Loading...
86-0714 Quality Assurance testing r RESOLUTION ACCEPTING THE PROPOSAL OF QUALITY ASSURANCE TESTING FOR SOIL BORINGS FOR THE RIVER TRAIL PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that James J. Cook, City Manager, be and is hereby authorized and directed to accept the proposal on behalf of the City of Elgin of Quality Assurance Testing for soil borings for the River Trail Project, a copy of which is attached hereto and made a part hereof by reference. s/ Richard L yerbir Richard L. Verbic, Mayor Presented: July 14, 1986 Adopted: July 14 , 1986 Vote: Yeas 7 Nays 0 Recorded: Attest: s/ Marie Yearman Marie Yearman, City Clerk Quality e4ssuranee P.O. BOX 1128, ST. CHARLES, ILLINOIS 60174 • (312)232-6171 O"esting June 24, 1986 City of Elgin 150 Dexter Court Elgin, Illinois 60120 Attention: Mr. Syed Ally RE: Soil Borings City of Elgin Dear Sir: We are pleased to submit the following proposal for the performance of a subsurface investigation at the site indicated above, and the preparation of an engineering report with recommendations pertinent to construction considerations and foundation design. Our fee for the performance of the above services will be based upon unit prices. An estimate of the total cost of the investigation and report is enclosed. It must be understood that, while the unit prices are firm, the number of units may be subject to change depending upon the subsurface conditions which are encountered. Unless additional drilling in excess of that inidcated in the estimate is required, or excessive set-up time is involved due to site conditions; the total estimated cost may be considered as a "not to exceed" value. If the above proposal meets with your approval, please sign one copy and return it to our office. Respectfully submitted, QUALITY ASSURANCE TESTING Shula Dodson Office Manager Accepted: Company: Zq, liln Address: Date: 7/F�o QUALITY OILS, CONSTRUCTION PROJECTS Quality e4ssurance P.O. BOX 1128, ST. CHARLES, ILLINOIS 60174 • (312)232.6171 Testing CLIENT: City of Elgin DATE: June 24, 1986 PROJECT IDENTIFICATION: Soil Borings for City of Elgin ESTIMATED NUMBER OF BORINGS: 5 ESTIMATED DEPTH OF BORINGS: 50' COST ESTIMATE NO. OF UNIT ESTIMATED ITEM DESCRIPTION UNIT UNITS PRICES COSTS 1 Mobilization of $ 150.00 Men & Equipment 2 Soil Borings Ft. 250 6.50 1625.00 (Normal Drilling "N" Value Less Than 60 Blows/Ft.) 3 Unconfined Ea. 100 4.50 450.00 Compressive Strength 4 Moisture Content Ea. 100 2.00 200.00 Test 5 Preparation of 500.00 Engineering Report Estimated Total $2925.00 QUALITY CONTROL FOR CONCRETE AGGREGATE, SOILS, CONSTRUCTION PROJECTS