Loading...
99-298 Resolution No . 99-298 RESOLUTION AUTHORIZING EXECUTION OF A FACADE IMPROVEMENT PROGRAM AGREEMENT (19 S . Spring Street) BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Joyce A. Parker, City Manager, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute a facade improvement program agreement on behalf of the City of Elgin with William Jones and Janet Jones for the property commonly known as 19 S . Spring Street, a copy of which is attached hereto and made a part hereof by reference . s/ Ed Schock Ed Schock, Mayor Presented: December 1, 1999 Adopted: December 1, 1999 Omnibus Vote: Yeas 6 Nays 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk CITY OF ELGIN FACADE IMPROVEMENT PROGRAM AGREEMENT THIS AGREEMENT is made and entered into this 1st day of December , 1999 , by and between the City of Elgin, Illinois, a municipal corporation (hereinafter referred to as "City") , and William J. & Janet K. Jones, (hereinafter referred to as "Owner") . WHEREAS, City has established a facade improvement program (hereinafter referred to as "Program") for application within certain areas of the corporate limits of City designated by City as appropriate for such application (hereinafter referred to as "Rehabilitation Areas") ; and WHEREAS, Program is administered and funded solely by City for purposes of the control and prevention of blight, dilapidation and deterioration of Rehabilitation Areas; and WHEREAS, pursuant to Program, City has undertaken to share the cost of facade improvements to certain structures within Rehabilitation Area, pursuant to the criteria set forth herein; and WHEREAS, City has or, shall retain the services of an architectural consultant (hereinafter referred to as "Consultant") to provide participants in Program with certain conceptual design work regarding proposed improvements, including, but not necessarily limited to, a color rendering of draft improvement designs and an outline of work specifications at no cost to Program participants; and WHEREAS, Owner owns at least 500i of a commercial building (s) , or is the tenant of a commercial building (s) located within a Rehabilitation Area, and owner desires to participate in Program pursuant to the terms and provisions of this Agreement . NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein, the sufficiency of which is hereby acknowledged, the parties hereto hereby agree as follows : Section 1 . City shall pay to Owner a sum not to exceed 3501 of the total approved project costs, such costs not to exceed $30 , 097 . 00 for facade improvements approved pursuant to the provisions of this Agreement (hereinafter referred to as "Eligible Costs") for the Structure referred to at Section 16 herein (hereinafter referred to as "Structure") . All parties hereto agree that all payments from the City provided for herein shall be made to William J. & Janet K. Jones, who shall provide the City with a full release upon receipt . Section 2 . Eligible costs shall include labor, material and equipment costs, and such other costs as may be reasonably necessary for the execution and completion of the facade improvement hereby provided for (hereinafter referred to as the "Work") , as designated from the design drawings and specifications approved by the Project Review Team pursuant to the provisions of Section 3 herein and prepared by Consultant (hereinafter referred to as "Plans") , which design photos and cost estimates are attached hereto and made a part hereof as Attachment "A" . Section 3 . No Work shall be undertaken or shall be considered to constitute the basis for an Eligible Cost until the design for such Work has been submitted to and approved in writing by the Project Review Team, consisting of the City' s Director of Business Services and Properties, City' s Historic Preservation Specialist, and City' s Rehabilitation Specialist . Such design shall include, but not be limited to, a date certain by which the Work shall be completed. In no event shall such work be completed more than one hundred eighty (180) days from the date of this Agreement, without the written consent of the Application Review Team. Section 4 . Notwithstanding anything to the contrary provided in this agreement, it is understood by the parties that the phase one project activities include exploratory demolition on the west elevation which may disclose required facade improvements in addition to the work contemplated in this agreement . In such an event it is understood that the owner may pursue an amended application to the City for further improvements to be included within the facade improvement program for the subject property and further participation by the City. Any such further participation by the City shall be at the sole and exclusive discretion of the City and shall require a written amendment to this agreement executed by the parties . Section 5 . The Project Review Team shall be permitted access to Structure to periodically review the progress of the Work. Such review shall not be in lieu of any other inspections which may otherwise by required by law or by City. Any and all portions of the work which do not, in the sole discretion of the Project Review Team, conform to the Plans or other applicable terms of this Agreement, shall be made to conform to the Plans and other applicable Terms of this Agreement upon written notice of the existence of such non-conforming portions . 2 Section 6 . Upon completion of the Work, and upon final inspection and written approval by the Project Review Team and such other final inspections and approvals as may be required by law, Owner shall submit to City: (1) an executed, notarized itemized contractor statement reflecting the total cost of the Work and each portion thereof, including, but not limited to, the cost of labor (whether provided by any contractor or subcontractor) , materials and equipment; (2) copies of all bids, contracts and invoices submitted, executed or incurred pursuant to the Work; and (3) reasonable proof of payment of all costs incurred pursuant to the Work. Section 7 . City shall pay to Owner the sum provided for at Section 1 herein within thirty (30) days of owner' s compliance with the provisions of Section 6 herein. In no event shall the amount paid to Owner exceed the amount specified in this Agreement or in the contractor statement . Section 8 . In the event Owner fails to complete the Work in accordance with the terms of this Agreement, or otherwise breaches the terms of this Agreement, City may terminate this Agreement upon written notice of breach and termination to Owner, and any and all financial or other obligations on the part of City shall cease and become null and void. Section 9 . Upon completion of the Work, and for a period of five (5) years thereafter, Owner shall properly maintain the Work in its finished form, without alteration or change thereto, and shall not enter into any agreement , or take any other steps to alter, change or remove such Work, or to create or undertake any other work which may constitute a deviation from the Plans, without prior written approval from the Project Review Team in its sole discretion. Section 10 . Nothing herein is intended to limit, restrict or prohibit the Owner from undertaking any other work in or about the subject premises which is unrelated to the facade improvement provided for in this Agreement . Section 11 . This Agreement shall be binding upon City and its successors, and upon Owner, Owner' s successors and assigns for a period of five (5) years from and after the date of completion and approval of the work. Owner shall provide subsequent Owner (s) of structure with a copy of this Agreement . This Agreement shall run with the land underlying Structure . 3 Section 12 . If Owner does not own the underlying property for which work is being done, Owner warrants and represents to City that Owner has a lease at the location for which the work is proposed for a term of at least six (6) years . Owner further warrants and represents that he has received authorization from all owners of the property for which work is to be done to accept funds under this program and to undertake the work. Further, such owner (s) of the property for which work is to be done hereby acknowledges that he is aware of this Agreement and authorized the work which is to be made to the structure . Said owner (s) of the property for which improvements are to be made further acknowledge that, as owner of the property, he is a party to this Agreement and is bound by the provisions of this Agreement specifically, but not limited to, the provisions of Section 6 of this Agreement . Each "Owner" signature hereto hereby warrants and represents that there are no other entities having an ownership interest in the Structure, which have not executed this Agreement . Section 13 . Owner hereby holds harmless and indemnifies City from and against any and all causes of action, suits, claims for damages, and any and all other liability, which may arise out of or in connection with Owner ' s or Owner ' s agents, employees and assigns ' negligent performance of any of the terms of this Agreement . Section 14 . This Agreement shall not be construed to create a partnership, joint venture or employment relationship between the parties hereto. Section 15 . This Agreement shall be subject to and governed by the laws of the State of Illinois . The parties hereto hereby agree that venue for any and all actions which may be brought by each and either of them to enforce the provisions of this Agreement shall be in Kane County, Illinois . Section 16 . The terms of this Agreement shall be severable . In the event that any of the terms or provisions of this Agreement are deemed to be void or otherwise unenforceable for any reason, the remainder of this Agreement shall remain in full force and effect . Section 17 . Owner ' s Name : William J. & Janet K. Jones Address : 204 Dupage Street, P .O. Box 765 City: Elgin State : IL Zip Code : 60121 Telephone Number: (847) 741-9393 Property Location: 19 S . Spring Street Ownership Interest : Owner Contact Person: 4 Owner' s Name : Address : City: State : IL Zip Code : Telephone Number : Property Location Ownership Interest : Owner: Owner' s Name : Address : City: State : IL Zip Code : Telephone Number: Property Location Ownership Interest : Tenant : Owner' s Name : Address : City: State : IL Zip Code : Telephone Number: Property Location Ownership Interest : IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date first appearing above . OWNERS CIT William J. n J ce . Parker, City Manager OWNER ATTEST: `r Jane Vf/ K. Jonesx Dolonna Mecum, City Clerk OWNER OWNER OWNER 5 City of Elgin Agenda Item o. November 03 , 1999 TO: Mayor and Members of the City Council FROM: Joyce A. Parker, City Manager SUBJECT: Facade Project for 19 South Spring Street PURPOSE The. purpose of this memoh informationldto the consider and a members with Facade