HomeMy WebLinkAbout26-138 Resolution No. 26-138 RESOLUTION AUTHORIZING EXECUTION OF AN AGREEMENT WITH HR GREEN, INC. FOR PROFESSIONAL SERVICES IN CONNECTION WITH THE HIGHLAND PHASE 3.11 — NORTH OF CHICAGO STREET COMBINED SEWER SEPARATION PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that pursuant to Elgin Municipal Code Section 5.02.020B(9)the City Council hereby finds that an exception to the requirements of the procurement ordinance is necessary and in the best interest of the city; and BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are hereby authorized and directed to execute an Agreement on behalf of the City of Elgin with HR Green, Inc., professional services in connection with the Highland Phase 3.11 —north of Chicago Street combined sewer separation project, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: August 26, 2026 Adopted: August 26, 2026 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk AGREEMENT THIS AGREEMENT ("Agreement") is made and entered into this 26 day of August , 2026, by and between the CITY OF ELGIN, an Illinois municipal corporation (hereinafter referred to as "CITY")and HR GREEN.INC.,an Iowa Corporation authorized to do business in the State of Illinois(hereinafter referred to as"ENGINEER"). WHEREAS, the CITY desires to engage the ENGINEER to furnish certain professional services in connection with Highland Phase 3.11 — North of Chicago Street Combined Sewer Separation Project(hereinafter referred to as the"PROJECT"); and WHEREAS, the ENGINEER represents that it is in compliance with Illinois Statutes relating to professional registration of individuals and has the necessary expertise and experience to furnish such services upon the terms and conditions set forth herein below. NOW, THEREFORE, it is hereby agreed by and between the CITY and the ENGINEER that the CITY does hereby retain the ENGINEER for and in consideration of the mutual promises and covenants contained herein, the sufficiency of which is hereby acknowledged to act for and represent it in the engineering matters involved in the PROJECT as described herein, subject to the following terms and conditions and stipulations,to-wit: 1. SCOPE OF SERVICES A. All work hereunder shall be performed under the direction of the Water Director of the CITY,hereinafter referred to as the"DIRECTOR". B. The scope of services includes providing professional consulting services to prepare contract plans and specifications and bidding documents and to provide bid award and assistance services for the PROJECT. C. A detailed Scope of Services for the PROJECT is attached hereto as Attachment A, and incorporated into this Agreement by reference herein. 2. PROGRESS REPORTS A. An outline project milestone schedule is provided hereinunder. • Executed Agreement and Notice to Proceed—August 17,2026 • Conceptual Design (30%)—November 6, 2026 • Preliminary (60%)Engineering Plans—January 22, 2027 • Pre-Final (90%)Engineering Plans—March 26,2027 • Final (100%)Contract Plans—May 14,2027 • Bid Award and Assistance—June 18,2027 B. A detailed project schedule for the PROJECT is included as Attachment B,attached hereto,and incorporated into this Agreement by reference herein. Progress will be recorded on the project schedule and submitted monthly as a component of the Status Report described in C below. C. The ENGINEER will submit to the DIRECTOR a monthly status report keyed to the project schedule. A brief narrative will be provided identifying progress, findings and outstanding issues. 3. WORK PRODUCT All work product prepared by the ENGINEER pursuant hereto including, but not limited to, reports, plans, designs, calculations, work drawings, studies, photographs, models and recommendations shall be the property of the CITY and shall be delivered to the CITY upon request of the DIRECTOR; provided, however, that the ENGINEER may retain copies of such work product for its records. ENGINEER'S execution of this Agreement shall constitute ENGINEER'S conveyance and assignment of all right,title and interest, including but not limited to any copyright interest, by the ENGINEER to the CITY of all such work product prepared by the ENGINEER pursuant to this Agreement. The CITY shall have the right either on its own or through such other engineers as determined by the CITY to utilize and/or amend such work product. Any such amendment to such work product shall be at the sole risk of the CITY. Such work product is not intended or represented to be suitable for reuse by the CITY on any extension to the PROJECT or on any other project, and such reuse shall be at the sole risk of the CITY without liability or legal exposure to the ENGINEER. 4. PAYMENTS TO THE ENGINEER(Lump Sum Method) A. The CITY shall reimburse the ENGINEER for services under this Agreement a lump sum of Seven Hundred Seventy-four Thousand Eight Hundred and Seventy- one Dollars($774,871.00), regardless of actual Costs incurred by the ENGINEER unless substantial modifications to the project are authorized in writing by the DIRECTOR and approved by way of written amendment to this Agreement executed by the parties.A detailed fee estimate for the PROJECT is attached hereto as Attachment C and incorporated into this Agreement by reference herein. B. For outside services provided by other firms or consultants,the CITY shall pay the invoiced fee to the ENGINEER,plus 0%. The cost of any such outside services is included within the total lump sum fee amount of Seven Hundred Seventy-four Thousand Eight Hundred and Seventy-one Dollars ($774,871.00), provided for in Section 4A above. C. Mileage and printing costs are included as reimbursable costs. The cost of any such reimbursable expenses is included within the total lump sum fee amount of Seven Hundred Seventy-four Thousand Eight Hundred and Seventy-one Dollars ($774,871.00),provided for in Section 4A above. D. The CITY shall make periodic payments to the ENGINEER based upon actual