Loading...
HomeMy WebLinkAbout97-242 Resolution No. 97-242 RESOLUTION ACCEPTING THE PROPOSAL OF STAN WHITE TRUCKING & EXCAVATING, INC. FOR HAULING FILL DIRT TO RANDALL RIDGE PARK • BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Robert O. Malm, Interim City Manager, be and is hereby authorized and directed to accept the proposal on behalf of the City of Elgin of Stan White Trucking & Excavating, Inc. for hauling fill dirt to Randall Ridge Park, a copy of which is attached hereto and made a part hereof by reference. s/ Kevin Kelly Kevin Kelly, Mayor • Presented: October 8, 1997 Adopted: October 8, 1997 Omnibus Vote: Yeas 6 Nays 0 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk STAN WHITE TRUCKING & EXCAVATING, INC. 37W230 RT 38 ST. CHARLES,IL.60175 Phone (630) 584-6746 Fax (630) 584-4528 PROPOSAL SUBMITTED TO PHONE DATE City of Elgin 847-931-6788 September 12, 1997 ATTN: Jerry Pask STREET JOB NAME 31 S. Grove Avenue Hauling Fill Dirt to Randall Ridge Park CITY,STATE AND ZIP CODE JOB LOCATION Elgin,IL 60120 Elgin,Illinois ARCHITECT DATE OF PLANS JOB PHONE We hereby submit specification and estimates for: Work to Include: Loading and hauling fill dirt from Prairie Materials Yard,Route 31,Elgin,to Randall Ridge Park,Elgin. Approximately 3000 cubic yards$2.80 per cubic yard(loose). Total Price $ 8,400.00 W� O apme, hereby to furnish material and labor- complete in accordance with above specification,for the sum of Eight Thousand Four Hundred and no/100- dollar($8,400.00) Payment to be made as follows: Monthly All material is guaranteed to be as specified All work to be completed in a workmanlike manner according to standard practices. Any alternation or deviation from above specifications involving extra costs will be executed only upm written orders,and will become an extra charge ova-and above the estimate. All agreennants contingent upon strikes,accidents or delays y and our can ol. Owner to carry fire,tornado and other necessary insurance. Our workers are fully covered by Workman's Compensation Insurance. Authorized �� Signature (�IJTiN Note: This proposal may be withdrawn by us if not accepted within _30 days. ACCe aatct4 Y r The above prices,specifications and conditions are catisfactory m a lie eby a ted. You are authorized to do the work as specified Payment will be made as outlined above. \ /Date of Acceptance: r G' / G I c( .7 Signature Signature "All work to be completed by September 19,1997 pending rain dates." Please sign and return one original. Thank You. OF E.40 o Agenda Item No. City of Elgin 'op1J u September 4, 1997 TO: Mayor and Members of the City Council FROM: Robert 0. Malm, Interim City Manager SUBJECT: Randall Ridge Park Grading PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider entering into a contract with Stan White Trucking and Exca- vating to move overburden from the mining operation to the Randall Ridge interior park site. BACKGROUND eft. The City is in the process of acquiring approximately 3 acres of land in the Randall Ridge subdivision as part of the park impact contribution from the developer, Colonial Enterprises, Inc. The park property is located on Winchester Drive and borders wetland, storm water management and floodplain areas associated with the Randall Road tributary to Tyler Creek (Sandy Creek) . The developer is in the process of grading the Randall Ridge interior park site in preparation for the transfer of the property to the City for future park development. The site must have approximately 3,000 yards of fill material added to accomplish the final grading to allow for the park development and positive drainage. The City has access to overburden material at the Sports Complex mining operation at no charge. The only cost to the City would be to move the material to the park site. Five quotes were sought for the hauling of the material with the lowest bid received from Stan White Trucking and Excavating at a cost of $8,700. The cost estimates are as follows: Stan White Excavating $ 8,700 Martam Excavating $15,000 Prairie Materials $18,000 Plote $24,750 Jack Grey Trucking No bid —Randall Ridge Park Grading September 4, 1997 Page 2 The developer will grade the material as well as grade the stockpiled topsoil on site and apply seed. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED Colonial Enterprises, Inc. Prairie Materials, Inc. (mining operation) FINANCIAL IMPACT Sufficient funds are available in the Park Impact Fund, account number 010-0000-231. 15-10 ($8,000) and 010-0000-231. 15-32 ($700) to cover this $8,700 expense. J LEGAL IMPACT None. ALTERNATIVES None. RECOMMENDATION It is recommended that the contract with Stan White Trucking and Excavating to move 3, 000 yards of overburden from the mining operation to Randall Ridge interior park at a cost of $8,700 be approved. Respectfully submitted, (141.c4,Ace„) NIATA.4) • Monica Meyers, Director Pa - . 4d Recreation ) 4/ Rob= t 0. Malm Interim City Manager mb