Loading...
HomeMy WebLinkAbout26-146 Resolution No. 26-146 RESOLUTION AUTHORIZING EXECUTION OF AN AGREEMENT WITH HAMPTON, LENZINI AND RENWICK, INC. FOR PROFESSIONAL SERVICES IN CONNECTION WITH THE SANDY CREEK DAM REMOVAL PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that pursuant to Elgin Municipal Code Section 5.02.020B(9)the City Council hereby finds that an exception to the requirements of the procurement ordinance is necessary and in the best interest of the city; and BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are hereby authorized and directed to execute an Agreement on behalf of the City of Elgin with Hampton, Lenzini and Renwick, Inc., professional services in connection with the Sandy Creek dam removal project, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: September 23, 2026 Adopted: September 23, 2026 Vote: Yeas: 7 Nays: 1 Attest: s/ Kimberly Dewis Kimberly Dewis, City Clerk AGREEMENT THIS AGREEMENT ("Agreement") is made and entered into this 23rd day of September , 2026, by and between the CITY OF ELGIN, an Illinois municipal corporation (hereinafter referred to as "CITY") and Hampton, Lenzini and Renwick, Inc.., a Delaware corporation(hereinafter referred to as"ENGINEER"). WHEREAS, the CITY desires to engage the ENGINEER to furnish certain professional services in connection with the Sandy Creek Dam Removal project(hereinafter referred to as the "PROJECT"); and WHEREAS, the ENGINEER represents that it is in compliance with Illinois Statutes relating to professional registration of individuals and has the necessary expertise and experience to furnish such services upon the terms and conditions set forth herein below. NOW, THEREFORE, it is hereby agreed by and between the CITY and the ENGINEER that the CITY does hereby retain the ENGINEER for and in consideration of the mutual promises and covenants contained herein, the sufficiency of which is hereby acknowledged to act for and represent it in the engineering matters involved in the PROJECT as described herein, subject to the following terms and conditions and stipulations,to-wit: 1. SCOPE OF SERVICES A. All work hereunder shall be performed under the direction of the Water Director of the CITY,hereinafter referred to as the"DIRECTOR". B. The scope of services includes providing professional consulting services to prepare contract plans and specifications and bidding documents and to provide bid award and assistance services for the PROJECT. C. A detailed Scope of Services for the PROJECT is attached hereto as Attachment A, and incorporated into this Agreement by reference herein. 2. PROGRESS REPORTS A. An outline project milestone schedule is provided hereinunder. • Executed Agreement and Notice to Proceed—August 17,2026 • Bathymetric Survey—October 2026 • Conceptual Design —February 2027 • Summary of Permitting Agency Discussions—April 2027 • Tyler Creek Watershed Coalition Presentation—Summer 2027 • IEPA 319(h)Grant Application—August 2027 B. A detailed project schedule for the PROJECT is included as Attachment B,attached hereto,and incorporated into this Agreement by reference herein. Progress will be recorded on the project schedule and submitted monthly as a component of the Status Report described in C below. C. The ENGINEER will submit to the DIRECTOR a monthly status report keyed to the project schedule. A brief narrative will be provided identifying progress, findings and outstanding issues. 3. WORK PRODUCT All work product prepared by the ENGINEER pursuant hereto including, but not limited to, reports, plans, designs, calculations, work drawings, studies, photographs, models and recommendations shall be the property of the CITY and shall be delivered to the CITY upon request of the DIRECTOR; provided, however, that the ENGINEER may retain copies of such work product for its records. ENGINEER'S execution of this Agreement shall constitute ENGINEER'S conveyance and assignment of all right,title and interest, including but not limited to any copyright interest, by the ENGINEER to the CITY of all such work product prepared by the ENGINEER pursuant to this Agreement. The CITY shall have the right either on its own or through such other engineers as determined by the CITY to utilize and/or amend such work product. Any such amendment to such work product shall be at the sole risk of the CITY. Such work product is not intended or represented to be suitable for reuse by the CITY on any extension to the PROJECT or on any other project, and such reuse shall be at the sole risk of the CITY without liability or legal exposure to the ENGINEER. 