progress within 30 days after receipt and approval of invoice. Said periodic payments to the ENGINEER shall not exceed the amounts shown in the following -2 - schedule, and full payments for each task shall not be made until the task is completed and accepted by the DIRECTOR. Date Estimate Percent Estimated Value of Estimated Complete Work Complete Invoice Value 8/31/2026 5.8% $45,041 $45,041 9/30/2026 22.7% $175,662 $130,621 10/31/2026 33.3% $257,850 $82,188 11/30/2026 46.6% $361,169 $103,318 12/31/2026 56.0% $433,609 72,440 1/31/2027 66.4% $514,456 $80,847 2/28/2027 75.6% $585,610 $71,154 3/31/2027 85.5% $662,658 $77,048 4/30/2027 93.4% $724,046 $61,388 5/31/2027 98.1% $759,964 $35,917 _ 6/30/2027 100.00% $774,871 $14,909 5. INVOICES A. The ENGINEER shall submit invoices in a format approved by the CITY. Progress reports(2C above)will be included with all payment requests. B. The ENGINEER shall maintain records showing actual time devoted and cost incurred. The ENGINEER shall permit the authorized representative of the CITY to inspect and audit all data and records of the ENGINEER for work done under this Agreement. The ENGINEER shall make these records available at reasonable times during the Agreement period, and for a year after termination of this Agreement. 6. TERMINATION OF AGREEMENT Notwithstanding any other provision hereof, the CITY may terminate this Agreement at any time upon fifteen (15)days prior written notice to the ENGINEER. In the event that this Agreement is so terminated, the ENGINEER shall be paid for services actually performed and reimbursable expenses actually incurred prior to termination, except that reimbursement shall not exceed the task amounts set forth under section 4 above. 7. TERM This Agreement shall become effective as of the date the ENGINEER is given a notice to proceed and, unless terminated for cause or pursuant to section 6, shall be deemed concluded on the date the CITY determines that all of the ENGINEER's work under this Agreement is completed. A determination of completion shall not constitute a waiver of any rights or claims which the CITY may have or thereafter acquire with respect to any term or provision of the Agreement. -3 - 8. NOTICE OF CLAIM If the ENGINEER wishes to make a claim for additional compensation as a result of action taken by the CITY,the ENGINEER shall give written notice of his claim within 15 days after occurrence of such action. No claim for additional compensation shall be valid unless so made. Any changes in the ENGINEER's fee shall be valid only to the extent that such changes are included in writing signed by the CITY and the ENGINEER. Regardless of the decision of the DIRECTOR relative to a claim submitted by the ENGINEER, all work required under this Agreement as determined by the DIRECTOR shall proceed without interruption. 9. BREACH OF CONTRACT If either party violates or breaches any term of this Agreement, such violation or breach shall be deemed to constitute a default, and the other party has the right to seek such administrative, contractual or legal remedies as may be suitable to the violation or breach; and, in addition, if either party,by reason of any default,fails within fifteen(15)days after notice thereof by the other party to comply with the conditions of the Agreement, the other party may terminate this Agreement. Notwithstanding the foregoing, or anything else to the contrary in this Agreement, with the sole exception of an action to recover the monies the CITY has agreed to pay to the ENGINEER pursuant to section 4 hereof, no action shall be commenced by the ENGINEER against the CITY for monetary damages. ENGINEER hereby further waives any and all claims or rights to interest on money claimed to be due pursuant to this Agreement, and waives any and all such rights to interest which it claims it may otherwise be entitled pursuant to law, including, but not limited to, the Local Government Prompt Payment Act(50 ILCS 501/1, et seg.),as amended, or the Illinois Interest Act(815 ILCS 205/1,et seq.),as amended. The parties hereto further agree that any action by the ENGINEER arising out of this Agreement must be filed within one year of the date the alleged cause of action arose or the same will be time-barred. The provisions of this section shall survive any expiration,completion and/or termination of this Agreement. 10. INDEMNIFICATION To the fullest extent permitted by law,ENGINEER agrees to and shall indemnify,defend and hold harmless the CITY, its officers,employees,agents, boards and commissions from and against any and all claims, suits,judgments, costs, attorneys fees, damages or other relief, including but not limited to workers compensation claims, in any way resulting from or arising out of negligent actions or omissions of the ENGINEER in connection herewith,including negligence or omissions of employees or agents of the ENGINEER arising out of the performance of this Agreement. In the event of any action against the CITY, its officers,employees, agents, boards or commissions, covered by the foregoing duty to indemnify, defend and hold harmless such action shall be defended by legal counsel of the CITY's choosing. The provisions of this section shall survive any expiration and/or termination of this Agreement. -4- 11. NO PERSONAL LIABILITY No official, director, officer, agent or employee of the CITY shall be charged personally or held contractually liable under any term or provision of this Agreement or because of their execution, approval or attempted execution of this Agreement. 12. INSII RANCE The ENGINEER shall provide, maintain and pay for during the term of this Agreement the following types and amounts of insurance: A. Comprehensive Liability. A policy of comprehensive general liability insurance with limits of at least $1,000,000 aggregate for bodily injury and $1,000,000 aggregate for property damage. The ENGINEER shall deliver to the DIRECTOR a Certification of Insurance naming the CITY as additional insured. The policy shall not be modified or terminated without thirty(30)days prior written notice to the DIRECTOR. The Certificate of Insurance which shall include Contractual obligation assumed by the ENGINEER under Article 10 entitled"Indemnification"shall be provided. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the CITY. There shall be no endorsement or modification of this insurance to make it excess over other available insurance, alternatively,if the insurance states that it is excess or prorated, it shall be endorsed to be primary with respect to the CITY. B. Comprehensive Automobile Liability. Comprehensive Automobile Liability Insurance covering all owned, non-owned and hired motor vehicles with limits of not less than $500,000 per occurrence for damage to property. C. Combined Single Limit Policy. The requirements for insurance coverage for the general liability and auto exposures may be met with a combined single limit of $1,000,000 per occurrence subject to a$1,000,000 aggregate. D. Professional Liability. The ENGINEER shall carry Engineers Professional Liability Insurance Covering claims resulting from error, omissions or negligent acts with a combined single limit of not less than $1,000,000 per occurrence. A Certificate of Insurance shall be submitted to the DIRECTOR as evidence of insurance protection. The policy shall not be modified or terminated without thirty (30)days prior written notice to the DIRECTOR. -5 - 13. CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, PROCEDURES AND SAFETY The ENGINEER shall not have control over or charge of and shall not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the construction, unless specifically identified in the Scope of Services. 14. NONDISCRIMINATION/AFFIRMATIVE ACTION The ENGINEER will not discriminate against any employer or applicant for employment because of race,color,religion,sex,national origin,age,ancestry,order of protection status,familial status, marital status, physical or mental disability, military status, sexual orientation, or unfavorable discharge from military service which would not interfere with the efficient performance of the job in question. ENGINEER shall take affirmative action to comply with the provisions of Elgin Municipal Code Section 5.02.040 and will require any subcontractor to submit to the CITY a written commitment to comply with those provisions. ENGINEER shall distribute copies of this commitment to all persons who participate in recruitment, screening, referral and selection of job applicants and prospective subcontractors. ENGINEER agrees that the provisions of Section 5.02.040 of the Elgin Municipal Code, 1976,as amended, is hereby incorporated by reference,as if set out verbatim. No person shall be denied or subjected to discrimination in receipt of the benefit of any services or activities made possible by or resulting from this Agreement on the grounds of race, color, religion,sex,national origin,age,ancestry,order of protection status,familial status,marital status, physical or mental disability, military status, sexual orientation, or unfavorable discharge from military service. Any violation of this paragraph shall be considered a violation of a material provision of this Agreement and shall be grounds for cancellation, termination or suspension, in whole or in part, of the Agreement by the CITY. 15. ASSIGNMENT AND SUCCESSORS This Agreement and each and every portion thereof shall be binding upon the successors and the assigns of the parties hereto; provided, however, that no assignment shall be made without the prior written consent of the CITY. 16. DELEGATIONS AND SUBCONTRACTORS Any assignment,delegation or subcontracting shall be subject to all the terms,conditions and other provisions of this Agreement and the ENGINEER shall remain liable to the CITY with respect to each and every item,condition and other provision hereof to the same extent that the ENGINEER would have been obligated if it had done the work itself and no assignment, delegation or -6- subcontract had been made.Any proposed subcontractor shall require the CITY's advanced written approval. 17. NO CO-PARTNERSHIP OR AGENCY This Agreement shall not be construed so as to create a partnership.joint venture. employment or other agency relationship between the parties hereto. 18. SEVERABILITY The parties intend and agreed that, if any section,sub-section,phrase,clause or other provision of this Agreement, or any portion thereof, shall be held to be void or otherwise unenforceable, all other portions of this Agreement shall remain in frill force and effect. 19. HEADINGS The headings of the several sections of this Agreement are inserted only as a matter of convenience and for reference and in no way are they intended to define, limit or describe the scope of intent of any provision of this Agreement,nor shall they be construed to affect in any manner the terms and provisions hereof or the interpretation or construction thereof. 20. MODIFICATION OR AMENDMENT This Agreement and its attachments constitutes the entire Agreement of the parties on the subject matter hereof and may not be changed, modified, discharged or extended except by written amendment duly executed by the parties. Each party agrees that no representations or warranties shall be binding upon the other party unless expressed in writing herein or in a duly executed amendment hereof,or change order as herein provided. 21. APPLICABLE LAW This Agreement shall be deemed to have been made in,and shall be construed in accordance with the laws of the State of Illinois.Venue for the resolution of any disputes or the enforcement of any rights pursuant to this Agreement shall be in the Circuit Court of Kane County, Illinois. 22. NEWS RELEASES The ENGINEER may not issue any news releases without prior approval from the DIRECTOR, nor will the ENGINEER make public proposals developed under this Agreement without prior written approval from the DIRECTOR prior to said documentation becoming matters of public record. 