Loading...
95-219Resolution No. 95 -219 Amended RESOLUTION AUTHORIZING PREPARATION AND EXECUTION OF INTERGOVERNMENTAL AGREEMENT WITH ELGIN COMMUNITY COLLEGE WHEREAS, it has been proposed that the City of Elgin and Elgin Community College enter into an intergovernmental agreement providing for an exchange of land and the construction of a roadway in order to provide for the anticipated growth of Elgin Community College and resulting effect on traffic to and from the campus of Elgin Community College; and WHEREAS, the City Council has discussed such proposal at several of its meetings and conducted a public hearing on the proposal. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that the Corporation Counsel is hereby authorized and directed to confer with designated counsel of Elgin Community College (ECC) to jointly prepare an intergovernmental agreement between the City of Elgin (City) and Elgin Community College which shall include the following terms: ROADWAY EXTENSION 1. Spartan Drive (roadway) to be extended from its present western terminus to existing College Green Drive by City. a. Proposed alignment of roadway is illustrated on Exhibit 1. Roadway shall be constructed to standards for a collector street under the city's subdivision ordinance (i.e. 70 foot right -of -way, 36 foot pavement with curb and gutter). b. Exhibit 2 is the narrative portion of a soils report for the area in and around the proposed roadway. The report indicates that portions of the roadway right -of -way will require structural fill to stabilize future roadway construction. The cost of required structural fill shall be included in roadway construction costs. C. The City and ECC recognize that additional surveying and tests for final engineering will be required to determine precise acreage, road alignment, and soil bearing conditions. The cost of such surveying and tests shall be included in roadway construction costs. d. Spartan Drive roadway extension construction to be initiated in 2000 with College Green Drive intersection design appropriate for Community College /Office, Research, Industrial Park entryway. LAND ACQUISITION & DISPOSITION 1. ECC purchases twenty -five (25) acre parcel from Zale Group (Zale Rental Parcel) for $2,0611307.50 and dedicates to City right -of -way required for Spartan Drive roadway extension. ECC conveys to City portion of Zale Rental Parcel included in Parcel A as illustrated on Exhibit 1. 2. ECC contributes $2,250,000.00 to the City to facilitate the followings a. Construction of a new eighteen hole golf course east of South McLean Boulevard. New golf course projected to open in Spring of 2000. b. Within six months, City purchases land and existing, unoccupied, model, five (5) dwelling unit townhouse structure (Westfield Development structure) located in and adjacent to the proposed Spartan Drive extended roadway right -of -way. City removes Westfield Development structure from roadway right -of -way. Acquisition and removal costs are estimated at $700,000.00. 3. City shall convey to ECC the portion of Spartan Meadows golf course illustrated on Exhibit 1 as Parcel B and the wetland /floodplain portion of Parcel A at the conclusion of the 2005 golf season. 4. The division of net developable land between the City and ECC is illustrated on Exhibit 1. The division provides approximately thirty (30) acres of net developable land for the City and forty (40) acres of net developable land for ECC (exclusive of roadway right -of -way). 5. ECC parcel of 40 acres to be reclassified Office, Research, Industrial (ORI) with a transition landscape yard of one hundred forty three (143) feet consistent with a Community Facility (CF) standard for a one hundred forty (140) acre land use. 6. City parcel of thirty (30) acres to be reclassified Office, Research, Industrial (ORI). 7. ECC to own area of Parcel A shown on Exhibit 1 within floodplain and containing wetlands. This portion of Parcel A shall be used for stormwater detention /wetlands enhancement; and to the extent that it is not required for stormwater detention purposes, will be available to ECC for recreational and instructional purposes. This portion of Parcel A to be classified Community Facility (CF). COSTS & FINANCING 1. ECC finances purchase of Zale Rental Parcel over a ten (10) year term. 2. City pays debt service on financing for purchase of Zale Rental Parcel. 3. City finances ECC contribution toward items referenced in paragraphs 2a and 2b under "Land Acquisition & Disposition" over a twenty (20) year term. 4. ECC pays debt service on financing for contribution referenced in paragraph 3 above. 5. Costs for acquisition and removal of Westfield Development structure for Spartan Drive extended right -of -way to be borne by City. 6. ECC reimburses City for cost of Spartan Drive roadway extension construction, including design and site preparation, in the sum of fifty (50) percent of each paid invoice presented for such purposes. BENEFITS 1. City recognizes the community development value of extending Spartan Drive to College Green Drive and providing land for future expansion of the community college. 