92-0610 Elgin Builders qa_off,Ok- RESOLUTION APPROVING CHANGE ORDER NO. 4 IN THE CONTRACT WITH ELGIN BUILDERS, INC. FOR RENOVATION OF LORD'S PARK PAVILION WHEREAS, the City of Elgin has heretofore entered into a contract with Elgin Builders, Inc. for the renovation of Lord's Park Pavilion; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 4, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 4, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: June 10, 1992 Adopted: June 10, 1992 Vote: Yeas 6 Nays 0 Recorded: Attest: sl Dolonna Mecum Dolonna Mecum, City Clerk Elgin, Illinois • RENOVATION OF THE LORD' S PARK PAVILION CHANGE ORDER 4 SCOPE: This Change Order No. 4 covers additional work required to complete construction changes for renovation of the Lord' s Park Pavilion. The Contractor for this project is Elgin Builders , Inc. , of Elain , Illinois . REASONS FOR CHANGE: This Change Order is required for the costs associated with the items requested by staff to complete the following work. 1 . Removal of a deteriorated portion of the stone wall in the Basement between the elevator and the toilets . The circumstance necessitating this change was that upon demolition of the adjacent work it was found to have lost its structural integrity. This was an unforeseeable existing site condition. 2 . Revision of Toilet accessories and amenities . The reason necessitating this change is that it is in the best interests of the City . This change was recommended by the Parks and Recreation Department in order to improve the day-to-day maintenance and the usability of the toilets . 3 . Provided additional exterior receptacles around the porch. The reason necessitating this change is that it is in the best interests of the City . This change was recommended by the Parks and Recreation Department in order to provide exterior program flexibility as well as allow for future decorative lighting . 4 . Remove the existing concrete retaining wall at the north end of the Pavilion and the adjacent sidewalk . The reason necessitating this change is that it is in the best interests of the City. This work would have been apart of the future landscaping work around the Pavilion, but it became logical to remove it at this time to coordinate with the construction of the north stairs of the Pavilion. 5 . Installation of below grade roof drainage piping around the Pavilion on all sides . The reason necessitating this change is that it is in the best interests of the City . This will eliminate a potential slipping situation as water is emitted from the downspouts below grade in lieu of on grade. The original design intent was to maintain the existing downspout location. During the course of construction, the City staff requested this as an improvement to the original design. 6 . Removal of weathered and previously damaged porch deck around the exterior of the Pavilion. The reason necessitating this change is that it is in the best interests of the City . This removal cost is based upon unit costs asked for in the original specifications in anticipation of potential deck replacement . Original deck replacement was contemplated in the original contract , but the exact amount could only be determined once the rehabilitation was underway . 7 . Structural repairs required to brace and straighten the roofs of the north and south wings . The reason necessitating this change is that it was an unforeseen condition . It was not until the contractor began work around the perimeter that the condition became exposed. It is a condition that has existed for decades , but remained concealed. 8 . Relocation of the downspout drainage of the round roof on the west side of the Pavilion. This involves tearoff and rebuilding the roof pitch and repair of the fascia to accommodate the revised drainage. This work also includes related clapboard siding replacement . The City staff and the Architect requested this change in the roof system to accommodate the roof runoff in a more efficient and aesthetic manner. The reason necessitating this change is that it is in the best interest of the City. It will bring the downspouts closer to the majority of the water runoff from the upper roofs . It will also reduce the visual impact of the downspout across the face of the brick wall below. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows : ITEM COST CHANGE Item 1 Add $ 6 , 706. 00 Item 2 Add $ 3 , 432 . 00 Item 3 Add $ 3 , 570 . 00 Item 4 Add $ 1 , 996 . 00 Item 5 Add $ 4 , 377 . 00 Item 6 Add $ 459. 00 Item 7 Add $70 , 510 .00 Item 8 Add $ 3 , 846 .00 Total Add $94 , 896 . 00 The present contract with Elgin Builders , Inc . is for $959 , 965 . 00 . By reason of Change Order No . 4 the contract for the Renovation of the Lord' s Park Pavilion will be increased in the amount of Ninety Four Thousand Eight Hundred and Ninety Six and 00/100 Dollars ( $94 , 896 . 00 ) . The new revised contract total will be One Million Fifty Four Thousand Eight Hundred Sixty One and 00/100 Dollars ($1 , 054, 861 . 00 ) . OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this /Itt day of , 1992 4- 4, Recommended: PARKSDZeARTMENT By : Accepted: ELGIN BUILDERS , INC. Party of the Second Part (Contractor) By: Via,m.,/ . Title: Date : Approved: City City of Elgin Party of . he First Part (Owner) By : / Title :__AC— A Y0hrid,n_a.e.,_ , II Date : c.1 k—a_j ql-, (7; N ELGIN BUILDERS INC. 1801 Larkin Avenue ELGIN, ILLINOIS 60123 Phone (708) 742-0090 Fax (708) 742-0185 OWNER'S PHONE DATE NAME Dahiguist & IUt7OW STREET 74?-4(16_3 MaY12 .100 NAME -- :1 19924U R 472 No. McLean Blvd. Lord's Park Pavilion 520 CITY STATE STREET Elgin Illinois 100 Oakwoosi Blvd. EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE 8-30-91 R-10-91 Elgin You arc hereby authorized to perform the following specifically described additional work: STRUCTURAL CHANGES PER SK-13 and 13A . Shoring of floors for stone wall removal stone. wall....-. Labor 2.4. hrs. @IR) 960.00 - materials disposal 15 yds. @15 225.00 _ Excavation and backfill for footings .240.00. ....... .. .... ....... _Concrete footing 196.00 ____Masonry_changes N/C _of_floor slabs_in _107, 108, 109, 117 Labor 32 hrs. @40 1 ,260.00 -Concrete"disposal 6 yds. @ $15 90.00 Excavate to lower grade _and gravel 386.00 Air compressor rental 246.00 _ft conc.rete ab @ $2..60 _1 ,716.00 _ T_w_o nem.sto_o_r_fra me s 256.00 -$5,831 .00--- G.C.O.H. & P. 15% 870 ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 6,706.O0 Payment will be made as follows: Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. Date 19 Authorizing Signature lOWNER SIGNS HERE) We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price. Authorized Signature Date May 12, 1992 (CONTRACTOR SIGNS HERE) Th5. S C WGE OFP Ft; rNi Q 23 (Twenty-three) REVISED NOTE:This Revision becomes part of,and in conformance with,the existing contract. ..J�� r ;-rte A(�r •� !'•. r-w �• R r—r �^-�w^-. -� r^•,. .� ('1 . N n1 t' I'��':`+ /_'1 iI,..� + 1. �/-"�� !`,F .u`i / ��_.'.. ,. �� 'r. li fi /. .\ . t' r r )r. ! {1':.i� '\J' ,` +�i�er + ti .. ELGIN BUILDERS INC. 1801 Larkin Avenue ELGIN, ILLINOIS 60123 Phone (708) 742-0090 Fax (708) 742-0185 OWNER'S PHONE DATE NAME Dahlquist & Lutzow 742-4063 May 12, 1992 STREET JOB NAME JOB NUMBER 472 No. McLean Blvd. Lord' s Park Pavilion 570 CITY STATE STREET Elgin Illinois 100 Oakwood Blvd. EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE 8-30-91 Elgin IL You are hereby authorized to perform the following specifically described additional work: __.._...__.._._..._..___._CITY REQUESTED CHANGES PER SK-12 & 13A ...........