23. COOPERATION WITH OTHER CONSULTANTS The ENGINEER shall cooperate with any other consultants in the CITY's employ or any work associated with the PROJECT. -7- 24. INTERFERENCE WITH PUBLIC CONTRACTING The ENGINEER certifies hereby that it is not barred from bidding on this contract as a result of a violation of 720 ILCS 5/33E et seq. or any similar state or federal statute regarding bid rigging. 25. SEXUAL HARASSMENT As a condition of this contract,the ENGINEER shall have written sexual harassment policies that include,at a minimum,the following information: A. the illegality of sexual harassment; B. the definition of sexual harassment under state law: C. a description of sexual harassment, utilizing examples; D. the vendor's internal complaint process including penalties; E. the legal recourse, investigative and complaint process available through the Illinois Department of Human Rights,and the Illinois Human Rights Commission; F. directions on how to contact the department and commission; G. protection against retaliation as provided by Section 6-101 of the Human Rights Act. A copy of the policies shall be provided by ENGINEER to the Department of Human Rights upon request(775 ILCS 5/2-105). 26. SUBSTANCE ABUSE PROGRAM. As a condition of this agreement, ENGINEER shall have in place a written substance abuse prevention program which meets or exceeds the program requirements in the Substance Abuse Prevention Public Works Project Act at 820 ILCS 265/1 et seq. A copy of such policy shall be provided to the DIRECTOR prior to the entry into and execution of this agreement. 27. WRITTEN COMMUNICATIONS All recommendations and other communications by the ENGINEER to the DIRECTOR and to other participants which may affect cost or time of completion, shall be made or confirmed in writing. The DIRECTOR may also require other recommendations and communications by the ENGINEER be made or confirmed in writing. - 8- 28. NOTICES All notices,reports and documents required under this Agreement shall be in writing and shall be mailed by First Class Mail,postage prepaid,addressed as follows: A. As to CITY: B. As to ENGINEER: Nora Bertram Ajay Jain Water Director President-Water City of Elgin HR Green, Inc. 150 Dexter Court 1391 Corporate drive., Suite 203 Elgin, Illinois 60120-5555 McHenry, IL 60050-5528 29. COMPLIANCE WITH LAWS Notwithstanding any other provision of this Agreement, it is expressly agreed and understood that in connection with the performance of this Agreement that the ENGINEER shall comply with all applicable Federal, State, City and other requirements of law, including, but not limited to, any applicable requirements regarding prevailing wages, minimum wage, workplace safety and legal status of employees. Without limiting the foregoing,ENGINEER hereby certifies, represents and warrants to the CITY that all ENGINEER'S employees and/or agents who will be providing products and/or services with respect to this Agreement shall be legally authorized to work in the United States. ENGINEER shall also at its expense secure all permits and licenses,pay all charges and fees and give all notices necessary and incident to the due and lawful prosecution of the work, and/or the products and/or services to be provided for in this Agreement. The CITY shall have the right to audit any records in the possession or control of the ENGINEER to determine ENGINEER'S compliance with the provisions of this section. In the event the CITY proceeds with such an audit the ENGINEER shall make available to the CITY the ENGINEER'S relevant records at no cost to the CITY. ENGINEER shall pay any and all costs associated with any such audit. 30. COUNTERPARTS AND EXECUTION This Agreement may be executed in counterparts, each of which shall be an original and all of which shall constitute one and the same agreement. This Agreement may be executed electronically, and any signed copy of this Agreement transmitted by facsimile machine or email shall be treated in all manners and respects as an original document. The signature of any party on a copy of this Agreement transmitted by facsimile machine or email shall be considered for these purposes an original signature and shall have the same legal effect as an original signature. -9- IN WITNESS WHEREOF, the parties hereto have entered into and executed this Agreement effective as of the date and year first written above. FOR THE CITY: FOR THE ENGINEER: By /�Z7 6j By: City Manager Name/Print:Aiay Jain Title: President-Water ( 'tv Clerk C J 12026\26023941Admm\Contract\Chent101-agt-062226-HtghlandNorthOfthicagoSepProj docx - I0- ATTACHMENT A SCOPE OF SERVICES ATTACHMENT A SCOPE OF SERVICES HIGHLAND PHASE 3.11 — NORTH OF CHICAGO STREET COMBINED SEWER SEPARATION PROJECT (DESIGN, CONTRACT PLANS, SPECIFICATIONS AND BIDDING SERVICES) CITY OF ELGIN, IL PROJECT BACKGROUND/PROJECT UNDERSTANDING HR Green, Inc. (ENGINEER) was retained by the City of Elgin, Illinois (CITY) to provide professional consulting services in connection with the Comprehensive Sewer Master Plan (Master Plan). As part of the Master Plan, the Highland Phase 3.11 - North of Chicago Street Combined Sewer Separation Project (PROJECT) within the Highland Combined Sewer Basin was identified as the design project for 2026 with an anticipated construction in 2027. In addition to improvements identified in the Master Plan the CITY recently discovered the intersection of Larkin Ave and Worth Ave is not separated as was previously thought. Investigating this intersection and proposing improvements to separate the intersection are also included in the scope of the PROJECT. The improvement limits include construction along Larkin Ave between Clifton Ave and Melrose Ave and along Melrose Ave, Aldine Ave, Alfred Ave, Edison Ave, Worth Ave, Commonwealth Ave and Monroe