Loading...
00-15 Resolution No . 00-15 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN TH CONTRACT WITH SEAGREN/SHALES FOR THE RIVERSIDE DEC REPAIR PROJECT WHEREAS, the City of Elgin has heretofore entered into a contract with Seagren/Shales for the R verside Deck Repair Project; and WHEREAS, it is necessary and desi able to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY TH1 CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Joyce A. 'arker, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference . s Robert Gilliam Robert Gilliam, Mayor Pro Tem Presented: January 26, 2000 Adopted: January 26 , 2000 Omnibus Vote : Yeas 4 Nays 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk . Change Order OWNER [X) ARCHITECT [X) CONTRACTOR [X) AIA Document G701 - FIELD [ OTHER [ Electronic Format THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. PROJECT: (name,address) CHANGE ORDER NUMBER: 1 Riverside Deck Parking Area DATE: 12-7-99 Elgin,Illinois ARCHITECT'S PROJECT NO: 31-5566.10 TO CONTRACTOR: CONTRACT DATE: July 14, 199.9 (name,address) Seagren/Shales CONTRAC—FOR: Parking Deck Repairs 749 North State Stree Elgin, Illinois 60123 The Contract is changed as follows: 1.)Removal and Replacement of an additional 1,500 square feet of precast planking(ai$17.00/s.f. $25,500.00 2.)Additional 470 square feet of waterproofing membrane and asphalt surface cr $4.70/s.f $2,209.00 3.)Deletion of Work Items 3.7&3.8 under the Base Contract ($3,900.00) Not valid until signed by the Owner,Architect and Contractor. The original(Contract Sum)(_.. : • •-: -•: '--. •- ' -)was $ 240,860.00 Net change by previously authorized Change Orders $ 0.00 The(Contract Sum)(_.. .• •.: ••. '•-.-• ' ' •)prior to this Change Order was $ 240,860.00 The(Contract Sum)(_.: . • ••: ••. •- . •• • ' •)will be(increased)(eased) (unchanged)by this Change Order in the amount of $ 23,809.00 The new(Contract Sum)(_.. • : •• .-- -) including this Change Order will be $ 264,669.00 The Contract Time will be(increased—)—(decreased)(unchanged)by (0 )days. The Date of Substantial Completion as of the date of this Change Order therefore is November 4, 1999 NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed maximum Price which have been authorized by Construction Change Directive. ARCHITECT CONTRACTOR OWNER Walker Parking Consultants Seagren/Shales City of Elgin Address Address Address 505 Davi Road 749 North State Street 150 Dexter Court El•' ,onois 60123 El in f \A . is Fl•i• inois 60120-5555 BY: U•�- BY:• P • ' : 12-10-99 DATE: 11-1 1T 1 0 DAT gee-- AIA e —AIA DOCUMENT G701 •CHANGE ORDER • 1987 EDITION • AIA • COPYRIGHT 1987 • T}E AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C., 20006-5292. WARNING: Unlicensed photoccpying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format-G701-1987 User Document: G701.CON-- 12/15/1999.AIA License Number 104688, which expires on 12/31/1999--Page#1 , 15:24 FROA-WALKER ELGIN IL +84T6917439 T-616 P.02/02 F-273 ViWALKER PHRKtNG CONSuLTAr4T; ATTACHMENT TO CHANGE ORDER NO.1 the additional added square footage of planking removal ant. replacement was added to The scope of the project due to the fact tlrut the deteriorated p coast plank was not entirely risible during dcrelopment of the original controcr scope doc ments. The existing precast plank where paved with asphalt. By these circumstances, it n r_essitntMd o change to the contract scope and was not reasonably foreseeable at the Tim- the contract was signed. The scope change was done in the best interest of the City. WALKER PARKING CONSULTANTS .-- `,cy OF ft.0 Y V `' " Agenda Item No. —City of Elgin January 3 , 2000 TO: Mayor and Members of the City Council FROM: Joyce A. Parker, City Manager SUBJECT: Authorization of Change Order No. 1, Final Payment and Acceptance of the Riverside Deck Repairs PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider acceptance of the subject improvements and the authorization of Change Order No. 1 and final payment . BACKGROUND On July 14, 1999, the City Council awarded to Seagren/Shales the contract for the Riverside Deck Repair Project . The City awarded a base bid and one of two alternatives . The base bid included replacement of approximately ten percent of the deck planks, the placement of water proofing membrane and asphalt surface . The awarded alternate, Alternate B, included the repairs and resurfacing of the ramp leading off of Chicago Street down to the deck. During the repairs, Walker Parking Consultant ' s inspection team determined that additional planking needed to be replaced thus increasing the contract quantity and necessitating a change order. Seagren/Shales has completed the project in compliance with the plans and specifications, as verified by the consultant, Walker Parking Consultants . A copy of Change Order No. 1 is attached as Exhibit A. The change order included an increase to contract quantities for removal and replacement of precast deck planking, a waterproofing membrane and asphalt surface and a decrease in contract quantities for full and partial floor repairs to the ramp just off of Chicago Street . COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None. Riverside Deck Repairs January 3 , 2000 Page 2 t FINANCIAL IMPACT The final contract amount with Seagren/Sales is as follows : . Original Contract Amount $240, 860 . 00 ▪ Change Order No. 1 • 23 , 809 . 00 • Final Contract • $264 , 669 . 00 Payments made to date total $201, 951 . 00 Leaving a final payment of $ 62 , 718 . 00 Funds for Change Order No. 1 and final payment ($62 , 718 . 00) are available in account no. 275-0000-791 . 92 31, project no. 339555 . LEGAL IMPACT None . ALTERNATIVES None . RECOMMENDATION It is recommended that City Council auth.rize execution of Change Order No. 1, accept the completed proj -ct and authorize final payment in the amount of $62, 718 . 00 to S=agren/Shales, Inc. ' - spe, tful y subm' tted, • Joy e A. P_rke r City Manag=r JE:do Attachment