4. PAYMENTS TO THE ENGINEER A. The CITY shall reimburse the ENGINEER for services under this Agreement a lump sum of Sixty-One Thousand Dollars ($61,000), regardless of actual Costs incurred by the ENGINEER unless substantial modifications to the project are authorized in writing by the DIRECTOR and approved by way of written amendment to this Agreement executed by the parties. A detailed fee estimate for the PROJECT is attached hereto as Attachment C and incorporated into this Agreement by reference herein. B. For outside services provided by other firms or consultants,the CITY shall pay the invoiced fee to the ENGINEER, plus 0%. The cost of any such outside services is included within the total lump sum fee provided for in Section 4A above. C. Mileage and printing costs are included as reimbursable costs. The cost of any such reimbursable expenses is included within the total lump sum fee provided for in Section 4A above. D. The CITY shall make periodic payments to the ENGINEER based upon actual progress within 30 days after receipt and approval of invoice. Said periodic payments to the ENGINEER shall not exceed the amounts shown in the following schedule, and full payments for each task shall not be made until the task is completed and accepted by the DIRECTOR. -2 - Date Estimate Percent Estimated Value of Estimated Complete Work Complete Invoice Value 9/30/2026 5% $3,050.00 $3,050.00 10/31/2026 15% $9,150.00 $6,100.00 11/30/2026 20% $12,200.00 $3,050.00 12/31/2026 25% $15,250.00 $3,050.00 1/31/2027 35% $21,350.00 $6,100.00 2/28/2027 50% $30,500.00 $9,150.00 3/31/2027 60% $36,600.00 $6,100.00 4/30/2027 70% $42,700.00 $6,100.00 6/30/2027 80% $48,800.00 $6,100.00 8/30/2027 100% $61,000.00 $12,200.00 5. INVOICES A. The ENGINEER shall submit invoices in a format approved by the CITY. Progress reports(2C above)will be included with all payment requests. B. The ENGINEER shall maintain records showing actual time devoted and cost incurred. The ENGINEER shall permit the authorized representative of the CITY to inspect and audit all data and records of the ENGINEER for work done under this Agreement. The ENGINEER shall make these records available at reasonable times during the Agreement period, and for a year after termination of this Agreement. 6. TERMINATION OF AGREEMENT Notwithstanding any other provision hereof,the CITY may terminate this Agreement at any time upon fifteen (15)days prior written notice to the ENGINEER. In the event that this Agreement is so terminated, the ENGINEER shall be paid for services actually performed and reimbursable expenses actually incurred prior to termination, except that reimbursement shall not exceed the task amounts set forth under section 4 above. 7. TERM This Agreement shall become effective as of the date the ENGINEER is given a notice to proceed and, unless terminated for cause or pursuant to section 6, shall be deemed concluded on the date the CITY determines that all of the ENGINEER's work under this Agreement is completed. A determination of completion shall not constitute a waiver of any rights or claims which the CITY may have or thereafter acquire with respect to any term or provision of the Agreement. 8. NOTICE OF CLAIM If the ENGINEER wishes to make a claim for additional compensation as a result of action taken by the CITY,the ENGINEER shall give written notice of his claim within 15 days after occurrence - 3 - of such action. No claim for additional compensation shall be valid unless so made. Any changes in the ENGINEER's fee shall be valid only to the extent that such changes are included in writing signed by the CITY and the ENGINEER. Regardless of the decision of the DIRECTOR relative to a claim submitted by the ENGINEER, all work required under this Agreement as determined by the DIRECTOR shall proceed without interruption. 9. BREACH OF CONTRACT If either party violates or breaches any term of this Agreement, such violation or breach shall be deemed to constitute a default, and the other party has the right to seek such administrative, contractual or legal remedies as may be suitable to the violation or breach; and, in addition, if either party,by reason of any default,fails within fifteen(15)days after notice thereof by the other party to comply with the conditions of the Agreement, the other party may terminate this Agreement. Notwithstanding the foregoing, or anything else to the contrary in this Agreement, with the sole exception of an action to recover the monies the CITY has agreed to pay to the ENGINEER pursuant to section 4 hereof, no action shall be commenced by the ENGINEER against the CITY for monetary damages. ENGINEER hereby further waives any and all claims or rights to interest on money claimed to be due pursuant to this Agreement, and waives any and all such rights to interest which it claims it may otherwise be entitled pursuant to law, including, but not limited to, the Local Government Prompt Payment Act(50 ILCS 501/1, et seq.), as amended, or the Illinois Interest Act(815 ILCS 205/1,et seq.),as amended. The parties hereto further agree that any action by the ENGINEER arising out of this Agreement must be filed within one year of the date the alleged cause of action arose or the same will be time-barred. The provisions of this section shall survive any expiration,completion and/or termination of this Agreement. 10. INDEMNIFICATION To the fullest extent permitted by law,ENGINEER agrees to and shall indemnify,defend and hold harmless the CITY, its officers,employees, agents,boards and commissions from and against any and all claims, suits,judgments, costs, attorneys fees, damages or other relief, including but not limited to workers compensation claims, in any way resulting from or arising out of negligent actions or omissions of the ENGINEER in connection herewith,including negligence or omissions of employees or agents of the ENGINEER arising out of the performance of this Agreement. In the event of any action against the CITY, its officers, employees, agents, boards or commissions, covered by the foregoing duty to indemnify, defend and hold harmless such action shall be defended by legal counsel of the CITY's choosing. The provisions of this section shall survive any expiration and/or termination of this Agreement. 11. NO PERSONAL LIABILITY No official, director, officer, agent or employee of the CITY shall be charged personally or held contractually liable under any term or provision of this Agreement or because of their execution, approval or attempted execution of this Agreement. -4- 12. INSURANCE The ENGINEER shall provide, maintain and pay for during the term of this Agreement the following types and amounts of insurance: A. Comprehensive Liability. A policy of comprehensive general liability insurance with limits of at least $1,000,000 aggregate for bodily injury and $1,000,000 aggregate for property damage. The ENGINEER shall deliver to the DIRECTOR a Certification of Insurance naming the CITY as additional insured. The policy shall not be modified or terminated without thirty(30)days prior written notice to the DIRECTOR. The Certificate of Insurance which shall include Contractual obligation assumed by the ENGINEER under Article 10 entitled"Indemnification"shall be provided. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the CITY. There shall be no endorsement or modification of this insurance to make it excess over other available insurance, alternatively,if the insurance states that it is excess or prorated, it shall be endorsed to be primary with respect to the CITY. B. Comprehensive Automobile Liability. Comprehensive Automobile Liability Insurance covering all owned, non-owned and hired motor vehicles with limits of not less than$500,000 per occurrence for damage to property. C. Combined Single Limit Policy. The requirements for insurance coverage for the general liability and auto exposures may be met with a combined single limit of $1,000,000 per occurrence subject to a$1,000,000 aggregate. D. Professional Liability. The ENGINEER shall carry Engineers Professional Liability Insurance Covering claims resulting from error, omissions or negligent acts with a combined single limit of not less than $1,000,000 per occurrence. A Certificate of Insurance shall be submitted to the DIRECTOR as evidence of insurance protection. The policy shall not be modified or terminated without thirty (30)days prior written notice to the DIRECTOR. 13. CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, PROCEDURES AND SAFETY The ENGINEER shall not have control over or charge of and shall not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the construction, unless specifically identified in the Scope of Services. -5 - 14. NONDISCRIMINATION/AFFIRMATIVE ACTION The ENGINEER will not discriminate against any employer or applicant for employment because of race,color,religion,sex,national origin,age,ancestry,order of protection status,familial status, marital status, physical or mental disability, military status, sexual orientation, or unfavorable discharge from military service which would not interfere with the efficient performance of the job in question. ENGINEER shall take affirmative action to comply with the provisions of Elgin Municipal Code Section 5.02.040 and will require any subcontractor to submit to the CITY a written commitment to comply with those provisions. ENGINEER shall distribute copies of this commitment to all persons who participate in recruitment, screening, referral and selection of job applicants and prospective subcontractors. ENGINEER agrees that the provisions of Section 5.02.040 of the Elgin Municipal Code, 1976, as amended, is hereby incorporated by reference,as if set out verbatim. No person shall be denied or subjected to discrimination in receipt of the benefit of any services or activities made possible by or resulting from this Agreement on the grounds of race, color, religion,sex,national origin,age,ancestry,order of protection status,familial status,marital status, physical or mental disability, military status, sexual orientation, or unfavorable discharge from military service. Any violation of this paragraph shall be considered a violation of a material provision of this Agreement and shall be grounds for cancellation, termination or suspension, in whole or in part, of the Agreement by the CITY. 15. ASSIGNMENT AND SUCCESSORS This Agreement and each and every portion thereof shall be binding upon the successors and the assigns of the parties hereto; provided, however, that no assignment shall be made without the prior written consent of the CITY. 16. DELEGATIONS AND SUBCONTRACTORS Any assignment,delegation or subcontracting shall be subject to all the terms,conditions and other provisions of this Agreement and the ENGINEER shall remain liable to the CITY with respect to each and every item,condition and other provision hereof to the same extent that the ENGINEER would have been obligated if it had done the work itself and no assignment, delegation or subcontract had been made.Any proposed subcontractor shall require the CITY's advanced written approval. 17. NO CO-PARTNERSHIP OR AGENCY This Agreement shall not be construed so as to create a partnership,joint venture. employment or other agency relationship between the parties hereto. -6- 18. SEVERABILITY The parties intend and agreed that, if any section, sub-section,phrase,clause or other provision of this Agreement, or any portion thereof, shall be held to be void or otherwise unenforceable, all other portions of this Agreement shall remain in full force and effect. 19. HEADINGS The headings of the several sections of this Agreement are inserted only as a matter of convenience and for reference and in no way are they intended to define, limit or describe the scope of intent of any provision of this Agreement,nor shall they be construed to affect in any manner the terms and provisions hereof or the interpretation or construction thereof. 20. MODIFICATION OR AMENDMENT This Agreement and its attachments constitutes the entire Agreement of the parties on the subject matter hereof and may not be changed, modified, discharged or extended except by written amendment duly executed by the parties. Each party agrees that no representations or warranties shall be binding upon the other party unless expressed in writing herein or in a duly executed amendment hereof,or change order as herein provided. 21. APPLICABLE LAW This Agreement shall be deemed to have been made in, and shall be construed in accordance with the laws of the State of Illinois. Venue for the resolution of any disputes or the enforcement of any rights pursuant to this Agreement shall be in the Circuit Court of Kane County, Illinois. 22. NEWS RELEASES The ENGINEER may not issue any news releases without prior approval from the DIRECTOR, nor will the ENGINEER make public proposals developed under this Agreement without prior written approval from the DIRECTOR prior to said documentation becoming matters of public record. 23. COOPERATION WITH OTHER CONSULTANTS The ENGINEER shall cooperate with any other consultants in the CITY's employ or any work associated with the PROJECT. 24. INTERFERENCE WITH PUBLIC CONTRACTING The ENGINEER certifies hereby that it is not barred from bidding on this contract as a result of a violation of 720 ILCS 5/33E et seq. or any similar state or federal statute regarding bid rigging. - 7- 25. SEXUAL HARASSMENT As a condition of this contract,the ENGINEER shall have written sexual harassment policies that include,at a minimum, the following information: A. the illegality of sexual harassment; B. the definition of sexual harassment under state law; C. a description of sexual harassment,utilizing examples; D. the vendor's internal complaint process including penalties; E. the legal recourse, investigative and complaint process available through the Illinois Department of Human Rights, and the Illinois Human Rights Commission; F. directions on how to contact the department and commission; G. protection against retaliation as provided by Section 6-101 of the Human Rights Act. A copy of the policies shall be provided by ENGINEER to the Department of Human Rights upon request(775 ILCS 5/2-105). 26. SUBSTANCE ABUSE PROGRAM. As a condition of this agreement, ENGINEER shall have in place a written substance abuse prevention program which meets or exceeds the program requirements in the Substance Abuse Prevention Public Works Project Act at 820 1LCS 265/1 et seq. A copy of such policy shall be provided to the DIRECTOR prior to the entry into and execution of this agreement. 27. WRITTEN COMMUNICATIONS All recommendations and other communications by the ENGINEER to the DIRECTOR and to other participants which may affect cost or time of completion, shall be made or confirmed in writing. The DIRECTOR may also require other recommendations and communications by the ENGINEER be made or confirmed in writing. 28. NOTICES All notices, reports and documents required under this Agreement shall be in writing and shall be mailed by First Class Mail,postage prepaid, addressed as follows: A. As to CITY: B. As to ENGINEER: Nora Bertram Water Director -8 - City of Elgin 150 Dexter Court Elgin, Illinois 60120-5555 29. COMPLIANCE WITH LAWS Notwithstanding any other provision of this Agreement, it is expressly agreed and understood that in connection with the performance of this Agreement that the ENGINEER shall comply with all applicable Federal, State, City and other requirements of law, including, but not limited to, any applicable requirements regarding prevailing wages, minimum wage, workplace safety and legal status of employees. Without limiting the foregoing, ENGINEER hereby certifies, represents and warrants to the CITY that all ENGINEER'S employees and/or agents who will be providing products and/or services with respect to this Agreement shall be legally authorized to work in the United States. ENGINEER shall also at its expense secure all permits and licenses,pay all charges and fees and give all notices necessary and incident to the due and lawful prosecution of the work, and/or the products and/or services to be provided for in this Agreement. The CITY shall have the right to audit any records in the possession or control of the ENGINEER to determine ENGINEER'S compliance with the provisions of this section. In the event the CITY proceeds with such an audit the ENGINEER shall make available to the CITY the ENGINEER'S relevant records at no cost to the CITY. ENGINEER shall pay any and all costs associated with any such audit. 30. COUNTERPARTS AND EXECUTION This Agreement may be executed in counterparts, each of which shall be an original and all of which shall constitute one and the same agreement. This Agreement may be executed electronically, and any signed copy of this Agreement transmitted by facsimile machine or email shall be treated in all manners and respects as an original document. The signature of any party on a copy of this Agreement transmitted by facsimile machine or email shall be considered for these purposes an original signature and shall have the same legal effect as an original signature. IN WITNESS WHEREOF, the parties hereto have entered into and executed this Agreement effective as of the date and year first written above. FOR THE ITY: FOR THE ENGINEER: 13 "11� > y: �, 1� City Manager Name/Print: Erica Spolar ;-11 /1 Title: Executive Vice President 'ity Clerk - 9 - ATTACHMENT A SCOPE OF SERVICES I a Hampton, Lenzini and Renwick, Inc. ,� Civil Engineers • Structural Engineers • Land Surveyors • Environmental Specialists www.hlrengineering.com August 25, 2026 ATTACHMENT A SCOPE OF SERVICES Sandy Creek Dam Removal Hampton. Lenzini and Renwick. Inc. (HLR) has prepared this proposal letter agreement to complete the concept design for the Sandy Creek Dam Removal project. This project is located at an in-line stormwater basin on Sandy Creek between Airlite Street and Highland Avenue in Elgin, Kane County, Illinois. The existing basin was constructed as a part of the Lincolnwood Terrace subdivision development in 1992 for stormwater storage and aesthetic purposes. The basin is controlled by a dam connected to the upstream wingwalls of the concrete box culvert crossing Highland Avenue, impounding Sandy Creek upstream to Airlite Street. While the basin was designed and originally functioned as an open pond, it has filled in with sediment over time. This is a result of large sediment discharge events paired with the typical sediment processes of in-line basins. This issue has worsened in recent years, exhibited by the development of dense stands of invasive vegetation such as cattail and phragmites in areas that previously were open water. The current status of the basin not only negatively impacts the aesthetics of the subdivision. but also the functional value of Sandy Creek by disrupting sediment transport. inhibiting fish passage, and deteriorating water quality. Removing the dam will address these impairments by draining the basin and restoring this reach of Sandy Creek. The preliminary scope of this project will consist of the development of a concept design for the removal of the dam and restoration of Sandy Creek upstream to Airlite Street. Detailed topographic. bathymetric. and sediment survey of the basin and surrounding area will be acquired to inform the concept design. Initial coordination with applicable regulatory agencies will be conducted in order to understand the permit requirements associated with this work and how the concept design can be tailored to best adhere to these requirements. Based on the concept design developed, an application for the IEPA Section 319(h) Nonpoint Source Pollution Control Financial Assistance Program will be submitted in order to fund the detailed design and construction of this work. The scope of services is detailed below. A detailed cost breakdown for these services is provided in Exhibit A. SCOPE OF SERVICES Task 1: Bathymetric/Sediment Survey Services Bathymetric survey will be completed with GPS base and receivers to determine sediment depths and distribution. which will provide an estimate for the total volume of deposited sediment. HLR will survey the bottom of the sediment utilizing a long probe that will be forced through the sediment to refusal, assuming that is the solid subbase.The limits will be 10 feet beyond the top of banks. Structure surveys will be completed for the existing dam and the culvert crossing Highland Avenue. Inverts will be collected for all culverts around the shore. The project will use Illinois East State Plane Coordinates and NAVD 1988 vertical datum. A volume calculation will be made for the elevation differences between the soft and hard bottom to quantify deposited sediment. Deliverables for Task 1 include a set of exhibits showing the stream/basin bathymetry and sediment depth. Task 2: Preliminary Engineering—Concept Design, Permit Coordination, and Grant Application HLR will prepare a concept design for the removal of the dam and restoration of Sandy Creek between Airlite Street and Highland Avenue. This concept design will be informed by the bathymetric/sediment survey and occur concurrently with initial permit coordination. A site visit will be conducted to assess current basin conditions and collect photos. 1707 N Randall Road 380 Shepard Drive 380 N lerra Cotta Road 3085 Stevenson Drive 323 West 3rd Street Suite 100 Elgin,Illinois 60123-7010 Unit G Suite 201 P 0 Box 160 Elgin,IL 60123 Tel 847 697 6700 Crystal Lake Illinois 60012 Springfield.Illinois 62703 Mt Carmel,Illinois 62863 Tel 847 697 6700 Fax 847 697 6753 Tel 847 697 6700 Tel 217 546 3400 Tel 618 262 8651 Fax 847 697 6753 Fax 847.697 6753 Fax 217 546 8116 Fax 618 263 3327 Sandy Creek Dam Removal August 25, 2026 Page J 2 The following criteria will motivate the concept design: • Remove the dam with minimal impact to the existing Highland Avenue culvert. • Minimize the immediate transport of sediment that has deposited in the basin to downstream reaches of Sandy Creek. • Mitigate the potential for increased flood risk along Sandy Creek due to the dam removal. • Restore approximately 500 linear feet of Sandy Creek by removing the impoundment and establishing morphology typical of nearby upstream and downstream reaches. • Eliminate the existing non-native and invasive vegetation and establish native vegetation typical of high- quality local stream corridors. Using these criteria, the proposed concept design will provide a proof-of-concept plan that restores the functional value of this reach of Sandy Creek by activating sediment transport processes, improving the ecological value of the stream corridor, restoring fish passage, and improving water quality. The primary water quality improvements that will be targeted are increased dissolved oxygen, reduced suspended solids and nutrients, and decreased algal growth. Due to the dynamic and circumstantial nature of permitting for dam removal projects in recent years,the scope of the concept design is fluid and will depend on input from relevant regulatory agencies such as USACE, IDNR-OWR. IDNR Dam Safety. IEPA. and Kane County Stormwater Management. The primary uncertainties at this time are the level of effort required for minimizing downstream sediment transport at the time of dam removal,as well as the extent to which the impoundment area must be restored via active intervention. At this time, two preliminary alternative pathways for the implementation of this project are: A. Low intervention 1. Notch the dam slowly to dewater the impoundment to minimize downstream sediment export. 2. Allow the stream upstream of dam to form new alignment between Airlite Street and Highland Avenue 3. Adaptive management of newly formed stream via erosion control blanket, seed and plug installation. and minor rock installation as needed based on assessment of changing stream conditions. B. High intervention 1. Dewater the basin and remove mobile sediment. 2. Remove the dam. 3. Restore the stream between Airlite Street and Highland Avenue by regrading a new alignment and installing erosion control blanket, seed, plugs, and rock. These and other pathways will be investigated as a part of this work, largely driven by constructability and permittability considerations. Coordination with regulatory agencies will be conducted in order to ascertain permit requirements; pre-application meetings will be held if allowed by these agencies. Once the permit requirements and scope of the concept design are refined, a concept plan view will be developed, including: • Method and timing of dam removal • Schematic of best management practices to restore Sandy Creek • Anticipated planting zones and preliminary seeding/planting mix • Dewatering and soil erosion & sediment control practices as needed An application will be prepared for the IEPA Section 319(h) Nonpoint Source Pollution Control Financial Assistance Program to fund detailed design, permitting. and construction. The grant application consists of concept plans, application forms on the Euna grants platform, letters of support, estimate of probable cost, preliminary pollutant loading reduction analysis using the Pollutant Load Estimation Tool (PLET), and a project narrative. Sandy Creek Dam Removal August 25, 2026 Page 13 Deliverables for Task 2 include: • Concept design Conceptual plan view for the proposed dam removal and stream restoration Preliminary estimate of probable cost • Anticipated permit timeline/pathway • IEPA 319(h) application Task 3: Coordination and Consultation This item includes coordination meetings and status updates throughout the project. • Coordination Meetings - Coordination meetings with the Client (assume 2 meetings) and Lincolnwood Terrace HOA. • Status Emails — HLR will provide regular updates to the Client and Lincolnwood Terrace HOA regarding project status. It is estimated that these emails will be monthly to provide clear updates or progress and upcoming milestones. Additionally, this task covers the presentation of findings. HLR will prepare a presentation summarizing the findings of the Sandy Creek Dam Removal project and discussing proposed solutions at one Tyler Creek Watershed Coalition Meeting and one Lincolnwood Terrace HOA board meeting. Task 4: Quality Assurance and Project Administration This task includes project administration, and quality assurance and quality control per HLR's QA/QC plan. Project management and administration will last throughout the expected duration of the project. Management and administration are necessary to ensure the successful completion of the project. The expected activities within this task include: • Project schedule/progress monitoring • Staffing, monitoring, including allocating staff as needed • Budget monitoring • Document management • Staff coordination • Invoicing Upon completion. this task also includes project close-out. which includes the delivery of the electronic files. This proposed Preliminary Engineering scope does not include. • Wetland delineation and report • Geotechnical report or analysis • Detailed hydraulic analysis • Detailed design and engineering plans for the dam removal and stream restoration • Structure evaluations • Parcel boundary verification • Bid documents or specifications • Detailed quantities • Environmental permitting or agency permit fees • Coordination with adjacent property owners • Utility coordination ATTACHMENT B PROJECT SCHEDULE ATTACHMENT B DETAILED PROJECT SCHEDULE Estimate Percent Estimated Value of Estimated Date Complete Work Complete Invoice Value 9/30/2026 5% $3,050.00 $3,050.00 10/31/2026 15% $9,150.00 $6,100.00 11/30/2026 20% $12,200.00 $3,050.00 12/31/2026 25% $15,250.00 $3,050.00 1/31/2027 35% $21,350.00 $6,100.00 2/28/2027 50% $30,500.00 $9,150.00 3/31/2027 60% $36,600.00 $6,100.00 4/30/2027 70% $42,700.00 $6,100.00 6/30/2027 80% $48,800.00 $6,100.00 8/30/2027 100% $61,000.00 $12,200.00 ATTACHMENT C FEE ESTIMATE - 12 - ATTACHMENT C DETAILED FEE ESTIMATE PROFESSIONAL ENGINEERING SERVICES SANDY CREEK DAM REMOVAL Employee Classification Project Phase/Task Direct Hours Fee PR E3 T3 SUR1 ENV2 Costs 1 BATHYMETRIC/SEDIMENT SURVEY SERVICES Bathymetric/Sediment/Topographic Survey 32 32 $ 4,320.00 Process Survey Data 0 $ - Plot Survey Data 2 2 $ 360.00 Create Existing Terrain Model(s) 4 4 $ 720.00 Sediment Volume Calculations 2 2 $ 360.00 2 PRELIMINARY ENGINEERING SERVICES Data Collection/Review 0 $ - Document Review(GIS, Studies, Reports, Existing Conditions) a 10 10 $ 1,850.00 Field Visit _ _ 8 4 _�_ 12 $ 2,100.00 Prepare Concept Plans 4 56 l 4 2 66 $ 12,370.00 Prepare Engineer's Estimate of Probable Cost-Concept Level 2 20 ; 22 $ 4,190.00 r Agency Coordination ' 8_ 32 5 45 $ 8,655.00 Prepare Permit Timeline/Pathway 7 12 2 I 21 $ 4,245.00 Prepare Illinois 319 h Fundin. ap.lication 50 50 $ 9,250.00 3 CONSULTATION AND COORDINATION Prepare and Attend Coordination Meetings(4) 12 12 $ 2,220.00 Prepare Presentation for HOA (1) Meetings 24 I 24 $ 4,440.00 Status U.dates 12 12 $ 2,220.00 4 QUALITY ASSURANCE AND PROJECT ADMINISTRATION Quality Assurance and Quality Control I 0 $ - Environmental Engineering QAQC 12 I 12 $ 2,220.00 Project Administration and Management I 0 $ - Environmental Engineering Project Administration 8 I 8 $ 1,480.00 TOTALS 21 256 12 32 13 334 $ 61,000.00 8/25/2026 1 of 1