St between Chicago St to Larkin Ave, for a total of approximately 5,700' (or 1.08 miles). The improvement limits for the PROJECT are as shown in the attached exhibits. The CITY has requested that professional consulting services be provided to prepare contract plans and specifications and bidding documents and to provide bid award and assistance services for the PROJECT. Below are the proposed scope of services to be completed for the PROJECT. SCOPE OF SERVICES The scope and level of effort required is based on the following project scope and limits (see attached Exhibits): 1) Storm Sewer Separation Improvements = - 5,400 linear feet (See Exhibit A) 2) Water Main Construction Improvements = - 1,900 linear feet (See Exhibit B) 3) Combined/Sanitary Sewer Lining = - 4,100 linear feet (See Exhibit C) As part of the coordination with the CITY and EEI, the ENGINEER understands that the lead services within the PROJECT's limits will be replaced prior to the PROJECT going to be in construction in 2027. Therefore, no lead service replacements have been included in the scope. Upon issuance of a Notice to Proceed (NTP), the ENGINEER will complete the following tasks under this scope of services: Task 1 - Kickoff Meeting Task 2 -Topographic Survey Task 3-Geotechnical Services Task 4 -Sewer Televising Video Review Task 5- Field Reconnaissance Scope of Services Highland Phase 3.11 —North of Chicago Street Combined Sewer Separation Project City of Elgin, IL Page 2 of 8 Task 6— Utility Coordination Task 7—Conceptual Design (30%) Task 8 — Preliminary Design (60% Contract Plans) Task 9— Pre-Final (90% Contract Plans) Task 10— Final (100% Contract Plans) Task 11 — Public Information Meeting Task 12 — Progress Meetings - (Conceptual, Preliminary, Pre-Final and Final Design) Task 13— Permitting Task 14 — Engineer's Opinion of Probable Construction Costs (EOPCC) Task 15 —Quality Assurance and Quality Control (QA-QC) Task 16— Modeling Updates—Overall System/Master Plan Model Task 17— Bid Award and Assistance Task 18 — Project Administration A detailed scope of services for each of the tasks identified above along with deliverables is provided below. TASK 1 — KICKOFF MEETING Scope of Work: The ENGINEER will prepare an agenda for the project and distribute it to CITY prior to the meeting. ENGINEER will attend a kickoff meeting with the CITY to discuss the project schedule, major deliverable milestones, and schedule. ENGINEER will also setup an internal meeting with the Design Team after the initial kickoff meeting with the CITY to coordinate the project scope, schedule, and expectations discussed with CITY staff. Deliverable: Minutes of the meeting with the CITY will be prepared and distributed to all attendees. TASK 2—TOPOGRAPHIC SURVEY Scope of Work: Survey and Right-of-Way (ROW) Services a. ROW Survey: ENGINEER will recover existing ROW evidence for approximately 410 feet along Larkin Ave, 570 feet along Melrose Ave, 570 feet along Aldine Ave, 660 feet along Alfred Ave, 730 feet along Edison Ave, 990 feet along Worth Ave, 990 feet along Commonwealth Ave, and 780 feet along Monroe St (see Figure A-1 below for survey limits). ENGINEER will calculate the existing ROW as shown on recorded subdivision plats to include on the base map. b. Roadway Topographic Survey: The roadway topographic survey will include the area lying within the existing ROW, within the limits described above and shown on Figure A-1. The topographic survey will include cross-sections at 50-foot intervals and extend 10 feet beyond the existing ROW. The survey will include visible existing features and improvements. Existing utilities will be surveyed from visible flags or markings. Storm sewer, sanitary sewer and water main structures will be surveyed, including rim elevation, invert pipe size, direction and elevation as observed at unlocked manholes. Trees lying within the limits described above and having a diameter of six inches or greater will be located, but the species will not be identified. Scope of Services Highland Phase 3.11 —North of Chicago Street Combined Sewer Separation Project City of Elgin, IL Page 3 of 8 The survey will reference existing NGS control stations, Illinois State Plane Coordinate System East Zone NAD83 (2011) and NAVD88 (US Survey Feet). c. Topographic Survey Base Map: ENGINEER will generate a base map in AutoCAD Civil 3D release 2026 of the existing features collected within the project limits according to IDOT standards. The topographic survey base map will include one (1) foot contours and show tags to existing visible utilities. Items not included in Agreement/Supplemental Services • Wire Height Survey • Tree Inventory • Plat of Dedication/Easements • Plat of Survey/Topography :_.__A. I .__:-,, -_. ATCITTOAAL AREA TO ONESTIGAGE PAO SEPARATE PER CT, V... T r -- . ,. t .4 ^ : 41! ".,.WVgirt.,/ y ,. - , ::, , , , Ardb... ," - _� . - >, y X Figure A-1 TASK 3—GEOTECHNICAL SERVICES Scope of Work: ENGINEER will subcontract with a qualified geotechnical consultant to provide geotechnical recommendations for construction as well as Clean Construction Demolition Debris (CCDD) certification and letter of acceptance from a qualified facility to receive uncontaminated spoil material generated onsite from trench excavation. Seven (7) geotechnical borings to a depth of 15' and eight (8) pavement cores within the project area are proposed. ENGINEER assumes the CCDD certification letter will require LPC-663 testing. Deliverable: PDF copies of the geotechnical report and CCDD certification and acceptance letter will be provided. Scope of Services Highland Phase 3.11 —North of Chicago Street Combined Sewer Separation Project City of Elgin, IL Page 4 of 8 Items Not Included in the Scope: Additional Geotechnical Investigations or soil borings including pavement cores other than as noted above are not included in the scope. If additional borings become necessary, ENGINEER can provide these services, upon