96-243 Resolution No. 96-243 RESOLUTION AUTHORIZING EXECUTION OF CONTRACT NO. 1 TO AN AGREEMENT WITH HNTB CORPORATION FOR RANDALL ROAD ELEVATED TOWER BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Richard B. Helwig, City Manager, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute Contract Amendment No. 1 on behalf of the City of Elgin with HNTB Corporation for engineering services for the Randall Road elevated tower, a copy of which is attached hereto and made a part hereof by reference. s/ Kevin Kelly Kevin Kelly, Mayor Presented: August 14 , 1996 Adopted: August 14, 1996 Omnibus Vote: Yeas 7 Nays 0 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk HNTB ARCHITECTS ENGINEERS PLANNERS 111 \ortb(anal Street.Suite 880 (biaago.llllnuls 60606-'252 May 28, 1996 (312)(1091/0 r:a.c(312)930 9063 Mr. Larry Deibert Elgin Water Department 150 Dexter Court Elgin, Illinois 60120-5555 Dear Larry: Re: Randall Road 1 MG Water Tank On May 16, I spoke with Peter Bityou about a contract amendment for the Randall Road tank, which we proposed in a letter to you dated May 14. Peter informed me that he had no objection to the proposed amendment except that he wanted to delete the weekly construction meetings which were proposed at the construction kickoff meeting. I have therefore, prepared a revised contract amendment which is attached for your review. The amendment contains three elements: a review of the project schedule; a proposed fee increase for design services; and a proposed fee increase for construction services. As background in support of the amendment, we offer the following information. Schedule Our contract called for a design phase lasting for twelve weeks. At the eleven week point,we delivered"pre-final"plans and specifications for review. Due to decisions made by the City which were beyond HNTB's control,the design work was suspended for a period of approximately fifteen months. The design work resumed in November 1995 and was completed in late December. Based on the original design schedule, construction was expected to commence in November of 1994 and be completed by December of 1995. The current schedule submitted by the tank contractor, CBI Na-Con, indicates substantial completion occurring in May 1997. Design After our submittal of pre-final plans on September 2, 1994, we worked occasionally on design alternatives to install a motor operator on an existing valve at the Airlite Water Plant. This work was performed at the City's request, but was not part of the original design scope. HNTB inspected the site and made field measurements to the surrounding area, prepared preliminary drawings and cost estimates for four alternatives and submitted several letters summarizing our findings. After sorting through several options involving excavation and yard piping changes at the Airlite Plant, HNTB ultimately located a compact body actuator and disconnect which could be installed on the existing valve in the existing vault. The estimated savings represented by this solution in comparison to other alternatives is $6,000. This work began in October 1994 and continued through August 1995. ] he 1/ l TB (. nm/ a n I \• \i.i. I� \1`V \ `r\.`-1 `KI:\I I\'\' i, :\\I"\ I'. \I1:.\ \I<'.h I `.I`.. )\([F i ♦. .l`.fcil I. .i Mr. Larry Deibert Page 2 May 28, 1996 Construction The City's decision to defer bidding on the tank project resulted in a 16-month delay in the construction schedule. The effect of this delay is that HNTB's direct costs (such as salary, overhead, and expenses) have risen from the original construction fee. The scope of construction services in the original contract is based on a work plan identical to the construction services provided for the Shales Parkway Tank construction project. There has been no change in scope for construction services, on this project. Based on the effect of a 16-month delay on direct costs, the revised cost of construction phase services is as follows: CONSTRUCTION SERVICES SUMMARY A. Periodic Construction Review 1. Pre-mobilization (March 1996- May 1996) 18 hrs $ 1,084 2. Foundation & erection (June 1996 -Nov. 1996) 214 hrs 12,883 3. Winter slowdown(Dec. 1996 - - Feb. 1997) 24 hrs 1,445 4. Painting and completion (March 1997 - June 1997) 114 hrs 6,863 SUB-TOTAL 370 hrs $22,275 B. Other Construction Phase Services 1. Shop Drawing Review 30 hrs $2,100 2. Management 30 hrs 2,400 3. As-Built