Loading...
HomeMy WebLinkAbout26-60 Resolution No. 26-60 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH CONNELLY ELECTRIC CO. FOR RIVERSIDE WATER TREATMENT PLANT AND WELL 5A MCC IMPROVEMENTS (Bid No. 25-035) WHEREAS, the City of Elgin has heretofore entered into a contract Connelly Electric Co. for Riverside water treatment plant and well 5A MCC improvements (Bid No. 25-035); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G. Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ David J. Kaptain David J. Kaptain, Mayor Presented: April 8, 2026 Adopted: April 8, 2026 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk City of Elgin Change Order ELGIN,ILLINOIS PROJECT 25-035 CHANGE ORDER No. 1 CONTRACT:Riverside Water Treatment Plant and Well 5A MCC Improvements Bid No.25-035 SCOPE: Perform structural modifications to the Sludge Control Building 1 Top Slab including removal of deteriorated concrete and components, foam injection repairs, and installation of new concrete and waterproofing. This change order affects a contract between the City and Connelly Electric Co.dated June 9,2025 for electrical and instrumentation and control work including the replacement of motor control centers. REASONS FOR CHANGE: • The condition of the Sludge Control Building 1 top slab has deteriorated since original installation in the 1980s. Issues include exposed and corroded reinforcement, damage to the underside of the concrete slab and insulation, delaminated concrete, cracks in insulation,and fallen debris. • Several temporary repairs have been performed, but additional damage has occurred necessitating a more permanent solution. • The MCC Improvements Project is constructing a new Electrical Room for Sludge Control Building 1 on the top slab; a structural assessment was performed, and the repairs will support the construction of the new Electrical Room. • Change Order No. 1 is in the best interest of the City and is authorized by law. The necessity for the change was unforeseen at the time the contract was originally executed. The changes contemplated in Change Order No. 1 are germane to the original agreement. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $3,933,000.00 CHANGE ORDER No. 1 Sludge Control Building 1 Top Slab Modifications $196,542.36 TOTAL FOR CHANGE ORDER NO. 1: ADD $196,542.36 TOTAL REVISED CONTRACT AMOUNT: $4,129,542.36 The original amount of the contract with Connelly Electric Co. is $3,933,000.00. Change Order No. 1 will increase the original contract amount by a total of$196,542.36, that sum representing four point nine percent(4.9%)of the original contract amount.The new contract amount,inclusive of all change orders is $4,129,542.36. OTHER CONTRACT PROVISIONS:All other contract provisions remain the same. CHANGE ORDER No. 1 March 25,2026 Agreed to this 8 day of April ,2025. Recommended by: PUBLIC SERVICES UNIT-WATER By: )01Z01 3e&z -in Title: wl(T F . -.. Di C O — Date: � �0 ZU Z,b Signature: , Accepted by: CONNELLY ELECTRIC CO. Party of the Second Part(Contractor) By: Brady Bartnicki Title: Sr Project Manager Date: 3/30/26 Signature: _ — - Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G.Kozal Title: Cite Manager Date: A ' 026 Signature: