Loading...
HomeMy WebLinkAbout26-118 Resolution No. 26-118 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH RIDDIFORD ROOFING COMPANY FOR HEMMENS CULTURAL CENTER ROOF REPLACEMENT (Bid No. 25-047) WHEREAS, the City of Elgin has heretofore entered into a contract with Riddiford Roofing Company for Hemmens Cultural Center roof replacement(Bid No. 25-047); and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: July 22, 2026 Adopted: July 22, 2026 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk ��or ric ° -_ City of Elgin Change Order ELGIN,ILLINOIS PROJECT: Heromens Cultural Center Roof Replacement—Bid 25-047 CHANGE ORDER NO. 1 CONTRACT: Hemmens Cultural Center Roof Replacement—Bid 25-047 SCOPE: Provide for the application of foam adhesive and the attachment of new fascia cleats to resolve unforeseen circumstances not known prior to the original scope of work. REASONS FOR CHANGE: Unforeseen field conditions and facility conflicts were encountered during the construction phase that differed from the original project assumptions and contract documents. These conditions required revisions to the construction approach, including adjustments to the application of foam adhesive for the insulation as well as mechanically attaching new fascia cleats.The proposed change order reflects necessary scope modifications necessary for the additional work to complete the project in compliance with applicable standards. The circumstances necessitating this change in performance were not reasonably foreseeable at the time the contract was signed;the proposed change order is germane to the original contract as signed; and the change order is in the best interests of the City of Elgin as authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $352,135.00 CHANGE ORDER NO. Additional adhesive and fascia cleats ADD $31,194.00 TOTAL REVISED CONTRACT AMOUNT: $383,329.00 The original amount of the contract with Riddiford Roofing Company is $352,135.00. Change Order No. I will increase the original contract amount by a total of $31,194.00, that sum representing 8.84% percent of the original contract amount. The new contract amount, inclusive of all change orders, is$383,329.00. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER NO. I Agreed to this 22 day of July . 2026. Recommended by: By: Glen Dettman Title: Superintendent, Building Maintenance Date: — 7/ f Z•w Signature: Accepted by: Riddiford Roofing company Party of the Second Part(Contractor) By: Christopher Riddiford Title: Vice President Date: 1:S Signature:Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G.Kozal Title:City Manager Date: ul , 0 6 _ Signature: C L_ 1 rad Dep Agreemen6Cnange Wee Nu I Bid 2100 ILdblurd Roofing•Ilcnwnaks Roof.Oean-7 14-26 du. 2