basis of cost plus a fee shall be calculated in accordance with the terms of those Subcon racts. ARTICLE 6 COST OF THE WORK 6.1 COSTS TO BE REIMBURSED 6.1.1 The term "Cost of the Work" shall mean costs necessarily incurred by the Construction Manager in the proper performance of the Work. Such costs shall be at rat=s not higher than those customarily paid at the place of the Project except with prior consent of the Owner. The Cost of the ork shall include only the items set forth in this Article 6 . 6 .1.2 LABOR COSTS .1 wages including costs for taxes, insurance, contributions, assessments and Benefits required by law or collective bargaining agre-ments of construction workers directly employed by t e Construction Manager to perform the construction of 'he Work at the site or, with the Owner's agreement, at off-site workshops. 16 6 .1 .3 SUBCONTRACT COSTS Payments made by the Construction Manag-r to Subcontractors in accordance with the requirements of the subcontracts, including Payment and Performance Bonds . 6 . 1.4 COSTS OF MATERIALS AND EQUIPMENT INCORPORATED IN THE COMPLETED CONSTRUCTION . 1 Costs, including transportat ' on, of materials and equipment incorporated or to .e incorporated in the completed construction. . 2 Costs of materials described ' n the preceding Clause 6 . 1 .4 .1 in excess of those actually installed but required to provide reasonable allowance for waste and for spoilage . Unused excess aterials, if any, shall be handed over to the Owner al the completion of the Work or, at the Owner' s optio , shall be sold by the Construction Manager; amounts realized, if any, from such sales shall be crediteo to the Owner as a deduction from the Cost of the ork. 6. 1. 5 COSTS OF OTHER MATERIALS AND 1QUIPMENT, TEMPORARY FACILITIES AND RELATED ITEMS . 1 Costs, including transportation, installation, maintenance, dismantling and removal of materials, supplies, temporary faciliti-s, Project vehicles, machinery', equipment, and han• tools not customarily owned by the construction work-rs, which are provided by the Construction Manager :t the site and fully consumed in the performance of the Work; and cost less salvage value on such items if not fully consumed, whether sold to others or reta:ned by the Construction Manager. Cost for items previously used by the Construction Manager shall mean fair market value. .2 Rental charges for temporary facilities, machinery, equipment, and hand tools not .ustomarily owned by the construction workers, which are provided by the Construction Manager at the si e, whether rented from the Construction Manager or others, and costs of transportation, installation, minor repairs and replacements, dismantling and emoval thereof . Rates and quantities of equipment re ted shall be subject to the Owner' s prior approval . . 3 Costs of removal of debris from the site . 17 6 .1 . 6 MISCELLANEOUS COSTS . 1 That portion directly attribu able to this Contract of premiums for the Constructio, Manager' s Payment or Performance bonds, if required. . 2 Sales, use or similar taxes iiposed by a governmental authority which are related to ' the Work and for which the Construction Manager is lia.le. .3 Royalties and license fees .aid for the use of a particular design, process or product required by the Contract Documents; the cost of defending suits or claims for infringement of pate t or other intellectual property rights arising from -uch requirement by the Contract Documents; payments -de in accordance with legal judgments against the Construction Manager resulting from such suits or claims and payments of settlements made with the Own:r' s consent; provided, however, that such costs of legal defenses, judgments and settlements shall not be included in the calculation of the Constructio Manager' s Fee or the Guaranteed Maximum Price an.; provided that such royalties, fees and costs are of excluded by the last sentence of Subparagraph 3 . 17 . 1 of the General Conditions or other provisi.ns of the Contract Documents. .4 Deposits lost for causes other than the Construction Manager' s negligence or failur: to fulfill a specific responsibility to the Owner set forth in this Agreement. .5 Legal, mediation and arbitr-tion costs, other than those arising from disputes s.lely between the Owner and Construction Manager, reas.nably incurred by the Construction Manager in the performance of the Work and with the Owner' s written permi-sion, which permission shall not be unreasonably be withheld. . 6 Reproduction costs and a_sociated postage and shipping costs . .7 Advertising expenses require. to comply with public bidding laws or required for ocal business outreach programs. . 8 Coordination of testing laboratories for tests required by the Contract Documents, except those related to nonconforming Work other than for which payment is permitted by Clause 6 . 1 . 8 . 2 . 18 . 9 Fees and assessments for tie building permit and other permits, licenses, and i spections for which the Construction Manager is req fired by the Contract Documents to pay. 6 .1.7 OTHER COSTS . 1 Other costs incurred in the performance of the Work if and to the extent approved i' advance in writing by the Owner. 6 .1. 8 EMERGENCIES AND REPAIRS TO DAMAGE■ OR NONCONFORMING WORK The Cost of the Work shall also incude costs described in Subparagraph 6 . 1 . 1 which are incurr=d by the Construction Manager: . 1 In taking action to prevent t reatened damage, injury or loss in case of an emergency affecting the safety of persons and prop-rty, as provided in Paragraph 10 .3 of the General Conditions . . 2 In repairing or correcting d=maged or nonconforming Work executed by the Constr ction Manager or the Construction Manager' s Subcon ractors or suppliers, provided that such damaged or nonconforming Work was not caused by the negligence or failure to fulfill a specific responsibility to the Owner set forth in this Agreement of the Construc ion Manager or the Construction Manager' s fo emen, engineers or superintendents, or other sup=rvisory, administrative or managerial personnel of the construction Manager, or the failure of the Constructio Manager' s personnel to supervise adequately the Work of the Subcontractors or suppliers, and only to the e tent that the cost of repair or correction is not recovered by the Construction Manager from insu.ance, Subcontractors or suppliers . 6.1. 9 The costs described in Subparagr_phs 6 . 1 . 1 through 6 .1 .8 shall be included in the Cost of the Work notwithstanding any provision of the General Conditions or other Conditions of the Contract which may require the Construction Manager to pay such costs, unless such costs are specifi ally excluded by the provisions of Paragraph 6 . 2 . 6 .2 COSTS NOT TO BE REIMBURSED 19 6 .2 .1 The Cost of the Work shall not incl de and the Owner shall not be required to pay for any of tie following, which list shall not constitute a limitation .1 Salaries and other compensatio of the Construction Manager' s personnel stationed at the Construction Manager' s principal office or .ffices other than the site office, except as specifically provided in Clauses 5 . 1 . 1 . 1, 5 . 1 . 1 .2, and 6 . 1 .2 . 1 . .2 Expenses of the Construction Ma ager' s principal office and offices other than the -ite office except as specifically provided in Paragraphs 5 . 1 and 6 . 1 . .3 Overhead and general expenses, e. cept as may be expressly included in Paragraphs 5 . 1 and - . 1 . .4 The Construction Manager' s capi.al expenses, including interest on the Construction Man-ger' s capital employed for the Work. .5 Rental costs of machinery and equipment, except as specifically provided in Subpara';raph6 .1 .5 . 2 . 6. Except as provided in Clause 6 . . 8 .2, costs due to the negligence of the Constructio Manager or to the failure of the Construction anager to fulfill a specific responsibility to the owner set forth in this Agreement . . 7 Except as provided in Clause 6 . 1 .7 .1, any cost not specifically and expressly descr bed in Paragraph 6. 1 . .8 Costs which would cause the Guaranteed Maximum Price to be exceeded. 6.3 ACCOUNTING RECORDS 6.3 .1 The Construction Manager shall k-ep full and detailed accounts and exercise such controls as may be necessary for proper financial management under this C.'ntract; the accounting and control systems shall be satisfacto y to the Owner. The Owner and the Owner's accountants shall be afforded access to the Construction Manager' s records, nooks, correspondence, instructions, drawings, receipts, subcont acts, purchase orders, vouchers, memoranda and other data relati g to this Project, and the Construction Manager shall preserve these for a period of not less than three years after final payment, or for such longer period as may be required by law. ?0 ARTICLE 7 CONSTRUCTION PHASE 7 . 