Loading...
HomeMy WebLinkAbout26-91 Resolution No. 26-91 RESOLUTION AUTHORIZING EXECUTION OF AN AMENDMENT AGREEMENT NO. 1 WITH ENGINEERING ENTERPRISES, INC. FOR ADDITIONAL SUPPLEMENTAL PROFESSIONAL ENGINEERING SERVICES IN CONNECTION WITH THE 2026 MCCLURE AVENUE RESURFACING PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that pursuant to Elgin Municipal Code Section 5.02.020B(9)the City Council hereby finds that an exception to the requirements of the procurement ordinance is necessary and in the best interest of the city; and BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are hereby authorized and directed to execute an Amendment Agreement No. 1 on behalf of the City of Elgin with Engineering Enterprises, Inc., for additional supplemental professional engineering services in connection with the 2026 McClure Avenue resurfacing project, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: May 27, 2026 Adopted: May 27, 2026 Omnibus Vote: Yeas: 8 Nays: 0 Abstain: 1 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk AMENDMENT AGREEMENT NO. I THIS AMENDMENT AGREEMENT No. 1 is hereby made and entered into this 27 day of May , 2026,by and between the City of Elgin,Illinois, a municipal corporation (hereinafter referred to as the "City"), and Engineering Enterprises, Inc, an Illinois Corporation, (hereinafter referred to as "Engineer"). WHEREAS,the City and Engineer hereto have previously entered into an agreement dated February 11,2026(hereinafter referred to as"Original Agreement"),wherein the City engaged the Engineer to furnish certain professional services in connection with the 2026 McClure Avenue Resurfacing Project(hereinafter referred to as the"Project"); and WHEREAS, the City has determined that the proposed scope of the Project should be further modified to include the additional Supplemental Professional Engineering Services described herein, including but not limited the resurfacing of a portion of Walnut Avenue (hereinafter referred to as"Supplemental Services"); and WHEREAS, the total fees that are to be paid to the ENGINEER pursuant to the Original Agreement are in a total amount not to exceed$179,994.00; and WHEREAS,the parties hereto have determined and agree that the total maximum payment for the Supplemental Services described in this Amendment Agreement No. 1 shall be in a total amount not to exceed$59,668.00; and WHEREAS,the changes contemplated by this Amendment Agreement No. 1 are germane to the Original Agreement as signed,and this Amendment Agreement No. 1 is in the best interests of City and is authorized by law. NOW,THEREFORE,for and in consideration of the mutual undertakings provided herein, and other good and valuable consideration,the receipt and sufficiency of which is hereby mutually acknowledged,the parties hereto agree as follows: 1. The above recitals are incorporated into and made part of this Amendment Agreement No. 1 as if fully recited herein. 2. Section 1 of the Original Agreement is hereby further amended by adding a new additional subparagraph E thereto to read as follows: "E. The ENGINEER shall provide the Supplemental Services for the PROJECT provided for in Amendment Agreement No. 1, said Supplemental Services to include the preparation of plans and specifications for additional roadway improvements associated with the PROJECT, as outlined and described in Attachment A-1, attached to Amendment Agreement No. 1 and incorporated herein by this reference (hereinafter referred to as the "Supplemental Services")." 1 3. That Section 2 of the Original Agreement is hereby further amended by adding the following to the end of Subparagraph B: "B. ENGINEER shall provide the Supplemental Services provided for in Amendment Agreement No. 1 in accordance with the schedule outlined and detailed in Attachment B-1, attached to Amendment Agreement No. 1 and incorporated herein by this reference." 