Loading...
94-0525 Western Area II Voucher 20 RESOLUTION AUTHORIZING THE ISSUANCE OF VOUCHER NUMBER 20 OF SPECIAL ASSESSMENT WESTERN ELGIN AREA II WHEREAS, the engineer' s payment estimate in the amount of $191, 655 . 32 has been presented to the City for work completed on Special Assessment Western Elgin Area II , a copy of said engineer' s estimate being attached hereto and made a part hereof . NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF LOCAL IMPROVEMENTS OF THE CITY OF ELGIN, that the Board of Local Improvements hereby approves the issuance of the following voucher in the following amount for Special Assessment Western Elgin Area II : Voucher No. 20 in the amount of $191, 655 . 32 to Arrow Road Construction. A copy of said voucher being attached hereto and made a part hereof. s/ George VanDeVoorde George VanDeVoorde, President Board of Local Improvements City of Elgin Presented: May 25, 1994 Adopted: May 25, 1994 Vote: Yeas 6 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk SPECIAL ASSESSMENT VOUCHER CITY OF ELGIN STATE OF ILLINOIS COUNTIES OF KANE AND COOK VOUCHER NO. 20 WESTERN ELGIN AREA II SPECIAL ASSESSMENT NO. TX 92 0004 $191,655.32 SPECIAL ASSESSMENT VOUCHER OF THE CITY OF ELGIN, KANE AND COOK COUNTIES, ILLINOIS: To the Finance Director of the City of Elgin, Illinois. From funds to be obtained by collection of the special assessment made by the City of Elgin, Kane and Cook Counties, Illinois, in proceedings filed in the Circuit Court of Kane County, Illinois, and confirmed by the said Court on the 23rd day of July, 1992 and on the 1st day of September, 1992, in proceedings bearing Docket Number TX 92 0004 for the purpose of paying the cost of construction work of the improvement known as Western Elgin Area II in said City of Elgin, the said City of Elgin will pay to Arrow Road Construction, or order, when collected, the sum of One Hundred Ninety-One Thousand Six Hundred Fifty-Five and 32/100ths ($191,655.32) with interest thereon from the date hereof at the rate of seven percent (7%) per annum. This Voucher is given pursuant to authority conferred by the General Assembly of the State of Illinois in Article 9, Division 2, Paragraphs 9-2-1 through 9-2-144 of the Illinois Municipal Code (Ill. Revised Statutes, Chapter 24, Paragraphs 9-2-1 through 9-2-144) , in the matter of the aforesaid improvement and is the 20th Voucher issued on account of such work done. This voucher was authorized by. the Board of Local Improvements. IN WITNESS WHEREOF, the City of Elgin Board of Local Improvements has caused this Voucher to be executed by its Mayor, countersigned by its Clerk, and its corporate seal o be affixed hereto at the City of Elgin, Illinois, this 14th d=,rof July, 1994. George , nDeVoorde, Mayor Countersigned: z,.,,,,(' // l -c,c4 t,- Dolonna Mecum, City Clerk Received the original of the foregoing Voucher this /r day of July, 1994. ARROW OAD CONSTRUCTION BY �� ���� • CITY OF ELGIN KANE COUNTY,ILLINOIS AREA II STREET AND SEWER IMPROVEMENTS CITY COST CENTER No:7109 ENGINEER'S FINAL PAYMENT ESTIMATE CONTRACTORS JOB NUMBER: 675 ESTIMATE NO.11 FROM DECEMBER 7,1993 TO JULY 1,1994 CONTRACTOR'S INVOICE NUMBER: 61880 PAYABLE TO: ARROW ROAD CONSTRUCTION 3401 SOUTH BUSSE ROAD P.O.BOX 334 MOUNT PROSPECT,ILLINOIS 60056 (708)437-0700 ITEM AWARDED ADDED DEDUCTED COMPLETED No. DESCRIPTION UNIT QUANTITY VALUE QUANTIT QUANTITY QUANTITY UNIT PRICE VALUE 1 EARTH EXCAVATION CU YD 49265 $228,589.60 2129 47136 $4.64 $218,711.04 2 TRENCHBACKFILL CU YD 10334 $191,592.36 49 10285 $18.54 $190,683.90 3 SUB-BASE GRANULAR MATERIAL TYPE B TON 4387 $53,170.44 2198 6585 $12.12 $79,810.20 4 TOPSOIL PLACEMENT(4") SQ YD 33598 $43,341.42 625 32973 $1.29 $42,535.17 5 12'AGGREGATE BASE COURSE,TYPE B TON 6635 $52,880.95 127 6508 $7.97 $51,868.76 6 8"AGGREGATE BASE COURSE,TYPE B TON 34619 $303,608.63 3383 31236 $8.77 S273,939.72 7 8"BITUMINOUIS BASE COURSE TON 4227 $127,824.48 3981 8208 $30.24 $248,209.92 8 BITUMINOUS MATERIALS(PRIME COAT) GAL 21143 $16,491.54 243 20900 $0.78 $16,302.00 9 BITUMINOUS SURFACE PLANT MIX,CLASS B(MODIFIE TON 18695 $507,382.30 1913 20608 $27.14 $559,301.12 10 RELOCATE WATER OR SLUDGE MAIN EACH 10 $20,600.00 6 4 $2,060.00 $8,240.00 11 10"DIA.RCCP STORM SEWER TYPE I,CLASS IV LN FT 234 $3,615.30 17 251 $15.45 $3,877.95 12 12'DIA.RCCP STORM SEWER TYPE I,CLASS IV LN FT 2864 $47,198.72 93 2957 $16.48 $48,731.36 13 15"DIA RCCP STORM SEWER TYPE I,CLASS IV LN FT 2103 $34,657.44 6 2097 $16.48 $34,558.56 14 15"DIA.RCCP STORM SEWER TYPE 2,CLASS III LN FT 2637 $43,457.76 102 2739 $16.48 $45,138.72 15 18'D1A.RCCP STORM SEWER TYPE I,CLASS IV LN FT 70 $2,018.80 1 71 $28.84 $2,047.64 16 18'DIA.RCCP STORM SEWER TYPE 2,CLASS III LN FT 1150 $21,321.00 6 1156 $18.54 $21,432.24 17 21"DIA RCCP STORM SEWER TYPE I,CLASS IV LN FT 329 $6,777.40 34 363 $20.60 $7,477.80 18 21'DIA RCCP STORM SEWER TYPE 2,CLASS III LN FT 624 $12,854.40 53 677 $20.60 S13,946.20 19 24'DIA.RCCP STORM SEWER TYPE 2,CLASS HI LN FT 1346 $31,886.74 181 1165 $23.69 $27,598.85 20 27'DIA RCCP STORM SEWER TYPE I,CLASS IV LN FT 312 $9,640.80 32 280 $30.90 $8,652.00 21 27"DIA RCCP STORM SEWER TYPE 2,CLASS III LN FT 391 $12,081.90 17 408 $30.90 $12,607.20 22 36'DIA RCCP STORM SEWER TYPE 2,CLASS III LN FT 1717 $67,203.38 589 1128 $39.14 $44,149.92 23 42"DIA.RCCP STORM SEWER TYPE Z CLASS III LN FT 661 $29,275.69 5 656 $44.29 $29,054.24 24 48"DIA RCCP STORM SEWER TYPE 2,CLASS III LN FT 1243 $64,014.50 20 1223 $51.50 $62,984.50 25 14'x 23'ELL.RCCP ST.SEWER,TYPE 