approval by the CITY, as supplemental services. TASK 4—SEWER TELEVISING VIDEO REVIEW Scope of Work: CITY will complete sewer televising of all combined sewers within the project area and provide to ENGINEER those tapes and reports for review. A summary of findings will be prepared and submitted to document areas feasible for and requiring sewer lining via Cured in Place Pipe (CIPP) versus spot repairs via open cut methods. These recommendations will then be incorporated in the final design per the CITY's preferred direction of improvement. Deliverable: A spreadsheet summarizing the video results and deficient segments. TASK 5— FIELD RECONNAISSANCE Scope of Work: ENGINEER will perform walkthrough during conceptual design to gain an understanding of existing site conditions that may impact final design in attempt to avoid future conflicts. ENGINEER and CITY representatives will then perform a walkthrough of the site prior to finalizing the 60% design plans to verify the existing site conditions and noticeable site conflicts such as existing trees, utility poles, etc. Additional reconnaissance will be completed with the CITY on an as needed basis for constructability review. The ENGINEER will also coordinate with the CITY's Forestry Department regarding existing parkway trees that are to be removed or remain in place based on their tree evaluation recommendation of the tree's type and condition within the project limits. Deliverable: N/A TASK 6— UTILITY COORDINATION Scope of Work: ENGINEER will initiate a JULIE Design Ticket for the PROJECT. The scope will include utility coordination with the CITY Utility Department, Public Works and Franchise Utilities Owners to finalize utility locations and possible conflicts in the field as plans are developed to pre- final and final stage. Deliverable: ENGINEER will provide correspondence and copies of utility maps received from the franchise utility companies for CITY records. TASK 7— CONCEPTUAL DESIGN (30%) Scope of Work: The proposed sewer separation strategy for the PROJECT generally includes installation of new storm sewers and leaving the existing combined sewer to serve as separate sanitary sewer. The PROJECT also includes the replacement of select water mains in Melrose Ave, Commonwealth Ave, and Monroe St. within the project limits. ENGINEER will prepare conceptual level design plans for discussion with CITY prior to advancing design to 60%. Concept plans will verify project limits for sewer separation and provide proposed storm sewer sizes, alignment and profiles. Concept plans will also identify potential conflicts with CITY and franchise Scope of Services Highland Phase 3 11 —North of Chicago Street Combined Sewer Separation Project City of Elgin. IL Page 5 of 8 utilities that will need to be coordinated during construction, limits of combined/sanitary sewer removal. and replacement and/or CIPP lining. Concept plans will be used to finalize the limit and scope of sewer separation project. Deliverable: Concept Plans (30%) plans in pdf format will be provided for review by the CITY. TASK 8, TASK 9 & TASK 10 — PRELIMINARY (60%), PRE-FINAL (90%) AND FINAL (100%) CONTRACT PLANS Scope of Work: These services will include preparing pre-final and final contract plans, specifications and bid documents to CITY Standards to ensure the proper bidding and award of a construction project. The specific scope for the contract plan services is further provided below: a. Design Standards: The Engineering and Contract Documents will be developed according to applicable regulatory agency requirements. These include the following design guidelines and ordinances: • City of Elgin standards and details; • Standard Specifications for Sewer and Water Main Construction in Illinois: • IDOT Standard Specifications: • IEPA NPDES Phase II regulations for Stormwater Pollution Prevention Plans (SWPPP); and • Kane County Stormwater Ordinance. • Fox River Water Reclamation District (FRWRD) standard details if applicable. b. Plans, Specification and Bid Documents: ENGINEER will develop and assemble the contract plans and special provisions for a local letting based on the selection of the construction limits identified in TASK 7—CONCEPTUAL DESIGN. Plans will be prepared in AutoCAD Civil 3D software. Plans will be developed to predetermined milestones for submittal which will consist of preliminary(60%), pre- final (90%) and final (100%) engineering plans and bid documents of the project limits. The bid documents will be prepared using the CITY provided front-end documents and bidding requirements. Comments received will be addressed aid a disposition of comments provided to the CITY. The general nature of improvements within the project limits will include construction of new storm sewers. water main adjustments as necessary, water main replacements, sanitary and water service replacements, existing combined sewer spot repairs and/or CIPP lining, pavement patching and full width resurfacing along impacted roadways. A typical set of contract plans will include the following minimum sheets: • Cover Sheet: • Index/General Notes/Standards: • Summary of Quantities: • Typical Sections: • Removal Plans; • Plan and Profile Sheets: • Schedules & Tags: • Erosion Control Plan; Scope of Services Highland Phase 3.11 —North of Chicago Street Combined Sewer Separation Project City of Elgin, IL Page 6 of 8 • Restoration Plans; and • Standard CITY and IDOT Construction Details. Typical Final Bid Documents will include: • Bid forms - Notice to Bidders, Instructions to Bidders, Bonding and Insurance Requirements • Contract Terms and Conditions; • Special Provisions; • Stormwater Pollution Prevention Plan (SWPPP); • Approved Permits; and • Contract Plans. Deliverable: 60%, 90%, 100% Contract Plans and Specifications and Bid Documents in pdf format for review by the CITY. TASK 11 — PUBLIC INFORMATION MEETING Scope of Work: ENGINEER will work with CITY staff to