Loading...
HomeMy WebLinkAbout26-124 Resolution No. 26-124 RESOLUTION AUTHORIZING EXECUTION OF A LOCAL PUBLIC AGENCY ENGINEERING SERVICES AGREEMENT WITH FEHR GRAHAM AND ASSOCIATES, LLC FOR CONSTRUCTION ENGINEERING SERVICES IN CONNECTION WITH THE 2026 SHALES PARKWAY AND EAST SIDE STREETS RESURFACING PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that pursuant to Elgin Municipal Code Section 5.02.020B(9)the City Council hereby finds that an exception to the requirements of the procurement ordinance is necessary and in the best interest of the city; and BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are hereby authorized and directed to execute a Local Public Agency Engineering Services Agreement on behalf of the City of Elgin with Fehr Graham and Associates,LLC,for construction engineering services in connection with the 2026 Shales Parkway and east side streets resurfacing project, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: August 12,2026 Adopted: August 12, 2026 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis,City Clerk 6 Illinois Department Local Public Agency of Transportation Engineering Services Agreement Using Federal Funds? ❑ Yes ® No Agreement For !Agreement Type Using State Funds(Non-MFT/TBP)? ❑ Yes ® No MFT/TBP CE Original LOCAL PUBLIC AGENCY Local Public Agency County Section Number _ Job Number Elgin Kane 26-00216-00-RS 1 Project Number _ Contact Name Phone Number Email IN/A Mike Pubentz, PE (847) 931-5968 mike.pubentz@cityofelgin.org SECTION PROVISIONS Local Street/Road Name Key Route Length Structure Number Various local roads N/A 3.55 mi. N/A Location Termini Add Location See attached location map Remove Location Project Description The project consists of HMA pavement resurfacing, curb and gutter, and sidewalk replacements along the following routes: Shales Parkway: From Maroon Drive to IL Route 20 Gifford Street: From Ann Street to 225' South of Summit Street Jefferson Avenue: From Chippewa Drive to Hiawatha Drive Martin Drive: From Chippewa Drive to Hiawatha Drive Chippewa Drive: From Jefferson Avenue to Congdon Avenue Duncan Avenue: From Dundee Avenue to City Limits/Township Line River Bluff: From: Prospect Boulevard to Logan Avenue Prospect Boulevard: From River Bluff to Cooper Avenue Augusta Avenue: From Cooper Avenue to Slade Avenue Engineering Funding ® MFT/TBP ❑ State ❑ Other Anticipated Construction Funding ❑ Federal ® MFT/TBP ❑ State ❑ Other AGREEMENT FOR ® Phase III -Construction Engineering CONSULTANT Prime Consultant(Firm) Name Contact Name Phone Number Email Fehr Graham Jason Stoll, PE (815) 562-9087 jstoll@fehrgraham.com Address City State Zip Code 515 Lincoln Highway Rochelle IL 61068 THIS AGREEMENT IS MADE between the above Local Public Agency(LPA)and Consultant(ENGINEER)and covers certain professional engineering services in connection with the improvement of the above SECTION. Project funding allotted to the LPA by the State of Illinois under the general supervision of the State Department of Transportation, hereinafter called the"DEPARTMENT,"will be used entirely or in part to finance ENGINEERING services as described under AGREEMENT PROVISIONS. Since the services contemplated under the AGREEMENT are professional in nature. it is understood that the ENGINEER. acting as an individual partnership, firm or legal entity,qualifies for professional status and will be governed by professional ethics in its relationship to the LPA and the DEPARTMENT. The LPA acknowledges the professional and ethical status of the ENGINEER by entering into an AGREEMENT on the basis of its qualifications and experience and determining its compensation by mutually satisfactory negotiations. Page 1 of 11 BLR 05530(Rev.04/23/26) WHEREVER IN THIS AGREEMENT or attached exhibits the following terms are used, they shall be interpreted to mean. Regional Engineer Deputy Director, Office of Highways Project Implementation, Regional Engineer. Department of Transportation Resident Construction Supervisor Authorized representative of the LPA in immediate charge of the engineering details of the construction PROJECT. In Responsible Charge Contractor A full time LPA employee authorized to administer inherently governmental PROJECT activities Company or Companies to which the construction contract was awards AGREEMENT EXHIBITS The following EXHIBITS are attached hereto and made a part of hereof this AGREEMENT: ® EXHIBIT 1: Scope of Services ® EXHIBIT 2: Project Schedule ® EXHIBIT 3: Qualification Based Selection(QBS)Checklist ® EXHIBIT 4: Cost Estimate of Consultant(CECS)Services Worksheet(BLR 05513 or BLR 05514 ) ® EXHIBIT 5 : Direct Costs Summary Sheet ® EXHIBIT 6: Location Map ® EXHIBIT 7: BDE 220A (Estimate of Time) I. THE ENGINEER AGREES, 1 To perform or be responsible for the performance of the Scope of Services presented in EXHIBIT 1 for the LPA in connection with the proposed improvements herein before described. 2. The Classifications of the employees used in the work shall be consistent with the employee classifications and estimated staff hours. If higher-salaried personnel of the firm, including the Principal Engineer, perform services that are to be performed by lesser-salaried personnel. the wage rate billed for such services shall be commensurate with the payroll rate for the work performed. 3. That the ENGINEER shall be responsible for the accuracy of the work and shall promptly make necessary revisions or corrections required as a result of the ENGINEER'S error, omissions or negligent acts without additional compensation. Acceptance of work by the LPA or DEPARTMENT will not relieve the ENGINEER of the responsibility to make subsequent correction of any such errors or omissions or the responsibility for clarifying ambiguities. 4. That the ENGINEER will comply with applicable Federal laws and regulations. State of Illinois Statutes. and the local laws or ordinances of the LPA. 5 To pay its subconsultants for satisfactory performance no later than 30 days from receipt of each payment from the LPA. 6 To invoice the LPA. The ENGINEER shall submit all invoices, based on the ENGINEER's progress reports, to the LPA employee In Responsible Charge, no more than once a month for partial payment on account for the ENGINEER's work to date. Such invoices shall represent the value, to the LPA of the partially completed work, based on the sum of the actual costs incurred, plus a percentage(equal to the percentage of the construction engineering completed)of the fixed fee for the fully completed work 7 The ENGINEER or subconsultant shall not discriminate on the basis of race. color, national origin or sex in the performance of this AGREEMENT. The ENGINEER shall carry out applicable requirements of 49 CFR part 26 in the administration of US Department of Transportation(US DOT)assisted contract Failure by the Engineer to carry out these requirements is a material breach of this AGREEMENT. which may result in the termination of this AGREEMENT or such other remedy as the LPA deems appropriate. 8. That none of the services to be furnished by the ENGINEER shall be sublet. assigned or transferred to any other party or parties without written consent of the LPA. The consent to sublet, assign or otherwise transfer any portion of the services to be furnished by the ENGINEER shall be construed to relieve the ENGINEER of any responsibility for the fulfillment of this AGREEMENT 9. For Construction Engineering Contracts: (a) For Quality Assurance services. provide personnel who have completed the appropriate STATE Bureau of Materials OC/QA trained technical classes. (b) For all projects where testing is required. the ENGINEER shall obtain samples according to the STATE Bureau of Materials"Manual of Test Procedures for Materials,"submit STATE Bureau of Materials inspection reports; and verify compliance with contract specifications. 10. That engineering services shall include all equipment. instruments, supplies.transportation and personnel required to perform the duties of the ENGINEER in connection with this AGREEMENT(See DIRECT COST tab in BLR 05513 or BLR 05514). II. THE LPA AGREES, 1. To certify by execution of this AGREEMENT that the selection of the ENGINEER was performed in accordance with the Professional Services Selection Act(50 ILCS 510)(Exhibit 3) 2. To furnish the ENGINEER all presently available survey data, plans. specifications, and project information. 3. For Construction Engineering Contracts Page 2 of 11 BLR 05530(Rev.04/23/26) (a) To furnish a full time LPA employee to be In Responsible Charge authorized to administer inherently governmental PROJECT activities. (b)To submit approved forms BC 775 and BC 776 to the DEPARTMENT when federal funds are utilized. 4. To pay the ENGINEER: (a) For progressive payments-Upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LPA. monthly payments for the work performed shall be due and payable to the ENGINEER, such payments to be equal to the value of the partially completed work minus all previous partial payments made to the ENGINEER_ (b) Final payment- Upon approval of the work by the LPA but not later than 60 days after the work is completed and reports have been made and accepted by the LPA and DEPARTMENT a sum of money equal to the basic fee as determined in this AGREEMENT less the total of the amount of partial payments previously paid to the ENGINEER shall be due and payable to the ENGINEER (c) For Non-Federal County Projects-(605 ILCS 5/5-409) (1) For progressive payments- Upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LPA. monthly payments for the work performed shall be due and payable to the ENGINEER. Such payments to be equal to the value of the partially completed work in all previous partial payments made to the ENGINEER. (2) Final payment- Upon approval of the work by the LPA but not later than 60 days after the work is completed and reports have been made and accepted by the LPA and STATE, a sum of money equal to the basic fee as determined in the AGREEMENT less the total of the amount of partial payments previously paid to the ENGINEER shall be due and payable to the ENGINEER 5. To pay the ENGINEER as compensation for all services rendered in accordance with the AGREEMENT on the basis of the following compensation method as discussed in 5-5 10 of the BLR Manual. Method of Compensation ❑ Percent ❑ Lump Sum ❑ Specific Rate ® Cost plus Fixed Fee. Fixed Total Compensation = DL + DC + OH +FF Where: DL is the total Direct Labor, DC is the total Direct Cost. OH is the firms overhead rate applied to their DL and FF is the Fixed Fee. Where FF = ( 0 33+ R)DL+ %SubDL.where R is the advertised Complexity Factor and%SubDL is 10%profit allowed on the direct labor of the subconsultants The Fixed Fee cannot exceed 15%of the DL+ OH. Field Office Overhead Rates;_Field rates must be used for construction engineering projects expected to exceed one year in duration or if the construction engineering contract exceeds$1.000.000 for any project duration 6. The recipient shall not discriminate on the basis of race. color. national original or sex in the award and performance of any US DOT-assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26 The recipient shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of US DOT-assisted contracts. The recipient's DBE program, as required by 49 CFR part 26 and as approved by US DOT. is incorporated by reference in this agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as violation of this AGREEMENT. Upon notification to the recipient of its failure to carry out its approved program. the Department may impose sanctions as provided for under part 26 and may. in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986(31 U S.0 3801 et seq ) III. IT IS MUTUALLY AGREED, 1. To maintain, for a minimum of 3 years after the completion of the contract, adequate books, records and supporting documents to verify the amount, recipients and uses of all disbursements of funds passing in conjunction with the contract: the contract and all books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General, and the DEPARTMENT; the Federal Highways Administration(FHWA)or any authorized representative of the federal government. and to provide full access to all relevant materials. Failure to maintain the books. records and supporting documents required by this section shall establish a presumption in favor of the DEPARTMENT for the recovery of any funds paid by the DEPARTMENT under the contract for which adequate books. records and supporting documentation are not available to support their purported disbursement. 2. That the ENGINEER shall be responsible for any and all damages to property or persons arising out of an error. omission and/or negligent act in the prosecution of the ENGINEER's work and shall indemnify and save harmless the LPA. the DEPARTMENT, Page 3 of 11 BLR 05530(Rev.04/23/26) and their officers, agents and employees from all suits, claims, actions or damages liabilities. costs or damages of any nature whatsoever resulting there from These indemnities shall not be limited by the listing of any insurance policy. The LPA will notify the ENGINEER of any error or omission believed by the LPA to be caused by the negligence of the ENGINEER as soon as practicable after the discovery. The LPA reserves the right to take immediate action to remedy any error or omission if notification is not successful, if the ENGINEER fails to reply to a notification; or if the conditions created by the error or omission are in need of urgent correction to avoid accumulation of additional construction costs or damages to property and reasonable notice is not practicable. 3. This AGREEMENT may be terminated by the LPA upon giving notice in writing to the ENGINEER at the ENGINEER's last known post office address. Upon such termination,the ENGINEER shall cause to be delivered to the LPA all drawings. plats. surveys. reports. permits. agreements, soils and foundation analysis. provisions, specifications, partial and completed estimates and data if any from soil survey and subsurface investigation with the understanding that all such materials becomes the property of the LPA. The LPA will be responsible for reimbursement of all eligible expenses incurred under the terms of this AGREEMENT up to the date of the written notice of termination 4_ In the event that the DEPARTMENT stops payment to the LPA.the LPA may suspend work on the project. If this agreement is suspended by the LPA for more than thirty(30)calendar days. consecutive or in aggregate. over the term of this AGREEMENT, the ENGINEER shall be compensated for all services performed and reimbursable expenses incurred prior to receipt of notice of suspension In addition, upon the resumption of services the LPA shall compensate the ENGINEER, for expenses incurred as a result of the suspension and resumption of its services, and the ENGINEER's schedule and fees for the remainder of the project shall be equitably adjusted. 5. This AGREEMENT shall continue as an open contract and the obligations created herein shall remain in full force and effect until the completion of construction of any phase of professional services performed by others based upon the service provided herein. All obligations of the ENGINEER accepted under this AGREEMENT shall cease if construction or subsequent professional services are not commenced within 5 years after final payment by the LPA. 6. That the ENGINEER shall be responsible for any and all damages to property or persons arising out of an error, omission and/or negligent act in the prosecution of the ENGINEER's work and shall indemnify and have harmless the LPA, the DEPARTMENT. and their officers. employees from all suits. claims. actions or damages liabilities. costs or damages of any nature whatsoever resulting there from. These indemnities shall not be limited by the listing of any insurance policy. 7. The ENGINEER and LPA certify that their respective firm or agency: (a)has not employed or retained for commission. percentage, brokerage, contingent fee or other considerations. any firm or person (other than a bona fide employee working solely for the LPA or the ENGINEER)to solicit or secure this AGREEMENT, (b)has not agreed. as an express or implied condition for obtaining this AGREEMENT. to employ or retain the services of any firm or person in connection with carrying out the AGREEMENT or (c)has not paid, or agreed to pay any firm, organization or person (other than a bona fide employee working solely for the LPA or the ENGINEER)any fee, contribution. donation or consideration of any kind for, or in connection with, procuring or carrying out the AGREEMENT. (d)that neither the ENGINEER nor the LPA is/are not presently debarred. suspended. proposed for debarment. declared ineligible or voluntarily excluded from covered transactions by any Federal department or agency, (e)has not within a three-year period preceding the AGREEMENT been convicted of or had a civil judgment rendered against them for commission of fraud or criminal offense in connection with obtaining, attempting to obtain or performing a public(Federal. State or local)transaction: violation of Federal or State antitrust statutes or commission of embezzlement,theft, forgery, bribery. falsification or destruction of records, making false statements or receiving stolen property. (f) are not presently indicated for or otherwise criminally or civilly charged by a government entity(Federal, State. or local)with commission of any of the offenses enumerated in paragraph(e)and (g)has not within a three-year period preceding this AGREEMENT had one or more public transaction(Federal, State, local)terminated for cause or default Where the ENGINEER or LPA is unable to certify to any of the above statements in this clarification. an explanation shall be attached to this AGREEMENT. 8. In the event of delays due to unforeseeable causes beyond the control of and without fault or negligence of the ENGINEER no claim for damages shall be made by either party. Termination of the AGREEMENT or adjustment of the fee for the remaining services may be requested by either party if the overall delay from the unforeseen causes prevents completion of the work within six months after the specified completion date. Examples of unforeseen causes included but are not limited to: acts of God or a public enemy acts of the LPA. DEPARTMENT<or other approving party not resulting from the ENGINEER's unacceptable services; fire: strikes: and floods. If delays occur due to any cause preventing compliance with the PROJECT SCHEDULE, the ENGINEER shall apply in writing to the LPA for an extension of time. If approved. the PROJECT SCHEDULE shall be revised accordingly. 9. By execution of this AGREEMENT the LPA and ENGINEER certify compliance with the Drug Free Workplace Ace(30 ILCS 580) The Drug Free Workplace Act requires that no grantee or contractor shall receive a grant or be considered for the purpose of being awarded a contract for the procurement of any property or service from the DEPARTMENT unless that grantee or contractor will provide a drug free workplace. False certification or violation of the certification may result in sanctions including. but not limited to suspension of contract or grant payments, termination of a contract or grant and debarment of the contracting or grant opportunities with the DEPARTMENT for at least one(1)year but not more than (5)years For the purpose of this certification. "grantee"or"Contractor"means a corporation. partnership or an entity with twenty-five(25) Page 4 of 11 BLR 05530(Rev.04/23/26) or more employees at the time of issuing the grant or a department, division or other unit thereof. directly responsible for the specific performance under contract or grant of$5,000 or more from the DEPARTMENT, as defined the Act The contractor/grantee certifies and agrees that it will provide a drug free workplace by: (a) Publishing a statement: (1) Notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance, including cannabis, is prohibited in the grantee's or contractor's workplace. (2)Specifying the actions that will be taken against employees for violations of such prohibition (3)Notifying the employee that, as a condition of employment on such contract or grant. the employee will: (a)abide by the terms of the statement; and (b)notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than five(5)days after such conviction. (b) Establishing a drug free awareness program to inform employees about. (1)The dangers of drug abuse in the workplace; (2)The grantee's or contractor's policy to maintain a drug free workplace. (3)Any available drug counseling, rehabilitation and employee assistance program: and (4)The penalties that may be imposed upon an employee for drug violations (c) Providing a copy of the statement required by subparagraph (a)to each employee engaged in the performance of the contract or grant and to post the statement in a prominent place in the workplace. (d) Notifying the contracting or granting agency within ten(10)days after receiving notice under part(b)paragraph (3)of subsection(a)above from an employee or otherwise receiving actual notice of such conviction. (e) Imposing a sanction on. or requiring the satisfactory participation in a drug abuse assistance or rehabilitation program. (f)Assisting employees in selecting a course of action in the event drug counseling.treatment and rehabilitation is required and indicating that a trained referral team is in place. Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free Workplace Act, the ENGINEER and LPA agree to meet the PROJECT SCHEDULE outlined in EXHIBIT 2. Time is of the essence on this project and the ENGINEER's ability to meet the PROJECT SCHEDULE will be a factor in the LPA selecting the ENGINEER for future projects. The ENGINEER will submit progress reports with each invoice showing work that was completed during the last reporting period and work they expect to accomplish during the following period 10. Due to the physical location of the project, certain work classifications may be subject to the Prevailing Wage Act(820 ILCS 130/0.01 et seq) 11. For Construction Engineering Contracts: (a)That all services are to be furnished as required by construction progress and as determined by the LPA employee In Responsible Charge. The ENGINEER shall complete all services herein within a time considered reasonable to the LPA, after the CONTRACTOR has completed the construction contract. (b)That all field notes, test records and reports shall be turned over to and become the property of the LPA and that during the performance of the engineering services herein provided for, the ENGINEER shall be responsible for any loss or damage to the documents herein enumerated while they are in the ENGINEER's possession and any such loss or damage shall be restored at the ENGINEER's expense. (c)That any difference between the ENGINEER and the LPA concerning the interpretation of the provisions of this AGREEMENT shall be referred to a committee of disinterested parties consisting of one member appointed by the ENGINEER, one member appointed by the LPA. and a third member appointed by the two other members for disposition and that the committee's decision shall be final. (d)That in the event that engineering and inspection services to be furnished and performed by the LPA(including personnel furnished by the ENGINEER)shall. in the opinion of the STATE be incompetent employed on such work at the expense of the LPA. (e) Inspection of all materials when inspection is not provided a the sources by the STATE Central Bureau of Materials, and submit inspection reports to the LPA and STATE in accordance with the STATE Central Bureau of Materials "Project Procedures Guide"and the policies of the STATE. AGREEMENT SUMMARY Prime Consultant(Firm) Name TIN/FEIN/SS Number Agreement Amount Fehr Graham 36-2780335 $140,396.00 Subconsultants TIN/FEIN/SS Number Agreement Amount Testing Services Corporation 35-0937582 $30,000.00 Subconsultant Total $30,000.00 Prime Consultant Total $140,396.00 Total for all work $170,396.00 Page 5 of 11 BLR 05530(Rev.04/23/26) AGREEMENT SIGNATURES Executed by the LPA Local Public Agency Type Local Public Agency Attest: The City of Elgin By(Si ature& Date) By(Signal re&Date) 8/12/2026 8/12/2026 L cal Public Agen •( Local Public Agency Type Title Elgin City Clerk Richard G. Kozel, City Manager • (SEAL) '^ 4 ., , , . ... \ 4.e' '2. I ,..-; ' - q 1 ..;,---.4..4.4*...4 ,. 4;- 1.4- " ,.; In` _ .- Execute. by tt ENGj4 R: Prime Consultant(Firm) Name Attest: Fehr Graham By(Signature&Date) By(Signature&Date) S4107/27/2026 / 07/27/2026 Tit e Title President 1incip APPROVED Regional Engineer, Department of Transportation(Signature& Date) For information about IDOTs collection and use of confidential information review the department's Identity Protection Policy. Page 6 of 11 BLR 05530(Rev 04/23/26) Local Public Agency Prime Consultant(Firm) Name County Section Number Elgin Fehr Graham Kane 26-00216-00-RS EXHIBIT 1 SCOPE OF SERVICES To perform or be responsible for the performance of the engineering services for the LPA. in connection with the PROJECT herein before described and enumerated below See attached scope of service in pages to follow: Page 7 of 11 BLR 05530(Rev.04/23/26) Exhibit 1 - SCOPE OF SERVICES The Phase III Construction Engineering services will include the following: Preconstruction Tasks: 1. Coordinate/Attend preconstruction meeting with interested parties to discuss goals, objectives,and issues. 2. Review the requirements of construction and required project permits. 3. Review the plans and specifications in depth,verifying quantities,elevations,and dimensions relevant to the project.Also,anticipate any potential conflicts or issues and develop solutions prior to construction. 4. Review the contractor's proposed construction schedule for compliance with contract. 5. Prepare a project contact list with names,addresses, phone numbers,and email addresses for contractors,subcontractors,and suppliers for the project.Also,submit 24- hour contact numbers for applicable parties. 6. Review the record drawing requirements with the contractor. Construction Tasks: 1. Provide a Resident Engineer for required daily activities such as:observing the progress and quality of the work and determining if the work is proceeding in accordance with the contract documents.Maintain site presence at times when the contractor is working. Disapprove any work failing to conform to the contract documents and immediately inform City.Verify that there are no deviations from the contract documents unless authorized by City. 2. Keep the inspector's daily reports and quantity book records up to date.Also maintain a project diary noting necessary observations.Advise if the contactor is falling behind schedule. 3. Maintain a submittal log and check status to ensure timely approval. 4. Perform quantity measurements to prepare pay estimates and change orders to review with contractor and submit to the City for review and approval. 5. Provide liaison functions related to coordination of contractors,utilities(if required), developers,other agencies, residents,and property owners engaged or affected by the project. 6. Check and approve any project and/or material submittals for compliance with standards. 7. Forward recommendations to the City representatives. 8. Provide Quality Assurance(QA)services in accordance with IDOT QC/QA practices and procedures(contractor will provide QC).Provide necessary coordination and qualified personnel to perform work for materials.Obtain and test soil,asphalt,concrete,and aggregate samples to perform necessary testing to fulfill QA/geotechnical requirements. Reports shall be prepared in a timely manner and coordinated with QC data.The consultant(or subconsultant)shall fulfill the requirements as the QA manager. 9. Maintain a set of working drawings as construction is progressing. 10. Provide necessary equipment, instruments,supplies,transportation,and personnel required to perform duties of the project team. 1 1. Maintain and periodically transmit to the contractor a running punch list to expedite project close out. 12. Obtain material acceptance certifications as materials are incorporated into the project to expedite project closeout.Withhold payment until material inspection and certifications are provided. Upload to CAIM1S as required by Ih(YI'. 13. Monitor and document erosion control and ensure conformity with the plans and standards. 14. Follow the IDOT Documentation of Contract Quantities guidelines.Complete other miscellaneous paperwork and requirements per IDOT to administer the project including but not limited to certified payrolls, DBE paperwork, interviews,independent weight checks,consultant evaluations,etc. 15. Provide the City with regular invoicing on the BLR 05621 form(Local Agency Cost Plus Fixed Fee Invoice)and provide supporting documentation as requested in order for the City to submit for reimbursement when applicable(such as certified time sheets and sub-consultant invoices) in accordance with Section 5-10 of the Bureau of Local Roads and Streets Manual. Post Construction Tasks: I. Perform final inspection with the City representative,Contractor,and applicable utilities to finalize punch list. Document the items in the final punch list and submit them to the contractor for close out.Verify completion of work and provide a recommendation to City. 2. Complete a contractor performance evaluation and conduct a post construction meeting with interested parties to discuss lessons learned and identify steps to eliminate problems in the future. 3. Verify that documentation is accomplished and that material inspections and certifications have been accounted for and are complete. 4. Provide documentation associated with the final balancing change order and final pay estimate. 5. Complete the job box(if required),the final papers,and conduct audit(s)when required. The job box(if required)will remain property of the City. If no job box is required,provide copies of final papers and other documentation as requested by the City. 6. Provide City with a set of record (as-built)drawings. 7. Close out the project with IDOT within a reasonable time frame after construction is completed. 8. Provide the City with a final invoice on the BLR 05621 form,labeled"& FINAL". Provide the BLR 05613 Engineering Payment Report with the invoice. 9. Prepare and submit necessary project closeout documentation to IDOT. Local Public Agency Prime Consultant(Firm)Name County Section Number Elgin Fehr Graham Kane 26-00216-00-RS EXHIBIT 2 PROJECT SCHEDULE • Bid Advertisement Date: June 9, 2026 • Bid Opening: June 25, 2026 • Target Construction Contract Award: July 8, 2026 • Anticipated Final Approval of Construction Engineering Services Agreement by City Council: July 8. 2026 • Target Pre-Construction Meeting: July 15, 2026 • Target Construction Start Date: August 3, 2026 • Construction Substantial Completion: October 31, 2026 • Construction Final Completion May 31, 2027 • Project Closeout: June 2027 Page 8 of 11 BLR 05530(Rev 04/23/26) Local Public Agency Prime Consultant(Firm)Name County Section Number Elgin Fehr Graham Kane 26-00216-00-RS Exhibit 3 Qualification Based Selection(QBS)Checklist The LPA must complete Exhibit 3. If the value meets or will exceed the small dollar threshold in 50 ILCS 510. QBS requirements must be followed Under the threshold, QBS requirements do not apply. The small dollar threshold is adjusted annually and can be found in IDOT Circular Letters.lf the value is under the threshold with federal funds being used, federal small purchase guidelines must be followed. ❑ Form Not Applicable(engineering services less than the threshold) Items 1-13 are required when using federal funds and QBS process is applicable. Items 14-16 are required when using State funds and the QBS process is applicable. No Yes 1 Do the written QBS policies and procedures discuss the initial administration(procurement, management and ® ❑ administration) concerning engineering and design related consultant services? 2 Do the written QBS policies and procedures follow the requirements as outlined in Section 5-5 and specifically ® ❑ Section 5-5.06(e)of the BLRS Manual? 3 Was the scope of services for this project clearly defined? ® ❑ 4 Was public notice given for this project? ® ❑ 5 Do the written QBS policies and procedures cover conflicts of interest? ® ❑ 6 Do the written QBS policies and procedures use covered methods of verification for suspension and debarment? ® ❑ 7 Do the written OBS policies and procedures discuss the methods of evaluation? ® ❑ Project Criteria Weighting 8 Do the written QBS policies and procedures discuss the method of selection? ® ❑ Selection committee(titles)for this project Top three consultants ranked for this project in order 1 2 3 9 Was an estimated cost of engineering for this project developed in-house prior to contract negotiation? ® ❑ 10 Were negotiations for this project performed in accordance with federal requirements. ® ❑ 11 Were acceptable costs for this project verified? ® ❑ Do the written QBS policies and procedures cover review and approving for payment. before forwarding the request ® ❑ 12 for reimbursement to IDOT for further review and approval? Do the written QBS policies and procedures cover ongoing and finalizing administration of the project(monitoring, 13 evaluation. closing-out a contract, records retention. responsibility. remedies to violations or breaches to a contract, ® ❑ and resolution of disputes)? 14 QBS according to State requirements used? ® ❑ 15 Existing relationship used in lieu of QBS process? ❑ 16 LPA is a home rule community(Exempt from QBS). ❑ Page 9 of 11 BLR 05530(Rev 04/23/26) EXHIBIT 4 0 Illinois Department COST ESTIMATE OF CONSULTANT SERVICES(CECS)WORKSHEET of Transportation FIXED RAISE Local Public Agency County Section Number City of Elgin Kane 26-00216-00-RS Prime Consultant(Firm) Name Prepared By Date Fehr Graham Jason Stoll, PE 6/17/2026 Consultant/Subconsultant Name Job Number Fehr Graham N/A Note: This is name of the consultant the CECS is being completed for. This name appears at the top of each tab. Remarks PAYROLL ESCALATION TABLE CONTRACT TERM 12 MONTHS OVERHEAD RATE 128.35% START DATE 7/13/2026 COMPLEXITY FACTOR 0 RAISE DATE 1/1/2027 % OF RAISE 3.00% END DATE 7/12/2027 ESCALATION PER YEAR % of Year First Date Last Date Months Contract 0 7/13/2026 1/1/2027 6 50.00% 1 1/2/2027 7/1/2027 6 51.50% BLR 05514(Rev. 1/24/26) Printed 6/17/2026 The total escalation = 1.50% ESCALATION Page 1 of 6 Local Public Agency County Section Number City of Elgin Kane 26-00216-00-RS Consultant / Subconsultant Name Job Number Fehr Graham N/A PAYROLL RATES EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET FIXED RAISE MAXIMUM PAYROLL RATE 90.00 ESCALATION FACTOR 1.50% JOB SPECIFIC-Classifications and Average Payrates need to match current payrolls submitted to the Department. IDOT AVG CLASSIFICATION PAYROLL RATES CALCULATED RATE ON FILE Principal $89.78 $90.00 Project Manager $59.64 $60.53 Senior Resident Engineer $52.79 $53.58 Engineering Technician- Field $27 80 $28.22 Project Administrator $32 76 $33.25 Engineering Technician- CAD $26.47 $26.87 Project Engineer $41.59 $42.21 Sr. Land Surveyor/PLS $58.67 $59.55 BLR 05514 (Rev. 1/24/26) Printed 6/17/2026 RATES Page 2 of 6 Local Public Agency County Section Number City of Elgin Kane 26-00216-00-RS Consultant I Subconsultant Name Job Number Fehr Graham N/A SUBCONSULTANTS EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET Contribution to Prime NAME Direct Labor Total Consultant ;Payroll Only, Total 0.00 0.00 NOTE: Only subconsultants who fill out a cost estimate that splits out direct labor may be listed on this sheet. BLR 05514(Rev. 1/24/26) Printed 6/17/2026 SUBS Page 3 of 6 Local Public Agency County Section Number 'City of Elgin 1 (Kane I 26-00216-00-RS J Consultant/Subconsultant Name Job Number Fehr Graham jN/A DIRECT COSTS WORKSHEET List ALL direct costs required for this project. Those not listed on the form will not be eligible for reimbursement by the LPA on this project. EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES(CECS)WORKSHEET CONTRACT ITEM ALLOWABLE QUANTITY RATE TOTAL Per Diem (per Federal GSA) Up to federal maximum 50.00 Lodging 'Actual Cost (per Federal GSA) (Up to Federal rate maximum) $0.00 Lodging Taxes an. Fees Actual Cost $0.00 (per Federal GSA) Air Fare Coach rate.actual cost.requires minimum two weeks' $0.00 .notice.with prior IDOT approval Vehicle Milege Up to Federal rate maximum S0.00 (per Federaleral GSA) Vehicle Owned or Leased(no mileage charge allowed) $45.00/half day(4 hours or less)or 590/full day 80 $90.00 S7.200.00 Vehicle Rental Actual Cost(Up to$55/day) SO 00 Tolls Actual Cost $0.00 Parking Actual Cost S0.00 Overtime Premium portion(Submit supporting documentation) S0.00 Shift Differential Actual Cost(Based on firm's policy) 50.00 Overnight Delivery/Postage/Courier Service Actual Cost(Submit supporting documentation) SO 00 Copies of Deliverables/Mylars(In-house) Actual Cost(Submit supporting documentation) $0 00 Copies of Deliverables/Mylars(Outside) Actual Cost(Submit supporting documentation) S0.00 Project Specific Insurance Actual Cost $0.00 Monuments(Permanent) Actual Cost $0.00 Photo Processing Actual Cost $0.00 2-Way Radio(Survey or Phase III Only) Actual Cost $0.00 Telephone Usage(Traffic System Monitoring Only) Actual Cost $0.00 CADD Actual Cost(Max S15/hour) 40 $15.00 S600.00 Web Site Actual Cost(Submit supporting documentation) $0.00 Advertisements Actual Cost(Submit supporting documentation) $0.00 Public Meeting Facility Rental Actual Cost(Submit supporting documentation) $0.00 Public Meeting Exhibits/Renderings&Equipment Actual Cost(Submit supporting documentation) S0.00 Recording Fees Actual Cost S0.00 Transcriptions(specific to project) Actual Cost $0.00 Courthouse Fees Actual Cost $0.00 Storm Sewer Cleaning and Televising Actual Cost(Requires 2-3 quotes with(DOT approval) $0.00 Traffic Control and Protection Actual Cost(Requires 2-3 quotes with IDOT approval) $0 00 Aerial Photography and Mapping Actual Cost(Requires 2-3 quotes with IDOT approval) $0.00 Utliity Exploratory Trenching Actual Cost(Requires 2-3 quotes with(DOT approval) $0.00 Testing of Soil Samples Actual Cost S0.00 Lab Services Actual Cost(Provide breakdown of each cost) $0.00 Equipment and/or Specialized Equipment Rental Actual Cost(Requires 2-3 quotes with(DOT approval) $0.00 S0 00 $0.00 $0.00 TOTAL DIRECT COSTS: S7,800.00 BLR 05514(Rev 1/24/261 Printed 6117/2026 DIRECT COSTS Page 4 of 6 Local Public Agency County Section Number City of Elgin Kane 26-00216-00-RS Consultant / Subconsultant Name Job Number Fehr Graham N/A COST ESTIMATE WORKSHEET EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET OVERHEAD RATE 128.35% COMPLEXITY FACTOR 0 DIRECT COSTS (not included in OVERHEAD& SERVICES BY %OF GRAND TASK row totals) MANHOURS PAYROLL FRINGE BENEFITS FIXED FEE OTHERS TOTAL TOTAL Const Obsery and Documentation 7.200 940 41.944 53.835 13 842 116,821 68.56% Construction Staking and Layout 10 345 443 114 902 0.53% Materials Testing and QC 20 774 994 255 30,000 32,023 18.79% Shop Drawings and Construction Eng. 600 47 2.260 2,900 746 6,506 3.82% Project Management and Admin. 105 5.412 6.946 1.786 14.144 8.30% Subconsultant DL 0.00 TOTALS 7.800 11221 50,735 I 65.118 16.743 30,000 170,396 100.00% BLR 05514(Rev. 1/24/26) Printed 6/17/2026 COST EST Page 5 of 6 Local Public Agency County Section Number City of Elgin Kane 26-00216-00-RS Consultant / Subconsultant Name Job Number Fehr Graham N/A AVERAGE HOURLY PROJECT RATES EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET SHEET 1 OF 1 Const Obsery and Construction Staking and Shop Drawings and Project Management and PAYROLL AVG TOTAL PROJ.RATES Documentation Layout Materials Testing and QC Construction Eng. Admin. HOURLY Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd CLASSIFICATION RATES Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg _ Part. Avg Principal 90.00 10.0 0.89% 0.80 5 10.64 ' 9.57 _ 5 4.76% 4.29 Project Manager 60.53 66.0 5.88% 3.56 4 20 00'- 12-11 2 4.26`. 2.58 60 57.14% 34.59 Senior Resident Engineer 53.58 600.0 53.48% 28.65 600 63.83% 34.20 _ Engineering Technician-F 28.22 308.0 27.45% 7.75 300 31.91% 9.01 8 80 00'- 22-57 Project Administrator 33.25 96.0 8.56% 2.85 40 4.26% 1.41 16 80.00°% 26.60 _ 40 38.10% 12.67 Engineering Technician-C 26.87 0 0 _ Project Engineer 42.21 40.0 3.57% 1.50 40 85.11'= 35-93 Sr. Land Surveyor/PLS 59.55 2.0 0.18% 0.11 2 20,00- 11.9' 0.0 0.0 00 00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 TOTALS 1122.0 100% $45.22 940.0 100.00% $44.62 10.0 100% $34 48 20.0 100% $38.71 47.0 100% 548.08 105.0 100 - S51.54 Printed 6/17/2026 BLR 05514 (Rev. 1/24/26) Page 6 of 6 AVG 1 Exhibit 5 Direct Costs Worksheet Local Public Agency County Section Number Job Number Elgin Kane 26-00216-00-RS Consultant/Subconsultant Name Fehr Graham CONTRACT ITEM ALLOWABLE QUANTITY RATE TOTAL Per Diem(Per Federal GSA) Up to Federal rate maximum Lod m er Federal GSA) Actual Cost(Up to Federal rate g g (p maximum) Lodging Taxes and Fees(per Federal Actual Cost GSA) Coach rate, actual cost, requires Air Fare minimum two weeks: notice,with prior IDOT approval Vehicle Mileage(per Federal GSA) Up to federal rate maximum Vehicle Owned or Leased(No mileage $45.00/half day(4 hours or less)or$90/ 80 $90.00 $7,200.00 charged allowed) full Vehicle Rental Actual Cost(Up to$55/day) Tolls Actual Cost Parking Actual Cost Overtime Premium portion (Submit supporting documentation) Shift Differential Actual Cost(Based on firm's policy) Overnight Delivery/Postage/Courier Actual Cost(Submit supporting Service documentation) Copies of Deliverables/Mylars(In- Actual Cost(Submit supporting house) documentation) Copies of Deliverables/Mylars(Outside) Actual Cost(Submit supporting documentation Project Specific Insurance Actual Cost Monuments(Permanent) Actual Cost Photo Processing Actual Cost 2-Way Radio(Survey or Phase III Only) Actual Cost Telephone Usage(Traffic System Actual Cost Monitoring Only) CADD Actual Cost(Max$15/hour) 40 $15.00 $600 00 Web Site Actual Cost(Submit supporting documentation) Actual Cost(Submit supporting Advertisements documentation) Public Meeting Facility Rental Actual Cost(Submit supporting documentation) Public Meeting Exhibits/Renderings& Actual Cost(Submit supporting Equipment documentation) Recording Fees Actual Cost Transcriptions(specific to project) Actual Cost Courthouse Fees Actual Cost Page 10 of 11 BLR 05530(Rev.04/23/26) CONTRACT ITEM ALLOWABLE QUANTITY RATE TOTAL Storm Sewer Cleaning and Televising Actual Cost(Requires 2-3 quotes with IDOT approval) Traffic