1,CLASS IV LN FT 629 $25,914.80 3 632 $41.20 $26,038.40 26 8"DIA PVC SANITARY SEWER LN FT 43 $1,328.70 146 189 $30.90 $5,840.10 27 10'DIA PVC SANITARY SEWER LN FT 245 $8,832.25 13 258 $36.05 $9,300.90 28 15"DIA.PVC SANITARY SEWER LN FT 6 $1,854.00 6 $309.00 $1,854.00 29 MANHOLE SPECIAL NO.1 EACH 1 $3,914.00 1 $3,914.00 $3,914.00 30 4'DIA MANHOLE TYPE A EACH 18 $16,686.00 2 16 $927.00 $14,832.00 31 5'DIA MANHOLE TYPE A EACH 46 $61,594.00 3 49 $1,339.00 $65,611.00 32 6 DIA.MANHOLE TYPE A EACH 7 $21,630.00 2 9 $3,090.00 $27,810.00 33 4'DIA.CATCH BASIN,TYPE A(QTY REDUCED C.O.#1) EACH 105 $91,927.50 7 98 $875.50 $85,799.00 34 2'DIA INLET,.TYPE A EACH 2 $1,030.00 1 3 $515.00 $1,545.00 35 ADJUSTING FRAMES&GRATES EACH 101 $10,403.00 61 40 $103.00 $4,120.00 36 CB'S&DRY WELLS TO BE FILLED WITH SAND EACH 41 $4,223.00 2 43 $103.00 $4,429.00 37 B6.I8 COMBINATION CURB&GUTTER LN FT 38492 $297,543.16 2906 41398 $7.73 $320,006.54 38 B6 BARRIER CURB LN FT 414 $3,626.64 6 420 $8.76 $3,679.20 39 DRIVEWAY PAVEMENT REMOVAL SQ YD 1148 $2,663.36 673 1821 $2.32 $4,224.72 40 COMBINATION CURB&GUTTER REMOVAL LN FT 3154 $4,888.70 296 2858 $1.55 $4,429.90 41 SIDEWALK REMOVAL(39,000 S.F.INCREASE C.O.#2) SQ FT 52485 $15,745.50 30758 122243 $0.30 $36,672.90 42 BITUMINOUS SURFACE REMOVAL(COLD MILLING) SQ YD 3586 $7,315.44 1678 1908 $2.04 $3,892.32 43 FIRE HYDRANTS TO BE MOVED EACH 3 $4,635.00 3 $1,545.00 $4,635.00 44 SODDING SQ YD 33297 $80,578.74 324 32973 $2.42 $79,794.66 45 TRAFFIC CONTROL L SUM 1 $44,476.43 1.00 $44,476.43 $44,476.43 46 MOBILIZATION L SUM 1 $60,358.00 1.00 $60,358.00 $60,358.00 47 SIDEWALK(39,070 S.F.INCREASED QUANTITY C.O.#2) SQ FT 93204 $210,641.04 30688 123892 $2.26 $279,995.92 48 DRIVEWAY SQ YD 6433 $129,496.29 767 7200 $20.13 $144,936.00 49 WATER MAIN ENCASEMENT LN FT 14 $1,442.00 14 $103.00 $0.00 50 ENGINEERS FIELD OFFICE L SUM 1 $9,270.00 1.00 $9,270.00 $9,270.00 51 UNDERGROUND LIFT STATION L SUM 1 $47,380.00 1.00 $47,380.00 $47,380.00 52 4'DUCTILE IRON FORCEMAIN LN FT 1372 $21,197.40 27 1399 $15.45 $21,614.55 53 DUCTILE IRON PIPE,CLASS 52,CEMENT LINED 4" LN FT 10 $2575.00 5 15 $257.50 $3,862.50 54 DUCTILE IRON PIPE,CLASS 52,CEMENT LINED 6" LN FT 10 $2,575.00 55 65 $257.50 $16,737.50 55 DUCTILE IRON PIPE,CLASS 52,CEMENT LINED 8" LN FT 2890 . $53,580.60 33 2857 $18.54 $52,968.78 56 VALVE VAULT 5'DIAMETER,TYPE 1 FRAME CLOSED LI EACH 11 $12,463.00 3 14 $1,133.00 $15,862.00 57 GATE VALVE,8' EACH 1 $360.50 1 $360.50 $360.50 58 FIRE HYDRANT EACH 4 $5,356.00 4 $1,339.00 $5,356.00 59 PRESSURE CONN&710N EACH 11 $22,660.00 12 $2,060.00 $24,720.00 60 WATER SERVICES NEAR SIDE EACH 27 $11,124.00 1 26 $412.00 $10,712.00 61 WATER SERVICES FAR SIDE EACH 35 $23,432.50 3 38 $669.50 $25,441.00 TOTALS $3,256,207.10 $3,524,338.83 •This total reflects quantity changes included in Change Orders#1&#2 UNIT MISCELLANEOUS EXTRAS AND CREDITS QUANTITY PRICE VALUE CHANGE ORDER#1,JUNE 24,1993 62. 2'DIA TYPE"C"CATCH BASIN EACH 15 $681.25 $10,218.75 63. 6"DIA PVC SANITARY SEWER LN FT 687 $29.98 $20,596.26 64. STRUCTURE RECONSTRUCTION EACH 60 $550.00 $33,000.00 65. FRAME&GRATE,TYPE I EACH 52 $150.00 $7,800.00 66. DUST CONTROL UNIT 15 $13.00 $195.00 CHANGE ORDER#2,AUGUST 25,1993 67. 5'DIA SANITARY MANHOLE EACH 3 $1,700.00 $5,100.00 68. UNSUITABLE SOIL REMOVAL&REPLACEMENT CU VD 8452 $29.00 $245,108.00 69. 8"CONCRETE PATCH SQ YD 36 $20.00 $720.00 70. 10"ASPHALT PATCH SQ YD 379 $40.00 $15,160.00 CHANGE ORDER#3,DECEMBER 8,1993 71. PETROMAT SQ YD 3420 $1.06 $3,625.20 72. 6"X6"WOLMANI7FD TIMBER TREE WELLS SQ FT 538 $23.00 $12,374.00 73. B-BOXES L SUM I $10,000.00 $10,000.00 74. 36"CONC PIPE RETURNED(PERFORATED) L SUM 1 $13,443.42 $13,443.42 75. CREDIT FOR RECYCLED BIT-MIX TON 1 8990 $1.50 ($28,485.00) 76. CREDIT FOR REDUCED THICKNESS OF C.C&G. L.F. 41398 $0.80 ($33,118.40) 77. DEDUCTION FOR WATERMAIN REPAIR L SUM 1 $3,187.67 ($3,187.67) 78. DEDUCTION FOR SIGN REPLACEMENT L SUM 1 $3,781.95 ($3,781.95) TOTAL MISCELLANEOUS EXTRAS AND CREDITS $308,767.61 TOTAL VALUE OF COMPLETED WORK $3,833,106.44 DEDUCT RETAINAGE(0%) $0.00 BALANCE DUE ON COMPLETED WORK $3,833,106.44 MISCELLANEOUS DEBITS VALUE PREVIOUS PAYMENTS PAYOUT NUMBER 1,APRIL 1,1993 $132,444.12 •PAYOUT NUMBER 2,APRIL 22,1993 $229,183.05 PAYOUT NUMBER 3,MAY 4,1993 $132,102.64 PAYOUT NUMBER 4,JUNE 1,1993 $394,614.16 PAYOUT NUMBER 5,JULY 1,1993 $259,347.25 PAYOUT NUMBER 6,JULY 30,1993 $408,951.03 PAYOUT NUMBER 7,AUGUST 27,1993 $662,493.09 PAYOUT NUMBER 8,SEPTEMBER 30 1993 $530,583.63 PAYOUT NUMBER 9,OCTOBER 29,1993 $610,810.27 PAYOUT NUMBER 10,DECEMBER 9,1993 $280,921.88 TOTAL MISCELLANEOUS DEBITS&PREVIOUS PAYMENTS $3,641,451.12 NET AMOUNT DUE $181,655.32 APPRO z• d►L 14.4-12- r. ` DATED —7 '— I ,1584 411M7'....—ROJECT_ ENGINEER APPROVED ��l, ∎�� At . _' DATED / ,1854 Or / ' CITY GINEER • • • CITY OF ELGIN KANE COUNTY,ILLINOIS AREA II STREET AND SEWER IMPROVEMENTS CITY COST CENTER No:7109 ENGINEER'S FINAL PAYMENT ESTIMATE CONTRACTOR'S JOB NUMBER: 675 ESTIMATE NO.11 FROM DECEMBER 7,1993 TO JULY 1,1894 CONTRACTOR'S INVOICE NUMBER: 61880 PAYABLE TO: ARROW ROAD CONSTRUCTION 3401 SOUTH BUSSE ROAD P.O.BOX 334 MOUNT PROSPECT,ILLINOIS 60056 (708)437-0700 ITEM AWARDED ADDED DEDUCTED COMPLETED No. DESCRIPTION UNIT QUANTITY VALUE QUANTIT QUANTITY QUANTITY UNIT PRICE VALUE 1 EARTH EXCAVATION CU YD 49265 $228,589.60 2129 47136 $4.64 $218,711.04 2 TRENCH BACKFILL CU YD 10334 $191,592.36 49 10285 $18.54 $190,683.90 3 SUB-BASE GRANULAR MATERIAL TYPE B TON 4387 $53,170.44 2198 6585 $12.12 $79,810.20 4 TOPSOIL