HomeMy WebLinkAbout99-58 7 fit , .. .. ,
v I s. uD
Resolution No. 99-58
RESOLUTION
APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH
METRO ENVIRONMENTAL CONTRACTORS, INC.
FOR ABOVE GROUND STORAGE TANKS
WHEREAS, the City of Elgin has heretofore entered into a
contract with Metro Environmental Contractors, Inc. for the
installation of above ground storage tank systems; and
WHEREAS, it is necessary and desirable to modify the terms
of the contract as is described in Change Order No. 1, attached
hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ELGIN, ILLINOIS, that Joyce A. Parker, City Manager, be
and is hereby authorized and directed to execute Change Order
No. 1, a copy of which is attached hereto and made a part
hereof by reference.
s/ Kevin Kelly
Kevin Kelly, Mayor
Presented: February 24 , 1999
Adopted: February 24 , 1999
Omnibus Vote: Yeas 6 Nays 0
Attest :
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
A•
ELGIN, ILLINOIS
PROJECT #379501
CHANGE ORDER NO.1
PROJECT: Installation of Aboveground Storage Tank Systems For Spartan Meadows, Bluff
City Cemetery and Sports Complex.
SCOPE: Installation of three (3) aboveground storage tank systems at three (3) locations
within the City of Elgin. Tanks are 1,000 gallon capacity, compartmentized into two (2) 500
gallon tanks. Project includes the installation of a concrete pad, protective barriers, electrical
hook-ups and all associated labor, materials and permits.
REASON FOR CHANGE: Metro Environmental was awarded the original contract in July
1998. At that time, sufficient funds were not available to fund the three (3)tanks
proposed by this change order. Therefore, this change order increases the original
contract quantity of AST's by three(3).
In addition to the increased quantities, this change order proposes an increase of
$500.00 per tank system. Metro Environmental has experienced an increase in
material costs due to price increases by the manufacturer since the original bid was
submitted in June 1998. The original bid for project was $27,737.00 per tank
system, for a total cost of$83,211.00. As a result of the increase in costs to
Metro Environmental, the revised unit bid price is $28,237.00, for a total revised
project cost of$84,711.00.
This change order is in the best interest of the city and authorized by law.
SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be
revised as follows:
ITEM ADD TOTAL
Aboveground Tank Systems (3) $28,237.00 (per tank) $84,711.00
1
•
CHANGE ORDER#1
February 2, 1999
PAGE 2
OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same.
Agreed to this 6 Ai " day of , 1999
Recommend:
FIRE DEPART
By:
Date: — 1
Accepted:
Party of the Second Part (Contractor)
By:
Title: CZ/
Date: „0/. 7?
APPROVED:
CITY OF ELGIN
Party o e First Part (Owner)
,7-)
By: r • -
Title: C./
Date: a/a G/l`'7
( )
` ' Agenda Item No.
City of Elgin
4TEDP-'
February 3 , 1999
TO: Mayor and Members of the City Council
FROM: Joyce A. Parker, City Manager
SUBJECT: Aboveground Storage Tanks
PURPOSE
The purpose of this memorandum is to provide the Mayor and
members of the City Council with information to consider
Change Order No. 1 to the "Above Ground Storage Tank" contract
with Metro Environmental
BACKGROUND
The Illinois Environmental Protection Agency and the Office of
the Illinois State Fire Marshal deadlines for upgrading
underground storage tank (UST) systems was December 22 , 1998 .
All noncompliant tanks as of that date were required to be
removed or taken out of service .
In June 1998 the City Council awarded the low bidder, Metro
Environmental Contractors, Inc . a contract for the the removal
of UST' s at Wing Park, Lords Park, Spartan Meadows, and Bluff
City Cemetery. Included in that bid package (Category #2,
Items #1 and #3) was the installation of replacement above-
ground storage tanks (ASTs) at Wing and Lords Parks . The bid
summary spread sheet of July 1998 is enclosed for your refer-
ence.
It was anticipated that 1, 000 gallon capacity AST systems
would be installed at Spartan Meadows, the Sports Complex and
Bluff City Cemetery as part of that bid package (Category #2 ,
Items #2, #4 , and #5, Alternate B) . However, bids exceeded
budgeted funds, and AST installations at these three sites had
to be deferred to 1999 .
As a result of the UST systems being removed, these three
sites no longer have on-site storage of fuel for off-road
equipment . It is critical to routine operations that an
adequate supply of fuel be available for these sites by early
spring. It takes approximately 90 days from the date of order
to have an AST system installed and functional .
• *
Aboveground Storage Tanks
February 3 , 1999
Page 2
Metro Environmental has agreed to hold its previous bid
pricing for the three additional AST systems, plus an addi-
tional $500 . 00 per tank as a result of price increases from
the tank manufacturer. The attached change order summarizes
the costs associated with the installation of three additional
ASTs .
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
Parks Department
INANCIAL IMPACT
The 1999 budget contains funding for installation of the three
above-ground storage tanks in account number
275-0000-791 . 92-46 , project number 379501 ($90, 000) . Suffi-
cient funds are available within this account to fund the
recommended award of $84 , 711 .
LEGAL IMPACT
This proposed change order requires an exception to the
procurement ordinance pursuant to Elgin Municipal Code Section
5 . 02 . 020B (6) .
ALTERNATIVES
1) Approve the change order to the Metro Environmental
contract for the installation of the three additional
aboveground storage tank systems in the amount of $84 , 711
($28, 237 per AST) .
2) Solicit bids for the installation of three aboveground
storage tanks .
RECOMMENDATION
It is recommended that the City Council approve Change Order
No. 1 with Metro Environmental in the amount of $84 , 711 and
direct staff to prepare the necessary resolution.
Respectfully submitted,
J yce . Parker
City Manager
sgb/sgb
Page 1 of 2
TABULATION OF BIDS
CITY OF ELGIN Metro Environmental American Tank Inc Loyalty Environmental Engineering Solutions
Contractors Inc 2711 S Wabash Ave. Services Inc One West State St
Invitation to Bid: 98-057 1111 W Dundee Road Chicago, IL 60616 330 S Washington Ave Suite 202
Date of Opening: 10/11/98 Wheeling, IL 60090 . LaGrange, IL 60525 Geneva, IL 60134
Department: Properties •
il
........ ... .. .... .
>��`e"i<rt o ..:;:::::::>�<><:... ... ..... »: < <:.,:::, .:...a ><< >< >»:.............. :.� � `��t<>< <'' >< '` '<> ><<>anount. «I
A::::»::::>;;>:«>:.... ...s .. t .n................................... ......... .a�un. ..................................Am.{tWl..t.........`> : �><;> >»>;Am.aun.e.. >; ::><> <�>:>`> <` Atngun.... ..... . . ....... . ...... ....... . ...............
p
CATEGORY#1 •
1 Removal of one UST at Wing
Park Maintenance Bldg. $1,903.00 $2,500.00 . $2,175.00 $3,400.00
2 Removal of one UST at Spartan
Meadows Golf Course Maintenance
Building $1,963.00 $2,500.00 $2,175.00 $3,400.00
3 Removal of one UST at Lord's Park
Maintenance Building $1,930.00 $2,500.00 $2,175.00 $3,400.00
4 Removal of one UST at Bluff City
Cemetary Office Building $1,903.00 $2,500.00 $2,175.00 $3,400.00
5 Removal of one steel gasoline
and one steel diesel UST from the
City of Elgin Maintenance garage
at 573 N Crystal Street $4,030.00 y $5,130.00 $7,400.00 $6,700.00
TOTAL Category#1 . • $11,729.00 $15,130.00 $16,100.00 $20,300.00
•
OPTIONAL ITEMS
1 Additional backfill materials(CA#6), •
itemized on a PER TON basis $15.00 $17.50 $17.00 $14.60
2 Excavation, transportation and
disposal of special waste soild, if
required, iemized on a cubic
yard basis - $50.00 $65.00 $58.75 $13.10
3 Landfill permitting and analysis of
special waste materials. Zero I $450.00 $100.00 $550.00
4 Removal of one fiberglas tank
from the City of Elgin Maintenance .
garage at 573 N Crystal Street $4,3.00.00 $5,500.00 $6,500.00 $3,900.00
•
6-6-ATE #GORY Installation of one AST at Wing
Park Maintenance Building
Base Bid: 500 gal gas diesel $25,136.00 $30,217.60 $39,680.00 •
•
Alternate A: 750 gal gas diesel $27,737.00 $31,617.00 $43,750.00 . •,
k Alternate B: 1000 gal gas diesel C 1-27,737.00) $31,617.00 $47,850.00
Page 2 .,_ _- .
