HomeMy WebLinkAbout25-212 Resolution No. 25-212 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH F.H. PASCHEN, S.N. NIELSEN& ASSOCIATES LLC FOR WING PARK FAMILY AQUATIC CENTER LONGEVITY & SAFETY RENOVATIONS (Job Order Contract) WHEREAS, the City of Elgin has heretofore entered into a Job Order Contract F.H. Paschen, S.N. Nielsen & Associates LLC for Wing Park family aquatic center longevity & safety renovations; and WHEREAS, it is necessary and desirable to modify the terms of the job order contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: December 17, 2025 Adopted: December 17, 2025 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk -0orccc, yo City of Elgin Change Order '1,AT'11 100 ELGIN,ILLINOIS PROJECT: 275010 CHANGE ORDER No. 1 CONTRACT: Wing Park Family Aquatic Center Longevity&Safety Renovations(JOC) SCOPE: Undertake a comprehensive renovation project at Wing Park Family Aquatic Center to improve safety, enhance guest experience, and ensure the facility's longevity through routine maintenance and strategic upgrades. REASONS FOR CHANGE: During the initial bid process for the Wing Park Pool project, site conditions did not indicate that the depth and extent of the existing concrete, caulk deterioration, gutter wall damage,and exposed bare surfaces would be as significant as what was later uncovered. To maintain the integrity and longevity of the pool structure, additional concrete demolition and replacement, full removal and replacement of gutter caulk,gutter wall repairs,and epoxy coating of exposed concrete are required to ensure a stable and watertight system. The circumstances that created the need for this additional work were not reasonably foreseeable at the time the contract was executed. The change remains fully consistent with the scope and intent of the original contract.This change order is in the best interests of the City of Elgin and is authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: Complete necessary concrete removal and replacement, restore gutter walls, remove and replace deteriorated caulk, and apply protective epoxy paint to exposed gutter surfaces. These improvements will ensure structural integrity, create watertight seals,and provide a clean,durable finish for long term use. ORIGINAL CONTRACT AMOUNT: $644,654.00 CHANGE ORDER No. 1 Gutter Wall Repair&Additional Concrete Work $33,450 TOTAL FOR CHANGE ORDER NO. 1: ADD $33,450 PREVIOUS CHANGE ORDER(S): Change Order No.N/A $0.00 TOTAL OF PREVIOUS CHANGE ORDERS: ADD $0.00 TOTAL REVISED CONTRACT AMOUNT: $678,104.00 The original amount of the contract with F.H. Paschen is$644,654. Change Order No. 1 totaling $33,450 will increase the original contract amount by a total of$33,450,that sum representing five point two percent(5.2%) of the original contract amount. The new contract amount, inclusive of all change orders,is$678,104. OTHER CONTRACT PROVISIONS:All other contract provisions remain the same. CHANGE ORDER No. I Agreed to this 17 day of December ,2025. Recommended by: Parks and Recreation By: Steve Gard Title: Sr. Recreation Supervisor—Aquatics Date: 1 c f 2 C Signature: Accepted by: F.H.Paschen Party of the Second Part(Contractor) By: Josh Curran Title: Vice President Date: 12/5/25 DN:mabgw.trio. .UcS. o . wfJ/.PaEhsn, Signature: •maelcu.1:104andw.x. 06 Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G. Kozal Title: City Manager Date: D/' r 17,2025 Signature: