Loading...
HomeMy WebLinkAboutT4-75 Ordinance No. T4-75 AN ORDINANCE PROVIDING FOR THE MAKING OF A LOCAL IMPROVEMENT IN AND FOR THE CITY OF ELGIN, COOK COUNTY, ILLINOIS BE IT ORDAINED by the Mayor and City Council of the City of Elgin, Cook County, Illinois: Section 1. That a local improvement shall be made in the City of Elgin, Cook County, Illinois, the nature, character, locality and description of which improvement is as follows: A connected system of cast iron water mains of sizes six inches (6") and sixteen inches (16") herein provided for and described as HIGHVIEW HILLS water main extension, Cook County, Elgin, Illinois, complete with gate valves, valve boxes, hydrants and all cast iron fittings, shall be constructed within public streets, all described as follows: A sixteen (16") inch water main from and connected with an existing sixteen (16") inch water main at a point fifteen feet (15') west of the centerline of ALLEN DRIVE and fifteen feet (15') south of the centerline of BODE ROAD, thence southerly for a distance of one thousand three hundred thirty feet (1330') parallel with the centerline of ALLEN DRIVE at a distance of fifteen feet (15') west of the centerline of ALLEN DRIVE except at the southern end of this section of the water main at which location the distance from the centerline of the pavement shall be variable. Also, a six inch (6") water main from and connected with a sixteen inch (16") water main hereinbefore provided for at a point fifteen feet (15') west of the centerline of ALLEN DRIVE and fifteen feet (15') north of the centerline of BRUCE DRIVE, thence westerly for a distance of five hundred ninety feet (590') parallel with the centerline of BRUCE DRIVE at a distance of fifteen feet (15') north of the centerline of BRUCE DRIVE to a point. Also, a six inch (6") water main from and connected with a six inch (6") water main at the above described point on BRUCE DRIVE, thence southerly for a distance of four hundred fifty feet (450') parallel to the centerline of MARK DRIVE and at a distance of fifteen feet (15') west of the centerline of MARK DRIVE, except at the southern end of this section of the water main at which location the distance of the water main from the centerline of the pavement shall be variable. Section 2. That the recommendation of the Board of Local Improvements of the City of Elgin, providing for the improvement, and the estimate of the cost thereof made by the President of the Board of Local Improvements, both hereto attached and made part hereof, be, and the same are hereby approved. r Section 6. That the Mayor of the CITY OF ELGIN be and he is hereby directed to file a Petition in the Circuit Court of Cook County, Illinois, in the name of the people of the CITY OF ELGIN, praying that steps may be taken to levy a special assessment for the purpose of defraying the expense of said improvement so far as the same may lawfully be done and to ascertain what property will be benefited, in accordance with the provisions of this ordinance, and in the manner prescribed by law. Section 7. That all ordinances, or parts of ordinances, in conflict with this ordinance, be, and the same are hereby repealed. Section 8. That this ordinance shall be in full force and effect from and after its passage and approval thereof according to law. PASSED: This 5th day of February, 1975. AYES: 7 NAYS: 0 ABSENT: 0 APPROVED: This 5th day of February, 1975. s/ W. E. Rauschenberger Mayor of the City of Elgin, Cook County, Illinois AITTESTED AND FILED IN MY OFFICE: This 5th day of February, 1975. s/ Margaret A. Glink Margaret A. Glink, City Clerk r ESTIMATE OF COST elow To: The Board of Local Improvements, City of Elgin, Kane County, Illinois Gentlemen: I herewith submit an Estimate of the Cost of the construction of a Local Improvement consisting of all necessary improvements necessary for the construction of the Fountain Square Plaza Mall, all as herein described, in accordance with the plans therefore, attached hereto and made a part hereof, including the cost of Engineering and Inspection, the cost of making, levying and collecting the Assessment therefore, as provided by Law, all in the City of Elgin, Kane County, Illinois: The mall improvement will be constructed completely within the right- of-way of Grove Avenue from Chicago Street to Spring Street, DuPage Street from Grove to Spring, Spring Street from DuPage to Prairie, and the alleys connecting Grove Avenue with Riverside Drive. The cost as estimated herein for each item shall be complete in place, including all material, labor and equipment. 849 Cu Yd Earth Excavation @ $ 5.00 $ 4,245 5,700 Sq Yd Pavement Removal @ 2.50 14,250 16,080 Sq Ft Sidewalk Removal @ 1.00 16,080 1,600 Lin Ft Curb Removal @ 2.00 3,200 f'' 31 Ea Catch Basin, Manhole or Valve @ 30.00 930 Vault to be Adjusted 21 Ea Catch Basin, Manhole or Valve @ 100.00 2,100 Vault to be Reconstructed 18 Ea Catch Basin, Valve Vault to be @ 100.00 1,800 Filled 9 Ea Manhole @ 600.00 5,400 10 Ea Valve Vault @ 500.00 5,000 5 Ea Fire Hydrant Relocation @ 1,000.00 5,000 22 Ea Street Light Removal @ 300.00 6,600 4,000 Cu Yd Areaway Granular Fill @ 4.00 16,000 800 Lin Ft Granite Curb @ 15.00 12,000 600 Lin Ft Concrete Curb, Type B @ 6.50 3,900 10 Ea Catch Basin @ 500.00 5,000 200 Lin Ft Storm Sewer, 10 Inch @ 10.00 2,000 400 Lin Ft Storm Sewer, 12 Inch @ 12.00 4,800 400 Lin Ft Storm Sewer, 15 Inch @ 15.00 6,000 300 Lin Ft Storm Sewer, 18 Inch @ 18.00 5,400 1,500 Lin Ft 6" Perforated, Corrugated Metal @ 8.00 12,000 Pipe, Under Drain System 47 Ea Concrete Planter Footing @ 500.00 23,500 60 Ea Pedestrian Light Foundation @ 250.00 15,000 9 Ea Street Light Foundation @ 350.00 3,150 70 Ea Bench Footing @ 40.00 2,800 36 Ea Tree Grate Footings @ 200.00 7,200 1) 75,700 Sq Ft Granite Settes @ 5.50 416,350 r 2) 4,800 Sq Ft Terrazzo @ 3.00 14,400 4,900 Ton Granular Base @ 9.00 44,100 6,080 Sq Ft Concrete Underlayment @ 1.50 9,120 . 47 Ea Precast Planter Unit @ 1,600.00 75,200 16 Ea Tree Grate - Type 1 @ 350.00 5,600 - LS North Alleyway Reconstruction @ 70,000.00 70,000 - LS South Alleyway Reconstruction @ 42,000.00 42.000 tow REPLACEMENT SPARE ITEMS 2 Ea Precast Planter Unit @ 1,400.00 2,800 3 Ea Precast Bollard @ 350.00 1,050 2 Ea Pedestrian Light @ 600.00 1,200 $1,556,000 Field Engineering and Testing 40,000 $1,596,000 Cost of Making, Levying and 50,000 Collecting the Assessment $1,646,000 The following items may be used as alternates to the base items described above: 1) 75,700 Sq Ft Hastings Pavers 2) 4,800 Sq Ft Exposed Aggregate 3) 38 Ea Shade Trees, 3 - 311 Inch Cal. 38 Ea Shade Trees, 5 - 51 Inch Cal. 4) 39 Ea Shade Trees, 6 - 61/2 Inch Cal. 5) 13 Ea Intermediate Trees, 6 - 8 Feet BB 13 Ea Intermediate Trees, 10 - 12 Feet BB Respectfully submitted, s/ W. E. Rauschenberger President of the Board of Local Improve- ments, City of Elgin, Cook and Kane Counties, Illinois I hereby certify that, in my opinion, the above Estimate does not exceed the probable cost of the proposed Improvement and the lawful expenses attending the same. s/ W. E. Rauschenberger President of the Board of Local Improve- ments, City of Elgin, Cook and Kane Counties, Illinois Dated this 5th day of February , 1975. r