PLACEMENT(4") SQ YD 33598 $43,341.42 625 32973 $1.29 $42,535.17 5 12'AGGREGATE BASE COURSE,TYPE B TON 6635 $52,880.95 127 6508 $7.97 $51,868.76 6 8"AGGREGATE BASE COURSE,TYPE B TON 34619 $303,608.63 3383 31236 $8.77 $273,939.72 7 8"BITUMINOUIS BASE COURSE TON 4227 $127,824.48 3981 8208 $30.24 $248,209.92 8 BITUMINOUS MATERIALS(PRIME COAT) GAL 21143 $16,491.54 243 20900 $0.78 $16,302.00 9 BITUMINOUS SURFACE PLANT MIX,CLASS B(MODIFIE TON 18695 $507,382.30 1913 20608 $27.14 $559,301.12 10 RELOCATE WATER OR SLUDGE MAIN EACH 10 $20,600.00 6 4 $2,060.00 $8,240.00 11 10'DIA.RCCP STORM SEWER TYPE I,CLASS IV LN FT 234 $3,615.30 17 251 $15.45 $3,877.95 12 12'DIA.RCCP STORM SEWER TYPE I,CLASS IV LN FT 2864 $47,198.72 93 2957 $16.48 $48,731.36 13 15'DIA RCCP STORM SEWER TYPE I,CLASS IV LN FT 2103 $34,657.44 6 2097 $16.48 $34,558.56 14 15'DIA.RCCP STORM SEWER TYPE 2,CLASS III LN FT 2637 $43,457.76 102 2739 $16.48 $45,138.72 15 18'DIA.RCCP STORM SEWER TYPE 1,CLASS IV LN FT 70 $2,018.80 1 71 $28.84 $2,047.64 16 18'DIA.RCCP STORM SEWER TYPE 2,CLASS III LN FT 1150 $21,321.00 6 1156 $18.54 $21,432.24 17 21"DIA.RCCP STORM SEWER TYPE I,CLASS IV LN FT 329 $6,777.40 34 363 $20.60 $7,477.80 18 21"DIA RCCP STORM SEWER TYPE 2,CLASS III LN FT 624 $12,854.40 53 677 $20.60 $13,946.20 19 24"DIA.RCCP STORM SEWER TYPE 2,CLASS III LN FT 1346 $31,886.74 181 1165 $23.69 $27,598.85 20 27'DIA.RCCP STORM SEWER TYPE I,CLASS IV LN FT 312 $9,640.80 32 280 $30.90 $8,652.00 21 27"DIA RCCP STORM SEWER TYPE 2,CLASS III LN FT 391 $12,081.90 17 408 $30.90 $12,607.20 22 36'DIA.RCCP STORM SEWER TYPE 2,CLASS III LN FT 1717 $67,203.38 589 1128 $39.14 $44,149.92 23 42'DIA RCCP STORM SEWER TYPE 2,CLASS III LN FT 661 $29,275.69 5 656 $44.29 $29,054.24 24 48"DIA RCCP STORM SEWER TYPE 2,CLASS III LN FT 1243 $64,014.50 20 1223 $51.50 $62,984.50 25 14'x 23"ELL.RCCP ST.SEWER,TYPE 1,CLASS IV LN FT 629 $25,914.80 3 632 $41.20 $26,038.40 26 8"DIA.PVC SANITARY SEWER LN FT 43 $1,328.70 146 189 $30.90 $5,840.10 27 10'DIA PVC SANITARY SEWER LN FT 245 $8,832.25 13 258 $36.05 $9,300.90 28 15'DIA PVC SANITARY SEWER LN FT 6 $1,854.00 6 $309.00 $1,854.00 29 MANHOLE SPECIAL NO.1 EACH 1 $3,914.00 1 $3,914.00 $3,914.00 30 4'DIA.MANHOLE TYPE A EACH 18 $16,686.00 2 16 $927.00 $14,832.00 31 5'DIA.MANHOLE TYPE A EACH 46 $61,594.00 3 49 $1,339.00 $65,611.00 32 6'DIA.MANHOLE TYPE A EACH 7 $21,630.00 2 9 $3,090.00 $27,810.00 33 4'DIA CATCH BASIN,TYPE A(QTY REDUCED C.O.#1) EACH 105 $91,927.50 7 98 $875.50 $85,799.00 34 2'DIA INLET,TYPE A EACH 2 $1,030.00 1 3 $515.00 $1,545.00 35 ADJUSTING FRAMES&GRATES EACH 101 $10,403.00 61 40 $103.00 $4,120.00 36 CB'S&DRY WELLS TO BE FILLED WITH SAND EACH 41 $4,223.00 2 43 $103.00 $4,429.00 37 B6.18 COMBINATION CURB&GUTTER LN FT 38492 $297,543.16 2906 41398 $7.73 $320,006.54 38 B6 BARRIER CURB LN FT 414 $3,626.64 6 420 $8.76 $3,679.20 39 DRIVEWAY PAVEMENT REMOVAL SQ YD 1148 $2,663.36 673 1821 $2.32 $4,224.72 40 COMBINATION CURB&GUTTER REMOVAL LN FT 3154 $4,888.70 296 2858 $1.55 $4,429.90 41 SIDEWALK REMOVAL(39,000 S.F.INCREASE C.O.#2) SQ FT 52485 $15,745.50 30758 122243 $0.30 $36,672.90 42 BITUMINOUS SURFACE REMOVAL(COLD MILLING) SQ YD 3586 $7,315.44 1678 1908 $2.04 $3,892.32 43 FIRE HYDRANTS TO BE MOVED EACH 3 $4,635.00 3 $1,545.00 $4,635.00 44 SODDING SQ YD 33297 $80,578.74 324 32973 $2.42 $79,794.66 45 TRAFFIC CONTROL L SUM 1 $44,476.43 1.00 $44,476.43 $44,476.43 46 MOBILIZATION L SUM 1 $60,358.00 1.00 $60,358.00 $60,358.00 47 SIDEWALK(39,070 S.F.INCREASED QUANTITY C.O.#2) SQ FT 93204 $210,641.04 30688 123892 $2.26 $279,995.92 48 DRIVEWAY SQ YD 6433 $129,496.29 767 7200 $20.13 $144,936.00 49 WATER MAIN ENCASEMENT LN FT 14 $1,442.00 14 $103.00 $0.00 50 ENGINEERS FIELD OFFICE L SUM 1 $9,270.00 1.00 $9,270.00 $9,270.00 51 UNDERGROUND LIFT STATION L SUM 1 $47,380.00 1.00 $47,380.00 $47,380.00 52 4"DUCTILE IRON FORCEMAIN LN FT 1372 $21,197.40 27 1399 $15.45 $21,614.55 53 DUCTILE IRON PIPE,CLASS 52,CEMENT LINED 4" LN FT 10 $2,575.00 5 15 $257.50 $3,862.50 54 DUCTILE IRON PIPE,CLASS 52,CEMENT LINED 6" LN FT 10 $2,575.00 55 65 $257.50 $16,737.50 55 DUCTILE IRON PIPE,CLASS 52,CEMENT LINED 8" LN FT 2890 $53,580.60 33 2857 $18.54 $52,968.78 56 VALVE VAULT 5'DIAMETER,TYPE 1 FRAME CLOSED LI EACH 11 $12,463.00 3 14 $1,133.00 $15,862.00 57 GATE VALVE,8" EACH 1 $360.50 1 $360.50 $360.50 58 FIRE HYDRANT EACH 4 $5,356.00 4 $1,339.00 $5,356.00 59 PRESSURE CONNECTION EACH 11 $22,660.00 12 $2,060.00 $24,720.00 60 WATER SERVICES NEAR SIDE EACH 27 $11,124.00 1 26 $412.00 $10,712.00 61 WATER SERVICES FAR SIDE EACH 35 $23,432.50 3 38 $669.50 $25,441.00 TOTALS $3,256,207.10 $3,524,338.83 •This total reflects quantity changes included in Change Orders#1&#2 UNIT MISCELLANEOUS EXTRAS AND CREDITS QUANTITY PRICE VALUE CHANGE ORDER#1,JUNE 24,1993 62. 2'DIA TYPE'C"CATCH BASIN EACH 15 $681.25 $10,218.75 63. 6'DIA PVC SANITARY SEWER LN FT 687 $29.98 $20,596.26 64. STRUCTURE RECONSTRUCTION EACH 60 $550.00 $33,000.00 65. FRAME&GRATE,TYPE I EACH 52 $150.00 $7,800.00 66. DUST CONTROL UNIT 15 $13.00 $195.00 CHANGE ORDER#2,AUGUST 25,1993 67. 5'DIA SANITARY MANHOLE EACH 3 $1,700.00 $5,100.00 68. UNSUITABLE SOIL REMOVAL&REPLACEMENT CU YD 8452 $29.00 $245,108.00 69. 8"CONCRETE PATCH SQ YD 36 $20.00 $720.00 70. 10"ASPHALT PATCH SQ YD 379 $40.00 $15,160.00 CHANGE ORDER#3,DECEMBER 8,1993 71. PETROMAT SQ YD 3420 $1.06 $3,625.20 72. 6"X6"WOLMANIZED TIMBER TREE WELLS SQ FT 538 $23.00 $12374.00 73. B-BOXES L SUM 1 $10,000.00 $10,000.00 74. 