- _... .... ._ .._........__......_____ —....__....._.___.._-__-- _..._...__.Lengthen_...counter...._top..._.. ...._..................... $86.00 _.. —____.__Chan.ges...._in. ha.throom....accessor.i es - 75.00.. .Stepmaster....floor in lieu. of specified ... . . 483.00 _.__._... ............. .......... . .._...._.......................... $64.4.00...._......._........... Plumbing changes 983.00 __.....Elec.tr.ical.._.. .hand.-dryers)........... ........ . _ 1 ,580.00 — - ..._.__.._.._..__.__._ ........_. ..2.,563..00._ . ..._......_ _— 128.00___-----..___��. _ ................._.._.-. 3;432.00 ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 3,432.00 Payment will be made as follows: Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. Date 19 Authorizing Signature (OWNER SIGNS HERE) We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price. 1 2 Authorized Signature �-�-z Date ay 19 92 �5 (CONTRACTOR SIGNS HERE) 11-)i CS L CHANGE O ► . E \:1 0, _ 23A (Twenty-three A)- REVISED \ NOTE:This Rovlelon becomes part ol.and In conformance MIA,the existing contract. ADDITIONAL WORK AUTHORIZATION ELGIN BUILDERS INC. 1801 Larkin Avenue ELGIN, ILLINOIS 60123 Phone (708) 742-0090 Fax (708) 742-0185 OWNER'S PHONE DATE NAME Dahlguist kJ lit7ow -742-40L3 JOB NAME . • STREET JB r : • 472 No. McLean Blvd. Lord' s Park Pavilion 520 CITY STATE STREET Elgin Illinois 100 oakwood Blvd. EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE IL You are hereby authorized to perform the following specifically described additional work: Eurnish_and_install_eight_(8.). xeceptacles-mounted-in- balcony_fiusb_with_the_cetling. (Ckt...31. controlled. via time clock) Furnish and install six (6) receptacles low on the exterior walls. (Ckt.331 $ 3,400.00 $ 4570_00_ ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 3,570.00 Payment will be made as follows: Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. Date 19 Authorizing Signature (OWNER SIGNS HERE) We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price. Authorized Signature Date May 12, 19 92 (CONTRACTOR SIGNS HERE) THIS IS CHANGE ORDER NO. 32 (Thirty-two) \ NOTE:Thle Revision becomes purl of,end In conformance with.the evicting contract. .y. ADDITIONAL WORK AUTHORIZATION ELGIN BUILDERS INC. 1801 Larkin Avenue ELGIN, ILLINOIS 60123 Phone (708) 742-0090 Fax (708) 742-0185 OWNER'S PHONE DATE NAME Dahlquist & Lutzow 742-4063 ' May 12, 1992 STREET JOB NAME JOB NUMBER 472 No. McLean Blvd. Lord's Park Pavilion CITY STATE STREET El gin Illinois 100 Oakwood Blvd. EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE 10-30-91 Elgin IL You are hereby authorized to perform the following specifically described additional work: Remove concrete wal k and retaininT wal 1 at north end. Backhoe 8 Hrs. @ $80 $ 640.00 Labor 8 Hrs. @ $40 320.00 A-i-r-comp ress or-renta-1----------- Concrete disRosal 2 loads @ 1110 220.00 Gravel backfill 110.00 ----Black--dirt--' 120.00 Rake seed 80:00 260.00 ,99_6_..00___ ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 1 ,q9fi_no Payment will be made as follows: Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. Date 19_ Authorizing Signature (OWNER SIGNS HERE) We hereby agree to furnish labor and materials-complete in accordance with the above specifications.at above stated price. Authorized Signature Date May 12, 1992 (CONTRACTOR SIGNS HERE) THIS IS CHANGE 0 •DER NO 33 (Thirty-three) \ NOTE:Thle Revision becomes part of,and In conformance with.the existing contract. rt.7:11T 0 Tv A 0 7 N. !I:\ T 7/7\77:7: ELGIN BUILDERS INC. 1801 Larkin Avenue ELGIN, ILLINOIS 60123 Phone (708) 742-0090 Fax (708) 742-0185 OWNER'S PHONE DATE NAME Dahlquist & I ut7nw 742-40.63 May 1992 STREET .100 NAME JOB NUMBER 472 H. McLean Blvd. Lord' s Park Pavilion 520 CITY STATE STREET Elwin Illinois 