of the City Council wit Improvement Program project for 19 South Spring Street . BACKGROUND The owners of the property, William and Janet Jones, wish to participate in the Facade Improvement Program. The 19 South Spring Street building has been a fixture in Elgin' s s . The building is a g ood P Center City for over 100 yeare of At some point in its turn-of-the-century masonry history, the building housed a diner which provided food service to employees working within the Center City. The facade work will be focueeof work is was tfol ows :st building elevations. The proposed sc o p wasfi Facade East Faca e 1 . Power washing 1 . Power washing 2 . Removal of stone veneer 2 . Tuck point brick wall 3 , Tuck pointing and brick wall 3 • Scrape and paint masonry Wall repair 4 , Repair and paint windows 4 . Repaint metal S . Reopen four first floor 5 . Repair and paint window Windows frames 6 . Remove existing signs 6 . Repaint shutters 7 . paint window trim project cost is $85, 992 . 50, not including The estimated P ro Under the provisions of the Facade architectural services . Improvement Program, the participants would be entitled to a rebate of 35 percent of the construction cost. The rebate, as calculated, would be $30, 097 . 38 . Facade Project for 19 South Spring Street November 03 , 1999 Page 2 COMMUNITY GROUPS INTERESTED PERSONS CONTACTED Elgin Heritage Commission. FINANCIAL IMPACT Approval of the comprehensive facade project for 9719 There spring Street at the 35 percent level would equal $30 , available funds remaining in the Downtown Redevelopment Fund. It be is proposed that unencumbered dollars Riverboat t utilized to fund this project nd be replenished he Down own Redevelopment Fund upon approval of the 2000 budget . A budget transfer will be required. Account number 350-0000-795 . 78-9 ,This project number 179543 , wi charged for this project .ll be cha1 year 2000 and project will not be actual cash outlayhunt 1 that time . therefore will not require an a LEGAL IMPACT ` ( �` VV None . ALTERNATIVES 1 . Approve the request by William Jones and Janet Jones for participation in the Facade Improvement Program. 2 . Reject the request to proceed with the project . RECOMMENDATION It is recommended that the outhuSsring Street with the Improvement project for 19 P Res ectfully submitte , J oy A. arker City Manager amp Attachment T• Y r _ x: ;'" p f a � f �� �y R '�L 4i � t .r.s.�,� rw�..,..•`2' � „r.e-e i■ �.�-•' _ a`C.., .� '- 2 �•'`sit° � - y�-t<ri,�/�' s�'�j-i r '.•,� �Y- ,�.-'� a_-i�.¢ ��y".ir k . Yom- �� _*s ' �,,' ; :.s..cc .� r �-""�x'a'irT.ws+r.r.£• ��5�'�'" Y'"'�'"`i 1 -- i i� crt,� ?''�=: rho. x7� `dy - �,c� � -�' GREG BERNA ARCHITECTS & DESIGN 221 DuPage Street Elgin,Illinois 60120 (847) 697-0260 October 14, 1999 Mr. Ray Moller City of Elgin 150 Dexter Court Elgin, IL. 60120-5555 19 Spring Street Scope of work: West West Elevation/ Sgrin Street: 1. 100% low power wash building max:600p.s.i. 2. 100% Remove stone veneer 3. Tuck point and repair brickwork 20% of brick wall 4. Repaint and prime existing metal over hang 5. Reinstall and repair transom glass above three doors 6. Repair all second floor window frames and paint 7. Repaint all first floor window and door frames and repair as needed 8. Repaint all railings 9. Repaint all window shutters. 10. Caulk all windows and door openings. 11.Reinstall one existing door. DATE: 10/14199 PROJ No. 98051 BERNA ARCHITECTS&DESIGN 19 SOUTH SPRING STREET FACADEIMPROVEMENT WEST ELEVATION. 