36"CONC PIPE RETURNED(PERFORATED) L SUM 1 $13,443.42 $13,443.42 75. CREDIT FOR RECYCLED BIT-MIX TON 18990 $1.50 ($28,485.00) 76. CREDIT FOR REDUCED THICKNESS OF C.C&G. L.F. 41398 $0.80 ($33,118.40) 77. DEDUCTION FOR WATERMAIN REPAIR L SUM 1 $3,187.67 ($3,187.67) 78. DEDUCTION FOR SIGN REPLACEMENT L SUM • 1 $3,781.95 ($3,781.95) TOTAL MISCELLANEOUS EXTRAS AND CREDITS $308,767.61 TOTAL VALUE OF COMPLETED WORK $3,833,106.44 DEDUCT RETAINAGE(0%) $0.00 BALANCE DUE ON COMPLETED WORK $3,833,106.44 MISCELLANEOUS DEBITS VALUE PREVIOUS PAYMENTS PAYOUT NUMBER 1,APRIL 1,1993 $132,444.12 • PAYOUT NUMBER 2,APRIL 22,1993 $229,183.05 PAYOUT NUMBER 3,MAY 4,1993 $132102.64 PAYOUT NUMBER 4,JUNE 1,1993 $394,614.16 PAYOUT NUMBER 5,JULY 1,1993 $259,347.25 PAYOUT NUMBER 6,JULY 30,1993 $408,951.03 PAYOUT NUMBER 7,AUGUST 27,1993 $662,493.09 PAYOUT NUMBER 8,SEPTEMBER 30 1993 $530,583.63 PAYOUT NUMBER 9,OCTOBER 29,1993 $610,810.27 PAYOUT NUMBER 10,DECEMBER 9,1993 $280,921.88 TOTAL MISCELLANEOUS DEBITS&PREVIOUS PAYMENTS $3,641,451.12 NET AMOUNT DUE $191,965.32 / 1 APPRO =" 1l ' DATED -7 - I ,1994 rim / '�"ROJECT ENGINEER APPROVED �-�.jL�� / ` A _ DATED 7/, ,1994 iir / F. CITY GINEER • • SINCE , ?_., 1925 1:, INVOICE NO. 61880 ARROW ROAD CONSTRUCTION COMPANY 3401 SOUTH BUSSE ROAD • P.O.BOX 334 • MT. PROSPECT. ILLINOIS 60056 TELEPHONE 437-0700 SOLD TO: City of Elgin LOCATION: Area II Street & Sewer Improvements 150 Dexter Court Elgin, IL 60120-5555 Attn: Mr. Steve Pertzborn OUR JOB NO. EST.NO. CUSTOMER CONTRACT OR P.O. '.O. TERMS PICKED UP AT PLANT INVOICE DATE 675 Final NET 10 DAYS 6/22/94 r. Sc-' �,�^,u. '4 ,> S .‘ e r: cr � > r.8'0' i t.A 't ge,,,,%, ,r _ t °q; ' rW s t r , 'a W w' i "5,t .�s 7 d 'dr"� eF t'' a7 w 4 � DES I"ol t4 ". 4' .< �tt� S '"£a 'X Q(,��( ' + �,., ,r ,d�,.,. rf �. � ? °�4', �, .,:'�., ,,..°„ ,,w t:r ,�.�^� ., :�a• r�,, ? � +��,.• p � ��Y'.t,sr, s �..��".a �4Y? ' rls� a�, Retention Rel-a e Request Contract Work Cor,"feted To Date 3,833,106.44 Less: Pay RequUo. ;r1 -132,444.12 2 -229,183.05 3 -132,102.64 4 -394,614.16 5 -259,347.25 6 -408,951.03 7 -662,493.09 8 -530,583.63 9 -610,810.27 '0 -280,921.88 Amount Due: 191,655.32 A SERVICE CHARGE OF 11/2% PER MONTH (18%PER ANNUM) FORM 101 2-83 WILL BE CHARGED O'" ALL ACCOUNTS AFTER 30 DAYS FINAL WAIVER OF LIEN STATE OF ILLINOIS SS Gty# COUNTY OF Cook • Loan# TO WHOM IT MAY CONCERN: WHEREAS the undersigned has been employed by City of Elgin to furnish Paving for the premises known as Area II Street & Sewer Improvements of which City of Elgin is the owner. The undersigned,for and in consideration of One Hundred Ninety—One Thousand, Six Hundred Fifty—Five and 32/100 ($ 19 1,655.32 ) Dollars, and other good and valuable consideration, the receipt whereof is hereby acknowledged, do(es) hereby waive and release any and all lien or