Loading...
98-163 Resolution No. 98-163 RESOLUTION APPROVING CHANGE ORDER NO. 2 IN THE CONTRACT WITH CERTIFIED MIDWEST CONSTRUCTION INCORPORATED FOR THE HEMMENS ROOF/PAVING PROJECT WHEREAS, the City of Elgin has heretofore entered into a contract with Certified Midwest Construction Incorporated for the Hemmens Roof/Paving Project; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 2, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Joyce A. Parker, City Manager, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute Change Order No. 2 , a copy of which is attached hereto and made a part hereof by reference. s/ Kevin Kelly Kevin Kelly, Mayor Presented: July 8, 1998 Adopted: July 8, 1998 Vote: Yeas 7 Nays 0 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk • A REC'D JUN 191998 CERTIFIED MIDWEST CONSTRUCTION INCORPORATED CHANGE ORDER NO. 2 JUNE 24, 1998 TRADE CONTRACTOR: Certified. Midwest Construction Inc. Purchase Order No. 063632 SCOPE: This Change Order No. 2 will provide additional services necessary to complete the Hemmens Roof/Paving Project . It will amend the scope of work and add the following items : 1 . Removal cf an aaditional layer of water proofing membrane and sand bed. 2 . Removal of a section of sidewalk and the replacement of same, including necessary curb and handicapped ramp with matching colored concrete . REASON FOR CHANGE: 1 . The removal of the layer of water proofing membrane and sand bed was required because the original material was wet and badly damaged. It was necessary to remove and replace the material . Cost $ 5, 306 . 00 2 . Removal and replacement of sidewalk sections and handicapped ramp. It was necessary to remove the next section of sidewalk north of the present contract limits, including the curbing and handicapped ramp. The change was required to eliminate the ponding of water at the joint between the new work and existing sidewalk and to ensure that the handicapped ramp was ADA compliant . Cost $ 4 , 711 . 00 1 SUMMARY OF CHANGES; 1 . Removal of water proofing $ 5, 306 . 00 2 . Sidewalk and Ramp Replacement $ 4 , 711 . 00 Change Order Total $ 10 , 017 . 00 Change Order No. 2 is necessary and proper due to the following: • The above changes were unforeseen, for the reasons listed, at the time the contract with Certified Midwest Construction, Inc . was authorizes. • It is in the best interest of the City to approve the above changes . • These changes are germane to the intent and scope of the original contract . CONTRACT STATUS : Original Contract Amount $416, 000 . 00 Change Order No. 1 Amount 25, 779 . 50 Change Order No. 2 Amount 10, 017 . 00 Final Contract Amount $451, 796 . 50 2 Agreed to this / day of L , 1998 Accepted: Recommended: Certified Midwest Raymond H. Moller Construction, Inc . Project Manager By By:-- i Title : Yr /1/,itN,.4 G t/Z Title : D;Q. i3v5/Liar &2a'c.1 Date : 6 - 19-9s Date : G ' o� Y 25 Approved: CITY OF ELGIN OWNER By: (2. AIL__ Date : 9lA-e l! ` ( r7 p Attest : 94e2 City Clerk 3