Loading...
93-287 Resolution No. 93-287 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH ATEC ASSOCIATES, INC. FOR ENVIRONMENTAL ASSESSMENT OF SOUTH GROVE AVENUE WHEREAS, the City of Elgin has heretofore entered into a contract with ATEC Associates, Inc. for an environmental assessment of South Grove Avenue; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Robert 0. Malm, Interim City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: November 17, 1993 Adopted: November 17, 1993 Vote: Yeas 6 Nays 1 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk ELGIN, ILLINOIS ADDITIONAL OVERSIGHT AND SERVICES FOR 210 SOUTH GROVE AVENUE AND 222-270 SOUTH GROVE AVENUE CHANGE ORDER NO. 1 SCOPE: This Change Order No. 1 covers additional oversight and services required at 210 South Grove site and 222-270 South Grove Avenue under a contract awarded on May 12, 1993 . The Contractor for this project is ATEC Associates, Inc. of Addison, Illinois . REASONS FOR CHANGE: This Change Order is required for the costs associated with the items requested by staff to complete the following work: 1 . Additional work associated with the preparation of bid specifications for the 210 South Grove Avenue projects . Aboveground Storage Tank Bid Due to the unknown quantity of product in the above- ground storage tanks, and the effect on the selec- tion of a contractor, it was necessary for ATEC to perform additional work to evaluate the contractor bids . • Only one contractor submitted a bid for the PCB project. To secure the best competitive bid, the PCB bid was offered a second time with additional contractors . ATEC required additional time for a site walk and contractor discussions for the second PCB bid. 2 . Oversight of the removal of soils from the underground and aboveground storage tank areas, and soil sampling following the removal of soil . Since it was necessary to excavate additional soils beyond the estimated 500 cubic yards, ATEC requires additional time for oversight of activities . Since this property is part of the lease with Hyatt, it will be necessary to collect confirmation soil samples for analysis following the removal of con- taminated soils . 3 . Environmental Services associated with the 210 South Grove Avenue and 222-270 sites . Including preparation of corrective action plans, meetings, and additional report requirements . 4 . Surveying associated with the Alternative Cleanup Objec- tives and Footprint of Proposed Terminal reports . Since it became apparent that it was necessary to submit re- ports to the Illinois Environmental Protection Agency (IEPA) and Hyatt, a baseline map including the location of all new and previously installed soil borings and monitoring wells was generated. This surveying included establishment of a grid system. Prior to this work, a site grid system was not established for the area. The surveying work was performed by Joseph A. Schudt and Associates . 5 . Environmental services associated with the removal of water from the basement of the building at 210 South Grove Avenue. This work included coordination with the Fox River Water Reclamation District (FRWRD) , meeting with FRWRD, sampling and analysis of water in the base- ment. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of contract will be revised as follows : ITEM COST CHANGE Item 1 Add $ 1,040 . 00 Item 2 Add $ 9, 127 . 00 Item 3 Add $12, 600. 00 Item 4 Add $ 1, 777 . 60 Item 5 Add $ 1, 373 . 10 The present contract with ATEC is for $31,664 . 00 . By reason of Change Order No. 1 the contract for the additional over- sight and additional services will be increased in the amount of twenty-five thousand nine hundred seventeen and 70/100 dollars ($25, 917 . 70) . The new revised contract total will be fifty-seven thousand five hundred eighty one and 70/100 ($57,581 . 70) . OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this 16th day of November, 1993 . Recommended: City of g By: / Date: Accepted: ATEC Associates, Inc. Party of the Second part (Contractor) Title: Date: Approved: City E1 in Part o e irst Part (Owner) By: VV Title: 'ey�,v,k �. Date: > >J 3�� i ' 1 8 ate 4 i IPOB oZ'liT; O S►i�id l' agog .� T ]cBL1I 9aa>ry-sue � and oo� of M I spa ram • oo'OeT� of on oo�cc of 0 s �yg 000ai of '0'� >�+o T � 91 ONT t UL'd ET@L-�Ji6/ WI --131H bZ:St 06. ST AM n Agenda Item No. November 15, 1993 TO: Mayor Y and Members of the City Council FROM: Robert O• Malm, Interim City Manager SUBJECT: Change Order No. and Services 1 for Additional 222-270 at 210 South Oversight South Grove Grove Avenue and Avenue POSE The purpose of this memorandum is t City Council Change services at the g Order No. 1 for forward to the Mayor Avenue and former D, additional Y and the propert H. Martin at oversight Avenue. Y located betweene 210 South ht and 222_270 Grove BACKGROUND South Grove ATEC Associates,and specifications, Inc. (ATEC story ) was awarded a Plans a tanks and nine above the removal Project d Prepare Avenue, ground storage f three underground Of previous) ATEC's scope of work g tanks at 210 remediation Y completed report, also included the South located Oversight and P installation review between 222_270 report preparation of soil borings, specifications prepared South Grove Avenue, of the ptOperty additionally included bl' ATEC The yards of soil the removalfor 210 South plans and cubic from under and disposal Grove Avenue Subsequently,of soil from ground story a °f 150 cubic quently, a contract the aboveground tank area, and 350 (BGS ground storage tank for the project, was awarded to BGS and Associate Attached is rates oversi Change Order No. with ght and services. 1 from ATEC regarding additional $25,917. 70, includes five items ATEC will be Provide l Present at the questions update on the remediation of November 17, 1993 f you may have regarding '''Ork and to g the change order.to answer any Change g Order No. 1 for Addi November 15, tional Oversight 1993 Page 2 9ht Services FINANCIAL IMPACT The change will result tract with ATEC from in a $25'917. 70 increase in the con- the oversight and sam $31'664 .00 to $57,581 . 70, for reimbursement Pling activities A Portion of storage tank fund from (Item 2) may and will be Illinois leaking underground eligible Fund (e tan The balance be Paid from the g underground account in the will come from the Risk Management 179504) . 1992 bond issue (342-0000-795. 92-32; rojet project RECOMMENDATION It is recommended the Order N 1 for the staff be directed additional oversi ht to execute Change g and services . Ro ert 40. alm Interim City Manager ROM:amp Attachments