1 PROGRESS PAYMENTS 7 . 1 . 1 The Construction Manager shall submit invoices in a format approved by the Owner. Progress reports shall be included with all payment requests . Based upon Applications for Payment submitted to the Owner by the COnstruction Manager and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Construction Manager as provided below and elsewhere in the Contract Documents. The Construction Manager shall maintain records showing actual time devoted and cost incurred. The Construction Manager shall permit the authorized representative of the Owner to inspect and audit all data and records of the Construction Manager for work done under this Agreement . The Construction Manager shall make these records available at reasonable times during the Agreement period and for a year after termination of this Agreement . 7.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month: 7 .1.3 Provided an Application for payment is received by the Owner not later than the first day of a month, the Owner shall make payment to the Construction Manager not later than thirty (30) days thereafter. ..Peryrrtsat—by- st7he--Eresm u_ s_. - . -111-4 -MOU - - _ - • 40 ' 410-41 hall be ma,da_b4--sg-iz4 - • - ' • - - - - • e Co. _ _ ' . ; le G . . - .6 . .d acco u,tion necess. • • 7.1.4 With each Application for Payment, the Construction Manager shall submit payrolls, petty cash accounts, receipted invoices or invoices with check Vouchers attached, and any other evidence required by the Owner or Architect to demonstrate that cash disbursements already made by the Construction Manager on account of the Cost of the Work equal or exceed (1) progress payments already received by the Construction Manager; less (2) that portion of those payments attributable to the Construction Manager' s Fee; plus (3) payrolls for the period covered by the present Application for Payment . 21 7 .1 .5 Each Application for Payment shall be based upon the most recent schedule of values submitted by the Construction Manager in accordance with the Contract Documents . The schedule of values shall allocate the entire Guaranteed Maximum Price among the various portions of the Work, except that the Construction Manager' s Fee shall be shown as a single separate item. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Construction Manager's Applications for Payment . 7 .1.6 Applications for Payment shall show the percentage completion of each portion of the Work as of the end of the period covered by the Application for Payment . The percentage completion shall be the lesser of (1) the percentage of that portion of the Work which has actually been completed or (2) the percentage obtained by dividing (a) the expense which has actually been incurred by the Construction Manager on account of that portion of the Work for which the Construction Manager has made or intends to make actual payment prior to the next Application for Payment by (b) the share of the Guaranteed Maximum Price allocated to that portion of the Work in the schedule of values . 7.1.7 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows : .1 Take that portion of the Guaranteed Maximum Price properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Guaranteed Maximum Price allocated to that portion of the Work in the schedule of values . Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as provided in Subparagraph 7 .3 . 7 of The General Conditions, even though the . Guaranteed Maximum Price has not yet been adjusted by Change Order. .2 Add that portion of the Guaranteed Maximum Price properly allocable to materials and ,equipment delivered and suitably stored at the site for subsequent incorporation in the Work or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing. 22 . 3 Add the Construction Manager' s Fee, less retainage of five percent (5%) . Upon fifty percent (50%) completion of the project, no further retainage will be withheld provided the Construction Manager is performing satisfactorily in the Architect and Owner' s opinions . Upon the satisfactory completion of a phase of the project as determined by the Architect and Owner the retainage from the Construction Manager' s fee for such phase of the project shall be paid to the Construction Manager. The Construction Manager' s fee shall be computed upon the Costs of Work described in the two preceding clauses at the amount which bears the same ratio to the Construction Manager's fixed actual fee as the Cost of Work in the two preceding clauses bears to a reasonable estimate of the probable Cost of Work upon its completion. .4 Subtract the aggregate of previous payments made by the Owner. . 5 Subtract the shortfall, if any, indicated by the Construction Manager in the documentation required by Subparagraph 7 . 1 . 4 to substantiate prior Applications for Payment, or resulting from errors subsequently discovered by the Owner' s accountants in such documentation. . 6 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Paragraph 9 .5 of the General Conditions . 7 .1.8 Payments to Subcontractors shall be subject to retention of ten percent (10%) . Upon fifty percent (50%) completion of a Subcontractor' s work, no further retainage will be withheld provided the Subcontractor is performing satisfactorily in the Owner's and Construction Manager' s opinions. 7 .1. 9Except with the Owner' s prior approval, the Construction Manager shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. 7 .1.10 In taking action on the Construction Manager' s Applications for Payment, the Architect, shall be entitled to rely on the accuracy and completeness of the information furnished by the Construction Manager and shall not be deemed to represent that the Architect has made a detailed examination, audit or arithmetic verification of the ,documentation submitted in accordance with Subparagraph 7 . 1 . 4 or Other supporting data; 23 that the Architect has made exhaustive or continuous on-site inspections or that the Architect has made examinations to ascertain how or for what purposes the Construction Manager has used amounts previously paid on account of the Contract . Such examinations, audits and verifications, if required by the Owner, will be performed by the Owner's accountants acting in the sole interest of the Owner. 7 .2 FINAL PAYMENT 7 .2.1 Final payment shall be made 4y the Owner to the Construction Manager when (1) the Contract has been fully performed by the Construction Manager except for the Construction Manager' s responsibility to correct nonconforming Work, as provided in Subparagraph 12 . 2 . 2 of the General Conditions, and to satisfy other requirements, if any, which necessarily survive final payment; (2) a final Application for Payment and a final accounting for the Cost of the Work have been submitted by the Construction Manger and reviewed and approved by the Owner' s accountants; and (3) a final Certificate for Payment has then been issued by the Architect . Such final payment shall be made by the Owner not more than 30 days after the issuance of the Architect ' s final Certificate for payment : 7 . 2 .2 The amount of the final payment shall be calculated as follows : .1 Take the sum of the Cost of the Work substantiated by the Construction Manager' s final accounting and the Construction ' Manager' s Fee; but not more than the Guaranteed Maximum Price. .2 Subtract amounts, if any, for which the Architect withholds, in whole or in part, a final Certificate for Payment as provided in Subparagraph 9 . 5 . 1 of the General Conditions or other provisions of the Contract Documents. .3 Subtract the aggregate of previous payments made by the Owner. If the aggregate of previous payments made by the Owner exceeds the amount due the Construction Manager, the Construction Manager shall reimburse the difference to the Owner. 7. 2 .3 The Owner' s accountants shall review and report in writing on the Construction Manager' s final accounting within thirty (30) days after delivery of the final accounting to the Architect by the Construction Manager. 24 Based upon such Cost of the Work as the Owner ' s accountants report to be substantiated by the Construction Manager' s final accounting, and provided the other conditions of Subparagraph 7 . 2 . 1 have been met, the Architect shall, within seven days after receipt of the written report of the Owner' s accountants, either issue to the Owner a final Certificate for Payment with a copy to the Construction Manager, or notify the Construction Manager and Owner in writing of the Architect ' s reasons for withholding a certificate as provided in Subparagraph 9. 5 . 1 of the General Conditions . The time periods stated in this Paragraph 7 . 2 supersede those stated in Subparagraph 9 .4 1 of the General Conditions . 7 .2.4 If the Owner' s accountants report the Cost of the Work as substantiated by the Construction Manager ' s final accounting to be less than claimed by the Construction Manager, the Construction Manager shall be entitled to proceed as follows without a further decision of the Architect . Unless agreed to otherwise, a demand for non-binding mediation of the disputed amount shall be made by the Construction Manager within sixty (60) days after the Construction Manager' s receipt of a copy of the Architect ' s final Certificate for Payment . Failure to make such demand within this 60-day period shall result in the substantiated amount reported by the Owner' s accountants becoming binding on the Construction Manager. Pending a final resolution of the disputed amount, the Owner shall pay the Construction Manager the amount certified in the Architect ' s final Certificate for Payment . 7 .2.5 If, subsequent to final payment and at the Owner' s request, the Construction Manager incurs costs described in Paragraph 6 . 1 and not excluded by Paragraph 6.2 (1) to correct nonconforming Work, or (2) arising from the resolution of disputes, the Owner shall reimburse the Construction Manager such costs and the Construction Manager 's Fee, if any, related thereto on the same basis as if such costs had been incurred prior to final payment, but not , in excess of the Guaranteed Maximum Price. If the Construction Manager has participated in savings, the amount of such savings shall be recalculated and appropriate credit given to the Owner in determining the net amount to be paid by the Owner to the Construction Manager. ARTICLE 8 INSURANCE AND BONDS 8 .1 INSURANCE REQUIRED OF THE CONSTRUCTION MANAGER 25 8 '1'I During both the preconstruction phase and construction phases of the Project, The Construction Manager shall purchase from and maintain in a company or companies lawfully authorized to do business in the State of Illinois with a Best ' s rating of no less than A-VII such insurance as will protect the Construction Manager from claims set forth below which may arise out of or result from the Construction Manager' s operations under this Agreement and for which the Construction Manager may be legally liable, whether such operations be by the Construction Manager or by a Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable: . 1 Claims under workers ' or workmen ' s compensation, disability benefit and other similar employee benefit acts which are applicable to the Work to be performed; . 2 Claims for damages because of bodily injury, occupational sickness or disease, or death of the Construction Manager' s employees; .3 Claims for damages because of bodily injury, sickness or disease, or death of any person other than the Construction Manager' s employees; 4 . Claims for damages insured by usual personal injury liability coverage which are sustained (1) by a person as a result of an offense directly or indirectly related to employment of such person by the Construction Manager _ or (2) by another person; 5 . Claims for damages, other than to the Work itself, because of injury to or destruction of tangible property, including loss of use resulting therefrom; 6 . Claims for damages because of bodily injury, death or a person or property damage arising out of ownership, maintenance or use of a motor vehicle; and 7 . Claims involving contractual liability insurance applicable to the Construction Manager' s obligations . 8.1.2 The insurance required by paragraph 8 . 1 . 1 shall be written for not less than the limits of liability specified below or required by law, as applicable. Coverage shall be maintained without interruption upon execution of this agreement until date of final payment and termination of any coverage required to be maintained after final payment . All ioograoce coverage shall be written on an occurrence basis. a. Commercial General Liability $2, 000 , 000 General Agregate Limit (other than Products-completed Operations) $2 ' 000' 008 Products-Completed Operations Aggregate Limit 26 $1. 000, 000 Personal and Advertising Liability $I' 800' 000 Each Occurrence Limit $1, 000, 000 Fire Legal Liability $10' 000 Medical Expense Limit (each person) $l, 000, 00 Employee Benefit Liability b. Business Automobile Liability $I' 000 , 000 Bodily Injury and Property Damage Combined Single Limit c. Excess Umbrella Liability - ;$5 ,000 ,000 .00 8 . 1 .3 The Owner shall be named as an additional insured under the insurance to be obtained by the Construction Manager pursuant to this agreement pursuant to � an additional insured endorsement and shall be in a form acceptable to the Owner. This insurance shall apply as primary insurance for claims or losses due to the Construction Manager' s operations with respect to any other insurance or self-insurance programs afforded to the Owner. There shall be no endorsement or modification of this insurance to make it excess over other available insurance, alternatively, if such insurance states that it is excess or pro rata, it shall be endorsed to the primary with respect to the Owner. Such insurance shall require that the Owner be notified if such insurance is to be cancelled or terminated at least thirty (30) days in advance of any such cancellation or termination. 8 . 1 . 4 The Construction Manager shall name the Architect, its agents, employees and consultants .as additional insureds on its liability insurance for bodily injury, sickness, disease, or death arising out of any negligent act or omission of the Construction Manager, its agents or others for whom the Construction Manager is legally responsible. The obligations of the Construction Manager shall not extend to the liability of the Architect, the Architect ' s consultants and agents and employees of any of them arising out of (1) the preparation or approval of maps, drawings, opinions, reports, surveys, change orders, designs or mpeoiticati000, or the giving of or the failure to give directions or instructions by the Architect, the Architect ' s consultants and agents and employees of any of them provided such giving or failure to give is the primary cause of the injury or damage. Such insurance to be provided on a primary non-contributory basis . 27 Such insurance shall require that the insurance carrier shall notify the Architect if such insurance is to be cancelled or terminated at least thirty (30) days in advance of any such cancellation or termination . 8' 2 PERFORMANCE AND PAYMENT BONDS The Construction Manager shall require each of the Subcontractors or Suppliers to furnish bonds covering faithful performance and completion of the Subcontract and payment of obligations arising thereunder. The cost thereof shall be included in the Cost of the Work. The amount of each bond shall be equal to one hundred percent (100%) of the Subcontract Sum. ARTICLE 9 MISCELLANEOUS PROVISIONS 9.1 MISCELLANEOUS PROVISIONS 9'1'1 It is expressly understood that the Owner shall be directly retaining the services of an Architect/Engineer. 9 .1'2 Notwithstanding anything contained herein, it is expressly understood that the Construction Manager' s Project Control Systems, including without limitation - estimating, scheduling, purchasing, cost reporting and project engineering systems, and all modifications, additions, or alterations thereto, are and shall remain the sole property of the Construction Manager. 9.1.3 It is expressly understood that in the event the Construction Manager incurs legal or other professional fees in the process of pursuing or defending a claim, suit or dispute with a Trade Contractor directly relating to the Project, on behalf of the Owoer, then such fees shall be reimbursable to the Construction Manager as a Cost of the Work pursuant to Article 6; provided however, that in no event shall such fees exceed _, and shall not include Attorney' s Fees . 9.1.4 If the Construction Manager wishes to make a claim for additional compensation as a result of action taken by the Owner or Architect, the Construction Manager shall give written notice of his claim within 15 days after occurrence of such action. No claim for additional compensation shall be valid unless so made. Any changes in the Construction Manager' s fee or the Guaranteed Maximum Price shall be valid only to the extent that such changes are included in writing signed by the Owner and the Construction Manager. 28 Notwithstanding the event of any claim, or other matter in question arising out of or relating to this Agreement or the breach thereof, the Construction Manager shall carry on the Work and the Owner shall continue to make payments in accordance with this Agreement . 9 .2 NO PUNITIVE DAMAGES To the fullest extent permitted by law, neither party to this agreement shall be liable to the other for any punitive damages resulting from the performance or nonperformance of the agreement notwithstanding the fault, tort (including negligence) , strict liability or other basis of legal liability of the parties so released or whose liability is so limited and shall extend to the officers, directors, employees, and agents of such party. 9.3 OTHER PROVISIONS 9.3 .1 Unless otherwise noted, the terms used in this Agreement shall have the same meaning as those in the General Conditions of the Contract for Construction, as amended. 9 .3.2 EXTENT OF CONTRACT This Contract, which includes this Agreement and the other documents incorporated herein by reference, represents the entire and integrated agreement between the Owner and Construction Manager and supersedes all prior negotiations, representations or agreements, either written or oral . This Agreement may be amended only by written instrument signed by both the Owner and Construction Manager. If anything in any document incorporated into this Agreement is inconsistent with this Agreement, this Agreement shall govern 9 .3 .3 OWNERSHIP AND USE OF DOCUMENTS The Drawings, Specifications and other documents prepared by the Architect, and copies thereof furnished to the Construction Manager, are the property of the Owner and are for use solely with respect to this Project. They are not to be used by the Construction Manager, Subcontractors, Sub-subcontractors or suppliers on other projects, or for additions to this Project outside the scope of the Work, without the specific written consent of the Owner and Architect . The Construction Manager, Subcontractors, Sub-subcontractors and suppliers are granted a limited license to use and reproduce applicable portions of the Drawings, Specifications, and other documents prepared by the Architect appropriate to and for use in the execution of the Work under the Contract Documents . 29 9 . 3 .4 GOVERNING LAW This Agreement shall be governed by, and construed in accordance with the laws of state of Illinois. Venue for the resolution of any disputes or enforcement of any rights arising out of or in connection with this agreement shall be in the circuit court of Kane County, Illinois . Notwithstanding the foregoing, the Construction Manager hereby acknowledges and agrees that the Owner as a home rule municipality may elect to exclude the provisions of the Public Construction Contract Act (30 ILCS 557/1 et . seq. , (Public Act 91-647) , hereinafter referred to as the "Act") from the provisions of this agreement and from the Project in general . The Construction Manager hereby waives the incorporation of the provisions of the Act into this Agreement and any amendments hereto and to the Project and waives any and all relief and additional compensation it would be entitled to as a result of the existence of the Act . The foregoing shall not, however, be interpreted to modify any other terms of this Agreement including any provisions of this Agreement which would otherwise entitle the Construction Manager to make claims for additional compensation. The Construction Manager agrees to include similar provisions relating to exclUding and waiving the provisions of the Act in a form acceptable to the Owner in all subcontracts and other agreements for the Project . 9 .3 .5 ASSIGNMENT The Owner and Construction Manager respectively bind themselves, their partners, successors, assigns and legal representatives to the other party hereto and to partners, successors, assigns and legal representatives of such other party in respect to covenants, agreements and obligations contained in the Contract Documents . Neither party to the Contract shall assign the Contract as a whole without written consent of the other . If either party attempts to make such an assignment without such consent, such purported assignment shall be void and without effect and that party shall nevertheless remain legally responsible for all obligations under the Contract . 9.3 . 6 NO PERSONAL LIABILITY No official, director, officer, agent or employee of the Owner shall be charged personally or held contractually liable under any -term or provision of this Agreement or because of their execution, approval or attempted execution of this Agreement . 31 9 .3 .7 GENERAL CONDITIONS FOR THE CONSTRUCTION PHASE For the Construction Phase, the General Conditions of the Contract shall be the 1997 Edition of AIA Document A20I' General Conditions of the Contract for Construction, as amended by the Supplementary General Conditions dated , and as amended by the version attached bereto, which is incorporated herein. For the Preconstruction Phase, or in the event that the Preconstruction and Construction Phases proceed 000cuzreutly, the 1987 Edition of AIA Document A201, General Conditions of the Contract for Construction, as amended by the Supplementary General Conditions dated June 14, 2000, shall apply to the Preconstruction Phase only as specifically provided in this Agreement . The term "Contractor" as used in the I987 Edition of AIA Document A201' General Conditions of the Contract for Construction shall mean the Construction Manager. In the event of any conflict between the terms of this agreement and such general conditions of the contract as provided in the 1987 Edition of AZA Document A20I, General Conditions of the Contract for Construction as amended, the terms of this agreement shall control . 9 .3 .8 NONDISCRIMINATION In all hiring or employment made possible or resulting from this Agreement, there shall be no discrimination against any employee or applicant for employment because of sex, age, race, color, creed, national origin, marital status, of the presence of any sensory, mental or physical handicap, unless based upon a bona tide occupational qualification, and this requirement shall apply to, but not be limited to, the following : employment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training, including apprenticeship. No person shall be denied or subjected to discrimination in receipt of the benefit of any . services or activities made possible by or resulting from this Agreement on the grounds of sex, race, color, creed, national origin, age except minimum age and retirement provisions, marital status or the presence of any oe000ry, mental or physical handicap . Any violation of this provision shall be considered a violation of a material provision of this Agreement . 3? 9 . 3 . 9 NO CO-PARTNERSHIP OR AGENCY It is understood and agreed that nothing herein contained is intended or shall be construed to, in any respect, create or establish the relationship of co-partners between the Owner and the Construction Manager or as constituting the Construction Manager as the general representative or general agent of the Owner for any purpose whatsoever. 9 .3.10 SEVERABILITY The parties intend and agreed that, if any paragraph, sub- paragraph, phrase, clause or other provision of this Agreement, or any portion thereof, shall be held to be void or otherwise unenforceable for any reason, all other portions of this Agreement shall remain in full force and effect . 9 . 3.11 HEADINGS The headings of the several paragraphs of this Agreement are inserted only as a matter of convenience and in no way are they intended to define, limit or describe the scope of intent of any provision of this Agreement nor shall they be construed to affect in any manner the teLlits and provisions hereof or the interpretation or construction thereof. 9 .3. 