100 Oakwood Blvd. EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE 8-30.9_3 Elgin IL You are hereby authorized to perform the following specifically described additional work: Install underground P.V.C. piping, for roof and storm drainage. . _ _ _ 130' of 6" P.V.C. installed at $10 $1,800.00 222' of 4" P.V.C. installed at $9.20 2,109.00 100' of 4" P.V.C. reused at $1.03 Cemented fittings destroyed $3,806.00_ & P. (15%) 571.00 ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 4,377.00 Payment will be made as follows: Same as contract Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. Date 19 Authorizing Signature (OWNER SIGNS HERE) We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price. Authorized Signature Date May 15th 19 92 (CONTRACTOR SIGNS HERE) ;1 :; " INTr:\F, „•Lf, A !I .; U . 35 (thirty-five) Revised NOTE:This Revision becomes part of,and In conformance with.the exIallno contract. ; Yi '' (—)i.t\t•` r;'?.:`_. ^.1.Ir I: .i;7- �;.�' I'^�';�..r ,1'�..C"f,•,- ..�e�<'�� 7.? c 7; ELGIN BUILDERS INC. 1801 Larkin Avenue ELGIN, ILLINOIS 60123 Phone (708) 742-0090 Fax (708) 742.0185 OWNER'S PHONE DATE NAME Dahlquist & Lutzow 742-4063 May 15,1.992 STREET JOB NAME JOB NUMBER 472 N. Mclean Blvd_ 590 CITY STATE STREET Elgin Illinois 100 Oakwood Blvd. EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE 8-30-91 Elgin 11 You are hereby authorized to perform the following specifically described additional work: Porch deck replacement as directed by Bruce Dahlquist. 67 sq. ft. at $6.85 $459.00 ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 459-00 Payment will be made as follows: Sam as contract Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. Date 19 Authorizing Signature (OWNER SIGNS HERE) We hereby agree to furnish labor and materials-complete in accordance with the above specifications.at above stated price. - • Authorized Signature Date May 15th 42 • (CONTRACTOR SIGNS HERE) li � t. q,R7-7 '��`-: � ,� �4 •L. '41 f ' --- 3G (thirty-six)�------------ NOTE:This Revision becomes part of.and In conformance with.the existing contract. st, 'or',1 ,: �yt 7r�,'{�"4•,i,(t..`Y ` ..f..: 'Trti ,fiC';�'A"'a!��•� �1�} ..%'�.h...../:.✓.i .r'. L) L�S J"'..1-. U L! tE irk`.. J`.•l.l.i� .a _ ..�J' 1:u::_.+�-�. L ELGIN BUILDERS INC. 1801 Larkin Avenue ELGIN, ILLINOIS 60123 Phone (708) 742-0090 Fax (708) 742-0185 OWNER'S 'PHONE DATE NAME Dahlquist & Lutzovr 742-4063 May 19, 1992 STREET JOB NAME JOD NUMBER 472 N. McLean Blvd. Lord' s Park Pavilion 520 CITY STATE STREET Elgin 111inois 100 Oakwood lilvd_ EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE 8-30-91 Elgin IL You are hereby authorized to perform the following specifically described additional work: Structural.. .repairs...to brace and straighten roof. _....__ - ..._. _......_......--.._._..Struct.u.ral_. steel $ 4,335.00..... ... . .. _._... .............. .__. -.._......_._..:- Bui._1.ding....materials . 2,578.00.. ..... .... Roofing._._..........._._. . ._...................._............_ ... . ..... 1,920.00. ........ ... .......................... -_.._...._... Carpenter labor, 1312 hrs. at $40 . . 52,480.00 . $61,313.00 _ . �_..._....._.. _G_.._C_..0.H....& P. (.15%). 9,197.UO ....... ..._......... ..................-----..._.......... . .........__ — _.._.. . _._._........_....... ..... ........._............ ............_.._...... ... .... .. ... . . . .. $70,510.00_......._ ..... . .. ............._.... --- • ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 70,510.00 Payment will be made as follows: Same as contract Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. Date 19 Authorizing Signature (OWNER SIGNS HERE) We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price. Authorized Signature erz�e�' tCO �� Date May 19th 19 92 NTRACTOR SIGNS HERE) 1 IV-V 5 d'ti' r''��' `' ;i t., fl../"ti4.it L It"'')f!