Control and Protection Actual Cost(Requires 2-3 quotes with IDOT approval) Aerial Photography and Mapping Actual Cost(Requires 2-3 quotes with IDOT approval) Utility Exploratory Trenching Actual Cost(Requires 2-3 quotes with IDOT approval) Testing of Soil Samples Actual Cost Lab Services Actual Cost(Provide breakdown of each cost) Equipment and/or Specialized Actual Cost(Requires 2-3 quotes with Equipment Rental IDOT approval) TOTAL DIRECT COSTS: $7,800.00 Page 11 of 11 BLR 05530(Rev 04/23/26) r RIVER BLUFF RD DUNCAN AVE SEE SHEET 5 SEE SHEET 7 CONGDON AVE CHIPPEWA DR PROSPECT BLVD MARTIN DR SEE SHEET 4 SEE SHEET 5 SEE SHEET 4 AUGUSTA AVE DUNCAN AVE SEE SHEET 6 SEE SHEET 7 441 NG �QJ� JEFFERSON AVE 11\._ SUMMIT ST SEE SHEET 4 N GIFFORD ST J}, SEE SHEET 3 y1GyD A� � BODE RD c,(//e400 Sr -.19) 120 11444 4' SHALES PKWY SEE SHEET 2 U.S.GRANT MEMORIAL HIGHWAY/US 20 EXHIBIT 6 N 12/15/2025 PROJECT LOCATION MAPS WE I FEHR GRAHAM IUJNOIS SHEET 1A tu: ENGINEERING&ENVIRONMENTAL WISCONSIN Nlko R 411 �St2\114i,5aw\2026_Eshtat 1.64.orFlwi WPM=ON NM NO.m.meows f 2026 FEHR GRAHAM -..--vert • t 44' ; lq ;`, ,�i r� ems. (7 , -471 ��.Y!I l ` • • %r 44 �� • - • ' • •• s If� ie. ..: rii SHELDoN DR �r 0 A R74, ~'Jam" - '�- - , .•ii i .� �.. t iiit lob A. \ 0-4 'M • dorWir 71 fj VCI) 4- _Ili • ' 04, """"' sor, a• O' N �_�i_A US - 2o w ON E EXHIBIT 6 S 12/15/2025 500 PROJECT LOCATION MAPS E-, 0 500 +FEET FEHR a R A FrA IwNOIS SHEET 2 GRAPHIC SCALE IN FEET IOWA c:\ra��2e\512\Ogi SheeM\2026_E:hWt I dwy SHALESR M PARKWAY ENGINEERING 8 ENVIRONMENTAL WISCONSIN i/2i/M 0 2026 FEHR GRAHAM 1 1 t 1-10 'Ili ilk -.0. . „__._. . . _ _ . .._ _ _ fri. 7 40,„ s tiO4 m a z } 00 1— NC O m Z Y _U = N N GIFFORD ST J Z a N Z N O Y z w pose- M M ! Z Y CC P ri-7-:- _, 5:,Ith 0 I '':!j_1. !- km.lurair m EXHIBIT 6 12/15/2025 200 0 200 FEET FEHR GRAHA PROJECT LOCATION MAPS � � ► -- I IWNaS SHEET 3 GRAPHIC SCALE IN FEET Iowa ENGINEERING& ENVIRONMENTAL WISCONSIN c: .30 26\S1 ogii St..b\2o26_Fshi* 1.e.q,aFR�2D Sr ur a�c«mu w as C. 184-003an �•'} f( 4 2026 FEHR GRAHAM Iv'ilk 4 HIAWATHA DR .1 no DR ,, 4 f _ O�9Ro. •;2 «1 IROQUOIS DR . < 3"`#k . 7....- * -.;P ice" 4 :- , - MOHAWK DR '"`� ..,, „. t.. ; i • ;1 'r At. I. i. , i -...,. .... wia-.IF _�� a .. .. 1 ' JA +1�t -am �� ! ' 40 _* ^;. A,,,t dd ♦ Z CHIPPEWA DR Z - : s in '1i:0 41/1111" I '+' . )10 , ,..toil: -. . 1.c. sit. . ,101 ,i4-,,,, ,- ..„ ,.+, , .; ..- . f .4, " . i.. EXHIBIT 6 12/15/2025 400 0 400 FEET 1 PROJECT LOCAI ION MAPS IFEHRGRAA1At1IWOIS SHEET 4 GRAPHIC SCALE IN FEETlows ENGINEERING ENVIRONMENTALWISCONSIN `G myn,26\S12\dQ^Streets\2U2&_Ex t 1.d y g1PPE1M DR uHCs omaw Fad Mo. iea-aoxib l 2026 FEHR GRAHAM I. 1 / RIVER BLUFF RD • fill .. CONGDON AVE - 4.112, law. 9 1 o ~Alb 411:111 m N Q W W U Z ~Q Q Q W N a ccc cc ~i� a o U N W tII® E S - EXHIBIT 6 12/15/2025 200 0 200 FEET FEHRGRAIIAII IWNOIS 1 PROJECT LOCATION MAPS I—i )--1t I SHEET 5 GRAPHIC SCALE IN FEET 1 ENGINEERING&ENVIRONMENTAL WISCONSIN 0: CJD 26 s12 09in Struts 1.eug. PROSPECT Blw LINOS asw MU NO Is.-oaa» /2026 FEHR GRAHAM / \ w Q Q La w o a o v) 0 AUGUSTA AVE 4 • -4, - Op i - < w w _ 0 V) U .a 41111411414 Ewa VZ _I)* f . P qk aitt. _ rn EXHIBIT 6 12/15/2025 100 0 100 FEET FEHRGRAilAM PROJECT LOCATION MAPS ILLINOIS SHEET 6 GRAPHIC SCALE IN FEETIOWA ENGINEERING& ENVIRONMENTAL WISCONSIN 114.G: C10\28 S12 Elgin Sb sb\2026Et 1. AUGUSTA AYE L oma MN IQ+w-0KM / ' ` 2026 FEHR CRAHAM N lif KL • ii, t. ' 1TL mmtil a x U) r w 0 z DUNCAN AVE .- :. DO • A, AVE- v w Z o `n pU 0 NpEE ql a 1- m w Q w Z z P fk O 0 O z m 0 U 1 000 0 1000 FEET I• ; ------ I I GRAPHIC SCALE IN FEET EXHIBIT 6 12/15/2025 FEHR GRAHAm IWNOIS PROJECT LOCATION MAPS IOWA SHEET�co� 7 ENGINEERING&ENVIRONMENTAL WISCONSIN \G�'� 26 Elsi+Stmorts\2026_ExtulA 14.51.cUNGw AVE ONE MACE LOOS NUM FON1 P . 1$4— 3n» 2026 FEHR GRAHAM EXHIBIT 7 - BDE 220A(ESTIMATE OF TIME) Illinois Department of Transportation E-mail Reset Form Estim, Contract Project _ County Notes l Kane 1 Route Section Various Routes 26-00216-00-RS Days Item Unit Quantity Rate Per Days Not Affecting Total Days Day Time Required TOPSOIL PLACE 4 SQ YD 1,147.00 1,147.00 1 1 0 SODDING SALT TOLERANT SQ YD 1,147.00 1,147.00 1 1 0 WATERING UNIT 3.40 3.40 1 1 0 TACK COAT POUND 32,322.00 30,000.00 1 0 1 LONGITUDINAL JOINT SEAL FOOT 18,736.00 20,000.00 1 0 1 HMA BINDER IL-19.0 N70 TON 2,626.00 1,000.00 3 0 3 HMA SURFACE IL-9.5 C N50 TON 5,418.00 1,000.00 5 0 5 HMA SURFACE IL-9.5 D N70 TON 1,313.00 1,000.00 1 0 1 PCC SIDEWALK 5 SQ FT 12,683.00 1,250.00 10 0 10 DETECTABLE WARNINGS SQ FT 950.00 950.00 1 1 0 HMA PAVEMENT REMOVAL 2 SQ YD 48,386.00 20,000.00 2 0 2 HMA PAVEMENT REMOVAL 6 SQ YD 11,722.00 5,000.00 2 0 2 CC&G REM FOOT 1,662.00 1,000.00 2 1 1 PCC SIDEWALK REMOVAL SQ FT 10,609.00 2,000.00 5 0 5 WATER VALVES TO BE ADJUST EACH 28.00 10.00 3 2 1 MANHOLE TO BE ADJUST EACH 82.00 10.00 8 4 4 INLETS TO BE RECONST EACH 1.00 2.00 1 0 1 INLETS TO BE ADJUSTED EACH 21.00 10.00 2 1 1 INLETS RECONST EACH 18.00 4.00 5 1 4 SAN MAN RECONST EACH 3.00 3.00 1 0 1 CC&G TB6.12 FOOT 1,577.00 300.00 5 2 3 REG SUB CONST PLAN L SUM 1.00 1.00 1 1 0 REG SUB CONST REPORT L SUM 1.00 1.00 1 1 0 REG SUB MONITORING DAY 2.00 1.00 2 2 0 MOBILIZATION L SUM 1.00 1.00 1 1 0 TRAF CONT 701422 L SUM 1.00 1.00 1 1 0 TRAF CONT 701501 L SUM 1.00 1.00 1 1 0 TRAF CONT 701701 L SUM 1.00 1.00 1 1' 0 - h TRAF CONT 701801 L SUM 1.00 1.00 1 1 0 CHANGE MESSAGE SIGN DAY 5.00 1.00 5 5 0 SHORT TERM PM FOOT 4,810.00 4,800.00 1 1 0 Page of BDE 220A(Rev. 10/02/24) Rate Per Days Total Days Item Unit Quantity Da Days Not Affecting Re uired y Time 4 SHORT TERM PM REM SQ FT 1,588.00 1,588.00 1 1 0 POLY PM T1 LTR-SY SQ FT 68.00 60.00 1 1 0 POLY PM T1 4 FOOT 22,814.00 10,000.00 2 0 2 POLY PM T1 6 FOOT 2,248.00 2,000.00 1 0 1 POLY PM T1 12 FOOT 66.00 66.00 1 1 0 POLY PM T1 24 FOOT 492.00 430.00 1 1 0 REFL PAVT MKR EACH 108.00 108.00 1 1 0 REFL PVT MKR REM EACH 108.00 108.00 1 1 0 CONSTRUCTION LAYOUT L SUM 1.00 1.00i 1 1 0 Total Actual Working Days Required 49 Total Days 50 Completed by Date Checked by Date Mason Quick 06/03/26 Trevor Larson 06/03/26 Regional Engineer Signature&Date Page of BDE 220A(Rev. 10/02/24)