Loading...
HomeMy WebLinkAbout26-7 Resolution No. 26-7 RESOLUTION AUTHORIZING EXECUTION OF CHANGE ORDER NO. 1 WITH GOLF CONSTRUCTION FOR PARKING STRUCTURE REPAIRS AND PAINTING AT THE SPRING STREET PARKING DECK (Bid No. 25-043) WHEREAS, the City of Elgin has heretofore entered into a contract Golf Construction for parking structure repairs and painting at the Spring Street parking deck (Bid No. 25-043); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G. Kozal,City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: January 14, 2026 Adopted: January 14, 2026 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk .0 or rec. � d=� �. City of Elgin Change Order 41Itoto`'' ELGIN,ILLINOIS PROJECT: Bid No. 25-043 CHANGE ORDER No. I CONTRACT: Parking Structure Repairs and Painting—Bid No. 25-043 SCOPE: This change order will provide additional concrete and tendon repair work necessary after the discovery of broken tendons during originally contracted repairs. REASONS FOR CHANGE: When the project was initially bid, site conditions and inspections did not suggest that there were multiple support tendons broken within the concrete floor structure of the deck. To maintain the integrity and longevity of the Spring St. Parking Deck, additional concrete and support tendons must be repaired as they are discovered. The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed.The change is germane to the original contract as signed. This change order is in the best interests of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: This contract is being increased by $87,385.This will allow the contractor to perform the additional concrete replacement and support tendons as described above. ORIGINAL CONTRACT AMOUNT: $199,375.00 CHANGE ORDER No. 1 Perform additional concrete and support tendon repairs $87,385.00 TOTAL FOR CHANGE ORDER NO. 1: ADD $87,385.00 TOTAL REVISED CONTRACT AMOUNT: $286,760.00 The original amount of the contract with Golf Construction was $199,375.00. Change Order No. l totaling$87,385.00 will increase the original contract amount by a total of$87,385.00, that sum representing forty-three point eight percent (43.8%) of the original contract amount. The new contract amount, inclusive of all change orders, is$286,760.00. OTHER CONTRACT PROVISIONS:All other contract provisions remain the same. CHANGE ORDER No. 1 2.624.0 Agreed to this 14 day of JA Jvh'l .2045: Recommended by: [INSERT NAME OF REQUESTING DEPARTMENT] By: Greg Hulke Title: Parks and Facilities Superintendent Date: January 69 2026 4 Signature: • / / �tA7 -'� G / ig Accepted by: GOLF CONSTRUCTION Party of the Second Part(Contract ) Jam By: ✓i/u1$ 4, h40 Title: ' ��SiGEw1 Date: I ✓ / p Signature: 1.t/r) `2e Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G.Kozal Title: City Manager Date: Ja 14,2026 Signature: Legal DcpMgrament\Chage Order-1.Oolf Contowction•Bid 25-043-I2-262S-CLBAN.docz