-�, y'?•i� (� 'I L/� u u >; 1' ��`�U�L. ISS ;�:_ 'sem: iL\.O'. - 37__ h- seven)___-seve )---- - - - - .t � n NOTE:This Revision becomes part ol,and In conformance with.tho existing contract. ELGIN BUILDERS INC. 1801 Larkin Avenue ELGIN, ILLINOIS 60123 Phone (708) 742-0090 Fax (708) 742-0185 OWNER'S PHONE DATE NAME Dahlquist & Lutzow 742-4063 May 21, 1992 STREET JOB NAME JOB NUMBER 472 N. McLean Blvd. Lord's Park Pavilion 520 CITY STATE STREET Floin Illinois 100 Oakwood Blvd EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE 8-30-91 Elgin IL You are hereby authorized to perform the following specifically described additional work: Rebuild roof over round porch area to reconfigure drainage to new scuppers. Demolition of old framing Building material s Carpenter labor. 48 hrs. at $40 1,920.00 Sheet metal scuppers 424.00 Delete one down. spout (122.00) --- $3,344.00 G.C.O.H. & P. (15%) 502.00 $3,846.00 ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 3,846.00 Payment will be made as follows: Same as contract Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. Date 19 Authorizing Signature (OWNER SIGNS HERE) We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price. Authorized Signature Date May 21st 1992 (CONTRACTOR SIGNS HERE) Or';i-‘; 1'0 r\ 39 (thirty-nine) %1..y kr..4-IL 1J cig en. 11‘.0L.i NOTE:This Revision becomes part of.and in conformance with,the existing contract. in � rAgenda Item No. June 4, 1992 TO: Mayor and Members of the City Council FROM: Larry L. Rice, City Manager SUBJECT: Remodeling of the Lords Park Pavilion PURPOSE The purpose of this memorandum is to forward to the Mayor and City Council recommendations concerning remodeling of the Lords Park Pavilion. BACKGROUND elm Architects Dahlquist & Lutzow prepared plans and specifi- cations for the remodeling of the pavilion last summer. Subsequently, a contract was awarded to Elgin Builders for the construction work which was begun on September 9, 1991 . Attached is Change Order No. 4 from Dahlquist & Lutzow regarding the remodeling work. The change order includes eight items with a total net cost of $94,894 . The most sig- nificant item in the change order is No. 7, which deals with increasing the structural stability of the pavilion roofs . The cost for bracing and repairing the roof systems is $70,510. The damage to the roof structure, which occurred over the life of the building, was not apparent until it was exposed during the remodeling process . The architects. will be present at the June 10 meeting to more fully explain the structural problems with the pavilion roofs and to answer any questions you may have regarding the change order. FINANCIAL IMPACT The change recommended by the architects will result in a $94, 894 increase in the contract with Elgin Builders from eft $959, 965 to $1, 064, 859 . There are sufficient funds available in the 1991 Bond Fund and the 1992 Park budget to finance the proposed work. Mayor and Members of the City Council June 4, 1992 Page 2 RECOMMENDATION It is recommended the staff be directed to execute Change Order No. 4 for the Lords Park Pavilion project. a L. Ric, City Manager LLR:amp Attachment r DAHLQUIST and LUTZOW architects, ltd. um June 7 , 1992 Lords Park Pavilion Change Order History HIDDEN CHANGE ORDER STRUCTURAL FIELD DESIGN ITEM CHANGE CONDITION OPTION Change Order No. 1 1 . Masonry/Foundation $ 47 , 155 2 . Porch columns $ 47 , 520 3 . Remove lath plaster and reinsulate $ 4 , 149 4 . Rotten beams $ 2 , 016 5 . Replace wood doors $ 2 , 320 6 . Omit storm windows ( $17 , 519 ) Change Order No . 2 1 . Replace round porch framing $ 3 , 900 2 . Remove bsmt columns $ 6 , 797 3 . Replace floor joists $ 5 , 972 4 . Switch gear revisions ( $ 500 ) 5 . Redesign sewer ( $ 595 ) 6 . Replace windows $ 2 , 864 Change Order No . 