Loading...
92-286 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH PRIME CONSTRUCTION, INC. FOR ELGIN MENTAL HEALTH CENTER WATER MAIN (W-24) WHEREAS, the City of Elgin has heretofore entered into a contract with Prime Construction, Inc. for the 1992 water distribution system improvements (W-24) ; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: November 11, 1992 Adopted: November 11, 1992 Omnibus Vote: Yeas 7 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk