Loading...
92-0122 Wil-Freds Change Order 9 RESOLUTION APPROVING CHANGE ORDER NO. 9 IN THE CONTRACT WITH WIL-FREDS CONSTRUCTION FOR THE SLADE AVENUE FACILITY WHEREAS, the City of Elgin has heretofore entered into a contract with Wil-Freds Construction for the Slade Avenue facility; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 9, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 9, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: January 22, 1992 Adopted: January 22, 1992 Omnibus Vote: Yeas 6 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk • 111 Agenda Item No. 4p�pglED TO: Mayor and Members of the City Council FROM: City Manager DATE : December 10, 1991 SUBJECT: SLADE AVENUE FACILITY CHANGE ORDER #9, WIL-FREDS CONSTRUCTION PURPOSE: This memorandum will provide the Mayor and Council with information to consider authorizing Change Order #9 with Wil-Freds Construction regarding telephone service at the Slade Avenue facility. BACKGROUND: When the Slade Avenue facility was being designed and equipment specifications drafted, the City was using a different phone system. This discrepancy was noted when the phones for the new facility were being ordered. To maintain consistency within the City, it is prudent to switch when the phones are installed. FINANCIAL IMPACT: The net cost to the Water Department for this substitution will be $1,803.26, including a credit of approximately $2,480. There are sufficient funds in the Water Department's operating budget to provide funds for this change order. r Page 2 RECOMMENDATION: It is recommended that the City Council authorize Change Order #9 with Wil-Freds Construction for $1, 803 . 26 for the installation (3, system consistent with City equipment. j Ci--t-f `Manage LLR:LED: jk 01141210.491 cc: Melford A. Dahl, City Engineer Attachment 47) • t • ;CDI CLARK DIETZ, INC. • • Request for 1817 S. Neil , Suite 100 Authorization P.O. Box 676 Of Changes • Champaign, IL 61820 217/373-8900 TO Mr. Larry Deibert PROJECT Slade Avenue Facility Director of Water Operations DATE 11/19/91 JOB NO E04020 City of Elgin CITY Elgin COUNTY Kane 150 Dexter Court STATE Illinois • Elgin, IL 60120-5555 CONTRACTOR Wil-Freds Construction CHANGE ORDER NO. 9 • GENTLEMEN: SHEET NO. 1 OF 3 The following changes) from the plans in the construction of the above designated project is recommended. ITEM(S) ADDITIONS DEDUCTIONS See attached documents. • Change .Proposal #34. $ 1 ,803.26 • The Contract Price for this Change Order will be ( increased) 6444000%00 .by the Amount of this Order: $ " 1 ,803.26 Amount of Previous Orders: $ 127 ,537.42 The work covered by this order Original Contract Amount: $3,694,400.00 shall be performed under the Original Contract Amount and Orders: $3,823,740.68 same terms and conditions as • that included in the original Contract. • The Contract Time will be Q1 #i(d0(t(W 00cx- a0 (Unchanged) by 0 calendar days (this C.O. ) . The date for completion of all work under the contract will be August 11 , 1992 • The date for substantial completion of work under the contract X11 be December 12, 1991 . Approval Recommended: Approved :y: • • I���'CJ�C r . Resident Project Repr _entative OwnElr' . ' epre five Approval Recommended: Accepted by: • 4111111rr _.. --- Clark, Dietz, Inc. CcntracLor • • • SLADE AVENUE FACILITY CHANGE ORDER #9, WIL-FREDS CONSTRUCTION When the Slade Avenue facility was being designed and ' equipment specifications drafted, the city was using a different phone system. This discrepancy was ,noted when-• the phones for the new facility were . being ordered. To maintain consistency with3,n_,the .city, it is . prudent to switch when: the phones are installed. .Therefore it is in the beet interests of the ,city that. this- change be executed. 1E „,.0( 4,` U i 1' (" ) • • • • • • • • WIL-FREDS P.O.BOX 4050 • NAPERVILLE,IL 60567 • (708)897 4000 October 29, 1991 �< OCT3 1991 Clark Dietz Inc. 1817 S. Neil Suite 100 Champaign, IL 61820 Attn: Marty Vogel Re: Slade Avenue Facilities - Elgin - Change Proposal #34 Dear Marty: Enclosed is the submittal for the owner's requested radio equipment for your review and approval. The additional cost for this change is $1,803.26 with the breakdown as follows: Althoff net add (see attached) 1,639.33 WFS 10% Management Fee 163.93 Total proposed amount $1,803.26 We trust this meets with your approval and await issuance of a change order. Yours very truly, WIL-FREDS CONSTRUCTION, INC. ,t7V" q H.W. Kleywe Project Manager Enclosure cc: CP #34 File HWK:dl c-d10.29 274 E. INDIAN TRAIL • AURORA, ILLINOIS 60505 FAX(708)897-4444 • ADDITIONAL WORK AUTHORIZATION ALTHOFF INDUSTRIES 8001 S. Route 31 CRYSTAL LAKE, IL 60014-9099 Phone 815 455-7000 OWNER'S Wil-Freds, Inc. (ATTN. : Butch Kleyweg) °NE(708) 897-4000 °"Oc NAME tober 22, 1991 STREET JOB NAME JOB NUMBER 274 E. Indian Trail Slade Avenue Facility EM 2724 CITY STATE STREET Aurora Illinois 60505 0 Slade Avenue EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE Elgin Illinois You are hereby authorized to perform the following specifically described additional work: TELEPHONE EQUIPMENT • Scan-AM CREDIT =($ 2,480.00) Radicom ADD = 3,905.50 $ 1,425.50 +15% = 213.83 TOTAL ADD = $ 1,639.33 • • • ADDITIONAL CHARGE FOR ABOVE WORK IS: $. 1.639.33 • Payment will be made as follows: Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. Date 19 Authorizing Signature (OWNER SIGNS HERE) We hereby agree to furnish labor and materials-complete in accordance with the above speclfications,at above stated price. Authorized Signature � Date October 22, 1991 (C NT A ll 31pNS HERE) THIS IS CHANGE bdletvffRPRiNt Manager NOTE: This Revision b.com.•p..1 01.and In conformance wMh,tM•alattnp CnnU.Ct. .4' TELEPHONE 708/695-6500 Ho FAX 708/931-5610 FOR HEARING IMPAIRED TDD 706/931-5616 CITY OF ELGIN 150 DEXTER COURT ELGIN, ILLINOIS 60120-5555 41110.- January 6, 1992 Mr. Don Dillenburg, P.E. Acting Manager, Permit Section Division of Public Water Supplies Illinois Environmental Protection Agency P.O. Box 19276 Springfield, IL 62794-9276 Dear Mr. Dillenburg: The project titled "Valve Replacement and Repairs to the Slade Avenue Reservoirs, " project construction permit #0389-FY1990, which you referred to in your letter dated December 17, 1991, has been combined with project "Slade Avenue Facilities, " permit #0157-FY1991, for construction. These projects were bid and awarded for construction by the Elgin City Council on September 26, 1990. The entire project is still under construction and should be completed during 1992. Should you have any questions or require additional information, please contact me at (708)931-6155. Sincerely, Larry E. I)eibert (V tJ Director of Water Operations LED:jk 21210106. 192 cc: Melford A. Dahl, City Engi eer Loni Mecum, City Clerkl Larry L. Rice, City Manager Michael H. Winegard, Consoer, Townsend & Associates, Inc. (iE) Printed on recycled paper