2. City recognizes and acknowledges the economic development benefit, to the community in general and School District U -46 in particular, of rezoning the Zale Rental Parcel from Planned Residence Conservation (PRC) to Office, Research, Industrial (ORI). 3. ECC recognizes value of obtaining roadway access to Randall Road and land for future expansion of the college campus. 4. City recognizes the potential for enhanced golf opportunities with the construction of the new eighteen hole facility east of South McLean Boulevard, GENERAL 1. City shall have right -of- first - refusal in the event that ECC decides to sell all or a portion of Parcel B. 2. ECC shall have right -of- first - refusal in the event that City decides to sell all or a portion of the existing eastern nine holes of Spartan Meadows golf course. JOINT COMMITTEE City and ECC shall form a committee composed of representatives of City, ECC and homeowners associations in surrounding area to periodically meet and discuss further development of ECC and use of territory exchanged by City and ECC. BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute an intergovernmental agreement, in such form as is approved by the Corporation Counsel, between the City of Elgin and Elgin Community College. BE IT FURTHER RESOLVED that an executed copy of the intergovernmental agreement authorized by this resolution shall be placed on file with the City Clerk. s/ Kevin Kelly Kevin Kelly, Mayor Presented: October 11, 1995 Adopted: October 11, 1995 Vote: Yeas 4 Nays 3 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk F J F- O V N O F- N .N J W R L) co N ^ a s{ ft5 = a ' Au i`IY U N M n a O D � m m Q Mr. Walter J. Magdziarz Buraidge Cassell Associates 2425 Royal Boulevard Elgin, Illinois 60123 Re: Preliminary Subsurface Exploration for Proposed ECC Development Elgin, Illinois PSI Project Number: 042 -55009 Gentlemen: In compliance with your instructions, we have conducted a preliminary subsurface exploration for the referenced project. The results of this exploration, together with our recommendations, are to be found in the accompanying report, three (3) of which are being transmitted herewith. If you have any questions concerning the report or require any additional information, please feel free to contact PSI at any time. Very truly yours, PROFESSIONAL SERVICE INDUSTRIES, INC. Matthew E. Ribordy Elgin Branch Manager MER/slb 666 To pate Hoed, Ltd W • F7ph, L 90123 • F xx : 708/831 -7110 • Fax : 708/8011.7125 i i i i I I WYi1�ilr s, �11);ilmmllj lit. 1. TITK� .t1 i r � r • ,� Dly PROFESSIONAL SERVICE INDUSTRIES, INC. NUMBER I PSI PROJECT 042-551-1,11 ► #I ilk • • r - -matt °n proposed ECC L This report presents the results of a soils exploration for the Development conducted for Burnidge Cassell Associates. The work for this project was performed in accordance with our Prop 1VN° : the 001 dated January 1995. Authorization to perform this exploration and analysis form of a letter agreement, dated 1995 fr om Burnidge Cassell Associates to Professional Service Industries, Inc. hLrVp1e loration and analysis was to identify The purpose of this preliminary subsurface exp the various soil and/or rock profile componems, test the engineering characteristics of the materials encountered, provide information to the Des Architects which Design Engineers and Archi preliminary design criteria, and to aid in the development of a could be used to formulate 8 and more comprehensive program for obtaining final design information. Additional field eering analysis of the data will be required prior to laboratory testing and an engin final design of the foundation system. voce The scope of the exploration and analysis included a reconnaissance of the immediate sis and site, the subsurface exploration, field and laboratory testing, and an engineering analy evaluation of the foundation materials•' The scope of services did not include any environmental assessment for the presence or absence of wetlands or hazardous or toxic materials in the soil, surface on the this groundwater, or air, on or below or around this site, Ay star ms oriconditions are strictly boring logs regarding odors, colors or unusual orsuspicious or development of this site, am for the information of the client. Prior to purchase environmental assessment is advisable. oral trio findings, recommendations, The Geotechnical Engineer warrants that £ter being, specifications, or professional advice contained herein. have been presented i' M ■ f sell r . -i . . r$ — — This preliminary report has been prepared for the exclusive use of Burmidge Cassell Associates for the specific application to the proposed ECC Development, yy _.