schedule one (1) public informational meeting for the project. ENGINEER will attend the public information meeting to solicit feedback and to answer any questions pertaining to impacts to affected properties, project duration and other pertinent items. The location for the public informational meeting will be identified and organized by the CITY. Deliverable: ENGINEER will prepare exhibits and presentation for the public meeting. TASK 12— PROGRESS MEETINGS Scope of Work: Leading up to and at the design milestones (i.e. concept (30% plan submittal), preliminary (60% plan submittal), pre-final (90% plan submittal), and final (100% plan submittal)), the ENGINEER will attend up to four (4) progress meetings to coordinate and discuss the CITY's review comments on the contract plans and specifications. This will allow CITY Staff and ENGINEER to discuss design elements, project progress, permitting, and costs at each of these above milestones to ensure that the project is progressing within budget and on schedule. Deliverable: ENGINEER will prepare minutes of the meetings and distribute to all attendees. TASK 13— PERMITTING Scope of Work: ENGINEER will prepare the permit application and necessary supporting documentation for permits relevant to this project which will include: • IEPA's Construction Permits for sanitary sewer (if applicable) and water main replacements; • IDNR— EcoCAT & State Historic Preservation Agency (SHPO) Consultation • Kane County Stormwater Permit for over 5,000 square-feet of hydrologic disturbance; and • An NPDES Phase II ILR10 General permit for construction activity with accompanying Stormwater Pollution Prevention Plan (SWPPP). Scope of Services Highland Phase 3.11 —North of Chicago Street Combined Sewer Separation Project City of Elgin, IL Page 7 of 8 In addition, and as necessary, coordination with Fox River Water Reclamation District (FRWRD) will be completed. Scope will include permit coordination with the regulatory agencies listed above. Deliverable: One (1) copy of each of the permit application(s) will be provided for CITY records. Items Not Included in the Scope: For the purposes of the scope, ENGINEER assumes that permits other than those noted above are not required and are therefore not included in the scope. If additional permits are identified requiring substantial permitting efforts. Direct costs associated with permit applications are the responsibility of the CITY. ENGINEER can provide these services, upon approval by the CITY, as supplemental services. TASK 14— ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS (EOPCC) Scope of Work: An Engineer's Opinion of Probable Construction Cost(EOPCC)will be prepared for CITY review with each milestone stage (Conceptual Design, 60%, 90% and 100%). If any adjustments are needed in the design plans including limits of construction adjustments, these discussions can occur early in the process. Deliverable: An Illinois Registered Professional Engineer(PE) signed and sealed EOPCC will be provided. TASK 15— QUALITY ASSURANCE AND QUALITY CONTROL (QA-QC) Scope of Work: A QA-QC review will be completed with each milestone stage (Conceptual Design. 60%, 90% and 100%). A constructability review will also be completed by ENGINEER's construction personnel. Deliverable: Plan and document review by an Illinois Registered Professional Engineer (PE) along with constructability review by ENGINEER's construction personnel. TASK 16— MODELING UPDATES —OVERALL SYSTEM MASTER PLAN MODEL Scope of Work: The scope of work will include the following for modeling updates: Basin Hydrologic and Hydraulic Analysis: As detailed survey and project design are finalized, the existing hydrologic and hydraulic model developed as part of the Master Plan will be updated. Additionally, the model will be utilized to identify and design improvements to separate the intersection of Larkin Ave and Worth Ave that has not previously been investigated. Deliverable: Model update summary memo Items Not Included in the Scope: N/A TASK 17— BID AWARD AND ASSISTANCE Scope of Work: The scope of work will include coordinating with the CITY procurement department for bid advertisement and issuance of bid documents, which typically include construction plans and specifications, bid forms, instructions to bidders, bonding and insurance requirements and applicable state or federal compliance. During the bidding period, ENGINEER will answer questions raised by potential bidders and issue addenda, if necessary. ENGINEER Scope of Services Highland Phase 3.11 — North of Chicago Street Combined Sewer Separation Project City of Elgin. IL Page 8 of 8 will ieview bid tabulations completed by the CITY of bids received and opened at the bid opening, complete reference checks and prepare a recommendation for award to the lowest responsible bidder_ Deliverable: Recommendation for award letter will be provided. TASK 18- PROJECT ADMINISTRATION Scope of Work: This task will include management of the project scope, schedule and budget including maintaining project documentation binder. A monthly progress report will be provided to the CITY detailing activities completed in the prior month and activities anticipated to be completed or undertaken in the following reporting period. Deliverable: Monthly progress report will be submitted to the CITY. A - - _ . � _ I91a nd I ADDITIONAL AREA TO INVESTIGAGE AND SEPARATE PER CITY a - ...... . \ ••., t 8 /1 - — OM i ' It # • IAN' facial _. I _.�Y Pen Ivan•.Ave ii _ I -'* T 36-1n w tt • a o Z .il d aar P ' ( E r,,..::A114 . 1 l_....'- .,,,,,_. • IS�In '� �' 2hln ilh • r 4.111 e ,IF .. i "1441-;10- • tilt"-Ir • ' ' "i ' k ' '46'1 - 111 i . brzl,' . )641;,.'1-all, ': !. ,,.,,,,,,i... '.— 7.. e .4- , ': j : • e :. , ,.. t ,le It , .. L . _ : .." ifr . . ?Ili, tal AA, 14 _ '!nr •_Ir •"` .