Loading...
90-1025 ECC Fountain Square Sewer 90-1oa5 CONTRACT 1 . This agreement, made and concluded the 25th day of October , 1990 between the City of Elgin acting by and through its Mayor and City Council known as the party of the first part, and Gluth Brothers Construction, Inc. his/their executors, administrators, successors or assigns, known as the party of the second part. 2 . WITNESSETH: That for and in consideration of the payments and agreements mentioned in the Letter of Proposal hereto attached, to be made and performed by the party of the first part. 3 . And it is also understood and agreed that the Letter of Proposal and the Plans for the E.C.C. Storm Sewer Improvements approved by the City of Elgin, Illinois, Engineering Division October 10, 1990, are all essentially documents of this contract and are a part hereof . 4 . IN WITNESS WHEREOF, The said parties have executed these presents on the date above mentioned. Attest: The Ci of Elgin a40/11ACum— City Clerk By ayor) (Seal) ( If a Corporation) Corporate Name:Gluth Bros. Construction, Inc. d*"1225‘2444419-- ( If a Co-Partnership) Attest: i<21.4„,i, Secretary November 1, 1990 MEMORANDUM TO: Loni Mecum, City Clerk FROM: Ralph Ridley, Engineer SUBJECT: ECC Fountain Square Storm Sewer Contracts You will find attached five (5) copies of the subject contract which have been executed by the contractor. The City Council authorized this contract at their last meeting. Please execute the contracts along with the Mayor, keep one copy and return the rest to me for distribution to the correct parties . Please let me know if you have any questions regarding this matter. Attachments • Ell _ ill yE� Agenda Item No. 3 October 19, 1990 MEMORANDUM TO: Mayor and Members of the City Council FROM: Larry L. Rice, City Manager SUBJECT: E.C.C. Storm Sewer Improvements PURPOSE: This memorandum will provide the Mayor and Council with information to consider the award of a contract for the subject project. BACKGROUND: The City Council authorized the staff to solicit proposals to complete the installation of a separate outfall system for the E.C.C. Fountain Square Plaza storm water system. Proposals were solicited from three firms. Only two of the firms returned a proposal, Illinois Hydraulic, Inc. , and Gluth Brothers, Inc. Gluth Brothers and Illinois Hydraulic has completed many projects for the City and private developers in a satisfactory manner. FINANCIAL IMPACT: The Engineer's Estimate for this project was $10,000 . The proposal price submitted by Gluth Brothers was in the amount of $8,932 .00 and Illinois Hydraulic was $16,800.00. There are sufficient funds available in the Sewer Fund to pay for this work. RECOMMENDATION: It is recommended that the City Council award a contract to Gluth Brothers, Inc. , for the E.C.C. Fountain Square Storm Sewer in the not exceed amount of $8,932.00. A copy of the proposals from Gluth Brothers, Inc. and Illinois Hydraulic, Inc. , and the contract are attached for your consideration. Lar • L. Rice City Manager Attachments Acod. ranz4utelian, TELEPHONE 815/338-1662 1151 LAKE AVENUE FAX 815/338-1047 WOODSTOCK,ILLINOIS 60098 CITY OF ELGIN 150 DEXTER COURT ELGIN, ILLINOIS 60120 ATTENTION: ENGINEERING DEPT.-MR. RALPH RIDLEY PROPOSAL FOR E.C.C. FOUNTAIN SQUARE PLAZA, STORM SEWER INSTALLATION, ELGIN. ILLINOIS 1 . 12" I .D. DUCTILE IRON 50 LF 50.00 2500.00 2. TYPE C PATCHES, 8" OF BAM 26 SY 45.00 1170.00 3. P.C.C. SIDEWALK. REMOVAL AND REPLACEMENT, 5" 192 SF 3.25 624.00 4. BITUMINOUS SURFACE, CL. I , 2" 26 SY 8.00 208.00 5. TRENCH BACKFILL 95 TN 15.00 1425.00 6. FRAME AND GRATE 1 EA 175.00 175.00 7. 4' I .D. PRECAST MANHOLE 1 EA 1750.00 1750.00 REMOVE EXISTING P.V.C. PIPE AND PLUG END 30 LF 6.00 180.00 9. 8" P.V.C. PERFORATED PIPE SURROUNDED WITH WASHED STONE AND ALL WRAPPED WITH GEOFABRIC 30 LF 30.00 900.00 TOTAL PROPOSAL 8932.00 GLUTH BROS. CONSTRUCTION. INC. i ii/./_- /___�► RANK GLU ' , PRESIDE , OCTOBER 15. 1990 SCC _ILLINOIS 1011f4 a _ = Ai) J HYDR4ULIC :;f ; ;:,� CONSTRUCTION COMPANY•P..O.BOX 545•ELGIN,IL. 60121•PH.312-742-1516 U ITY OF ELGIN ENGINEERING DEPT. October 17, 1990 Mr. Ralph L. Ridley City of Elgin 150 Dexter Court Elgin IL 60120 Subject: ECC Fountain Square Plaza Storm Sewer Installation Dear Ralph: We are pleased to submit a price of $16.800.00 for new storm sewer work on DuPage Street. All items are in accordance with plans dated October 10, 1990 as prepared by the City of Elgin. We exclude railroad flagmen and railroad insurance. If you have any questions, please call me at the above number. Respectfully submitted, ILLINOIS HYDRAULIC CONSTRUCTION CO. eL % e _ Chuck O'Connor Underground Supervisor CO/cl A,