19 S.SPRINGS SL FACADE ESTIMATE PROJECT COST ESTIMATE .............. jj'� I PRICE�.,-,'-- DIVISION zA-SUBSTRUCTURE BUILDING SUB-STRUCTURE .. ........... ... DLIMPSTFK//BUILDING $500.00 DMSION 3_CONCRETE DIVISION 4-WA--SONRy EXISTING BRICK WALLS 000.00 4"TUCK FT. 040.00 REMOVING STONE AND REPAIR 300.00 CLEANING . ... ... ..... ...... ............ DMSION 5-METALS DIVISION 8-WOOD&PLASTIC ROUGH-CARPENTRY TEMPORARY PROTECTION 2,000 ADD $1.00 ADD $23,000-00 MISC. D BLOCKING&LANDING/STEPS 3,000 ADD $ ,000-00 DMSION 7-THERMAL Jt MOISTURE PROTECTION WATER PROOFING CAULK AND SEALANTS 500 ADD $1.00 ADD $500.00 EXTERIOR CAULK DMSION DOORS&WINDOWS ....... ....................... EXTERIOR "I'll DOORS"1 "I'll ASSEMBLED COSTS ... ... DOORS FRAME AND HARDWARE -SINGLE REINSTALL EXTERIOR GLAZING 8 EA. $450.00 EA- $3,600.00 WINDOWS AT EXTERIOR REPAIR I EA. $450.00 EA. STOREFRONT AT EXTERIOR PAINTING 375 S.F. $1.50 S.F. $562.50 E I PPIN AND PRIME ROOF Bs S.F. $1.50 S.F. $52.50 AND FRAMES PAINT RAILINGS 35 EA $45.00 EA $150.00 DOORS DIVISION 10 SPECIALITIES 10 M.H. $70.00 M . $700.00 DEMO. $n sm.00 SUB-TOTAL_;i�5�':"- GENERAL CONDITIONS 0.1 S2.9 GENERAL CONTINGENCY .7 ToVkG 4p]RQJECT,. ........... ................. 2 TOTAL.'t 35%CITY REFUND -$11370.98 Page 1 _ r S"""Fi�irr �_� , �.f.�7� .f1•r ` C•� '�z '`j M� � f 7fj "'L�.� i �"' � ( k .� T 3 J �. .,� ° �if "�`�• • " .wa S rr - • e f. r 1 - CTO """'�.+t�.�.a - w► .. �_ j i t r. ;,�i�'�.�i�-•tom '"r ��.ty/r J`r r3 s I I In �� Ila� `r - R t _ W,y.i j -��r 'i T�K;•x'�4 '�"'s� gst_-,.--F £� �,T i( r. b w � Y ^- yk GREG BERNA ARCHITECTS & DESIGN 221 DuPage Street Elgin,Illinois 60120 (847) 697-0260 October 14, 1999 Mr. Ray Moller City of Elgin 150 Dexter Court Elgin, IL. 60120-5555 19 Spring Street Scope of work: EAST East Elevation/Zeigler Court: 1. 100% low power wash building. max. 650psi. 2. 20% Remove paint on brickwork 3. Tuck point 80% of brick wall 4. Repair chimney as required 5. 100% Prime and paint masonry wall. 6. Repair parapet at north corner of building 7. Repair five second floor windows 8. Repair or replace down spouts. 9. Reopen four first floor windows and repair windows as needed. 10. Caulk all windows and door openings. 11.Rework and remove electrical as required for masonry clean up. 12.Replace and install security light fixture. 13.Remove existing signs and repair masonry as needed. 14.Paint or stain all windows and trim. DATE 10/14/99 PROJ No. 98051 - BERNA ARCHITECTS&DESIGN 19 SOUTH SPRING STREET FACADE IMPROVEMENT EAST ELEVATION 19 S.SPRINGS!2EIGLER COURT FACADE ESTIMATE PROJECT COST ESTIMATE ESCRIPTION. " QUAN: PRICE/UNIT "PRICE DIVISION 2-SITEWORK SITE ELECTRICAL 2 EA $125 00 EA $250.00 EXTERIOR LIGHTING SECURITY $ 21300.00 REMOVE OLD ELECTRIC ON EXTERIOR DIVISION 2A-SUBSTRUCTURE BUILDING SUBSTRUCTURE DUMPSTER/BUILDING MATERIAL REMOVAL 1 EA. $500.00 $500.00 EA DIVISION 3-CONCRETE DIVISION 4-MASONRY EXISTING BRICK WALLS 4'TUCK PT. 1,800 S.F. $8.00 S.F. $14,400.00 MASONRY REPAIR 150- S.F. $15.00 S.F. $2,250.00 CLEANING MASONRY W1 PAINT 1,800 S.F. $4.50 S.F. $8,100.00 DIVISION 5-METALS DIVISION 6-WOOD 8:PLASTIC ROUGH CARPENTRY TEMPORARY PROTECTION 1,000 ADD $1,000.00 51.00 ADD 3,500 AD MISC.WOOD BLOCKING D $1.00 ADD $3,500.00 DIVISION 7-THERMAL 8:MOISTURE PROTECTION CAULK AND SEALANTS 300 ADD $1.00 ADD $300.00 EXTERIOR CAULK SPOUTS 75 L.F. $17.00 L.F. $1,275.00 DOWN DIVISION 8-DOORS&WINDOWS EXTERIOR GLAZING 9 EA. $650.00 S.F. $5,850.00 WINDOWS AT EXTERIOR PAINTING 1,800 S.F. $4.00 S.F. 57,200.00 EPDXY PAINT AT WALLS 9 EA 535.00 EA $315.00 DOORS AND FRAMES DIVISION 10-SPECIALITIES 20 M.H. $70.00 M.H. $1,400.00 DEMO $48,640.00 SU BTOTAL :;- GENERAL CONDITIONS 54 864 00 GENERAL CONTINGENCY 0.1 TOTAL-PROJECT COST- a$53,504.00 TOTAL - - $53,5U.00 35%CITY REFUND=$18726.40 Page 1 _ 3 City of Elgin Agenda Item No. November 