Drawings 16 hrs 937 SUB-TOTAL 76 hrs $5,437 C. Expenses 1. Transportation $1,200 2. Testing Services 900 3. Printing& Miscellaneous 400 SUB-TOTAL $2,500 REVISED CONSTRUCTION PHASE TOTAL = $30,212 e:\22247\corspd\l_02ran Mr. Larry Deibert Page 3 May 28, 1996 If this amendment now meets with your approval please sign the attached agreement and return one copy to us. Thank you for your consideration. Very truly yours, HNTB CORPORATION / ohn V. O'Holleran, P.E. Gre ry . Casimer Vice President Project Manager JVO/GPC/kdt c: P. Bityou HNTB File No.22247-DS-021-002 e:\22247\corspd\I_02ran RANDALL ROAD 1 MG ELEVATED WATER STORAGE TANK REQUEST FOR ADDITIONAL COMPENSATION CONTRACT AMENDMENT NO. 1 May 24, 1996 DATE ORIGINAL ACTUAL/ PROJECT SCHEDULE CONTRACT PROJECTED DIFFERENCE Design Start Date: 6-13-94 6-13-94 0 Design Completion: 9-13-94 12-27-95 67 Weeks Construction Start: 11-15-94 3-8-96 68 Weeks Construction Substantial 11-30-95 5-8-97 74 Weeks Completion: Construction Final: 12-30-95 7-11-97 78 Weeks Requested Additional Compensation Design Additional work included incorporation of control valve and telemetry at the Airlite Plant (52 manhours)and increases in management, salary, and office overhead costs due to changes in the design completion date which were beyond the control of HNTB. Original Design Fee $21,380 Design Extra 2,910 Design Total 24,290 Construction Additional compensation is based on increases in salary, expenses, and overhead resulting from a 78-week extension of the project schedule which was beyond the control of HNTB. Original Construction Fee $23,430 Construction Extra 6,782 Construction Total $30,212 ORIGINAL CONTRACT TOTAL = $ 44,810 REQUESTED AMENDMENT = $ 9,692 e:\22247\work\amend 0l.doc CONTRACT AMENDMENT NO. 1 The undersigned hereby agree to amend the original professional services agreement dated June 13, 1994, by increasing the contract fee in the amount of$9,692. ATTEST: CITY OF ELGIN DATE: SV/5767 ATTEST: HNTB CORPORATION DATE: 7-25-16 By: i'/, John V. O'Holleran, P.E. Vice President e:\22247\work\amend 01.doc r 1 , • ra °��t Agenda Item No. illb %r July 12, 1996 TO: Mayor and Members of the City Council FROM: Richard B. Helwig, City Manager SUBJECT: Amendment No. 1 to Agreement for Engineering Services with HNTB Corporation for Randall Road Elevated Tower PURPOSE This memorandum will provide the Mayor and members of the City Council with information to consider awarding Amendment _` No. 1 to the agreement for engineering services with the rik consulting firm of HNTB Corporation, Chicago, for additional design and construction services . BACKGROUND On May 25, 1994, a contract was awarded to HNTB Corporation for preparation of engineering plans and specifications for the 1.0 million gallon Randall Road elevated tower. The contract was executed on June 13, 1994 . The overall schedule for design services was 12 weeks, and the schedule for con- struction services was 14 months . The City's budget consider- ations postponed the construction funding 16 months until this year. This amendment contains fee increases for design and construction services totaling $9,692 . The additional costs involve design services for a control valve and teleme- try at the Airlite Street Water Treatment Plant and addition- al construction compensation based on increases in salary, expenses, and overhead resulting from a 78-week extension of the project schedule. A detailed proposed Contract Amendment No. 1 is attached. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None. r r1 1 Amendment No. 1/Agreement with HNTB Corporation July 12, 1996 Page 2 FINANCIAL IMPACT As part of the 1996 bond sale, $1 . 430 million was issued for the Randall Road water tower project. To date, $1 ,331 million has been encumbered and spent. There are sufficient water funds remaining in account number 396-4000-795 . 92-36, project number 409517 , Randall Road 1 MG Water Tower, to pay for this amendment. LEGAL IMPACT None. ALTERNATIVES None. RECOMMENDATION It is recommended that the Mayor and members of the City Council authorize the execution of Amendment No. 1 to the agreement for engineering services with HNTB Corporation to provide for these additional services for a price of $9,692 . a()-e If144j-‘7 4a) k Respectfully submitted, l‘er 1 David L. Lawry, 'P.E. Director of Public Works �� . i401 Richard B. Helwig City Manager RBH:DL:PLB: jm Attachment fek