12 MODIFICATION OR AMENDMENT This Agreement and its attachments constitutes the entire Agreement of the parties on the subject matter hereof and may not be changed, modified, discharged or extended except by written amendment duly executed by the parties . Each party agrees that no representations or warranties shall be binding upon the other party unless expressed in writing herein or in a duly executed amendment hereof, or change order as herein provided. 9 .3 .13 NEWS RELEASES The Construction Manager may not issue any news releases without prior approval from the Manager nor will the Construction Manager make public proposals developed under this Agreement without prior written approval from the Manager prior to said documentation becoming matters of public record. 9 . 3.14 COOPERATION WITH OTHER CONSULTANTS The Construction Manager shall cooperate with any other consultants in the Owner' s employ or any work associated with the Project . 33 9 . 3 .15 INTERFERENCE WITH PUBLIC CONTRACTING: P.A. 85-1295 The Construction Manager certifies hereby that it is not barred from bidding on this contract as a result of violations of either Section 33E-3 or Section 33E-4 of the Illinois Criminal Code. 9. 3 .16 SEXUAL HARASSMENT. As a condition of this contract, the Construction Manager shall have written sexual harassment policies that include, at a minimum, the following information: A. the illegality of sexual harassment; B_ the definition of sexual harassment under state law; C. a description of sexual harassment utilizing examples; D. the Construction Manager' s internal complaint process including penalties; E. the legal recourse, investigative and complaint process available through the Illinois Department of Human Rights, and the Illinois Human Rights Commission; F. directions on how to contact the department and commission; G. protection against retaliation as provided by Section 6-101 of the Human Rights Act (copy attached) ; Copies of the policies must be provided to the City of Elgin and the Illinois Department of Human Rights upon request . P.A. 87- 1257 9.3.17 WRITTEN COMMUNICATIONS All recommendations and other communications by the Construction Manager to the Manager and to other participants which may affect cost or time of completion, shall be made or confirmed in writing. The Manager may also require other recommendations and communications by the Construction Manager be made or confirmed in writing. 9.3.18 NOTICES All notices, reports and documents required under this Agreement shall be in writing and shall be mailed by First Class Mail, postage prepaid, addressed as follows: As to Owner As to Construction Manager Raymond H. Moller M.I .C. Director of Economic Development Dennis Kihtop City of Elgin President 150 Dexter Court M. I.C. Inc. Elgin, Illinois 60120-5555 1344 HollisterDr . E-Mail : Moller_r@cityofelgin. org Batavia, IL 60510 E-Mail : Dennis@micconstruction.com 34 ARTICLE 10 TERMINATION OR SUSPENSION 10.1 TERMINATION PRIOR TO ESTABLISHING GUARANTEED MAXIMUM PRICE 10 .1.1 Prior to execution by both parties of Amendments to this agreement establishing the final Guaranteed Maximum Price, the Owner may terminate this Contract at any time without cause, and the Construction Manager may terminate this Contract for any of the reasons described in Subparagraph 14 . 1 . 1 of AIA Document A201 . 10. 1.2 If the Owner or Construction Manager terminates this Contract pursuant to this Paragraph 10 . 1 prior to commencement of the Construction Phase, the Construction Manager shall be equitably compensated for Preconstruction Phase services performed prior to receipt of notice of termination; provided, however, that the compensation for such services shall not exceed the compensation set forth in Subparagraph 4 . 1 . 1 . 10.1.3 If the Owner or Construction Manager terminates this Contract pursuant to this Paragraph 10 . 1 after commencement of the Construction Phase, the Construction Manager shall, in addition to the compensation provided in Subparagraph 10 . 1 .2 be paid an amount calculated as follows : . 1 Take the Cost of the Work incurred by the Construction Manager. . 2 Add the Construction Manager' s Fee computed upon the Cost of the Work to the date of termination at the rate stated in Paragraph 5 . 1 or, if the Construction Manager' s Fee is stated as a fixed sum in that Paragraph, an amount which bears the same ratio to that fixed-sum Fee as the Cost of Work at the time. of termination bears to a reasonable estimate of the probable Cost of the Work upon its completion. . 3 Subtract the aggregate of previous payments made by the - Owner on account of the Construction Phase. The Owner shall also pay the Construction Manager fair compensation, either by purchase or rental at the election of the Owner, for any equipment owned by the Construction Manager which the Owner elects to retain and which is not otherwise included in the Cost of the Work under Clause 10 . 1 . 3 . 1 . 35 To the extent that the Owner elects to take legal assignment of subcontracts and purchase orders (including rental agreements) , the Construction Manager shall, as a condition of receiving the payments referred to in this Article 10, execute and deliver all such papers and take all such steps , including the legal assignment of such subcontracts and other contractual rights of the Construction Manager, as the Owner may require for the purpose of fully vesting in the Owner the rights and benefits of the Construction Manager under such subcontracts or purchase orders . Subcontracts, purchase orders and rental agreements entered into by the Construction Manager with the Owner' s written approval prior to the execution of Amendments to this agreement shall contain provisions permitting assignment to the Owner as described above. 10 .2 TERMINATION SUBSEQUENT TO ESTABLISHING GUARANTEED MAXIMUM PRICE Subsequent to execution by both parties of Amendments to this agreement establishing the final Guaranteed Maximum Price, the Contract may be terminated as provided in Article 14 of AIA Document A201 . 10 .2. 1 In the event of such termination by the Owner, the amount payable to the Construction Manager pursuant to Subparagraph 14 . 1 .2 of AIA Document A201 shall not exceed the amount the Construction Manager would have been entitled to receive pursuant to Subparagraphs 10 . 1 . 2 and 10 . 1 .3 of this Agreement . 10 .2. 2 In the event of such termination by the Construction Manager, the amount to be paid to the Construction Manager under Subparagraph 14 . 1 .2 of the General Conditions shall not exceed the amount the Construction Manager would be entitled to receive under Subparagraphs 10 . 1 . 2 or 10 . 1 . 3 above, except that the Construction Manager' s Fee shall be calculated as if the Work had been fully completed by the Construction Manager, including a reasonable estimate of the Cost of the Work for Work not actually completed. 10 .2. 3 Subsequent to execution by both parties of amendments to this agreement establishing the final Guaranteed Maximum Price, the Owner may terminate this contract without cause at Owner' s convenience upon fifteen (15) days prior written notice to the Construction Manager. 36 In the event of such termination by the Owner the amount payable to the Construction Manager pursuant tol subparagraph 14 . 1 . 2 of AIA Document A201 shall not exceed the Lamount the Construction Manager would have been entitled tO receive pursuant to subparagraphs 10 . 1 .2 and 10 . 1 . 3 of this Agreement . In such event the Construction Manager shall als0 be reimbursed for its actual costs for demobilization and the costs of any cancellation of existing subcontracts and purchase orders, provided however, the reimbursement for actual costs of demobilization shall in no event exceed One Hundred Thousand Dollars ($100, 000 . 00) and shall not exceed the Guaranteed Maximum Price . 10 .3 SUSPENSION The Work may be suspended by the Owner as provided in Article 14 of the General Conditions; in such case, the Guaranteed Maximum Price, if established, shall be increased as provided in Subparagraph 14 .3 .2 of the General Conditions except that the term "cost of performance of the Contract" in that Subparagraph shall be understood to mean the Cost of the Work and the term "profit" shall be understood to mean the Construction Manager ' s Fee as described in Subparagraphs 5 . 1 . 