claim of,or right to,lien,under the statutes of the State of Illinois,relating to mechanics'liens,with respect to and on said above-described premises, and the improvements thereon, and on the material, fixtures, apparatus or machinery furnished, and on the moneys,funds or other considerations due or to become due from the owner,on account of labor,services,material, fixtures,apparatus or machinery heretofore furnished,or which may be furnished at any time hereafter,by the undersigned for the above-described premises. Given under hand and seal this 23rd day of June 19 94 Signature and Seal: NOTE:All waivers must be for the full amount paid. If waiver is for a corporation, rporate name s ould be used,corporate seal affixed and title of officer signing waiver should be set forth;if waiver is for a partnership,the partnership name should be used,partner should sign and designate himself as partner. STATE OF ILLINOIS CONTRACTOR'S AFFIDAVIT SS COUNTY OF Cook TO WHOM IT MAY CONCERN: THE undersigned,being duly sworn,deposes and says that he is R. J. Rizzo Vice President of the Arrow Road Construction Co. who is the contractor for the paving work on the building located at Area II Street & Sewer Improvements owned by City of Elgin That the total amount of the contract including extras is$3,833, 106.44 on which he has received payment of $ 3,641,451 . 12 prior to this payment. That all waivers are true, correct and genuine and delivered unconditionally and that there is no claim either legal or equitable to defeat the validity of said waivers.That the following are the names of all parties who have furnished material or labor, or both for said work and all parties having contracts or sub contracts for specific portions of said work or for material entering into the construction thereof and the amount due or to become due to each,and that the items mentioned include all labor and material required to complete said work according to plans and specifications: CONTRACT AMOUNT THIS BALANCE NAMES WHAT FOR PRICE PAID PAYMENT DUE Arrow Road Construction Co. L.E.M. * 3,833,106.44 3,641,451.12 191,655.32 0.00 All materials taken from fully paid stock and delivered to jobisite in Arran s trucks. TOTAL LABOR AND MATERIAL TO COMPLETE _ 3,833,106.44 3,641,451.12 191,655.32 0.00 That there are no other contracts for said work outstanding,and that there is nothing due or to become due to any person for material,labor or other work of any kind done or to be done upon or in connection with said work other than above stated. Signed this 23rd day of June , 19 /_ /.�` ' •"OFFICIAL SEAL" Subscribed and sworn to before me this 23rd dtig June 19 94 Notary Public, State of Illinois ( \ My Commission Ex^fires 8 4 • 1 J\ / F.3870 Rl/89 i�(�/_