Loading...
91-0814 Central Blacktop c►1-obi14 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH CENTRAL BLACKTOP CO. , INC. FOR THE SHILOH AVENUE RESURFACING PROJECT WHEREAS, the City of Elgin has heretofore entered into a contract with Central Blacktop Co. , Inc. for the Shiloh Avenue resurfacing project; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: August 14, 1991 Adopted: August 14, 1991 Omnibus Vote: Yeas 6 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk i q • ELGIN, ILLINOIS SHILOH AVENUE RESURFACING PROJECT CHANGE ORDER NO. 1 SCOPE: This Change Order No. 1 covers the additional items for the Lords Park Zoo Path Additional Paving. The general contractor for this project is Central Blacktop of South Elgin, IL. REASONS FOR CHANGE: This change order is required for the costs associated with the items requested by the Parks Department to be added to the improvements to complete the entire pathway through the Lord' s Park Zoo. This increase was not anticipated at the time the contract was bid. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows : ITEM ADD Combination Curb & Gutter Removal $ 173.25 P.C.C. Sidewalk Removal (-) 352 .30 P.C.C. Driveway Pavement Removal 1,207 .50 Structure Adjustments (Manhole) (-) 175.00 Structure Adjustments (Catch Basin) (-)2, 100. 00 Bit. Materials (Prime Coat) MC-30 888.00 Bit. materials (Prime Coat) MC-85-100 12 .35 Pavement Patching (Special) , 8" (-)2,547 .75 Combination Curb & Gutter, Type B-6 . 12 483.45 P.C.C. Sidewalk, 5" (-) 826 .00 P.C.C. Driveway Pavement, 6" 3,277 .50 Earth Excavation, 10" 3,562 .50 Granular Sub-base (8" ) , CA-6 5,925. 00 Sodding (-) 1, 185.00 Galvanized Steel Pipe w/end cups (2") 47 .25 Bit. Mixture Complete, Class B (-) 1,740.00 Mixture for Cracks, Joints & Flangeways (-) 770.00 Supplemental Watering (Sod) (-) 110.00 Fill Void Behind Museum Steps 500.00 Combination Curb & Gutter, Change 6 . 12 to 6 . 18 849 . 15 TOTAL NET ADDITIONAL COST $ 7,119.90 , r CHANGE ORDER NO. 1 July 17, 1991 Page 2 The present contract with Central Blacktop , Inc. is for $112,613.75 . By reason of this Change Order No. 1, the contract for the Shiloh Avenue Resurfacing Project will be increased in the amount of Seven thousand one hundred and nineteen and 90/100 dollars($ 7, 119 .90) , the total contract value being One hundred nineteen thousand seven hundred thirty-three and 65/100 dollars ($119,733.65) . OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this /0/ day of , 1990. Recommended: ENGINEERING DIV SION By: (J'' Date: g-Z-ci Accepted: CENTRAL BLACKTOP CO. ,INC. Party o the Second Part (Contractor) / By: A / . rs.,� Title: `v �L /t-�- Date: 0/4/ Approved: CITY OF ELGIN Party of the Fi .tt• (Owner) BY: " . tel. Pia! MII air/Title: �t�%-.i Date: 0 ' ' 4 ^ Elm Han Agenda Item No. July 17 , 1991 MEMORANDUM TO: Mayor and Members of the City Council FROM: Larry L. Rice, City Manager SUBJECT: Shiloh Avenue Resurfacing Project PURPOSE: This memorandum will provide the Mayor and Council with information to consider approval of Change Order Number 1 for the subject project. BACKGROUND: The City Council awarded the subject project to eft. Central Blacktop of South Elgin on September 12, 1990. The project included resurfacing Shiloh Avenue, paving the access drive and miscellaneous concrete work at the Lord's Park Museum and paving a pathway through the Lord's Park Zoo. The engineer's estimate for the work within the zoo indicated that there would not be sufficient funds available to complete the entire pathway. Therefore, the contract quantities only included enough materials to pave approximately half of the path. Because the costs submitted by Central Blacktop were lower than anticipated, Central Blacktop was requested to pave the entire pathway (see the attached sketch) . The cost to do the work at a later date would have been significantly greater because it would have required a contractor to move in equipment to pave this small portion only which then would probably not be part of a larger project. FINANCIAL IMPACT: The additional work at the Lord's Park Zoo was completed at an additional cost to the contract of $7, 119.90 (see the attached change order) . There are sufficient funds available within the "Parks Maintenance Capital Budget (082-983-9933) to cover the cost of the additional paving. ►^ r PATHWAYS & AREAS TO BE PAVED PPv /tP4°# 1•. •• rbk cko� • i s 10•± //Oy 4. a. z NO SCALE_ r laJ DETAIL NO. 2