1 . IN WITNESS WHEREOF, the undersigned have placed their hands and seals upon and executed this Agreement in triplicate as though each copy hereof was an original and that there are not other oral agreements that have not been reduced to writing in this statement. For the Owner: Dated this / PI- 030VLA-le 4day of , A.D. , 2001 ATTEST: The City of Elgin AI BY: 1( ._ 1/4, By, .._ O . .. :_. City Clerk Cly Mi ager (Seal) 37 For the CONSTRUCTION MANAGER,� 'l Dated this day of \`!x` '�UA / A. 1:D. , 2001 . ATTEST M. I .IC. Inc. By: 11),../.016k) By: `�.. Secretary (SEAL) 38 FEB-09-2001 FRI 06:05 PM FISCAL SERVICES F7'-,./, NO. 1 947 931 5622 P. 31/38 • lune 14, 20U0 5iIN'i.F`,II_N1. P.Y G�Ni.'i.t 'CON-n11-ION` II � These Supplementary General Conditions amendDoc..iment 2C[, General Conditions of t Contract for Construction, 1987 cdtiioa, as follows 1.1.2 Revise the last scn'.ence of this suoparn;raph.to read e A.rehi:eft and Consmicttor. 41ana, . shall each, however, be entitled to performance and enforcer:.e.: of obligations under the other's contract intended to facilitate performance of its duties." 1.3.1 Add the following in the ninth line after"the author of:Incrn and": "Owner has and". 2.2.1 Delete this subparagraph ;nits entirety. 2.2.2 Revise this subparagraph to read "The Owner shall fur::: h surveys descr.bing physical characteristics, legal limitations and utility locations for the sir of the Project,soil reports and subsurface investigations,and a legal description of the ;it_." 2.2.4 Delete the period () at the end of this Pal•nT70h _nal n 1 etc' fntlow1110 ":rrul the ('onttruuricn .\lanager shall be entitled to rely upon the accu-acy and completeness thereof." 2.4.I Delete the third sentence and substitute the following in !ace therefor: "In such case, the cost of correcting such deficiencies shall be charged against the Guar?. teed Maximum Price_" Delete the laic sentence and substitute the following in place therefor: "If the -ost of correcting such deficiencies exceeds the unpaid balance of the Guaranteed Maximum Price.the Consmaction Manager shall pay the difference to the Owner."- 3.3.3 Add the following at'che beginning of this sentence: "'Except as may be approved in writing by the Owner and the Architect,". 3.6.1 Delete this subparagraph and substitute the following in place therefor: "The Construction (/' Manager shall pay all sales, consumer.use and other similar taxes for the Work or portions thereof provided by the Construction Manager which arc legally enact:_at the time the Guaranteed Maximum Price is established." 3.12.8 Delete the period(.) at the end of the last sentence in t paragraph and add the following: ", except for arty such errors or omissions which are within the Ar httect's statutory or customary design responsibility." 3.13.2 At the end of this paragraph delete "to the Construction Manager" and substitute the followinc2 in its place: "against the Guaranteed Maximum?rice." 3.15.1 Replace the entire paragraphwit!1 the following: "To the Fullest extent permittedby law, the Consiniction Manager waives any right of contribution against and shall indemnify and hold harmless the Owner,Owner's R'epresenta.tive, Architect. Architect's cons::!tants, a1:d agents and employees of any of them from and against claims, damages. losses and expenses, t'Cluding but not limited to attorney's _ 1 FE3-09-2001 FRl 06:05 Pay FISCAL SERVICES F^,'/1 HO. 1 847 931 5622 P. 32/38 Jure 14 2 ri lees, artsirlc out 0 a: res'e;ong from ur :n connect:on w:Cr. the performance of the Work, provided th t i.-iv sccli claim, damage, fuss, nr Grease (these. are c0ilc_!ive,y referred 'claim s ) is ICL butablc to bodily injury, Sickness, disease or death or to injury to or dc:struz:ton of ianatbie property (other thant%' t Work itselr) including loss of use resulting therefrom and is caused in .'hole or in oar. by any negligent ac: Or omission o! Contractor, any Subcontractor, anyone .:hoes:lac's any of thcrn may be liable:, regardless of %c'hether or not tt is caused :n part by a patty ir.dem.ifica ber_ecnder. Such obligation 511311 not be construed to ilegat ,abridge, or r'-'7'uCe Other riyhor obi,g_.ocs of indemnity r wh..h would otherwise exist as to a party or person described in this C untr act;" 3.'S.4 Add the following new Subparagraph: "The Owner sha!lleause _nv ocher contractor who may have a contract with the Omer to perform construction or instaiiiation Work in the areas where Work w'i!l be performed under the Ow'ncrrCor.structtoit :Manager Agreement, :o agree to indemnify the Owner and Construction Manager and hold them harmless from all cia: as for bodily injury and property damage char may arise from that contractor's opera::ons, Such pra,.'Bions `'1311 be in a form satisfactory to the Construction Manager." 4.1.4 Delete in its entirety. 4 2.4 relete the first sentence. 4.2.7 Revise the first sentence to read as follows: "The Architect shall review and approve or take other appropriate action upon the Construction Manager's submittals such as shop drawings, product data and samples for conformance with infommation given and the design concept expressed in the Contract Documents. The Architect shall carefully study and compare 4s?drawings and other information furnished by the Cons:ruction Manager with the Contract Docu ncnts and shall at once report to the Construction ,Manager errors, inconsistencies or omissions disco‘cred." 4.2.12 In line six, insert a period(.)after "...partiality to either.' Delete: and shall not be liable for the result o f any interpretation or decision rendered in good faith int such capacity." 4.3.2 Delete all references to arbitration in this paragraph. 4.3.4 In line two, delete "including arbitration". 4.4.4 Revise the latter parr of thc first sentence to read as foltovs: "which!ecision sh:.:11 not be final and binding on the parties." 4.5 Delete this paragraph and its subparagraphs in their entirety 6.3.1 In the last sentence substitute "Owner".for "Architea;'... 7.3 Change "Construction Change Directive" to "Constrtction1Chauge Authorization" in this paragraph and its subparagraphs. 7.3.2 Revise the first sentence to read. "A Consnvetion Charge c\utiioria.atian in thc form attached hereto as Exhibit SGC-A shall be used in the absence of tonal ajgrecment oil the terms of a Change Order .11 9 FES-09-2001 FRI 06:06 PM FISCAL SERVICES FAX NO. 1 847 931 5622 P. 33/38 • • • June 14, 2000 7.3.3.3 Revise this phrase to read as follows: "(l) the Cost of the Work as defined in Article 6 of the OwnertConstruction Manager Agreement for the Change in the Wqr ; (2)an overhead factor of eight percent(8%), plus (3) the Construction Manager's Fee a; descnbedjin Subparagraph 5.1.2 of the Owner/Construction Manager Agreement. 8.3.1 Replace the paragraph with the following: "8.3.1 If the Construction Manager is delayed at any time in progress of the Work by an act or neglect of the Owner or Architect, or of an employee of either, or of a separate contractor directly employed by the Owner,or by ghanges ordered in the Work by the Owner, or by acts of God, or by strikes or by other causes beyond the Construction Manager's control, or by other causes which the Owner and Architect determine may justify delay,then the contract time shall be extended by Change Order for such reasonable time as the Owner and Architect may determine. For the purposes of this paragraph, delays caused by the subcontractors or suppliers shall not be consented as being beyond the control of the Construction Manager." For the purposes of this paragraph an 'Act of God' means an earthquake, flood,cloudburst, tornado, or other phnomena of nature beyond the power of the Construction Manager to foresee or to make preparation and defense against. Precipitation, windstorms,or other natural phenomena of normal intensity, based on U.S. Weather Bureau reports, for the particular locality and for the particular season of the year in which the Work is being prosecuted, shall not be construed an 'Act of God' and no extension of time will be granted for the delays resulting there from. No extension of time will be granted for any delay or skispension of Work due to the fault of the Construction Manager. No extension of time on account of a delay due to unforeseen causes will be granted if written application therefore is not filed by the Construction Manager with the Owner and thc Architect setting forth the reasons which the Construction Manager believes will justify the approval of its request." 9.1.1 Add thc following to the end of this paragraph: "Whenever the team"Contract Sum" appears throughout the Contract Documents it shall be deemed to mean "guaranteed Maximum Price". 