4. That Section 4 of the Original Agreement is hereby amended by adding the following paragraph E and Payment Schedule to read as follows: "E. For the Supplemental Services described in Attachment A-1 to Amendment Agreement No. 1, ENGINEER shall be paid at an hourly rate for the classifications of personnel who perform work on this PROJECT; provided,however,that ENGINEER shall be paid a maximum fee not to exceed the total amount of$59,668.00 for the Supplemental Services to be provided pursuant to this Amendment Agreement No. 1, regardless of the actual time or actual costs incurred by the ENGINEER unless substantial modifications and scope of work are authorized in writing by the CITY and approved pursuant to a further written amendment to this Agreement. For the purposes of clarification, the total fees to be paid to the ENGINEER pursuant to the Original Agreement and Amendment Agreement No. 1 shall not exceed total amount of$239,662.00. The detailed basis of the additional fee associated with Amendment Agreement No. 1 is included in Attachment C-1, attached to Amendment Agreement No. 1 and incorporated herein by this reference, and is based on hourly rates of personnel utilized. The Standard Schedule of Charges dated January 2026, attached to Amendment Agreement No. 1 as Attachment E-1 and incorporated herein by this reference, shall be utilized for the Supplemental Services for the PROJECT. Payment Schedule for Supplemental Services ESTIMATED ESTIMATED VALUE ESTIMATED INVOICE DATE %COMPLETE OF WORK COMPLETE VALUE 5/21/2026 30% $ 17,900.40 $ 17,900.40 _ 6/21/2026 95% _ $ 56,684.60 $ 38,784.20 7/21/2026 100% $ 59,668.00 $ 2,983.40 Total 100% $ 59,668.00 " 5. That except as amended in this Amendment Agreement No. 1 the Original Agreement shall remain in full force and effect. 6. That in the event of any conflict between the terms of the Original, the provisions of this Amendment Agreement No. 1 shall control. 7. This Amendment Agreement No. 1 may be executed in counterparts, each of which shall be an original and all of which shall constitute one and the same agreement. For the purposes of executing this Amendment Agreement No. 1, any signed copy of this Amendment Agreement No. ltransmitted by fax machine or e-mail shall be treated in all manners and respects as an original document. The signature of any party on a copy of this Amendment Agreement transmitted by 2 fax machine or e-mail shall be considered for these purposes as an original signature and shall have the same legal effect as an original signature. Any such faxed or e-mailed copy of this Amendment Agreement No. 1 shall be considered to have the same binding legal effect as an original document. At the request of either party any fax or e-mail copy of this Amendment Agreement No. 1 shall be re-executed by the parties in an original form. No party to this Amendment Agreement No. 1 shall raise the use of fax machine or e-mail as a defense to this Amendment Agreement No. 1 and shall forever waive such defense. IN WITNESS WHEREOF, the undersigned have entered into and executed this Amendment Agreement No. 1 as of the date and year first written above. CITY 0 IN ENGINEER By: By: /City Manager Its Attest: City Cle Legal DcptlAgie�en pnecnng Enterprises-Amend Age:•2026 McClure Wale t Resurfacing-5-19-26.do. 3 CITY OF ELGIN,IL ADDITIONAL RESURFACING ON WALNUT AVENUE 2026 McClure Avenue Resurfacing Project —Walnut Avenue Additional Work City of Elgin Attachment A-1 — Scope of Services The City of Elgin requires Design Engineering services for the City's 2026 McClure Avenue Resurfacing Project which includes additional resurfacing on Walnut Avenue. A map of all roadways to be included in the program can be found in Attachment D of this proposal. In order to successfully complete this project, various items will need to be addressed during the design engineering for this project. Our proposed scope of services will include the following: DESIGN ENGINEERING 2.1 Project Management and Coordination • Project Management and Coordination • Coordinate Final Scope with City • Subconsultant Coordination and Review 2.2 Project Meetings • One (1) Progress Meeting with City 2.3 Data Collection • Acquire and Review City Utility Data 2.4 Develop Base Plan Sheets • Develop Base Plan Sheets Utilizing Existing Topographic Survey, GIS &Aerials 2.5 Analyze/Finalize Roadway Rehabilitation Methods • Analyze Pavement Core Information • Recommend Roadway Improvements to City Staff for Approval 2.6 Site Assessment and Field Measurements • Review Asphalt, Curb, and Sidewalk Conditions • Review Sidewalk Corners for ADA Compliance • Utility Structure Inspections • Sign Inventory 2.7 Preparation of Final Plans, Specifications and Estimates J Preparation of Construction Plans in IDOT Format • Title Sheet • General Notes • Typical Sections • Summary of Quantities • Plan Sheets • Project Details • City Details • District One Details and IDOT Highway Standards • Prepare Construction Specifications • All required bidding and letting information PAGE 1 CITY OF ELGIN. IL ADDITIONAL RESURFACING ON WALNUT AVENUE • City special provisions and contracting information • Project specific special provisions • Preparation of Engineer's Opinion of Probable Construction Costs 2.9 QC/QA of Final Plans & Bid Package • Final Review of Plans and Quantities • Final Review of Bid Package, Project Specifications and Estimate of Cost The following scope of services will be provided by EEI's subconsultant, Rubino Engineering • Perform Pavement Cores • Prepare Pavement Core Summary Report • CCDD Analysis • Prepare LPC 663 Form EXCLUSIONS The above scope of services excludes the following: • Bidding (Coordinated/Managed by the City) • Resident Coordination The above scope for "2026 MCCLURE AVENUE RESURFACING PROJECT" summarizes the work items that will be completed for this contract. Additional work items, including additional meetings beyond the meetings defined in the above scope shall be considered outside the scope of the base contract and will be billed in accordance with the Standard Schedule of Charges. PAGE 2 ATTACHMENT B-1: ESTIMATED SCHEDULE CLIENT PROJECT NUMBER City of Elgin EG2508 PROJECT i?T!t DATE PREPARED BY Additional Work for Walnut Avenue Resurfacing 4/20/26 CJO TASK TASK DESCRIPTION 2026 NO 2.1 Project Management and Coordination 2.2 Meetings with City Staff 2.3 Data Collection 2.4 Develop Base Plan Sheets(Utilizing GIS) 2.5 Analyze/Finalize Roadway Rehabilitation Methods 2.6 Site Assessment and Field Measurements 2.7 Final Plans.Specifications and Estimates 2.8 QC/QA of Final Plans 2.9 Bidding and Contracting Construction' 'Construction Engineering to be provided under a separate agreement 52 Wheeler Road.SunarGre .L 30554 TeCb.;O465.E;7OC Fax• (,7C'I ATTACHMENT C-1: ESTIMATED LEVEL OF EFFORT AND ASSOCIATED COST PROFESSIONAL ENGINEERING SERVICES CLIENT PROJECT'\,JNIti_F. CI o1 Elgin EG2508 Pi•:OJEC T T F"LE •"L P•-Lam:.,EU L'i Addi5onal Work for Walnut Avenue Resurfaci • 4120/26 CJO TASK ROLE SPM PM SPE 1 PE SPT 1 ST ADMIN NO TASK DESCRIPTION PERSON HOURS COST RATE S254 5228 5203 518.1 $191 $167 S79 2.1 Project Management and Coordination 6 4 10 $ 2.104 2.2 Meetings with City Star 2 4 6 $ 1.192 2.3 Data Collection 2 2 2 6 $ 1.230 2.4 Develop Base Sheets(Utilizing GIS) 4 8 16 40 68 $ 12,120 2.5 