TABULATION OF BIDS -
CITY OF ELGIN Metro Environmental . American Tank Inc Loyalty Environmental Engineering Solutions
Contractors Inc 2711 S Wabash Ave. Services Inc One West Stale St
Invitation to Bid: 98-057 1111 W Dundee Road Chicago, IL 60616 330 S Washington Ave Suite 202
Date of Opening: 10/11/98 Wheeling, IL 60090 LaGrange, IL 60525 Geneva, IL 60134
•
Department: Properties
•
::;::;::::::;.::.::.::.:::. . ::.::<.:::.;,.>:.::.;;:.::;<.:;:.:::.:::.:::::::..<. Iriounf;::::.;:;:.;:.;:;:.::.;.;;:.::.;::.;::gNeat}Ullt::::::>:.N:::,:::::::::::::::.:_.rltnoul..t....................................... .
2�Installation of one AST at •
•
Spartan Meadows Golf Course
Maintenance Building
Base Bid: 500 gal gas diesel $25,136.00 $30,217.00 $39,680.00
Alternate A: 750 gal gas diesel $27,737.00 $30,617.00 $43,750.00
Alternate B: 1000 gal gas diesel 027,737.9 $31,617.00 $47,850.00
Installation of one AST at Lord's •
Park Maintenance Building
Base Bid: 500 Gal gas diesel $25,136.00 $30,217.00 $39,680.00
Alternate A: 750 gal gas diesel $27,737.00 $31,617.00 $43,750.00
Alternate B: 1000 gal gas diesel 027,737.00 ) $31,617.00 $47,850.00
el Installation of one AST at the Bluff
City Cemetery Office Building •
Base Bid: 500 Gal gas diesel $25,136.00 $30,217.00 $39,680.00
•
Alternate A: 750 gal gas diesel $27 737.00 $31,617.00 $43,750.00
•
Alternate B: 1000 gal gas diesel $27,737.0_9 $31,617.00 $47,850.00
OPTIONAL ITEM • .
Installation of one AST at the
Elgin Sports Complex
Base Bid: 500 gal gas diesel $25,136.00 $30,217.00 $39,680.00
Alternate A: 750 gal gas diesel $27,737.00 $31,617.00 $32,750.00
Alternate B: 1000 gal as diesel ($27,737.09; $31,617.00 $47,850.00
CATEGORY#3
•
Category#3 shall include tightness ,
testing of(5) UST's:
3 at 35 Ann Street and
2 at 573 N Crystal Street .
TOTAL COST-CATEGORY#3 $2,475.00 $3,000.00 . $5,500.00
Payment Discount(if any)
l' P\..uM\Ck.a Mh>„7 Qa -1-v.€. �t_c�l/N C.t-:t�Cr�`"\c_kv c.e-N (-.-�3- - i3 - - _k 1-N .- hv _1)..)N 1 l.`., L\�',1L.--
C`\ )C.-7-k i Ads -(`.'\\c�'.�s' /
Vy\C-tom�•. �-r\ Ast 4�:(\rn��--t 9_ �:ti- � '�Z;rA.� b rn�:-..v\� w , �' :,
02/03/99 11:30 METRO-ENOIRONMENTALCONTRACTORS 4 9316179
• � N0.287 D02
liftfENVIRONMENTAL CONTRACTORS, INC.
t 1111 West Dundee Road Wheeling, Illinois 60090-3936
(847)465-4000 FAX 465-1864
i
Fcbrucuy 1, 1999
Mr. Steve Bone
City of Elgin
150 Dexter Court
Elgin,IL 60120
Dear Mr. Bone:
MI:TR(Environmental Contractors,Inc. is writing this letter as per your request regarding
additional aboveground storage tanks. The prices submitted under bid number 98-057 dated
10/11/98 have changed due to an increase in material costs.
The new price for a 1,000 gallon aboveground storage tank will be$28,237.00,this is a$500.00
change from the 1998 pricing.
If you have any further requests of questions,please feel free to contact me at 847-465-4000.
Respectfully,
MEMO Environmental Conti-actors,Inc.
•
/,'"C4--
Keith J. Duda
Vice President
KJDIrz