9.6.1 Gadd the following after"after the Architect has issued a Certificate for Payment": "or within fifteen(15)days after the Construction Manager submits its Application for Payment,whichever first occurs,. 9.6.2 In line two(2)delete "upon" and substitute the following inits place "within five(5)days of'. 9.7.1 In line six(6)delete "or awarded by arbitration", 10.1.2 In the second line after the phrase "material reasonably believed to be" add the following: "hazardous waste, including but not limited to,". In addition delete the last two(2)sentences of this purpgraph and substitute the following in its place: "The Owner shall be responsible for the removal, encapsulation, transportation, and disposal of any hazardous material required in connection with the Project." 10.1.4 In line seven (7)add the following after"material is": "ha3ardous, including without limitation,". In addition, delete everything in the first sentence after"including loss of use resulting therefrom". 10.2 Add the following additional subparagraph as 10.2.8: the perforrnance of the foregoing services by the Construction Manager shall not relieve the subcontractors iof their responsibilities fur the safety of persons and property and for compliance with all Federal,State and local statutes, rules, regulations and orders of any governmental authority applicable to the conduct or the Work." 3 • FEB-09-2001 FRI 06:07 PM FISCAL SERVICES FA (1O. 1 847 931 5622 P. 34/38 :uric 14, 2000 11.1.1 Delete this paragraph in its entirety. II.1.2 Delete thisaragralph in its P � entirety. 11.1.4 Add the following as an additional paragraph "Thi l Construction Manager shall include language in all subcontracts and purchase orders for the Arlhttece and Owner to be named as "additional insureds" on all liability insurance of not less than: STATUTORY WORKERS' COMPENSATION EMPLOYERS' LIADILITYY(not less than 5[00,000)and coverage uidti`r the United States Longshoremen's and Harbor Workers' Compensation Act, Broad Form All States Coverage, COMMERCIAL GENERAL LIABILITY To be provided on an"occurrence" basis, with coverage to include explosion, collapse and underground hazards (XCU), Blanket Contractual,Produced Independent Contractors, Completed Operations, Personal Injury, and EmOoyees as additional insured. BODILY INJURY LIMITS PROPERTY DAMAGE LIMITS $1,000.000 each occurrence $1,000,000 each occurrence 52,000,000 aggregate • - 52,000,000 aggregate PERSONAL. INJURY LIMITS 51,000,000 each occurrence $1,000,000 aggregate 'Aggregate shall apply to this project oily(aggregate not to include other projects)and must be identified as suchion the certificate of insurance. AUTOMOBILE LIABILITY including owned,non-owned, and hired automobiles. Automobiles of subcontractors and material suppliers must meet the same insurance rcquirements. BODILY INJURY LIMrfS • PROPERTY DAMAGE LIMITS $1,000,000 Each Person 51,000,000 Each Occurrence 51,000,000 Each Occurrence EXCESS UMBRELLA LIABILITY.to provide insurance in excess of Employer's Liability, Commercial General Liability,i:and Automobile Liability policies required hereunder. 55,000,000 each occurrence and 55,000100 general policy aggregate_" 11.3.1.1 In line fiver(4)after "collapse" add"flood". 4 FEB-09-2001 FR 106 07 PM FISCAL SERVICES FAX NO. 1 84 7 931 5622 P. 35/38 • lune I a, ?')OO 1 1.3.I.3 Revised the first sentence to read as follows: "lithe Property Insurance requires minimum deductibles, the Owner shall be responsible For the payment of same." Delete the rest of this subparagraph. 11.3.1 Delete this subparagraph in its entirety. 11.3.9 in line seven (7), insert a period after"reach" and delete tie balance of the sentence. 11.3.10 In line two, insert a period after"insurers" and delete t:-.e balance of the paragraph. 12.1.1 In the second to the last line delete"at the Construction tanager's expense" and substitute in its place the following: "as a Cost of the Work." 17.1.2 In line eight(8)delete "the Construction,Manager shall pay such costs" and substitute in its place "the cost of uncovering and replacement shall be charged to the Q;unranteed Maximum Price if not otherwise recoverable from a subcontractor." 12.2.1 Delete the last sentence and substitute the following inII ce therefor: "The cost of correcting such rejected work shall be reimbursable to the Construction Maiager pursuant to Clause 6.1.8.2 of the Owner/Construction Manager Agreement." 12.2.4 Delete the paragraph after the first sentence and substitutle the following in place therefor. "lithe Construction Manager does not proceed with the correction of such defective or nonconforming Work within a reasonable time fixed by written notice from the Architect, the Owner may remove it and may store the materials or equipment and charge the cost thereot'to the Guaranteed Maximum Price. To the extent that the cost of such removal and storage exceeds the unppid balance of the Guaranteed Maximum Price, and the Construction Manager does not pay the cost of such removal and storagc within ten days of the Owner's notice, the Owner may upon ten additional days written notice sell such Work at auction or at private sale and shall account for the net proceeds thereof, after deducting all the costs that should have been borne by the Construction Manager. If such proceedsiof the sale do not cover all costs which the Construction Manager should have home. the Construction Manager shall pay the difference to the Owner." 12.2.5 Delete the period(.)at the end of this sentence and add tlhe following: "unless the cost of correcting such Work is reimbursable to the Construction bf anager under Clause 6.1.8.2 of the O veer/Construction Manager Agreement." 13.5.1 In line 8 delete "and shall bear all related costs of tests, inspections and approvals" and substitute with the following: "the cost of which shall be reimbursable toithe Construction Manager as a Cost of the Work." 13.5.3 In line four(4)delete "the Construction Manager shall bear". in addition at the end of this paragraph delete the period (.) and add the following: "shall becharged against the Guaranteed Maximum Price." 13.6 Revise the paragraph to read: "Payments due and unpaid Funder the Contract Documents shall bear interest from the date payment is due at 7 %%per annum." 14.1.1.3 in line five (5) delete "on a Certificate for Payment". :5 FEB-09-2001 FRI 06:08 PM FISCAL SERVICES FAX NO. 1847 931 5622 P. 36/38 • June 14, 200f) 14.1.1 5 Delet this subparagraph in its cntirery. 14.1.2 Tit line four (4) after "payment for Work executed" add "it_s;'gee earned to the date of termination". 14.3.3 In the first line delete "may" and substitute in its ?lacy End of Supplementary General Conditions 6 0 M.I.C., Inc. /00r111\ SPECIALISTS IN COMMERCIAL & INDUSTRIAL CONTRACTING EXHIBIT A KEY PERSONNEL C STS EMPLOYEE JOB DESCRIPTION HOURLY RATE DENNIS KINTOP PROJECT EXECUTIVE $85.00 TRAVIS WOOD SITE SUPERINTENDEN' $60.00 RON WARD PROJECT MANAGER $60.00 SUSAN DORNBOUSCH PAYOUTS &WAIVERS $45.00 TAUNYA KENNY SHOP DRAWINGS-SUP RT $40.00 BETSY VARTANIAN SUPPORT STAFF $27.00 1344 HOLLISTER DRIVE • BATAVIA, IL 60510 • 630/879-6775 • FAX 630/879-6796 • • .. co M.I.C.,Inc. IIPIECIAUSTO IN COAL GOODUOTIIIAL CONTRACTING 1344 NOW/ITER MOVE•RATAVIA IL 110610•11301117114775•TAX Climirairros CONSTRUCTION CHANGE AUTHORIZATION ! PROJECT NAME: Elgin River Front-segment 1 . CHANGE AUTHORIZATION NO. J. . ARCHITECT: Hitchcock Design Group . DATE OF ISUANCE: March , 2001 . OWNER: City of Elgin . ORIGINATOR: Taunya Kenny . In order to expedite the Work and avoid or minimize delays In the Work which will affect Contract Sum and/or Contract Time,the Contract Documents are hereby amended to include the additional Work descrbed below,which is beyond the current scope of Work. • ••,-.:•• with this Work promptly. Costs as incurred herein are in addition to the current Contract Sum and will • - Invoiced and paid on a monthly basis and identified as separate items within the requisition. Final cost for ori Involved and change In Sum and Time(if any)will be submitted for inclusion in a final Change Order adjusting the Contract Sum and/or Contract Time. 1 Definition: . • • LABOR $ CIRCLE ONE MATERIAL $ T&M OH B P $ FIXED TOTAL $ ESTIMATED OTHER Attachments: . Does Proposed Change involve a change in Contract Sum? 0 N 0 Yes (Increase] $ . Does Proposed Change involve a change in Contract Time? 0 No 0 Yes (Increase] days. SIGNED BY: DATE: M.I.C., Inc. SIGNED BY: DATE: Hitchcock Design Group SIGNED BY: DATE: City of Elgin COPIES: ClOwner OFile ElArchitect 0 Subcontractor 0 0 I AbPRP. CERTIFICATE OF LIABILITY CINSURANC5fR CW IN-1 DATE(MIA/DDIY/Y) 03/2201 PRODUCER THIS CERTIFIdATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Buttrey-Wulff-Masaninga Agency HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR 355 First St. PO Box 580 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Batavia IL 60510 Phone: 630-879-0111 Fax:630-879-0216 INSURERS AFFORDING COVERAGE INSURED INSURER A: Bkttuninous Casualty Corp. INSURER B M.I.C. , Inc. INSURER C: — 1344 Hollister Drive INSURER D:Batavia IL IL 60510 1--- I INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE OR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. MSSPOLICY EFFECTIVE POUCY EXPIRATION LIR TYPE OF INSURANCE POLICY NUMBER DATE(MMIDD(YY) DATE(MWODNY) LIMITS GENERAL LIABILITY EACH OCCURRENCE $10 0 0 0 00. A X COMMERCIAL GENERAL LIABILfTY CLP2 32 8 152B 08/27/00 08/27/01 FIRE DAMAGE(Any one fire) $ 100000. CLAIMS MADE X OCCUR MED EXP(Any one person) $ 10000. 