Analyze/Finalize Roadway Rehabilitation Methods 1 2 3 $ 596 2.6 Site Assessment and Field Measurements 2 48 50 S 9.288 2.7 Final Plans,Specifications and Estimates 8 68 24 48 148 S 26.936 2.8 OC/OA of Flnal Plans 4 4 $ 912 Design Engineering Subtotal: 29 2 1311 40 99 - 295 $ 54.378 PROJECT TOTAL. -1 29( 2I 135I 40I 85I -I! 255I 53,17E EEI STAFF DIRECT EXPENSES SPM Senior Project Manager Printing/Scanning= PM Project Manager Rubino(Cores&CCDD)= $ 5,290 SPE 1 Senior Project Engineer I PE Project Engineer DIRECT EXPENSES a $ 5.290 SPT 1 Senior Project Technician I ST Senior Technician LABOR SUMMARY ADMIN Adminst•ative Assistant EEI Labor Expenses= S 54 375 TOTAL LABOR EXPENSES $ 54,378 TOTAL COSTS $ 59.668 1 Legend Ii ( 2026 Roadway Program Limits i 1 0. et tio `= N Goethe St 1. "� I ' 1 e II 1 \ r ar1 Schiller St i l 14• r 1 i _ __" , \, l th I Buckeye St U l ! , >. - ' xi I I I , 1 a, Pine St . i Offn8St a • CO '1 . 1 0 C a 3 t nd St st f Demmea v. 1 CD I 4 Murray Ave Clair n .t wow St F DATE N OECEMBER 2028 Engineering Enterprises, Inc. ATTACHMENT D-1 52 Wheeler Roar:4i PROJECT NO Eclsoo LOCATION MAP Sugar Grove. Illinois :;;:,:, BY Mg . 630; 966 6700 PAT"' .,..�...__.��. ELGIN j Fa\u 6ll•Pt NOgMP.GAYV I) .•s.r.. •.�u. ...•a: I b Port 61 -ii = _ lo-nwrc•Aw i. non S Syrn, y K!>ty di PI' sr 4ccd33""" = ae F:pn r. - i ! u a. Sr 4-yS� - c, O:.V n. d r 5 .1 7 T.1 I � t "a"""„ tit \\ t 1 °.• •.wralrtr.M.fir. t I 3 e 3 1 cw. Ts.q.St \ fr•..•$ . S I O ,s i 1 _ `.`mesa �1 t f T I15 \ d° u H.M u Con St i ; Hnp.Cl a fir" suerdish Si T - ' E.r•Sf l , ... �,s 6t • ~ - ` r ; _ I - Kr..St Z _ *v.-- Ss K is S ayS r s.+bn u i • to z 1 . t t 1 a ' . O..u - . - Hv fie• ! r ' . ) 1 ' . ; r y 1 I yy ii M.'7E'sl Rhfy St = •etwni Se Dr i / . us AK Fro. 1. 6 Yu..Shd Unity S..Mt P011,-.r Is US:OIM iref.a 31 3 newly it SONh mil' ESN W Os �l • 'yµ r sralu.,An o A. 'C' U o t,J.. 110E F.p,,,K 4 1 aK‘rt1...e R° r Legend 4, ,� iric 2026 Roadway Program Limits c{ �•:..R. Engineering Enterprises, Inc. DATE MARCH 2O2o ATTACHMENT D-1 N PRO!ECT NO � 52 L'Jneelei Raa�. Eczsoa LOCATION MAP I dam. Sugar Grove, 1 i.rots 6OS`_� MST / killir ., i0' 466 6/0 PATH IG I 1 V 1�' I ' .tsr.mit i...r.-• E L ;=R.?U CC FIEF FrGga n". J ` ENGINEERING ENTERPRISES, INC. kir 52 Wheeler Road, Sugar Grove, IL 60554 Ph: 630.466.6700• Fx:630.466.6701 www.eeiweb.com ATTACHMENT E-1 14;_•ARD SCH 0 ULE OF CHAR . •-_J'1, .%; 2026 EMPLOYEE DESIGNATION CLASSIFICATION HOURLY RATE Senior Principal E-4 $268.00 Principal E-3 $262.00 Senior Project Manager E-2 $254.00 Project Manager E-1 $228.00 Senior Project Engineer/Surveyor II P-6 $218.00 Senior Project Engineer/Surveyor I P-5 $203.00 Project Engineer/Surveyor P-4 $184.00 Senior Engineer/Surveyor P-3 $169.00 Engineer/Surveyor P-2 $153.00 Associate Engineer/Surveyor P-1 $139.00 Senior Project Technician II T-6 $191.00 Senior Project Technician I T-5 $179.00 Project Technician T-4 $167.00 Senior Technician T-3 $153.00 Technician T-2 $138.00 Associate Technician T-1 $120.00 Engineering/Land Surveying Intern I-1 $ 89.00 Director of Marketing and Business Development M-4 $141.00 Marketing Coordinator M-2 $105.00 Executive Administrative Assistant A-4 $ 84.00 Administrative Assistant A-3 $ 79.00 VEHICLES. DRONE, EXPERT TESTIMONY, REPROGRAPHICS AND DIRECT COSTS* Vehicle for Construction Observation $ 20 00 A Unmanned Aircraft System / Unmanned Aerial Vehicle/ Drone $245.00 Expert Testimony $300.00 In-House Scanning and Reproduction $0.25/Sq. Ft. (Black & White) $1.00/Sq. Ft. (Color) Reimbursable Expenses (Direct Costs) Cost Services by Others (Direct Costs) Cost + 10% " unless specified otherwise in agreement ^per day charges capped at the current IDOT daily rate OUTSTANDING SERVICE • EVERY CLIENT • EVERY DAY