+. M The site for the proposed future development upon which this soils exploration has been made, is located throughout the Spartan Meadows Golf Course in Elgin, Illinois. t 3 MID **444 991 • • The field exploration to evaluate the engineering characteristics of the foundation materials included a reconnaissance of the project site, drilling the test borings, performing standard penetration tests and recovering split barrel samples. The depth to groundwater was recorded in each test boring after completion,. Six (6) test borings and sixteen (16) auger profile borings were drilled to depths ranging from ten (10) feet to twenty -five (25) feet below the existing ground surface. They were drilled in the locations determined by Bumidge Cassell Associates, and are indicated on the Boring Location Plan provided in the Appendix. The test borings were located in the field by the PSI Driller utilizing normal taping procedures. They are presumed to be accurate to within a few feet. After completion of the test borings, the drill holes were backfrlled with excavated soil and the site was cleaned as required. Drilling and Sampling Procedures The structure borings were made by a drilling rig equipped with a rotary head. Hollow -stem augers were used to advance the holes. Representative samples were obtained employing split- barrel sampling procedures in general accordance with the procedures for "Penetration Test and Split- Barrel Sampling of Soils" (ASTM D 1586.) 0 The auger profile borings were made by a drilling rig equipped with a rotary head. Continuous flight augers were used to advance the holes. The augers wen advanced for a of the soil profile and frequely a minimum rotation to avoid soil samples were obtained from the material retained sampling and lodging. Representative on the spiral flights of the auger. Field Tes`c and Measure n4f Pe.d.rltt'on Tests - During the sampling pr°ccdure' standard penetration tests (SPT) were performed at predetermined intervals to obtain the standard penetration value of the soil. The standard penetration value (N) is defined as the number of blows of a 140 pound hammer, falling thirty (30) inches, required to advance the split -barrel sampler one (1) foot . into the soil. The sampler is lowered to the bottom of the previously cleaned drill hole and advanced by blows from the hammer. The number of blows are recorded for each of three (3) successive increments of six (6) inches penetration. The "N" value is obtained by gadding the second and third incremental numbers. The results of the standard penetration indicate the relative density of cohesionless soils and comparative y of cohesive soils, and thereby provide a basis for estimating the relative strength comp the soil profile components. ``dater Av.el Measurements - Water level depths were obtained during the test boring operations. They are noted on the test boring logs presented in the Append liable relatively pervious soils, such as sandy soils, the indicated depths are usually groundwater levels. In relatively impervious soils, a suitable estimate of the groundwater depth may not be possible, even after several days of observation. Seasonal variations, influence theldepths proxhmity to groundwater Volume of watery will largely conditions epend on the permeability of the soils- Ground Surface Elevations - Ground surface elevations at the test boring locations were not provided. Therefore, all references to depth of the various strata and materials encountered are from existing grade at the time of drilling. In addition to the field exploration, a supplemental laboratory testing program was conducted to evaluate additional pertinent engineering characteristics of the foundation materials necessary in analyzing the behavior of the foundation systems for the proposed development. The laboratory testing program included supplementary visual classification and water content tests on all samples. In addition, selected samples were subjected to Atterberg Limits Tests ASTM D43181 vmh:rorw a.nb. WKkAWss. Estimates of unconfined compressive strengths were made on cohesive samples by the use of a calibrated penetrometer. All phases of the laboratory testing program were conducted in general accordance with applicable ASTM Specifications. The results of these tests are to be found on the accompanying boring logs located in the Appendix. SUBSURFACE C®NDMONS General The types of foundation bearing materials encountered in the test borings have been visually classified. They are described on the boring logs. The results of the field penetration tests, strength tests, water level observations and other laboratory tests are presented on the boring logs in graphic and numerical form. The soil profile encountered: was erratic. Representative samples of the soils were placed in sample jars. They are now stored in the laboratory for further analysis if desired. Unless notified to the contrary, 'all samples will be disposed of after three (3) months. The stratification of the soil as shown on the boring logs, represents