`t' "a 5Itane Covnty/Kucera•Microsoft,Vantor,., __ a..,. ._. a ....ea fy Highland Basin-North of Chicago Street Legend wta Combined Sewer Separation Project c>«ee,.n system N 2026 Design-2027 Construction Proposed Storm Sewer Per Master Plan — Existing Storm Sewers 0 125 250 500 Proposed Storm Sewer Improvements Design Yr-Construction Year 0 Project Limits I '�eet IA--... City of Elgin 2025-2026-Chicago St I-} Illinois ---= 2026-2027-North of Chicago St HRGreen PLOT 8.06.AM 6/152025 BY One, FILE Jt202'612602344\DeugntGISWcProZ1-0a2a26-ScopngExbx-0E2<26FJpnNonhOtCmcagoSep aprx — r „r aeL,b W. j f a r 1 • t - s Av. 1 —2 i 1 9 ', ► • s e- 6 Wolf Ave 6- 4- iit 5 16- r eiir—t ii I „► l4. •".L4.6.43/4a". 1• <{ '1 c� �-� 1 •, a 1. 6- 1 .,•:'8I 6' - _Yi �" q St- �is 1 : ♦ 6- f . ' --VT, 11 a ' (w__� I Ji 001 Is 41111., *opt; a� r __..r....A. - T-100- -et v4 1 � i Or < • 1iii _ 44 �,�a{• - a _ •_ , 6- i .. �I I -�T•ln�67 6" pen Ivan Ave f-". 11111111 III J • .. 6-. 4.-.9 f ° .I.• 1 6' • �s� NOW y .�y1h; , e 'w' �. 'P�� 6- « • �11- - a - -a` 6(_ I�r _ 1 . _ � V OC . _' ' "" �. R: :4. Highland i a 1 4''. 7"6e; o 6- . 1 Ave - 002' 8 13•, , i AlirOillir., T. iR / re ♦Rimyairr.. / • p lir 6 r 6- i 6• 6i, -- 6 — 6- — � 6- ---- — r — —CTk+90 ._ ag :70 ' v�,,---— - — 16- t� - - -- -— . , , , • -,..•oe T V i ke q F ,,"tr -°4 Ali KA IL 81 rIP4§;/. , ,t1 6.11114",e ifilm'a 4 0.64,..6 411 .S i �� 1 I . I )_._a fatl _ _ It �� ii 4 ` ^. Nave Cvrrtt/Au<e•a,Mtcro•eft,Vantar 40 �I Highland Basin-North of Chicago Street Legend Combined Sewer Separation Project �`..s,w.., 2026 Design-2027 Construction N O r X I+I r.I? r, �x Limits 0 125 250 500 Proposed Water Main Improvements Existing/Abandoned Water Mains ! Feet City of Elgin Water Main to be Replaced 11. Illinois « Combined Basins HRGreen PLOT 807AM 5/11/2025 BY'aver FILE.J.1202612602304DaalpntGlSWcPr041.0.24265copngExlex-042426-ElpnNorOgtChicapoSop am 11 >,i . r.,1/0- 1..'-4 T i" :o . 1 ,.�, I t' a .� , Ave , • ' Mill f1 f .,.1 yoir F Nr-- . f.' . • ( v St - 1. , , . in. , , - .0 1 • ••AT ,,. mip, ,,,, alit. :„.iir,,, , , ,._.._iri-ITTF 6'1' _.,,t, .):71.., 1 til.: lailirilidi&.:. , ' Al,!',, ltiri4 aft._. y ��`, «, rR.�� µi gyp_ I I jr �71 A, ,30 lif i °LwoL, .se ' Penn Ivan•-Ave -, . 'ram ~!.•-mow 'i 1 1 VII -pi 1 MA • ' I igh.; �• # s �-rf. . . —FA' Highland a < d F e ;fie = Ave - 002' i 3 ooir .( ' -Lii,t ' It" lirsi --.1,-- ii;;;; --,w, 1._...1-. ,- ! ..-- i .4-4' F.. i.: 36 ten► .r 30 36 Chkago Y - 6— Plik.'" ' :fil 04' —, "...:: , . f _ • r k. t P lug nc ! . e_.,_,„! • - H .'fir .4" 74 a Zir -ir A -1 +< f .r. - I . er i -� r1/1 lir ',i ;, ' CountY/Kuceac c '::r,.c. . . , milL Highland Basin-North of Chicago Street Legend Combined Sewer Separation Project 2026 Design-2027 Construction EXHIBIT C Combined Basins 0 125 250 500 Proposed Combined Sewer Improvements Existing Combined/Sanitary Sewers f City of Elgin Sewer to be Lined liR� Feet Illinois F-1 Project Limits HRGreer PLOT 806 AM 6/152026 BY Idner FILE J12026126023940eergn\GISWCPro01-042426-ScopnpEA88-041426E ianoon�OfCtmAgoS.v.er ATTACHMENT B PROJECT SCHEDULE ATTACHMENT B PROJECT SCHEDULE HIGHLAND PHASE 3.11 -NORTH OF CHICAGO STREET COMBINED SEWER SEPARATION PROJECT Task Descriptions Original Schedule Date(s) N/A Notice To Proceed August 17,2026 Task 1 Kickoff Meetings(Internal and City) August 17,2026 August 21,2026 Task 2 Topographic Survey August 17,2026 September 25,2026 Task 3 Geotechnical Subconsultant Services August 17,2026 September 25,2026 Task 4 Sewer Televising Review August 17,2026 September 11,2026 Task 5 Field Reconnaissance March 12,2027 August 17,2026 Two weeks prior to 90% Task 6 Utility Coordination April 30,2027 August 17,2026 Two weeks prior to Final Task 7 Conceptual Design(30%) August 17,2026 November 6,2026 Conceptual Review Meeting November 6,2026 November 20,2026 Task 8 Preliminary(60%)Engineering Plans November 6,2026 January 22,2027 City Review Period(2 weeks) January 22,2027 February 5,2027 Task 9 Pre-Final(90%) Engineering Plans January 22,2027 March 26,2027 City Review Period(2 weeks) March 26,2027 April 9,2027 Task 10 Final(100%)Contract Plans March 26,2027 May 14,2027 City Review Period(1 week) May 14,2027 May 21,2027 Task 11 Public Information Meeting April 5,2027 April 30,2027 Task 12 Progress Meetings[4-(30%,60%,90% November 6,2026 May 21,2027 and 100%) Task 13 Permitting November 6,2026 May 14,2027 Task 14 Engineer's Opinion of Probable November 6,2026 May 14,2027 Construction Costs(EOPCC) Task 15 Quality Assurance and Quality Control August 17,2026 May 14,2027 (QA-QC) Task 16 Modeling Updates-Confirm Design in August 17,2026 May 14,2027 Master Plan Model Task 17 Bid Award and Assistance May 17,2027 June 18,2027 Task 18 Project Administration August 17,2026 June 18,2027 ATTACHMENT C FEE ESTIMATE - 13 - H. ATTACHMENT C-FEE ESTIMATE •1• HRGreen HIGHLAND PHASE 3.11-NORTH OF CHICAGO E_ LGIN STREET COMBINED SEWER SEPARATION PROJECT Labor Sub- Total Task Descriptions Hours Direct Costs Fee Consultant FEE FINAL ENGINEERING PLANS,CONTRACT DOCUMENTS AND BIDDING SERVICES(SEE ATTACHMENT A) Task 1 Kickoff Meeting 14 $4,042 $114 $4,156 Task 2 Topographic Survey 417 $71,442 $1,125 $72,567 Task 3 Geotechnical Subconsultant Services 12 $3,028 516,495 $19,523 Task 4 Sewer Televising Review 48 $9,551 $9,551 Task 5 Field Reconnaissance 48 $11,332 $342 $11,674 Task 6 Utility Coordination 80 $16,856 516,856 Task 7 Conceptual Design(30%) 742 $163,070 $163,070 Task 8 Preliminary(60%)Engineering Plans 676 $148,816 $148,816 Task 9 Pre-Final(90%)Engineering Plans 516 $113,972 $113,972 Task 10 Final(100%)Contract Plans 252 $53,993 $53,993 Task 11 Public Information Meeting 32 $6,739 $6,739 Task 12 Progress Meetings(30%,60%,90%and 100%) 20 $5,017 55,017 Task 13 Permitting 88 $17,131 $125 $17,256 Task 14 EOPCC 116 $24,794 $24,794 Task 15 Quality Assurance and Quality Control(QA-QC) 96 $22,772 $22,772 Task 16 Modeling Updates 76 $19,502 $19,502 Task 17 Bid Award and Assistance 100 $22,081 $22,081 Task 18 Project Administration 180 $42,532 542,532 PROJECT TOTALS 3,513 $756,670 $16,495 $1,706 $774,871