Loading...
91-1106 Ainlay Tank Testing d 91- 11b(z, RESOLUTION APPROVING CHANGE ORDER NO. 2 IN THE CONTRACT WITH AINLAY TANK TESTING AND REPAIR, INC. FOR THE REMOVAL OF UNDERGROUND STORAGE TANKS WHEREAS, the City of Elgin has heretofore entered into a contract with Ainlay Tank Testing and Repair, Inc. for the removal of underground storage tanks; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 2, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 2, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: November 6 , 1991 Adopted: November 6, 1991 Omnibus Vote: Yeas 7 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk CITY OF ELGIN REMOVAL OF UNDERGROUND STORAGE TANKS CHANGE ORDER NO. 2 SCOPE: This Change Order No. 2 covers additional work re- quired by the Office of Illinois State Fire Marshal and the Illinois Environmental Protection Agency for the proper Removal of underground storage tanks, contaminated product, and contaminated soils for the City of Elgin. The contractor for this project is Ainley Tank Test- ing & repair Inc. , Algonquin, IL. REASONS FOR CHANGE: This change order is required for the costs associated with the additional work required by the Office of the Illinois State Fire Marshal and the Illinois Environmental Protection Agency - Division of Land Pollution Control, for the corrective action needed for the proper removal and disposal of underground storage tanks and contaminated soils from the Lords Park Pavilion property site. The magnitude of these changes in the scope of work were not anticipated under the original con- tract. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the con- tract will be revised as follows : LORDS PARK PAVILION: Tank Removal $ 2 ,460 . 00 Soil Borings 400 . 00 Excavating and disposal of contaminated soil Est. 650 cu yd @$54 35, 100. 00 Backfilling with clean soil Est. 600 cu yds @$20 12 , 000 . 00 Less original contract amount -2,560 . 00 TOTAL NET Additional Cost $47 ,400 . 00 CHANGE ORDER NO. 2 Page 2 The present contract with Ainley Tank Testing & Repair Inc. is for $720, 609 . 50 . By reason of Change Order No. 2, the contract for the removal of underground storage tanks will be increased in the amount of $ 47 ,400 . 00, thereby making the total contract value to be $768, 009 . 50. All other contract provisions shall remain the same. Agreed to this Cc�" day of NQW-c , 1991 . Recommended: BUREAU OF IN IECT QN SERVICES By: Date: //- // ACCEPTED: AINLEY TANK TESTING & REPAIR INC. Party of the Second Part (Contractor) 7 BY: ,:: , �(. ase, T e: Date: //-s- / Approved: CITY OF ELGIN Party of th- Fig Owner) By: r <-_ Title: C •��NNo�e �t� Date: \\,- ( k 0 Eon CO Lk) r A enda Item DD O k) October 23, 1991 MEMORANDUM TO: Mayor and Members of City Council FROM: City Manager SUBJECT: Change Order No. 2 - Underground Storage Tank Removal PURPOSE: The purpose of this memorandum is to provide Council with information to consider Change Order No. 2 to the subject contract. em. BACKGROUND: At your July 11th meeting, Council awarded a contract for the removal of underground storage tanks at various locations throughout the City to Ainley Tank Testing & Repair Inc. , of Algonquin. At your September 11th and 25th Committee of the Whole and regu- lar meeting, Council reviewed and approved Change Order No. 1, which dealt with the problems that were encountered in the South Grove Redevelopment District. During this same time frame, Ainley began work at the Lord's Park Pavilion; while the initial work indicated only a minimal amount of soil contamination, following the actual removal of the heating fuel tank, a relatively large vein of contaminated soil was discovered directly under the tank to a depth of about 12-15 feet below the asphalt driveway immediately east of the pavilion. Because of its closeness to the structure and the fact that the building renovations have begun, staff has had a number of meetings with the architect, the general contractor, Ainley, and the IEPA in order to develop the appropriate plan for the removal of the contaminated soil without interfering to any great degree with the on-going renovations. Following our most recent meeting with the IEPA on Monday, Octo- ber 21, and the taking of additional soil samples by Ainley dita yesterday, it is now our collective best judgment that the con- tamination can be removed through additional soil excavations without adversely affecting the renovation project. To that end, the attached Change Order #2 has been developed for Coun- cil 's consideration. Memo to Mayor and Members of City Council Page 2 October 23, 1991 411 FINANCIAL IMPACT: The City will begin the application process with the IEPA in order to access the State's Leaking Underground Storage Tank (LUST) fund for this site. Because this tank was less than 1100 gallon capacity and contained only heating fuel, it is believed that only a $10,000 deductible would apply. The LUST application process is on a reimbursement basis and is expected to take several months. In the interim, funds need to be established to complete the tank removal and soil clean-up at the Lords Park Pavilion. Our earlier analysis of the General Fund found the following: Monies could be made available for these costs before State LUST funds or other possible recovery sources are received. At this late point in the year, there have been no major unforeseen expenses other than Change Order #1 that have impacted the General Fund' s contin- gencies, and there is approximately $700,000 unexpended between Non-departmental 's Special Projects Account (Approp. #190-959 ) and Non-departmental 's Capital Ac- counts (Approp. #190-978 & #190-991) . RECOMMENDATION: The recommendation is that the City Council411 approve Change Order No. 2 for the removal of underground tanks in the amount of $47,400. 00. This work at the Pavilion could resume next Wednesday and be completed by week's etteli City Man er -- .A e CITY OF ELGIN REMOVAL OF UNDERGROUND STORAGE TANKS CHANGE ORDER NO. 2 SCOPE: This Change Order No. 2 covers additional work re- quired by the Office of Illinois State Fire Marshal and the Illinois Environmental Protection Agency for the proper Removal of underground storage tanks, contaminated product, and contaminated soils for the City of Elgin. The contractor for this project is Ainley Tank Test- ing & repair Inc. , Algonquin, IL. REASONS FOR CHANGE: This change order is required for the costs associated with the additional work required by the Office of the Illinois State Fire Marshal and the Illinois Environmental Protection Agency - Division of Land Pollution Control, for the corrective action needed for the proper removal and disposal of underground storage tanks and contaminated soils from the Lords Park Pavilion property site. The magnitude of these changes in the scope of work were not anticipated under the original con- tract. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the con- elk tract will be revised as follows: LORDS PARK PAVILION: Tank Removal $ 2,460 .00 Soil Borings 400 .00 Excavating and disposal of contaminated soil Est. 650 cu yd @$54 35, 100. 00 Backfilling with clean soil Est. 600 cu yds @$20 12, 000. 00 Less original contract amount -2, 560. 00 TOTAL NET Additional Cost $47 ,400 .00 w CHANGE ORDER NO. 2 Page 2 41/ The present contract with Ainley Tank Testing & Repair Inc. is for $720,609 . 50 . By reason of Change Order No. 2, the contract for the removal of underground storage tanks will be increased in the amount of $ 47,400.00, thereby making the total contract value to be $768,009 .50 . All other contract provisions shall remain the same. Agreed to this day of , 1991 . Recommended: BUREAU OF INSPECTION SERVICES By: Date: ACCEPTED: AINLEY TANK TESTING & REPAIR INC. Party of the Second Part (Contractor) 47, By: Title: Date: Approved: CITY OF ELGIN Party of the First Part (Owner) By: Title: Date: Speed Message To dike Sarro From Nancy Roll • • ■ Subject Ainlay Taak Change Order #2 Date November 8 19 91 Per your request, attached find a duplicate original and photocopy of the executed change order. Signed WUsonJones KY W 4JMMf PAINTED WM U SA Carbonless