03 , 1999 TO: Mayor and Members of the City Council FROM: Joyce A. Parker, City Manager SUBJECT: Facade Project for 19 South Spring Street PURPOSE The. purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider a Facade Improvement Program project for 19 South Spring Street . BACKGROUND The owners of the property, William and Janet Jones, wish to participate in the Facade Improvement Program. The 19 South Spring Street building has been a fixture in Elgin' s Center City for over 100 years. The building is a good example of turn-of-the-century masonry construction. At some point in its history, the building housed a diner which provided food service to employees working within the Center City. The facade work will be focused on the west and east building elevations . The proposed scope of work is as follows : Wes . Facade East Facade 1 . Power washing 1. Power washing 2 . Removal of stone veneer 2 . Tuck point brick wall 3 . Tuck pointing and brick wall 3 . Scrape and paint masonry repair Wall 4 . Repaint metal 4 . Repair and paint windows 5 . Repair and paint window 5 . Reopen four first floor frames Windows 6 . Repaint shutters 6 . Remove existing signs 7 . Paint window trim The estimated project cost is $85, 992 . 50, not in architectural services. Under the provisions of the Facade Improvement Program, the participants would be entitled to a rebate of 35 percent of the construction cost. The rebate, as calculated, would be $30, 097 . 38 . Facade Project for 19 South Spring Street November 03 , 1999 Page 2 COMMUNITY GROUP 'INTERESTED PERSONS CONTACTED Elgin Heritage Commission. FINANCIAL IMPACT Approval of the comprehensive facade project for 19 South Spring Street at the 35 percent level would equal $30, 097 . There are no available funds remaining in the Downtown Redevelopment Fund. It is proposed that unencumbered dollars within the Riverboat Fund be utilized to fund this project and be replenished from the Downtown Redevelopment Fund upon approval of the 2000 budget . A budget transfer will be required. Account number 350-0000-795 . 78-99, project number 179543 , will be charged for this project . This project will not an completed until 1 that00 time . .. therefore will not require LEGAL IMPACT VVV None. ALTERNATIVES 1 . Approve the request by William Jones and Janet Jones for participation in the Facade Improvement Program. 2 . Reject the request to proceed with the project . RECOMMENDATION It is recommended that the h South Spring Street be approved. Facade Improvement prod approved, Res ectfully submitte , eQ - Joy A. arker City Manager amp Attachment T 3 :( RFC # „r• N71 aJ� j � �C - a '� � s {s gv��d�:.a dry �• -_ � x �r '� 7 _r r. � i s ��tt�yti,���F.i Y�Y �•- 'rlawi� a.�>. � - ' `�+1t, � ���r_ �`h l_ •-+� � . �a r � xµsr � � I g EiIY c � +� a x ri ! - . AW GREG BERNA a ARCHITECTS & DESIGN 221 DuPage Street Elgin, Illinois 60120 (847) 697-0260 October 14, 1999 Mr. Ray Moller City of Elgin 150 Dexter Court Elgin, IL. 60120-5555 19 Spring Street Scope of work: West West Elevation/ Spring Street: 1. 100% low power wash building max:600p.s.i. 2. 100% Remove stone veneer 3. Tuck point and repair brickwork 20% of brick wall 4. Repaint and prime existing metal over hang 5. Reinstall and repair transom glass above three doors 6. Repair all second floor window frames and paint 7. Repaint all first floor window and door frames and repair as needed 8. Repaint all railings 9. Repaint all window shutters. 10. Caulk all windows and door openings. 11.Reinstall one existing door. PROJ No. 93061 DATE: 10114/99 BERNA ARCHITECTS&DESIGN 19 SOUTH SPRING STREET FACADEIMPROVEMENT WEST ELEVATION. 