3 1 . Elevator door rev . ( $ 825 ) 2 . Door 1 & 2 - new frames $ 420 3 . Door hardware ( $ 102) 4 . Exist . rubble wall removed $ 1 , 484 5 . Curbs and planters $ 5 , 499 6 . Relocate telephone conduit $ 683 7 . Transformer pad retaining wall $ 1 , 014 8 . Bathroom partitions $ 531 9 . Relocate vent $ 679 10 .Rotten joists $ 547 11 .Rotten base $ 524 Change Order No . 4 1 . Stone wall by toilets $ 6 , 706 2 . Toilet accessories $ 3 , 432 3 . Exterior receptacles $ 3 , 570 4 . Conc . retaining wall $ 1 , 996 472 N. McLean Boulevard, Elgin, Illinois 60123 ER 708-742-4063 BE FAX 708-742-9734 HIDDEN CHANGE ORDER STRUCTURAL FIELD DESIGN ITEM CHANGE CONDITION OPTION Change Order No. 4 (cont. ) 5 . Below grade roof drainage $ 4 , 377 6 . Porch deck $ 459 7 . Eave repairs $ 70 , 510 8 . Round roof revisions $ 3 , 846 = TOTAL $177 , 073 $22 , 567 $ 9 , 789 Change Order Summary Base Contract: $ 845 ,432 Contract thru C.O. #4 : $1 , 054 , 861 Summary of Change Order Items : 1 . Hidden Structural Changes : $177 , 073 2 . Field Conditions : $ 22 , 567 3 . Design Options : $ 9 , 789 TOTAL $209 , 429 Hidden structural changes were extraordinary conditions : Delete $177 , 073 Field conditions and design option changes amount to $32 , 356 32 , 356/845 , 432 = 3% changes DAHLQUIST and LUTZOW architects, ltd. NM June 4 , 1992 Lord's Park Pavilion History of Eave Problem 1 . The structural survey in Preservation Plan identified the overall roof problem. This roof problem began with the improper design and construction of the upper roof 100 years ago. 2 . The initial roof stabilization program undertaken prior to the current construction project took care of the outward thrust problem caused by the movement of the upper roof in the large central room. 3 . The intent from the beginning of design was never to straighten out the building, but leave in the existing deflection . From a time and financial standpoint , it would not have been practical to straighten out the building. 4. Since the existing structure was to be left alone, destructive surveying and testing was not done. The structural condition of the porch rafters pulling away from the perimeter beam over the columns was not visible. 5 . Current construction activity provided us the opportunity to see this "pulling away" condition . Upon close inspection, it is evident that this condition has been in existence for a substantial period of time. If the wood members were properly attached over the years , the ends of the members would not have weathered. However, the ends show the same weathering as the adjacent exposed wood surfaces . 472 N. McLean Boulevard, Elgin, Illinois 60123 ME 708-742-4063 BE FAX 708-742-9734 cr. . • June 10 , 1992 Lord's Park Pavilion Structural Eave Analysis Preconstruction Conditions • �- am =L = 1�,i `jam— � - —ji.F ;ice . i i� �.= :�.==rte.= - `�-�,_�-ice.-_,�'�lF '; /i4L �......�.-....-.--'..--:--e-----..=----,------ -- ------ ' -_ - x ._.--.. -•�= _ �__- • i 1 1 q I =•1 Q 111 11111111111111111 III!' .1 •r UM _ _ 1.1...,.. ....... I1�1PrrniTI I I I I I I I I I I I I ---n Fl"n - t gGN__-.CEIt..ING, RAFTERS -- EXISTINy eza.M QluJ-L- -G1-AP CONCF�I.ED bENI►.tb LG-N GIilll EKISTINGI MOULDING ECTION T�-+RU PORGN C�ILLN _S . (21.--1 June 10 , 1992 Lord ' s Park Pavilion Structural Eave Analysis Construction Condition ,\ a' 1 .-1411111‘1116** : lroil `,44.....4 ..:IL \ O ' A i i j� / .0' ...lg. 1 • • Cf June 10 , 1992 Lord' s Park Pavilion • Structural Eave Analysis Construction Condition - (continued) i 1 I! 11 I I \ I Will ______ t J Ai ___ t.,. 1111.11.1111111111111 PO RCN _.GEILINo, RAFTCRS-.. EXFflNO SEA M 7 - 5ECAME XPO t) POcGH �EGDME EXPO 5 eC CE1LtNGI DU2INC, CoNSTRUCTIo14 SECTION THRU PORCH CEILING-4