1 PERSONAL&ADV INJURY $ 1000 0 0 0. GENERAL AGGREGATE $2000000. GEM.AGGREGATE LIMIT APPLIES PER: [ PRODUCTS-COMP/OP AGG $2000000. —1 POLICY il 78, —LOC AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1000000. A X ANY AUTO CAP3094769B 08/27/00 . 08/27/01 (F_a accident) ALL OWNED AUTOS BODILY INJURY r $ SCHEDULED AUTOS (Per person)1 , X HIRED AUTOS BODILY INJURY $ X NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY I AUTO ONLY-EA ACCIDENT $ ANY AUTOEA ACC $ OTHER THAN AUTO ONLY: AGG $ EXCESS LIABILITY EACH OCCURRENCE $ A X OCCUR [ CLAIMSMADE CUP2532562B 08/27/00 08/27/01 AGGREGATE $5000000. $ DEDUCTIBLE $ X RETENTION $ 0 1 s ..„. CA 0-ft s- WORKERS COMPENSATION AND A TORY LIMITS ER EMPLOYERS'LIABILITY A WC3094767B 08/27/00 1 08/27/01 ELEICHMXIDEW $500000. EL.DISEASE-EA EMPLOYEE $5 0 0 0 0 0. E.L.DISEASE-POLICY LIMIT $ 5 0 0 00 0. OTHER DESCRIPTION OF OPERATIONS/LOCATONSNEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS Job: Riverwalk, Elgin, Ili/ Primary & NonContributory Additional Insureds: City of Elgin - owner; pertchcock Design Group - Landscape Architect. GL & WC Policies Include A Waiver Of Subrogation. OCP PofLicy Named Insured: City of Elgin & Hitchcock Design Group, 150 Dexter Court, Elgin, IL 60120. OCP Liability Limit $1,000,000/$2,000,000. j CERTIFICATE HOLDER Y ADDITIONAL INSURED;INSURER LETTER: A CANCELLATION ELGCI-1 SHOULD ANY CF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THI CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL City of Elgin IMPOSE NO OILIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR 150 Dexter Court REPRESENTAIIIVES. drnarr.,WULFIPAVXKniGjlk AGM% IMK" Elgin IL 60120 I John J. *Alf 0 . .1 H ,,,•- .0 r- 4 _ .. ..;file . ., ACORD 26-S(7197) I I ,, .toi .-•.-,. • 1988 , ._. OF Etc). City of Elgin Agenda Item No. Ir (PIOTEDIO'%. :,-,•1,--747,-; A4. E " L February 28, 2001 G TO: Mayor and Members of the City Council N -FROM: Joyce A. Parker, City Manager fit t tir A t t t 1 A.Mt C.Iti t 111211,1, SUBJECT: Construction Management Service Contract for the Phase I Civic/Cultural; District Riverfront/Center City Master Plan Project PURPOSE The purpose of this memorandum is to pro' ide the Mayor and members of the City Council with information to Consider entering into an agreement with M. I .C. , Inc. for construction management services related to construction of the Phase d Riverfront/Center City Master Plan Project. BACKGROUND rft. On September 27, 2000, the City Council approved a contract with the architectural firm, Hitchcock Design Group, to design the Phase Riverfront/Center City Project and prOvide limited construction phase services. The Phase I plans and the bid specifications are complete. The original budget estimates included an allowance for Construction Management Services . Following the completion of the plans and specifications, a Request for Qualifications was submitted to 13 area construction managers . Six Elgin firms were included within the list of firms contaCted. In order to keep the riverfront project on track, a relatively short turn around on the RFQ' s was stipulated. Two firms responded to the RFQ: Jirsa Construction (Elgin and M. I .C. Construction (Batavia) . Two firms submitted letters stating they were unable to respond to the RFQ due to other obligatiOns. Lamp Incorporated and Martam Construction, both Elgin firms, submitted the letters. A review team consisting of Rick HitchcoCk, Jack Shales, Dave Lawry and Ray Moller conducted the interviews with Jirsa and M. I .C. Both firms are qualified construction managers and have worked with Hitchcock Design Group on other riverfront and park development projects . The review team concluded that M. I .C. should be selected as the construction manager for the Riverfront Phase I project due to their extensive experience with riverfront redevelopment projects in Batavia and Dundee. elmw Construction Management Service Contract February 28', 2001 Page 2 The three phases of the construction manager contract are : Bidding/Contract Award; Construction Phase and Post Construction Phase. In the Bidding/Contract Award phase, the CM will assist in the evaluation and analysis of bids and make recommendations regarding contract award. The construction phase commences upon completion of the bid process and generally consists of construction inspection, scheduling and managing the various stages of construction, subcontractors coordination and site logistics . M. I .C. 1will be responsible for all scheduling, trade (subcontractor) coordination, and material ordering. The type of contract including this high level of project oversight is referred to as a Guaranteed Maximum Price Contract (GMP) . The GMP type contract commits the CM to a maximum price for all work and requires the C1,1 to manage the project schedule. The subject contract fee consists of Only preconstruction and construction management service costs at this time . When bids are completed, amendments to the subject contract will be prepared to establish the GMP for that project . The GMP will consist of the total of all low bids for the particular phase, a three percent (3%) Constructor' s contingency and a two percent (2%) owner' s contingency. The constructor' s three percent (3%) contingency covers their risk in guaranteeing the price . This contingency will be usedrto cover those cost items which may have inadvertently been left out of the bid documents . The contingency will not be used to cover changes in scope (i . e. change orders) . Use of the constructor' s contingency must be reported to the City' s project manager prior to use . The two percent (2%) owner' s contingency is intended to cover change order issues less than $10, 000 . , The contract establishes authority for the City Manager to approve change orders less than $10, 000 to help expedite the construction process . Any use of this contingency by the City Manager will be reported to the City Council . Any change order exceeding $10, 000 or when the two percent (2%) contingency is exceeded, mist adhere to the City' s established change order procedure. An incentive clause is also included within the subject contract . The CM shares 25 percent of all remaining dollars below the GMP. rm. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED Project Management Team (PMT) and the Rverfront Action Committee (RAC) . . - . rm Construction Management Service Contract 11 February 28"), 2001 Page 3 FINANCIAL IMPACT / 1 The budget for this project is $5, 300 , 000 To date, $1 , 034 , 910 has already been charged to this project . The cost for the preconstruction services , construction phase and post construction phase services equals $33 , 927 . 00 and $277,[069 . 00, respectively, for a total of $310 , 996 . 00 . Sufficient funds exist within account no. 275-0000-791 . 92-32 , project number 039518 for the contract . LEGAL IMPACT Uj\)4A contract will need to be prepared and reviewed by the Legal Department . ALTERNATIVES Approve contract as recommended or direct staff to adjust the contract in line with City Council recOmendations . rRECOMMENDATION It is recommended that the City Council approve the subject contract with M. I . C. in the amount of $310, 996. 00 and direct staff , to prepare the contract documents. qoypectaaly mitted, 41,47 .411 ce A. Parker City Manger . . RHM: sp rft ,