19 S.SPRINGS St FACADE ESTIMATE PROJECT COST ESTIMATE DESCRIPTION PRICE/UNIT PRICE DIVISION 2A-SUBSTRUCTURE BUILDING SUB-STRUCTURE DUMPSTER/BUILDING MATERIAL REMOVAL 1 EA. 1 $500.00 IEA. $ DMSION 3-CONCRETE r DMSION 4-MASONRY EXISTING BRICK WALLS ,C TUCK PT. 750 S.F. $8.00 S.F. $6,000.00 'REMOVING STONE AND REPAIR BRICK 315 S.F. $16.00 S.F. $5,040.00 CLEANING 900 SF $7.00 S.F. —$6,300.00 DIVISION 5-METALS DMSION 6-WOOD&PLASTIC ROUGH CARPENTRY TEMPORARY PROTECTION MISC.WOOD BLOCKING&LANDING/STEPS 30 ADD 1 $21i jWD! $3.000.001 1 1 DMSION 7-THERMAL&MOISTURE PROTECTION WATER PROOFING CAULK AND SEALANTS EXTERIOR CAULK SW ADD $1.00-WE—$sw.00 DIVISION s-DOORS&WINDOWS EXTERIOR DOORS ASSEMBLED COSM DOORS,FRAME HARDWARE INSTALLED -SINGLE REINSTALL I EA. $650.00 EA. $650.00 EXTERIOR GLAZING —WINDOWS AT EXTERIOR REPAIR 8 EA. $450.00 EA. I $3,1500.00, STOREFRONT AT EXTERIOR 1 EA. $450.00 EA. $450.00 PAINTING EPDXY PAINT AND PRIME ROOF 375 S.F. $150 S.F. —$562.50 PAINT RAILINGS 35 S.F. $1.50 S.F. $52.50 DOORS AND FRAMES 4 EA. $45.00 EA $180.00 DMSION 10-SPECIALITIES IDEMO. 10 M.H.1 $70.00 M.H. $700.00 ISUEI.!TOTALT77 $2 7 35O GENERAL CONDITIONS GENERAL CONTINGENCY 0.1 F_$2,90.50 T O,TAC..pko7JECT,COST 7 -" 77,- -7.7 TOTAL 7 35%CITY REFUND =$11370.98 Page I 19 S. SPRING ST EAST ELEVATION FACADE IMPROVEMENT PROGRAM f � � s� t € � r r a '.� _';'�rte'` ,.��,r r i''# cp. r'r r�,r �,c �-a 5• s '�`'. �, � 's ,F- � -- Red } � f '�F�.,i�'='F�s '�„"`'�1�`.,-x'21 ins i_t ��ft". r 'gyp -. ► �, } , GREG BERNA ARCHITECTS & DESIGN 221 DuPage Street Elgin,Illinois 60120 (847)697-0260 October 14, 1999 Mr. Ray Moller City of Elgin 150 Dexter Court Elgin, II,. 60120-5555 19 Spring Street Scope of work: EAST East Elevation/Zeigler Court: 1. 100% low power wash building. max.650psi. 2. 20%Remove paint on brick work 3. Tuck point 80% of brick wall 4. Repair chimney as required 5. 100% Prime and paint masonry wall. 6. Repair parapet at north corner of building 7. Repair five second floor windows 8. Repair or replace down spouts. 9. Reopen four first floor windows and repair windows as needed. 10. Caulk all windows and door openings. 11. Rework and remove electrical as required for masonry clean up. 12.Replace and install security light fixture. 13.Remove existing signs and repair masonry as needed. 14.Paint or stain all windows and trim. roll PROJI No. 98051 DATE: 10/14/99 BERNA ARCHITECTS&DESIGN 19 SOUTH SPRING STREET FACADE WROVEMENT EAST ELEVATION 19 S.SPRINGSI ZEIGLER COURT FACADE ESTIMATE PROJECT COST ESTIMATE F,F.D r V, DESCRIPTION, V PRICEIIJNIT:�,��,-� PRICE-��, DIVISION 2 SITEWORK QUAN. SITE ELECTRICAL EXTERIOR LIGHTING SECURITY 2 EA- $129.00 EA $253.00 2,400.00 REMOVE OLD ELECTRIC;ON EXTERIOR DMSION 2A-SUBSTRUCTURE BUILDING SUB-STRUCTURE DUMPSTER I BUILDING MATERV REMOVAL 1 EA. $500.00 EA $500.00 DMSION 3-CONCRETE ,DMSION 4-MASONRY EXISTING BRICK WALLS CTUCKFrr- 'C $8.00 S.F. $2 MASONRY REPAIR S.F.: $15.00 S.F. ,250.00 S.F.CLEANING MASONRY W/PAINT 1,8W 4-50 $8,100.00 S.F. DMSION 5-METALS DMSION 6-WOOD&PLASTIC ROUGH CARPENTRY TEMPORARY PROTECTION 1.000 ADD $1.00 IADD $1,000.00 I MISC.WOOD BLOCKING 3,600 ADD $1.00 JADD 1 $3,500.00 DIVISION 7-THERMAL&MOISTURE PROTECTION CAULK AND SEALANTS EXTERIOR CAULK 300 ADD $1.00 WD- $300.00 DOWNSPOUTS 75 L.F. $17.00 L.F. $1,275.00 DMSION 8-DOORS&WINDOWS EXTERIOR GLAZING WINDOWS AT EXTERIOR 9 EA. $650.00 S.F. $5,850.00 PAINTING 1,800 S.F. $4.00 S.F. $7,200.00 EPDXY PAINT AT WALLS ; DOORS AN FRAMES 9 EA. -$35.001 $315.IDO DIVI N 10-SPECIALITIES DEMO 71-20 M.H. $70.00 M.H. $1,4 GENERAL CONDITIONS GENERAL CONTINGENCY 0.1 $4, '��5 11R$��jW,socoo TOTALPROJECT CO-1 'iE�.00 ITOTAV- 35%CITY REFUND=$18726.40 Page I