the soil conditions at the actual boring locations. Variations may occur between the borings. Lines of demarcation represent the approximate boundary between the soil types, but the transition may be gradual, or not clearly defined. Soil Conditions Borings B-1 through B-5 were taken along the existing gravel access road which connects the Spartan Meadows club house with the equipment shed, The borings were spaced at approximately 200' intervals, and were extended to depths of between (10) and fifteen (15) feet below the existing ground surface. An idealized soil profile along the boring locations would be as follows: 0' - !': Very dense, brown sand and gravel fill. This was a compacted material similar in composition to IDOT CA-6 which was used as the roadway base. V - 3.5': Consists of a consolidated, very stiff, black silty clay. Qp values generally range between 2.0 tsf and 4.0 tsf. The moisture content of this soil ranged from 15 to 20 percent. 3.5' -10.0% Consists of a soft, normally consolidated, yellow and gray clay. Qp values for this soil generally were in the range of 0.25 tsf to 0.50 tsf. The moisture content of this soil ranged from 20 to 34 percent. The results of tests on a selected soil sample from this stratum indicate that 4 7M 17 0 J J I the material is medium in plasticity, with an average liquid limit of approximately 34% and an average plasticity index of 14%. The elevation of the groundwatu ipprOximately 5 feet below the existing ground surface; Borings B-6 through B -1I were performed along a route which crossed through the golf course in an east to west direction (see the boring site plan for specific test locations). In general, the surface of this area is covered by a mantle of black, clayey silt topsoil which is approximately 2 to 3 feet in thickness. The topsoil is underlain in most areas by a mixture of silty or clayey sands and clayey silts. A uniform soil profile was not evident from the borings. The groundwater elevation in this area varied from a depth of 1 foot near boring , B-9 to greater than 10 feet in borings B-6 an &7: - In the area of boring &8, which was performed very near an existing pond, the soil conditions were somewhat different than what was encountered in the other boring locations. The black, clayey silt topsoil in this location extended to a depth of 5 feet below the existing ground surface. The moisture content of this soil was significantly higher than in other boring locations. Moisture content results were 32 and 60 percent, at depths of 1 and 3 feet, respectively. Based on the moisture content test results, the topsoil located near the pond probably contains a greater percentage of organic than topsoil located in other areas of the golf course. Borings B -12 through &15 were initially performed to delineate significant areas of peat or other highly organic soils. During our exploration, no peat was encountered in any of the borings. The soils found were similar to what had been discovered in other areas of the golf course; black, clayey silt topsoil underlain by soils ranging from silty sands to very stiff, silty clays. The groundwater depth was also very erratic as it ranged from 1 foot in boring &13 to greater than 10 feet in boring 1314. The six, twenty-foot structure borings taken throughout the proposed development, again indicate a very erratic and changing soil profile. Soils ranging from silty clays to we114 graded sands, were encountered during drilling. It should be noted, however, that except for SB-4, the soils encountered dad seem suitable for supporting future construction. In the area of SB-4, the upper thirteen (13) feet consists of soft, organic soils, or, normally consolidated, very soft clays. Standard penetration values range from six (6) blows per foot, to one (1) blow advancing the split spoon eighteen (18) inches. The moisture contents of these soils are very high, ranging from thirty -six (36) to ninety-nine (99) percent. The compressibility of these soils, as indicated by a comparison of the Atterberg Limits to the natural moisture content, the relative strength and the standard penetration resistance is very high. 5 f i M11OW)"04 .If. a alt." o The water levels measured in the test borings ranged from one (1) foot to greater than ten (10) feet below the ground surface. These water levels were erratic and may indicate, a complicated hydraulic condition consisting of a perched water level. The level of the perched water is related to permeability, lateral drainage, the amount of rainfall in previous months and may even be nonexistent during dry periods. •'tt Prior to any construction on the proposed site, a thorough subsurface investigation should be performed. The test borings indicate that the soil composition may change significantly within small distances throughout the site. Therefore, a thorough investigation is necessary to accurately define the existing soil conditions used in the design process. R